20261110012proposal.pdf

PDF 3 MB Posted

Attached to
City of Middleton, CTH M Pheasant Br Creek Bridge B-13-0905 CTH M
Solicitation number
20261110012
Issued by
Dane County, Wisconsin

About this file

Summary

This is a proposal document and special provisions for a Wisconsin Department of Transportation construction contract for the City of Middleton involving the CTH M Pheasant Branch Creek Bridge project (B-13-0905) in Dane County. The scope of work includes grading, base aggregate, HMA pavement, concrete sidewalk, removal of existing structure B-13-046, erosion control items, storm sewer items, traffic signal removal and installation, and construction of three new structures (B-13-0905, R-13-400, and R-13-401). The project requires closure of CTH M for a maximum of 132 calendar days during Stage 1 and Branch Street for a maximum of 31 calendar days during Stage 2. Contractors must begin work within 10 calendar days after receiving written notice to proceed, which will not be issued prior to March 15, 2027. The contract specifies interim liquidated damages of $4,000 per calendar day for CTH M closure delays beyond 132 days and $2,500 per calendar day for Branch Street closure delays beyond 31 days. Extensive coordination requirements are mandated with utility providers, City of Middleton officials, businesses, residents, and environmental consultants throughout construction.

The proposal includes standard bid requirements such as proposal guaranty bonds, annual bid bonds, and debarment certifications. Special provisions address environmental considerations including fish spawning protection restrictions from March 1 to June 15, migratory bird nest protection, endangered bat habitat avoidance measures, and creosote-contaminated soil excavation and disposal procedures at DNR-licensed landfills. Contractors must comply with the Wisconsin Pollutant Discharge Elimination System Transportation Construction General Permit for stormwater discharge management across the 2.42-acre project site. Additional requirements include Americans with Disabilities Act compliance for pedestrian access, holiday and special event work restrictions, utility relocation coordination along the project corridor, and submission of an Erosion Control Implementation Plan 14 days prior to clearing operations. Payment for work will be made according to unit prices bid in the schedule of items, with various specialized items including stainless steel reinforcement, concrete staining, landscape planting, bird deterrent systems, and traffic signal equipment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

!#��$�%��!����#�#��!"%�&�����'�������())(�*��+,-����(�.#�#��/�/0��1 2010�����1 ���304/�10�4���/��5 ������� 4�65/�&**78��8,, �9.:�����,�&) :�#;��$�<�==� ���!#�A��:�

B�A��=C �A8�78�*�& :%?�< "�!

���C!

D�#@#@ �=E F

��E �$������D��B$��#@ �����E ��C!�# =���G �D�#@�#@ =����������H F !#���!=�:�!=�#��!�(���������I ���!#;�H F !#��$�%��!����#�#��!J,&>���(�� K##� @����������I

���!#;��!��� B��$�#@����KIL(A�=�.

�+M� ���%�� -� �E �E ���*>����,K���C!

=�"���=E�!#�C =�A ���L!# �I��� �N O���� �� >�K==� >�P���:�= Q �����E ���C@#(%@�� ���C!

�;�D��!>���!� #@���R !#�#�E =���E S#@�##@ Q���!

���!�>?�C@D�;���B��������>�!=����== B ���##�!C#@��������������=S�!=#@�##@ ����C

�@�E =�!#��!;�C�

�D�� #�B

#�#�E ��==�!C�! �!!

#��!D�#@#@��������������=(1T�UTV�WXYUZ�UTV[\X]̂Z�T\�W_̀aXV�VbXW��XYbc[d��T\e��\TfTW[g�cb̂U�W_̀aXVVXUY�[U�̂ĝhV\TUXh�̀Xi�TU�Vb̂��UV̂\ÛVj.

=��!=��D��!�#��� �kkkkkkkkkkkkkkk+.�C!�#

���
>��#��;��

�:��������!�LQ���

�- +A�== ��.�C!�# �A�== -+A�== -2T\�1̂ f[\Va ÛV�6Ŵ��Ugd/df̂�Tl��T\em �#�

��$�KD��=�"�#

�I ���!#;�H

��n��05�/�2���o�11�5���6����0�

H

��E���>�I��=�!C>�KCC�

C�# ���E !#>�K��@��#���E �H ����!=�I D��B>.#����.

D �>�L�����!�:�!#���>�� !#�.�C!�!C>�%��$$� �:�!#���>���E !#�<��B�!C>�M�C@#�!C>�%��$$� �.�C!���>�H #��!�!C�����>H

PLEASE ATTACH

PROPOSAL GUARANTY HERE

Effective with November 2007 Letting Proposal Requirements

PROPOSAL REQUIREMENTS AND CONDITIONS

The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.

If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.

The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.

The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;

otherwise to be returned.

The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.

The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.

The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.

The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.

The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.

Effective with November 2007 Letting Proposal Requirements

The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.

In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.

The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.

If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.

Effective with August 2015 Letting Bid Preparation

BID PREPARATION

Preparing the Proposal Schedule of Items A. General

(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:

1. Electronic bid on the internet.

2. Electronic bid on a printout with accompanying diskette or CD ROM.

3. Paper bid under a waiver of the electronic submittal requirements.

(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.

(3) The department will provide bidding information through the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.

(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:

Info Tech Inc.

5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com

(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.

(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.

(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com

B. Submitting Electronic Bids B.1 On the Internet

(1) Do the following before submitting the bid:

4. Have a properly executed annual bid bond on file with the department.

5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.

(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:

1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.

2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.

3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid

4. Submit the bid before the hour and date the Notice to Contractors designates

5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.

(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.

B.2 On a Printout with Accompanying Diskette or CD ROM

(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:

https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx

Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.

(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:

Bidder Name

BN00

Proposals: 1, 12, 14, & 22

(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.

(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.

(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.

2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.

3. The diskette or CD ROM is not submitted at the time and place the department designates.

B Waiver of Electronic Submittal

(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.

(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.

The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."

(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:

1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.

2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.

3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.

(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.

PROPOSAL BID BOND Wisconsin Department of Transportation

DT1303 1/2006

Proposal Number Project Number Letting Date

Name of Principal

Name of Surety State in Which Surety is Organized

We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.

If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.

The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.

IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)

PRINCIPAL

(Company Name) (Affix Corporate Seal)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

(Company Name)

(Signature and Title)

NOTARY FOR PRINCIPAL

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

(Name of Surety) (Affix Seal)

(Signature of Attorney-in-Fact)

NOTARY FOR SURETY

(Date)

State of Wisconsin ) ) ss.

County )

On the above date, this instrument was acknowledged before me by the named person(s).

(Signature, Notary Public, State of Wisconsin)

(Print or Type Name, Notary Public, State of Wisconsin)

(Date Commission Expires)

Notary Seal

IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.

CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation

DT1305 8/2003

Time Period Valid (From/To)

Name of Surety

Name of Contractor

Certificate Holder Wisconsin Department of Transportation

This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.

This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.

Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.

(Signature of Authorized Contractor Representative) (Date)

Effective with March 2010 Letting

LIST OF SUBCONTRACTORS

Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.

No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.

Name of Subcontractor Class of Work Estimated Value

Effective with December 2000 Letting Debarment Certification

CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER

RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS

Instructions for Certification

1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.

2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.

3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.

4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.

6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.

7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).

Effective with December 2000 Letting Debarment Certification

9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.

Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions

1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:

(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;

(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;

(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and

(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.

5993-01-77 1 of 52

Special Provisions Table of Contents

Article Description Page #

1. General

2. Scope of Work

3. Prosecution and Progress

5. Holiday and Special Event Work Restrictions

6. Utilities

7. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit

8. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm

Water Discharges

9. Environmental Protection, Aquatic Exotic Species Control

10. Erosion Control Structures

11. Notice to Contractor, Contamination Beyond Construction Limits

12. Notice to Contractor, Notification of Demolition and/or Renovation No Asbestos Found

13. Notice to Contractor – Creosote Lumber

14. Notice to Contractor – Parcel 2 Tree Clearing Coordination

15. Notice to Contractor – Parcel 2 Trailhead Construction

16. Construction Over or Adjacent to Navigable Waters

17. Coordination with Businesses and Residents

18. General Provisions for Storm Sewer

19. Removing Commercial Business Sign, Item 204.9060.S.01

20. Removing Gate, Item 204.9060.S.02

21. Excavation, Hauling, and Disposal of Potential Creosote Contaminated Soil, Item 205.0508.S

22. Abutment Construction

23. Bar Steel Reinforcement HS Stainless Structures, Item 505.0800.S

24. Concrete Staining B-13-0905, Item 517.1010.S.01; Concrete Staining R-13-400, Item

517.1010.S.02; Concrete Staining R-13-401, Item 517.S.03

25. Architectural Surface Treatment B-13-0905, Item 517.1050.S.01

26. Landscape Planting Surveillance and Care Cycles

27. Removing Signs Type II

28. Temporary Audible Message Devices, Item 644.1900.S

29. Lamp, Ballast, LED, Switch Disposal by Contractor, Item 659.5000.S

30. Installing and Maintaining Bird Deterrent System Station 104+95 EB, Item 999.2000.S

31. Outlet Boxes 4x4x6-Inch, Item SPV.0060.01

32. Remove Traffic Signals CTH M & Branch Street, Item SPV.0060.02

35. Emergency Vehicle Preemption System CTH M & Branch Street, Item SPV.0060.05

36. Utility Line Opening (ULO), Item SPV.0060.06

37. Luminaire Utility City of Middleton, Item SPV.0060.07

38. Salvage Bike Racks, Item SPV.0060.08

5993-01-77 2 of 52

39. Precast Sign Post Base, