20261117 RFP27_016 Countywide Bicycle and Ped.pdf
PDF 800 KB Posted
- Solicitation number
- PE-66300-NONST-2027-000000136
- Issued by
- Dooly County, Georgia
About this file
This Request for Proposal (RFP 27-016) is issued by the Glynn County Board of Commissioners, Georgia, in collaboration with the Brunswick Area Transportation Study (BATS) Metropolitan Planning Organization, to solicit professional planning and technical services for developing a Countywide Bicycle and Pedestrian Master Trails Plan. The plan will serve the BATS Metropolitan Planning Area, which is coterminous with Glynn County, including unincorporated areas, St. Simons Island, Sea Island, the City of Brunswick, and the Jekyll Island Causeway intersection. The consultant will conduct comprehensive planning analysis, public engagement, and technical services to inventory existing bicycle and pedestrian facilities, analyze safety and connectivity gaps, evaluate network deficiencies, develop prioritized recommendations, and produce an actionable implementation plan. The project is funded with federal transportation planning funds administered by the Georgia Department of Transportation (GDOT) under PI No. 0021179 and is subject to 2 CFR Part 200. The deadline for proposal submission is December 17, 2026, at 1:30 PM via the County's eProcurement Portal, with a non-mandatory pre-proposal meeting scheduled for November 24, 2026. The anticipated contract award date is January 7, 2027, with a contract term of eighteen months from the Notice to Proceed date (target date March 1, 2027), resulting in an anticipated completion date of approximately August 2028.
The prime proposer must hold GDOT prequalification in Area Class 1.02 (Urban Area and Regional Transportation Planning) and Area Class 1.13 (Non-Motorized Transportation Planning) as of the proposal due date. The consultant is responsible for acquiring all required data, including GDOT crash data, American Community Survey estimates, LEHD LODES data, travel-pattern datasets (Replica, StreetLight, or equivalent), and field verification data. Insurance requirements include general liability of at least $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability of $1,000,000 combined single limit, errors-and-omissions coverage of $1,000,000 per claim and in the aggregate, and workers' compensation insurance. The project will coordinate with the concurrent Safe Streets and Roads for All (SS4A) Safety Action Plan, scheduled for completion by the end of 2027. Pricing shall be submitted as a separate fee proposal with no fees included in the technical proposal submission. The contract will incorporate the RFP terms, exhibits, and the consultant's accepted proposal, with payment due within thirty days of County approval of invoices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GPR attachment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GLYNN COUNTY GEORGIA
BOARD OF COMMISSIONERS
COUNTYWIDE BICYCLE AND PEDESTRIAN MASTER
TRAILS PLAN
REQUEST FOR PROPOSAL
RFP27-016
RESPONSE DEADLINE: December 17, 2026, 1:30 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/glynncounty file:///C:/portal/glynncounty
Glynn County BOC Countywide Bicycle and Pedestrian Master Trails Plan - RFP27-016
1 | P a g e
Table of Contents
1. INTRODUCTION
2. INVITATION TO PROPOSERS
3. INSTRUCTIONS TO PROPOSERS
4. DEFINITIONS AND GENERAL TERMS AND CONDITIONS
5. PROGRAM SERVICES
6. PROPOSAL REQUIREMENTS
7. EVALUATION
8. PRICING PROPOSAL
9. VENDOR QUESTIONNAIRE
Attachments:
A - Glynn County Sample Contract
B - Appendix A
C - Appendix E TITLE VI
2 | P a g e
1. INTRODUCTION
1.1. SUMMARY
The Board of Commissioners of Glynn County, Georgia (“the Owner”) seeks proposals from interested qualified firms to provide professional planning, analysis, public engagement, and technical services to develop a Countywide Bicycle and Pedestrian Master Trails Plan for the Brunswick Area Transportation
Study (BATS) Metropolitan Planning Area, including all the details outlined and required in the Program
Services section. This solicitation re-advertises services previously procured under RFP 26-007. The project is funded with federal transportation planning funds administered by the Georgia Department of
Transportation (GDOT) under PI No. 0021179 and is subject to 2 CFR Part 200 and the federal provisions in Exhibit I.
1.2. BACKGROUND
Glynn County, the City of Brunswick, and Jekyll Island are experiencing increased demand for safe, connected, and accessible bicycle and pedestrian infrastructure. The community has a long-standing interest in expanding multimodal transportation options to enhance quality of life, improve public health, promote environmental sustainability, and support economic development through tourism and outdoor recreation.
The Brunswick Area Transportation Study (BATS) is the designated Metropolitan Planning Organization
(MPO) for the region and is responsible for coordinating transportation planning within the
Metropolitan Planning Area, which is coterminous with Glynn County. Recent updates to the County and
City Comprehensive Plans, along with other local and regional initiatives, have highlighted the need for a cohesive, countywide strategy to address gaps in bicycle and pedestrian connectivity and to improve multimodal access.
The purpose of the Plan is not only to inventory existing facilities, but to understand how the existing bicycle and pedestrian network functions, where connectivity and accessibility deficiencies exist, what improvements are needed, and which improvements should be prioritized through a documented, data-driven evaluation process. Its recommendations must rest on quantified analysis of safety, network comfort and connectivity, travel patterns, demand, destination access, and the needs of residents with limited transportation options. The Plan will guide future investment in bicycle and pedestrian infrastructure, prioritizing projects that improve safety, connectivity, access, and recreational opportunities throughout Glynn County.
A Safe Streets and Roads for All (SS4A) Safety Action Plan for Glynn County began in September 2026 and is scheduled for completion by the end of 2027. The selected consultant will coordinate with that effort as described in Section 5 and Exhibit E.
The selected consultant will work closely with BATS staff, local jurisdictions, key stakeholders, and the public to produce an actionable, implementable Master Trails Plan aligned with the BATS 2050
Metropolitan Transportation Plan (MTP) and other relevant regional initiatives.
3 | P a g e
1.3. CONTACT INFORMATION
Project Contact:
Jason Hagen
Program Management Director
1725 Reynolds Street
Ste. 300
Brunswick, GA 31520
Email: jhagen@glynncounty-ga.gov
Phone: (912) 554-7139
Procurement Contact:
Resden Talbert
Procurement Officer
1725 Reynolds Street
Brunswick, GA 31520
Email: rtalbert@glynncounty-ga.gov
Phone: (912) 554-7135
Department:
PROCUREMENT
1.4. TIMELINE
Release Project Date November 17, 2026
Pre-Proposal Meeting (Non-Mandatory) November 24, 2026, 10:30am
Administrative Conference Room #216 located on the 2nd floor of the Harold Pate Building 1725
Reynolds Street Brunswick, GA 31520. For those unable to attend in person, the pre-bid meeting will be streamed live via Teams. Meeting ID: 280
748 448 173 935 Passcode: WG6y7QK6 or Dial by Phone +1 912-244-3558, Phone
Conference ID: 667 894 485#
Question Submission Deadline December 2, 2026, 5:00pm
County Question Response Deadline December 7, 2026, 5:00pm mailto:jhagen@glynncounty-ga.gov tel:(912)554-7139 mailto:rtalbert@glynncounty-ga.gov tel:(912)554-7135
4 | P a g e
Proposal Submission Deadline December 17, 2026, 1:30pm
At 2:00 PM the bids will be opened in conference room 224 located on the second floor of the Harold
Pate Building 1725 Reynolds Street Brunswick, GA and will be publicly read. Bid openings are also streamed live on the County's Youtube Channel.
Intended Date for Contract Award January 7, 2027
5 | P a g e
2. INVITATION TO PROPOSERS
Finance Department
1725 Reynolds St., Suite 300
Brunswick, GA 31520
Countywide Bicycle and Pedestrian Master Trails Plan, Project FY27
RFP27-016
2.1. INVITATION TO PROPOSERS
The Board of Commissioners, Glynn County, Georgia will receive sealed technical and fee proposals for:
Countywide Bicycle and Pedestrian Master Trails Plan. Proposals will be received via the County's eProcurement Portal at https://procurement.opengov.com/portal/glynncounty until 1:30 pm on
Thursday, December 17, 2026, for the above referenced service which are described in the schedules attached hereto. Proposals will be publicly opened and only the name(s) of those Proposers responding will be mentioned. All Proposers are invited to be present during the proposal opening.
There will be a Non-Mandatory Pre-proposal Conference held on Tuesday, November 24, 2026 at 10:30 am at Administrative Conference Room #216 located on the 2nd floor of the Harold Pate Building 1725
Reynolds Street Brunswick, GA 31520. For those unable to attend in person, the pre-bid meeting will be streamed live via Teams. Meeting ID: 280 748 448 173 935 Passcode: WG6y7QK6 or Dial by Phone +1
912-244-3558, Phone Conference ID: 667 894 485#. Any questions and /or misunderstandings that may arise from this request shall be submitted, in writing via the County's eProcurement Portal Q&A feature no later than 5:00 pm on Wednesday, December 2, 2026. All Questions and Answers submitted will be posted to the website no later than Monday, December 7, 2026. Answers to questions submitted that materially change the conditions and specifications of this Invitation for Proposal will be promulgated to all addressees as an addendum. All contact concerning this solicitation shall be made through the
County's eProcurement Portal Q&A feature. Bidders shall not contact County employees, Department
Heads, Evaluation Committee Members or Elected Officials with questions or any other concerns about the solicitation. Any discussions or documents will be considered non-binding unless incorporated and promulgated in an addendum. It shall be the Proposers responsibility to seek clarification as early as possible prior to the opening of proposals.
The Proposer’s response shall include a technical proposal and a separate fee proposal. Proposals should include all requested information as stated in this RFP.
Glynn County Board of Commissioners anticipates making a single contract award; however, it reserves the right to make multiple awards should it deem in the best interest of the County. Such an award, if any, is projected to be accomplished within sixty (60) days from the proposal opening.
The Board of Commissioners, Glynn County, Brunswick Georgia reserves the right to reject any or all proposal, waive technicalities and make the award in the best interest of the County.
https://procurement.opengov.com/portal/glynncounty
6 | P a g e
Sincerely, Resden Talbert
Director of Capital Development and Procurement
Glynn County Board of Commissioners
7 | P a g e
3. INSTRUCTIONS TO PROPOSERS
3.1. INTENT
It is intended that the Instructions to Proposers, General Conditions, and Detailed Specifications shall define and describe the complete work to which they relate.
3.2. WORK TO BE DONE
The Board of Commissioners of Glynn County, Georgia (“the Owner”) seeks proposals from interested qualified firms to provide the services summarized below, including all the details outlined and required in the Program Services section.
The Board of Commissioners of Glynn County, Georgia (“the Owner”) seeks proposals from interested qualified firms to provide professional planning, analysis, public engagement, and technical services to develop a Countywide Bicycle and Pedestrian Master Trails Plan for the Brunswick Area Transportation
Study (BATS) Metropolitan Planning Area, including all the details outlined and required in the Program
Services section. This solicitation re-advertises services previously procured under RFP 26-007. The project is funded with federal transportation planning funds administered by the Georgia Department of
Transportation (GDOT) under PI No. 0021179 and is subject to 2 CFR Part 200 and the federal provisions in Exhibit I.
3.3. SITE EXAMINATION
The Proposer is advised to examine the location of the work and to inform himself fully as to its conditions; the conformation of the ground; the character, quality and quantity of the products needed preliminary to and during the prosecution of the work; the general and local conditions and all other matters which can in any way affect the work to be done under the Contract. Failure to examine the site will not relieve the successful Proposer of his obligation to furnish all products and labor necessary to carry out the provisions of his contract. The Proposer shall confine his examination to the specific areas designated for the proposed construction, including easements and public rights of way. The Proposer is solely responsible for any damages caused by his examination of the site.
3.4. DOCUMENT EXAMINATION
The Proposer is advised to examine all documents and current parameters of the services in becoming fully informed as to their conditions. This includes the conformity with specific standards and the character, quality and quantity of the reports and services provided. Failure to examine these areas will not relieve the successful Proposer of the obligation to furnish all products and services necessary to carry out the provisions of the contract.
3.5. PROPOSAL AND CONTRACT SECURITY
None required for this Request for Proposal.
3.6. DETERMINATION OF SUCCESSFUL PROPOSER
The Contract will be awarded to the Proposer with the highest score, if awarded.
8 | P a g e
A. Responsibility: The determination of the Proposer’s responsibility will be made by the Owner.
The Proposer shall furnish to the Owner all such information and data for this purpose as the
Owner may request. The Owner reserves the right to reject any Proposal if the evidence submitted by, or investigation of, the Proposer fails to satisfy the Owner that he is properly qualified to carry out the obligation of the Contract.
B. Responsiveness: The determination of responsiveness will be made by the Owner based on a consideration of whether the Proposer has submitted a complete Proposal form without irregularities, excisions, special conditions, or alternative Proposals for any item unless specifically requested in the Proposal form.
3.7. PROPOSAL ALTERNATES
Proposers are requested to review proposal alternates, if any, as outlined on the Proposal Form.
3.8. SUBMISSION OF PROPOSALS
Proposals shall be submitted via the County's eProcurement Portal at 1:30 pm on Thursday, December
17, 2026 as indicated in the Invitation. Glynn County will not accept late Proposals. Proposers are reminded that documents and information in the possession of Glynn County will be treated as confidential/proprietary information only to the extent permitted by the Georgia Open Records Act, and will be exempt from disclosure to a third party only to the extent permitted by the Georgia Open
Records Act. Should you believe that your Proposal contains any trade secrets you must submit an affidavit, along with the Proposal/proposal, that states that specific portions of the Proposal/proposal contain trade secrets as defined by Georgia law (Article 27 of Chapter 1 of Title 10 of the Official Code of
Georgia). Furthermore, the affidavit must be detailed, citing specifically (citing paragraphs, articles, provisions, pages, etc.) the portions of the Proposal/proposal containing any trade secrets.
3.9. PROPOSAL FORM
Proposals shall be submitted via the County's eProcurement Portal by responding to all vendor questions included herein. The Proposer will submit a TECHNICAL PROPOSAL, and a separate FEE proposal as indicated in the Vendor questionnaire. For fee proposals prices shall be based upon unit prices for estimated quantities excepting where Proposal items require lump sum proposals as indicated by the Proposal Form. Where errors or omissions result in discrepancies in Proposal totals, prices per unit as submitted will be binding. Final payment will be based upon actual in-place measured quantities, excepting where lump sums are requested for Proposal items.
3.10. GRATUITIES
Glynn County acknowledges that, particularly during the holiday season, it may be customary to provide gifts to employees or departments. However, the Glynn County Personnel Policy prevents the acceptance of such gifts. Your cooperation in respecting the policy is appreciated.
3.11. GEORGIA OPEN RECORDS ACT
Proposers are reminded that documents and information in the possession of Glynn County will be treated as confidential/proprietary information only to the extent permitted by the Georgia Open
9 | P a g e
Records Act, and will be exempt from disclosure to a third party only to the extent permitted by the
Georgia Open Records Act. Should you believe that your Proposal contains any trade secrets you must submit an affidavit, along with the Proposal, that states that specific portions of the Proposal contain trade secrets as defined by Georgia law (Article 27 of Chapter 1 of Title 10 of the Official Code of
Georgia). Furthermore, the affidavit must be detailed, citing specifically (citing paragraphs, articles, provisions, pages, etc.) the portions of the Proposal containing any trade secrets.
3.12. PROPOSERS PRACTICAL AND FEE RESPONSE
These instructions are an integral part of any proposal. The Proposers' response shall include the required practical/technical proposal and fee proposal with all other information requested in this
Request for Proposal (RFP). Practical response must not have fees listed therein. If a fee is located in the practical/technical response, the submission will be considered non-responsive and will not be evaluated. The fees shall be the full cost to the Board of Commissioners, Glynn County, Georgia.
Practical and Fee Proposals must be submitted separately as per the instructions in the Vendor
Questionnaire. Failure to do so WILL result in disqualification of the Request for Proposal submission.
Glynn County anticipates making a single award; however, it reserves the right to make multiple awards should it deem in the best interest of the County. It is anticipated that such an award, if any, will be accomplished within sixty (60) days (unless otherwise agreed upon by the Proposer(s) and the County) from the proposal opening.
Glynn County provides equal opportunity for all businesses and does not discriminate against any person or business because of race, color, religion, sex, national origin, and handicap or veteran’s status.
This policy ensures all segments of the business community have access to supplying the goods and services needed by Glynn County.
3.13. GDOT PREQUALIFICATION
The Prime proposer must be prequalified by the Georgia Department of Transportation in Area Class
1.02 (Urban Area and Regional Transportation Planning) and Area Class 1.13 (Non-Motorized
Transportation Planning) as of the proposal due date. The Proposer shall upload its GDOT prequalification certification with its proposal. Proposals from Proposers not so prequalified will be deemed non-responsive.
A Prime cannot use a subconsultant to satisfy these mandatory prime classes.
10 | P a g e
4. DEFINITIONS AND GENERAL TERMS AND CONDITIONS
4.1. DEFINITIONS
Company - The Proposer
County - The Glynn County Board of Commissioners
County Employee - An employee of Glynn County subject to its personnel policies
Department - A unit of the Glynn County government that encompasses similar staff functions, purposes, and goals and operates under the direct supervision of the Glynn County Board of
Commissioners, a Constitutional Officer or an Appointed Official
Fee - A dollar amount inclusive of all Proposer's costs (overhead, insurance, labor, equipment, advertisements, etc.), general & accounting, and profit charged for a specific service(s)
Principal - Any officer or Manager of the proposing organization, and any person, firm, corporation, partnership, joint venture, or other entity, who or which owns or controls three percent (3%) or more of the voting stock or any equivalent voting interest of a partnership or joint venture
Proposal - An offer or statement of a price and project description in response to a request for materials or services to be rendered to the County or its employees
Proposer - Any corporation, partnership, individual, sole proprietorship, joint stock company, joint venture, or any other private legal entity that has submitted a bid which conforms in all material respects to the requirements set forth in the RFP
Request for Proposal (RFP) - Executed documents, including documents attached or incorporated by reference, utilized for soliciting proposals in accordance with the RFP procedures and instructions set forth herein.
Contractor – The successful Proposer(s)
4.2. NOTICE OF AWARD (NOA) OF CONTRACT
As soon as possible, and within 60 days after receipt of Proposals, the County shall notify the successful
Proposer(s) of the award of the contract. Should the County require additional time to award a contract, the time may be extended by mutual agreement between the County and the successful Proposer. If an
Award of Contract has not been made within 60 days from the Proposal date or within the extension mutually agreed upon, the Proposer may withdraw the Proposal without further liability on the part of either party.
4.3. EXECUTION OF CONTRACT DOCUMENTS
A. Within fifteen (15) days of Notification of Award of Contract, the County shall furnish the
Contractor the conformed copies of Contract Documents for execution by him and his Surety.
B. Within fifteen (15) days after receipt, the Contractor shall return all the documents properly executed by himself and his Surety. Certificates of insurance for the required limits will accompany the Contract documents.
11 | P a g e
C. Within thirty (30) days after receipt of the documents executed by the Contractor and certificates of insurance, the County shall complete the execution of the documents.
Distribution of the completed documents will be made upon completion. Should either party require an extension of any of the time limits stated above, this shall be done only by mutual agreement between both parties.
4.4. PERFORMANCE AND PAYMENT BONDS
None required.
4.5. INSURANCE
The Contractor shall not commence work under this contract until all insurance described below has been obtained and such insurance has been approved by the County, nor shall the Contractor allow any subcontractor to commence work on his subcontract until all similar insurance required of the subcontractor has been so obtained and approved by the Contractor.
A. Liability The Contractor shall maintain such insurance as will protect him from claims under workmen's compensation acts and from any other claims for damages to property, and for personal injury, including death, which may arise from operations under this contract, whether such operations be by himself or by any sub-contractor or anyone directly or indirectly employed by either of them. Certificates of such insurance shall be filed with the Owner. The
Contractor shall be responsible for providing adequate limits of insurance when working within property owned by railroads, as established by such railroad company.
B. Indemnity To the fullest extent permitted by laws, statutes, rules and regulations, the
Contractor shall indemnify and hold harmless the County, Engineer, Engineer’s Consultants and the Officers, Managers, Employees, Agents, and other Consultants of each and any of them from and against claims, costs, damages, losses, and expenses, including but not limited to all fees and charges of engineers, architects, attorneys and other professionals and all court costs, arising out of or resulting from performance of the work, but only to the extent caused in whole or in part by negligent, reckless, willful and wanton, or wrongful acts or omissions of the
Contractor, its Officers, Managers, Employees, Agents, and anyone directly, or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, cost, damage, loss, or expense is caused in part by a party indemnified hereunder, except that no party shall indemnify any other party or person for their own sole negligence.
Such obligation shall not be construed to negate, abridge or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph.
Comprehensive General Liability The successful Proposer shall exercise proper precaution at all times for the protection of persons and property. He shall carry approved insurance from insurance companies authorized to do business in Georgia and having an A.M. Best’s rating of
B+ or better with the following minimums:
*The limits of insurance are as follows: general liability insurance of at least One Million
(1,000,000) Dollars (Combined Single Limit per occurrence) and Two Million (2,000,000) Dollars
12 | P a g e aggregate; automobile insurance of at least One Million (1,000,000) Dollars (Combined Single
Limit per accident for bodily injury or property damage); errors-and-omissions coverage insurance of at least One Million (1,000,000) Dollars per claim and in the aggregate, maintained for the duration of the work and for two (2) years after final payment, and Workers’
Compensation Insurance as will protect potential Proposer or offeror from Workers’
Compensation Acts.
*Contractors Liability Insurance shall be effective for the duration of the work as described in the contract documents, including authorized change orders, plus any period of guarantee as required herein.
4.6. INDEMNIFICATION
The Contractor will indemnify and hold harmless the County and their agents and employees from and against all claims, damages, losses and expenses including attorneys' fees arising out of or resulting from the performance of the work, provided that any such claims, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, including the loss of use resulting therefrom; and is caused in whole or in part by any negligent or willful act or omission of the Contractor, and subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable. In any and all claims against the County or any of their agents or employees, by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under the
Worker's Compensation Acts, Disability Benefits Acts or other employee benefits acts.
4.7. NOTICE TO PROCEED
The Notice to Proceed is typically issued within ten (10) days of the execution of the Contract
Agreement by the County.
4.8. TERMINATION
Termination for Convenience of Owner. The Owner may, at will, upon written notice to the Contractor, terminate (without prejudice to any right or remedy of the Owner) the whole or any portion of the Work for the convenience of the Owner.
ermination for Cause. If the Contractor fails to perform any of its obligations under this Contract in a timely and proper manner, including failure to meet the due dates or acceptance criteria in Exhibit D, the County may give the Contractor written notice specifying the failure. If the Contractor does not cure the failure within ten (10) days after receipt of the notice, or within such longer period as the County may allow in writing, the County may terminate the Contract for cause, in whole or in part, by written notice. Upon termination for cause, the Contractor shall deliver to the County all completed and partially completed work products, data, and GIS files, and shall be paid only for work satisfactorily performed and Accepted before the termination date, less any costs the County incurs because of the
Contractor’s failure, including the excess cost of completing the work. If a termination for cause is later determined to have been improper, it shall be treated as a termination for the convenience of the
13 | P a g e
Owner. Termination by the Contractor. The Contractor may terminate this Contract only for the
County’s material breach that remains uncured thirty (30) days after the County receives written notice of the breach from the Contractor. The termination notice shall be deemed received three (3) days after placing the notice in the United States mail. Deliverables upon Termination. Upon any termination, the
Contractor shall deliver to the County, within fifteen (15) days, all work products, data, GIS files, survey and engagement records, and native files prepared under this Contract, in the formats required by
Exhibit G.
4.9. ASSIGNMENTS
The Contractor shall not assign the whole or any part of this Contract or any monies due or to become due hereunder without written consent of the County. In case the Contractor assigns all or any part of any monies due or to become due under this Contract, the Instrument of assignment shall contain a clause substantially to the effect that is agreed that the right of the assignee in and to any monies due or to become due to the Contractor shall be subject to prior liens of all persons, firms, and corporations for services rendered or materials supplied for the performance of the work called for in this contract.
4.10. SUBCONTRACTING
A. The Contractor shall not subcontract the complete work, or any major part thereof, and shall not award any work to any subcontractor without prior written approval of the County, which approval will not be given except upon the basis of written statements containing such information as the County may require.
B. The Contractor shall utilize the services of specialty subcontractors on those parts of the work which, under normal contracting practices, are performed by specialty subcontractors. If the
Contractor desires to perform specialty work he shall submit a request to the County accompanied by evidence that the Contractor's own organization has successfully performed the work in question, is presently competent to perform the work, and the performance of the work by specialty subcontractors will result in materially increased costs or inordinate delays.
C. The Contractor shall be as fully responsible to the County for the acts and omissions of his subcontractors, and of persons either directly or indirectly employed by them, as he is for the acts and omissions of persons directly employed by him. The Contractor must ensure payment is made in full to any and all sub-contractors. The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the Contractor by the terms of the General Conditions and other Contract Documents insofar as applicable to the work of subcontractors and to give the Contractor the same power as regards to terminating any subcontractor that the County may exercise over the Contractor under any provision of the
Contract Document. Nothing contained in this Contract shall create any contractual relation between any subcontractor and the County.
4.11. AUTHORITY OF PROJECT MANAGERS
The Project Manager or his representative shall act as the County's Practical Representative during the execution of this contract. He shall decide questions which may arise as to quality and acceptability of
14 | P a g e services and products furnished and work performed. He shall interpret the practical intent of the
Contract Documents in a fair and unbiased manner. He will make random inspections to determine if the services are proceeding in accordance with the Contracts Documents. He shall judge as to the accuracy of quantities submitted by the Contractor in payment requests and the acceptability of the work which these quantities represent. The decisions of the Project Manager or his representative shall be final and conclusive and binding upon all parties to the Contract.
Key Personnel: The Project Manager and key personnel named in the proposal shall remain assigned to the project for its duration. Substitution requires the County’s prior written approval of a replacement with equal or better qualifications. The County may require the removal of any individual whose performance it reasonably finds unsatisfactory.
4.12. SEPARATE CONTRACTS
A. The County reserves the right to let other contracts in connection with this project. The
Contractor shall afford other Contractors reasonable opportunity for the execution of their work, and the Contractor and other Contractors shall properly connect and coordinate their work with each other. If the proper execution or results of any part of the Contractor's work depends upon the work of any other Contractor, the Contractor shall inspect and promptly report to the Engineer or his representative any defects in such work that render it unsuitable for such proper execution and results.
B. The County may perform additional work related to the project with his own forces. The
Contractor will afford the County reasonable opportunity for the execution of work, and shall properly connect and coordinate his work with theirs.
4.13. LAWS AND REGULATIONS
A. The Contractor's attention is directed to the fact that all applicable Federal, State and County laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over the project shall apply to the contract throughout, and they will be deemed to be included in the contract as though written out in full herein. The Contractor shall keep himself fully informed of all laws, ordinances and regulations of the Federal, State, County and municipal governments or authorities in any manner affecting those engaged or employed in the work or the materials used in the work or in any way affecting the conduct of the work and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over same. If any discrepancy or inconsistency should be discovered in these Contract Documents or in the specifications herein referred to, in relation to any such law, ordinance, regulation, order or decree, he shall herewith report the same in writing to the County.
B. He shall at all times observe and comply with all such existing and future laws, ordinances and regulations, and shall protect and indemnify the County and its agents the violation of any such law, ordinance, regulation, order or decree, whether by himself or by his employees. Permits and licenses of a temporary nature, necessary for the prosecution of the work shall be secured and paid for by the Contractor.
15 | P a g e
4.14. NOTICE AND SERVICE THEREOF
A. All Notices, demands, requests, instructions, approvals, and claims shall be in writing.
B. Any notice to or demand upon the Contractor shall be sufficiently given if delivered at the office of the Contractor specified in the Proposal (or at such other office as the Contractor may from time to time designate to the County in writing), or if deposited in the United States Mail in a sealed, postage-prepaid envelope, or delivered, with charges prepaid, to any telegraph company for transmission, in each case addressed to such office.
C. All papers required to be delivered to the County shall, unless otherwise specified in writing to the Contractor, be delivered to the County Purchasing Agent, Glynn County, Georgia. Any notice to or demand upon the County shall be sufficiently given if delivered to the Office of said
Purchasing Agent or if deposited in the United States Mail in a sealed, postage-prepaid envelope, or delivered with charges prepaid to any telegraph company for transmission, in each case addressed to said Purchasing Agent or to such other representative of the County or to such other address as the County may subsequently specify in writing to the Contractor for such purposes.
D. Any such notice or demand shall be deemed to have been given or made as of the time of actual delivery or (in the case of mailing) when the same should have been received in due course of post or (in the case of telegrams) at the time of actual receipt, as the case may be.
4.15. SPECIFICATIONS
The Special Conditions, Practical Specifications, Statement of Work, Contract Documents, and all supplemental documents, are considered essential parts of the Contract Agreement, and requirements occurring in one are as binding as though occurring in all. They are intended to define, describe and provide for all work necessary to provide the services in an acceptable manner.
4.16. CHANGES IN THE CONTRACT
A. Changes in the Work. The County may at any time, as the need arises, order changes within the statement of the work without invalidating the Contract Agreement. If such changes increase or decrease the amount due under the Contract Documents, or in the time required for performance of the work, an equitable adjustment shall be negotiated culminate by the issuance of a Contract amendment. The Purchasing Agent, also, may at any time, by issuing a
Contract amendment, make changes in the details of the work. The Contractor shall proceed with the performance of any changes in the work so ordered by the Purchasing Agent unless the
Contractor believes that such order entitles him to a change in the fee or time or both, in which event he shall give the Purchasing Agent written notice thereof within fifteen (15) days after the receipt of the Contract amendment, and the Contractor shall not execute such amendments pending the receipt of an executed Notice to Proceed instruction from the County. The County may, when changes are minor or when changes would result in relatively small changes in the
Fee or Contract Time, elect to postpone the issuance of a Contract amendment until such time
16 | P a g e that a single amendment of substantial importance can be issued incorporating several changes.
In such cases, the County shall indicate this intent in a written notice to the Contractor.
B. Changes in Fee. The Fee shall be changed only by a mutual agreement by the Contractor and the
County transmitted as a Contract amendment. The value of any work covered by an amendment or of any claim for increase or decrease in the Fees shall be determined by one or more of the following methods in the order of precedence according to the following list:
l) By estimating the number of unit quantities of each part of the work which is changed and then multiplying the estimated number of such unit quantities by the fee Proposal for a unit quantity thereof.
2)The County shall fix the total lump sum value of the amendment in the work of the
Contractor, and shall set out the price which shall be added to or deducted from the Fees.
The Contractor shall, when required by the County, furnish to the County an itemized breakdown of the quantities and prices used in computing the value of any change that might be ordered.
4.17. PAYMENTS AND COMPLETION
A. Breakdown of Cost. Before the first application for payment, the Contractor shall submit to the
Contract Practical Representative a breakdown of fees for the various portions of the work, including quantities if required by the Administrator, aggregating the total Fee prepared in such form as specified or as the Administrator and the Contractor may agree upon and supported by such data to substantiate its correctness as the Administrator may reasonably require. This schedule, when approved by the Administrator, shall be used only as a basis for the Contractor's application for payment.
B. Certificate for Payments. If the Contractor has made application for payment as above, the
Contract Practical Representative will validate the application for such amount as is determined to be properly due, or state in writing the itemized and specific reasons for withholding an application as provided herein. After the Administrator has validated the application for payment, the County shall pay to the Contractor, within thirty (30) days, the amount covering services or work performed or completed. No application for payment, nor any payment, shall constitute an acceptance of any work or service not in accordance with the Contract
Documents.
C. Failure of Payment. If the Contract Practical Representative should fail to approve an application for payment, through no fault of the Contractor, within seven (7) days after receipt from the Contractor, or if the County should fail to pay the Contractor within thirty (30) days after receipt of the Contract Practical Representative ‘s approval for Payment, then the
Contractor shall receive interest on the balance due with the interest being one percent (1%) per month not to exceed three (3) months (3%). The County reserves the right to reject the
Administrator's certification of any application for payment by the Contractor without the accrual of interest.
17 | P a g e
D. Governing Document All parties expressly agree that the provisions of the Georgia Prompt Pay
Act, Title 13, Chapter 11, of the Official Code of Georgia Annotated, are superseded by the terms and conditions of this agreement.
4.18. CONTRACTOR'S CLAIM
No claim for additional or other compensation beyond the fees shall be allowable unless the Contractor makes and continuously maintains written demand therefor within thirty (30) days of the occurrence of any event which given rise to such claim.
4.19. CONTRABAND
Employees of the successful Proposer shall not enter County Buildings with goods or products that shall be considered contraband, i.e. drugs, drug paraphernalia, tobacco products smokeless or otherwise, etc.
4.20. OFFICE HOURS
Glynn County Board of Commissioners is open to the public Monday through Friday, 8:00 A.M. to 5:00
P.M.
4.21. WORK SCHEDULING
The successful Proposer shall arrange his work schedule as directed in the Statement of Work and approved by the Contract Practical Representative.
