20261110037proposal.pdf
PDF 3 MB Posted
- Solicitation number
- 20261110037
- Issued by
- Florence County, Wisconsin
About this file
This is a proposal document related to a local street improvement project in Eau Claire, Wisconsin, involving the City of Eau Claire for the E Hamilton Ave project from Horlacher Ln to Gateway Dr. The project encompasses excavation of common materials, installation of base aggregate dense, concrete sidewalk construction, curb ramps, storm sewer work, concrete curb and gutter installation, and all incidental items necessary to complete the work as specified in the project plans and contract documents. The scope of work includes site preparation, drainage infrastructure, and pedestrian accessibility improvements along the designated street corridor.
The proposal document appears to contain technical specifications and cost breakdowns for the various construction elements required to complete the street improvement project. Specific pricing terms, bid amounts, contractor information, and detailed line-item costs are referenced within the proposal, though the document content is not fully legible in the provided format. The project represents a municipal infrastructure investment by the City of Eau Claire to enhance and modernize the local street system in the specified area.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!#��$�%��!����#�#��!"%&'�(��&)(�(����*++*�,�&-�.����*�/#�#��0�01��2 3121�����2 ���4150�21�5���0��6 ������� 5�760��,,'8�(8�+ �9/:��(�(��'( :�;� ��A!�#��B�#
C�D�"� AE:�/%F ;�
G�D#@ !G ���H!
G��GG
!#�$%��!����#�#��!<���!� ��G�!
C�#@#@ �G?
G� I
��GG
�!��@�!GG
�����<�!G#�� �$������C��J$��#@ G ��H!�# G���K G<��!�� ��G�!
�C�#@�#@ !G G����������F I !#���!G�:�!G�#��!�*���������B ���!#D�F I G���D���
!#��$�%��!����#�#��!LM�<���*�� >##� @����������B
���!#D��!��� J��$�#@����>B;*N�G�/ �-A� ���%�� M�����J�!H�"�D�>���H!
G�"���G?�!#�H G�N �B��� �O P���� ��
<�>GG�
��<�:�#D<�/#�# <�Q���:�G R G ���H@#*%@�� !G ���H!
G��GG
�<G �D�C��!<���!� #@���S G� G���?
T#@�##@
��GG
R���!
G�!G �� ��D�� G#@ ��G$���#@
���!�<=�H@C�D���J��������<�!G����GG
!G�<�!G@�� @ J G#@ �!G
���##�!H#@��������������GT�!G#@�##@
��GG
����H ����D
�G�� #�D���!G�� #�D< G�!#��!D�H�
G�!�!D ��� �C�� #�J !�!D� #��!�!�
��GG�!H�! �!!
#��!C�#@#@��������������G*2U�VUW�XYZV[�VUW\]Ŷ_[�U]�X̀abYW�WcYX��YZcd\e��U]f��]UgUX\h�dc_V�X̀abYWWYVZ�\V�_h_iW]UVYi�aYj�UV�Wc_��VW_]V_Wk/ G��!G��C��!�#��� �#@���G�# �lllllllllllllll-/�H!�# <� �#��D�� ��$���� �!��!.-���!#����%D�
| � | �� |
| <� | �#��D�� |
�:��������!�;R���
�. -N�GG
��/�H!�# .-���!#����%D�
�N�GG
.-N�GG
.3U]�2_g\]Wb_VW�7X_��Vhe0eg_�Um��U]fn �#� ��$�>C��G�"�# G "�# �B ���!#D�F G �#��D�/
��o��16�0�3���p�22�6���7����1�
F
��?���<�B��G�!H<�>HH�
H�# ����!G�B �/�G C��J<�/#����/ C !#/�H!�!H<�%��$$� �:�!#���<���?
!#�q��J�!H<�/�!�#��D<���# �<�F
PLEASE ATTACH
PROPOSAL GUARANTY HERE
Effective with November 2007 Letting Proposal Requirements
PROPOSAL REQUIREMENTS AND CONDITIONS
The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.
If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.
The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.
The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;
otherwise to be returned.
The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.
The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.
The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.
The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.
The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.
Effective with November 2007 Letting Proposal Requirements
The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.
In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.
The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.
If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.
Effective with August 2015 Letting Bid Preparation
BID PREPARATION
Preparing the Proposal Schedule of Items A. General
(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:
1. Electronic bid on the internet.
2. Electronic bid on a printout with accompanying diskette or CD ROM.
3. Paper bid under a waiver of the electronic submittal requirements.
(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.
(3) The department will provide bidding information through the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.
(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:
Info Tech Inc.
5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com
(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.
(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.
(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com
B. Submitting Electronic Bids B.1 On the Internet
(1) Do the following before submitting the bid:
4. Have a properly executed annual bid bond on file with the department.
5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.
(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:
1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.
2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.
3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid
4. Submit the bid before the hour and date the Notice to Contractors designates
5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.
(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.
B.2 On a Printout with Accompanying Diskette or CD ROM
(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.
(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:
Bidder Name
BN00
Proposals: 1, 12, 14, & 22
(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.
(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.
(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.
2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.
3. The diskette or CD ROM is not submitted at the time and place the department designates.
B Waiver of Electronic Submittal
(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.
(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.
The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."
(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.
2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.
3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.
(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.
PROPOSAL BID BOND Wisconsin Department of Transportation
DT1303 1/2006
Proposal Number Project Number Letting Date
Name of Principal
Name of Surety State in Which Surety is Organized
We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.
If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.
In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.
The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.
IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)
PRINCIPAL
(Company Name) (Affix Corporate Seal)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
NOTARY FOR PRINCIPAL
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
(Name of Surety) (Affix Seal)
(Signature of Attorney-in-Fact)
NOTARY FOR SURETY
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.
CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation
DT1305 8/2003
Time Period Valid (From/To)
Name of Surety
Name of Contractor
Certificate Holder Wisconsin Department of Transportation
This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.
This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.
Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.
(Signature of Authorized Contractor Representative) (Date)
Effective with March 2010 Letting
LIST OF SUBCONTRACTORS
Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.
No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.
Name of Subcontractor Class of Work Estimated Value
Effective with December 2000 Letting Debarment Certification
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER
RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS
Instructions for Certification
1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.
4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.
6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.
7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).
Effective with December 2000 Letting Debarment Certification
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.
Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions
1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and
(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.
7995-02-76 1 of 10
Special Provisions Table of Contents
Article Description Page #
1. General
2. Scope of Work
3. Prosecution and Progress
4. Traffic
5. Holiday and Special Event Work Restrictions
6. Utilities
7. Municipality Acceptance of Sanitary Sewer and Water Main Construction
8. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm
Water Discharges
9. Notice to Contractor – City of Eau Claire Transit
10. Coordination with Businesses and Residents
11. Public Convenience and Safety
12. Referenced Construction Specifications
13. Adjusting Manhole Covers, Item 611.8110
14. Temporary Audible Message Devices, Item 644.1900.S
15. Connect to Existing Storm Sewer Manhole, Item SPV.0060.01; Connect to Existing Sanitary
Manhole, Item SPV.0060.05
16. Connect to Existing Storm Sewer Pipe, Item SPV.0060.02
17. Sanitary Manholes & Castings 4-FT Diameter, Item SPV.0060.03. Sanitary Sewer Service Wye, 8-Inch x 4-Inch, Item SPV.0060.04; 8-Inch Sanitary Sewer, Item SPV.0090.02; 4-Inch Sanitary Sewer Service, Item SPV.0090.03
18. Remove and Replace Hydrant, Item SPV.0060.06; Cut and Cap Existing Watermain, Item SPV.0060.07; Hydrant Lead 6-Inch, Item SPV.0090.04
19. Adjusting Valve Boxes, Item SPV.0060.08
20. Concrete Curb & Gutter 24-Inch Type D, Item SPV.0090.01
7995-02-76 2 of 10
STSP’S Revised July 1, 2026
SPECIAL PROVISIONS
1. General.
Perform the work under this construction contract for the following projects:
Project ID 7995-02-76 C Eau Claire, E Hamilton Ave Horlacher Ln to Gateway Dr Local Street Eau Claire County
Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.
100-005 (20260701)
2. Scope of Work.
The work under this contract consists of excavation common, base aggregate dense, concrete sidewalk, curb ramps, storm sewer, concrete curb & gutter and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
104-005 (20090901)
3. Prosecution and Progress.
Begin work within 10 calendar days after the engineer issues a written notice to do so.
Provide the time frame for construction of the project within the 2027 construction season to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Assure that the time frame is consistent with the contract completion time.
Upon approval, the engineer will issue the notice to proceed within ten calendar days before the beginning of the approved time frame.
To revise the time frame, submit a written request to the engineer at least two weeks before the beginning of the intended time frame. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.
Protection of Endangered Bats Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges, culverts, and other structures. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work, and notify the engineer and the WisDOT Regional Environmental Coordinator
(REC).
Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.
Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.
Tree Clearing/Trimming:
To avoid adverse impacts upon protected bats, do not perform tree clearing/trimming between April 15 and October 31, both dates inclusive. If the required tree clearing/trimming is not completed by April 14, 7995-02-76 3 of 10 the department will suspend all tree clearing/trimming and associated work directly impacted by clearing/trimming. Tree clearing/trimming is limited to that which is specified in the plans. Contractor means and methods to remove additional trees/branches will not be allowed. If it is determined that additional trees with a 3-inch or greater diameter at breast height (dbh), or branches of any size on those sized trees, need to be removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.
Due to potential for erosion, do not perform grubbing operations at the time of tree clearing unless grading activities will commence in those areas immediately following the tree clearing, or as otherwise approved by the engineer. Provide information for the grubbing and grading activities, including the schedule of operations, in the Erosion Control Implementation Plan (ECIP).
Submit a schedule and description of clearing operations with the ECIP 14 days prior to any clearing operations. The department will determine, based on schedule and scope of work, what additional erosion control measures shall be implemented prior to the start of clearing operations, and list those additional measures in the ECIP.
4. Traffic.
Close E Hamilton Ave to through traffic and maintain access for local traffic. Access will be maintained to residences and business entrances within the construction limits.
Maintain emergency, residential, businesses and local traffic access at all times within the project.
Maintain access to the Town of Washington Fire Station at Station 12+26 RT at all times.
E Hamilton Ave & Gateway Drive Intersection Maintain access to Gateway Drive north of E Hamilton Avenue at all times.
Place gravel at the same level of the surface layer if left overnight to prevent dips in the travel surface.
Pave any disturbed travel areas between Station 23+25 and the end of the project before the end of the work week
Wisconsin Lane Closure System Advance Notification Prior to starting work, provide closure information to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).
Discuss LCS completion dates and provide changes in the schedule to the engineer at project meetings in order to manage closures nearing their completion date.
5. Holiday and Special Event Work Restrictions.
Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying E Hamilton Avenue traffic during the following holiday and special event periods:
- From noon Friday, May 28, 2027 to 6:00 AM Tuesday, June 1, 2007; Memorial Day;
- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027; Independence Day;
- From noon Friday, September 3, 2027 to 6:00 AM Tuesday, September 7, 2027 Labor Day.
6. Utilities.
This contract does not come under the provision of Administrative Rule Trans 220.
The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process or from the project engineer after the contract has been awarded and executed.
Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow up with a confirmation
7995-02-76 4 of 10 notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.
stp-107-066 (20240703)
The following utilities have facilities within the project limits:
AT&T (COMLN) has underground communication facilities and above ground pedestals within the project. AT&T will remove all peds from within the road right of way between Station 11+00 LT and 20+00 LT. The existing crossing at Station 20+20 will remain in place; however, the pedestal will be relocated outside of proposed construction limits. Work will be completed prior to construction.
Charter (COMLN) has underground and over facilities throughout the project limits. Overhead facilities are located on Xcel Energy poles.
The pedestals at Station 12+20, 13+50 and 22+75 RT will be relocated to the edge of the right of way.
Overhead lines between Station 14+85 and 23+00 RT will be relocated to the new Xcel Energy poles.
Work will be completed prior to construction.
City of Eau Claire (SEWR) has underground sanitary facilities within the project limits. Utility relocations and adjustments will be required and will be completed as part of the project.
City of Eau Claire (WATR) has underground sanitary facilities within the project limits. Utility relocations and adjustments will be required and will be completed as part of the project.
Xcel Energy (ELCTY) has overhead facilities located along the south side of E Hamilton Avenue. Six power poles between Station 15+00 RT and Station 23+00 RT will be relocated prior to construction to the southern edge of the right of way.
Xcel Energy (GSPTR) has underground gas lines within the project limits along the south side of the roadway. Xcel Energy will relocate the gas main outside of the roadway within the boulevard in the fall of 2026. Work will be completed prior to construction.
Xcel Energy will install a new gas main along the north side of E Hamilton Avenue between Station 11+00 LT and Station 16+00 LT. Installation will occur during construction after clearing and grubbing is completed. Contact Xcel Energy 3 weeks prior to beginning clearing and grubbing so they can schedule their work. New gas main construction is anticipated to take 1 week to complete.
The existing service crossings between Station 11+00 and 16+00 will be discontinued after installation of the new main is complete. The existing gas crossings under E Hamilton Avenue at Station 16+11, 17+91 and 23+30 will remain.
7. Municipality Acceptance of Sanitary Sewer and Water Main Construction.
Coordinate all sanitary sewer and water main tie-ins and opening and closing of water valves with City of Eau Claire Utilities.
Contract and coordinate utility activities. Contact property owners 72 hours and again 24 hours in advance of an interruption in utility service. Where utility shutdowns may affect businesses, coordinate interruptions with the businesses and it may require night work to minimize disruption. Sanitary sewer and water service may not be interrupted for a period exceeding two hours unless prior approval is obtained from Eau Claire Utilities and property owners.
Both the department and the City of Eau Claire personnel will inspect construction of sanitary sewer and water main under this contract. However, acceptance of the sanitary sewer and water main construction will be by the City of Eau Claire.
8. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm Water Discharges.
The following Project IDs have one acre or more of land disturbing construction activity and are required to obtain coverage under the TCGP. The permit requirements are part of the contract:
Project ID Design Calculated Amount of Land Disturbing Construction Activity (acres)
7995-02-76 1.26
7995-02-76 5 of 10
This permit is the Wisconsin Pollutant Discharge Elimination System, Transportation Construction General Permit, (WPDES Permit No. WI-S066796-2) and is located at:
https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
The department will apply for coverage under the TCGP upon submittal of the complete ECIP from the contractor, and concurrent with the department providing the ECIP to the Department of Natural Resources (DNR). The DNR will convey permit coverage upon the department’s approval of the ECIP and DNR concurrence that the project has met the requirements for coverage under the TCGP.
Do not begin land disturbing construction activity until the ECIP is approved and the DNR conveys TCGP coverage for the project.
A “Certificate of Permit Coverage” will be provided by the DNR upon conveyance of coverage under the permit. Post the “Certificate of Permit Coverage” in a conspicuous place at the construction site.
Stormwater discharge permit coverage for additional land disturbing construction activities related to contractor means and methods, including temporary support activity sites, will be considered as part of the ECIP review and approval process. Coverage under the TCGP for additional land disturbance areas will be considered if the areas meet all of the following:
• Must meet the TCGP applicability criteria.
• Must be for the exclusive use of WisDOT projects.
• Land disturbance first commences after the ECIP approval, and the areas are fully restored to meet the final stabilization criteria of the TCGP upon completion of the work.
Obtain any permits for areas that are not approved by the department for coverage under the TCGP.
stp-107-056 (20260701)
9. Notice to Contractor – City of Eau Claire Transit.
Coordinate with the Eau Claire Transit Authority at (715) 839-5111 at least 7 calendar days prior to disruption of the transit route or stop to allow coordination with drivers and marking of temporary stop locations.
10. Coordination with Businesses and Residents.
The contractor shall arrange and conduct a meeting between the contractor, the department, City of Eau Claire, affected residents including property owners and renters, local officials and business people to discuss the project schedule of operations including vehicular and pedestrian access during construction operations. Hold the first meeting at least one week before the start of work under this contract and no further meetings will be required unless directed by the engineer. The contractor shall arrange for a suitable location for meetings that provides reasonable accommodation for public involvement. The City of Eau Claire will prepare and coordinate publication of the meeting notices and mailings for meetings.
The contractor shall schedule meetings with at least 2 weeks prior notice to the engineer to allow for these notifications.
11. Public Convenience and Safety.
Revise standard spec 107.8(6) as follows:
Check for and comply with local ordinances governing the hours of operation of construction equipment.
Do not operate motorized construction equipment from 9:00 PM until the following 7:00 AM, unless prior written approval is obtained from the engineer.
stp-107-001 (20060512) https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
7995-02-76 6 of 10
12. Referenced Construction Specifications.
Construct the work enumerated below conforming to the City of Eau Claire Standard General Conditions and Special Provisions for Street and Utility Construction, Latest Edition. If there is a discrepancy or conflict between the referenced specification and the standard specifications regarding contract administration, part 1 of the standard specifications governs.
Conform to the referenced construction specifications for the following:
1. Sanitary Sewer Items
2. Water Main Items stp-105-002 (20130615)
13. Adjusting Manhole Covers, Item 611.8110.
This special provision describes adjusting manhole covers conforming to standard spec 611 as modified in this special provision.
Add to standard spec 611.3.7 the following:
Set the manhole frames so that they comply with the surface requirements of standard spec 450.3.2.9.
At the completion of the paving, a 6-foot straightedge shall be placed over the centerline of each manhole frame parallel to the direction of traffic. A measurement shall be made at each side of the frame. The two measurements shall be averaged. If this average is greater than 5/8 inches, reset the manhole frame to the correct plane and elevation. If this average is 5/8 inches or less but greater than 3/8 inches, the manhole frame shall be allowed to remain in place but shall be paid for at 50 percent of the contract unit price.
If the manhole frame is higher than the adjacent pavement, the two measurements shall be made at each end of the straightedge. These two measurements shall be averaged. The same criteria for acceptance and payment as above, shall apply.
stp-611-005 (20200629)
14. Temporary Audible Message Devices, Item 644.1900.S.
A Description This special provision describes providing, maintaining, and removing temporary audible message devices. These devices are used on temporary pedestrian facilities to guide individuals with sight disabilities.
B Materials Furnish temporary audible message devices from the approved products lists.
C Construction
Provide and maintain temporary audible message device. Maintain and repair devices within two hours of being notified by the project engineer of an issue.
Contractors record messages as approved by the engineer.
Mount temporary audible message devices on drums, temporary sign supports, or other locations approved by the engineer. Locate motion detection areas that will be effective in activating the device to operate properly. Avoid locating motion detection areas that will cause activation by trees, traffic, or other known regular activity.
Move and adjust devices after disruptions by the work or the public.
Maintain devices in a working condition and replace batteries as needed. Replace any devices that are not working properly within 2 hours of being notified of an issue.
Use tamper-proof hardware for mounting.
7995-02-76 7 of 8
D Measurement The department will measure temporary audible message devices by the day, acceptably completed.
E Payment The department will pay for measured quantities at the contract unit price under the following bid item:
ITEM NUMBER DESCRIPTION UNIT
644.1900.S Temporary Audible Message Device DAY
Payment is full compensation for providing, maintaining, and removing temporary audible message device.
The department will not pay for devices that are inoperable.
stp-644-190 (20250108)
15. Connect to Existing Storm Sewer Manhole, Item SPV.0060.01;
Connect to Existing Sanitary Manhole, Item SPV.0060.05.
A Description This special provision describes connecting to existing sanitary sewer. Perform work in accordance with the City of Eau Claire Standard General Conditions & Specifications for Street & Utility Construction, latest edition.
B Materials Furnish all materials that conform to the requirements of this section and the City of Eau Claire Standard General Conditions & Specifications for Street & Utility Construction, latest edition, for sanitary and storm sewer.
C Construction Make connections to existing sanitary sewer manholes at the locations shown on the plans. Excavate to expose existing storm or sanitary manhole at the location of connection. Core drill required opening in existing riser. For sanitary manholes, install new pipe in flexible manhole connector (boot).
If a boot cannot be retrofit to manhole, use waterstop and hydraulic cement to waterproof the connection.
D Measurement The department will measure Connect to Existing Storm Sewer Manhole and Connect to Existing Sanitary Manhole by each unit, acceptably completed.
E Payment The department will pay for measured quantities at the contract unit price under the following bid item:
ITEM NUMBER DESCRIPTION UNIT
SPV.0060.01 Connect to Existing Storm Sewer Manhole EACH SPV.0060.05 Connect to Existing Sanitary Sewer Manhole EACH
Payment is full compensation for the connection to existing manhole including all couplings, connectors, fittings, and miscellaneous materials required for the connection, and for all excavating and backfilling.
16. Connect to Existing Storm Sewer Pipe, Item SPV.0060.02.
This special provision describes connecting new storm sewer pipe to existing storm sewer pipe as shown on the plans and as hereinafter provided.
B Materials Mortar: Material complying with standard spec 519.2.3.
7995-02-76 8 of 9
Standard Coupling or Joint: Pipe manufacturer’s standard coupling or joint materials capable of producing a soil-tight joint.
Gravity Pipe Coupling: Premanufactured rubber or elastomeric sleeve and stainless band assembly fabricated to mate with the outer diameters of the pipes to be joined and complying with ASTM C1173.
Concrete for Pipe Collar: Material complying with standard spec 520.2.4.
C Construction Excavate as required both horizontally and vertically to locate connection point and determine the material and diameter of the existing pipe. Comply with the requirements of standard spec 608.3.
Connect new pipe to existing pipe using a mortar joint, standard coupling or joint, or gravity pipe coupling.
Use concrete collar for connection to existing pipe where the engineer agrees a mortar joint, standard coupling or joint, or gravity pipe coupling cannot be used.
D Measurement The department will measure Connect to Existing Storm Sewer Pipe as each individual unit, acceptable completed.
E Payment The department will pay for measured quantities at the contract unit price under the following bid item:
ITEM NUMBER DESCRIPTION UNIT
SPV.0060.02 Connect to Existing Storm Sewer Pipe EACH
Payment is full compensation for furnishing and installing materials including mortar, joint materials, coupling, and/or concrete, for locating the existing pipe, and for excavation, backfilling, disposing of surplus material, and restoring the work site; except the department will pay for the pipe separately.
17. Sanitary Manholes & Castings 4-FT Diameter, Item SPV.0060.03.
Sanitary Sewer Service Wye, 8-Inch x 4-Inch, Item SPV.0060.04;
8-Inch Sanitary Sewer, Item SPV.0090.02;
4-Inch Sanitary Sewer Service, Item SPV.0090.03.
A Description This special provision describes providing and installing sanitary sewer items. Perform work in accordance with the City of Eau Claire Standard General Conditions & Specifications for Street & Utility Construction, latest edition.
B Materials Furnish all materials that conform to the requirements of this section and the City of Eau Claire Standard General Conditions & Specifications for Street & Utility Construction, latest edition, for sanitary and storm sewer.
C Construction Construct Sanitary Sewer items according to plans, details, and specifications.
D Measurement The department will measure Sanitary Manholes & Castings 4-FT Diameter by the each, for each structure acceptably completed.
The department will measure Sanitary Sewer Service Wye, 8-Inch x 4-Inch by each unit acceptably completed.
The department will measure 8-Inch Sanitary Sewer in length by the linear feet as measured along the centerline of the pipe through manholes, junctions, and fittings, acceptably completed.
The department will measure 4-Inch Sanitary Sewer Service by the lineal foot, as measured along the pipe centerline from the main to the end at the property line, including the riser section, acceptably completed.
E Payment The department will pay for measured quantities at the contract unit price under the following bid items:
7995-02-76 9 of 10
ITEM NUMBER DESCRIPTION UNIT
SPV.0060.03 Sanitary Manholes & Castings 4-FT Diameter EACH SPV.0060.04 Sanitary Sewer Service Wye, 8-Inch x 4-Inch EACH SPV.0090.02 8-Inch Sanitary Sewer LF SPV.0090.03 4-Inch Sanitary Sewer Service LF
Payment for Sanitary Manholes & Castings 4-FT Diameter is full compensation for staking, furnishing and building the masonry sanitary sewer manhole.
Pa…