4.22. GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT
Pursuant to O.C.G.A. § 13-10-91 (Georgia Security and Immigration Compliance Act), every public employer, every contractor of a public employer, and every subcontractor of a public employer’s contractor must register and participate in a federal work authorization program. No public employer shall enter into a contract for the physical performance of services within this state unless the contractor registers and participates in a federal work authorization program to verify the work eligibility information of all new employees. No contractor or subcontractor shall enter into a contract or subcontract with a public employer in connection with the physical performance of services within this state unless such contractor or subcontractor registers and participates in a federal work authorization program to verify the work eligibility information of all new employees. Contractor acknowledges that the awarding of this contract is conditioned upon initial and ongoing compliance by the contractor and any subcontractor with the requirements of O.C.G.A. § 13-10-91 and Rule 300-10-1-.02 of the Georgia
Department of Labor; The requirements of O.C.G.A. § 13-10-91 pertaining to registering and participating in a federal work authorization program apply to public employers, their contractors, and subcontractors, as follows: On or after July 1, 2007, to contractors and subcontractors of 500 or more employees; On or after July 1, 2008, to contractors and subcontractors of 100 or more employees; and
On or after July 1, 2009, to all other contractors or subcontractors. Contractor agrees that in the event it employs or contracts with any subcontractor(s) in connection with this contract, Contractor shall secure from the subcontractor(s) an indication of the employee-number category applicable to the subcontractor. Contractor agrees that its compliance with the requirements of O.C.G.A. § 13-10-91 and
Rule 300-10-1-.02 of the Georgia Department of Labor shall be attested by execution of the Contractor
Affidavit which is attached hereto and which shall be a part of this contract. Contractor agrees that, in
18 | P a g e the event it employs or contracts with any subcontractor(s) in connection with this contract, Contractor shall secure from the subcontractor(s) an attestation of the subcontractor’s compliance with O.C.G.A. §
13-10-91 and Rule 300-10-1-.02 of the Georgia Department of Labor by the subcontractor’s execution of a Subcontractor Affidavit provided by Glynn County. Contractor shall maintain records of such attestation for inspection by Glynn County at any time. The Subcontractor Affidavit shall become a part of the contractor/subcontractor agreement.
4.23. CONTRACT REVIEW BY FHWA
The contract between the selected firm and the County may be submitted for review to FHWA. The
County desires that the costs it incurs for services provided by the selected firm be eligible for FHWA reimbursement. While the County understands that the selected firm cannot guarantee that the services it provides will be eligible for FHWA reimbursement, the County nevertheless desires that the selected firm utilize its professional judgment and expertise in an effort to limit its services to those which are eligible for FHWA reimbursement.
4.24. COUNTY EXPENDITURES
The County desires to enter into a contract for professional services with a firm possessing a high level of expertise and professional skill in the areas described in this RFP. As such, the County desires that the selected firm be contractually required to guarantee that all documents generated pursuant to the contract shall be in compliance with FHWA regulations and will be in a form so as to ensure eligibility of
FHWA reimbursement regardless of whether or not FHWA actually reimburses.
4.25. CLEAN AIR ACT / CLEAN WATER ACT
All contractors agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended
(33 U.S.C. 1251-1387).
4.26. CONFLICT OF INTEREST
This contract, and all subcontracts, are subject to the Glynn County Ethics Ordinance, sections 2-2-41 through 2-2-51. The Ethics Ordinance prohibits Glynn County officials and employees from attempting to realize personal financial gain through their service or employment with Glynn County. Officials and employees are likewise prohibited from having any financial or other private interest, direct or indirect, which is in conflict with the discharge of their duties or in conflict with the best interests of Glynn
County.
4.27. DEBARMENT AND SUSPENSION REQUIREMENTS
A contract award will not be made to parties listed on the governmentwide exclusions in the System for
Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement
Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” The awardee will be required to provide their UEI and EIN for verification before the issuance of a contract.
https://www.law.cornell.edu/topn/air_pollution_control_act https://www.law.cornell.edu/uscode/text/42 https://www.law.cornell.edu/uscode/text/42/7401 https://www.law.cornell.edu/uscode/text/42/7671q https://www.law.cornell.edu/topn/clean_water_act https://www.law.cornell.edu/uscode/text/33 https://www.law.cornell.edu/uscode/text/33/1251 https://www.law.cornell.edu/uscode/text/33/1387 https://www.law.cornell.edu/cfr/text/2 https://www.law.cornell.edu/cfr/text/3/part-1986 https://www.law.cornell.edu/cfr/text/3/part-1989
19 | P a g e
4.28. EQUAL EMPLOYMENT OPPORTUNITY (EEO) CLAUSE
A. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and the employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
B. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor,· state that all qualified applicants will receive consideration for employment-without regard to race, color, religion, sex or national origin.
C. The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement, or other contract or understanding, a notice to be provided advising the said labor union or workers' representative of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
D. The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations and relevant orders of the Secretary of Labor.
E. The Contractor will furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
F. In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by the rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order
11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or
20 | P a g e vendor. The Contractor will take such action with respect to any subcontract or purchase order as the administrating agency may direct as a means of enforcing such provisions, including sanctions for noncompliance. Provided, however, that in the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the Contractor may request the United States to enter into such litigation to protect the interests of the
United States.
4.29. RECORD KEEPING AND INSPECTION
The Contractor agrees that Glynn County, the Georgia Department of Transportation, and the U.S.
Department of Transportation, the Comptroller General of the United States, or any of their duly authorized representatives, shall have access to any books, documents, papers, and records of the contractor which are directly pertinent to this Agreement for the purposes of making audit, examination, excerpts, and transcriptions for 3 years after final payment and all pending matters are closed.
4.30. BYRD ANTI-LOBBYING AMENDMENT
Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352.
Each tier must also disclose any lobbying with non-Federal funds that take place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award.
A Byrd Anti-Lobbying certificate must be completed and returned with all bids.
4.31. NO OBLIGATION BY FEDERAL GOVERNMENT
The federal government is not a party to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .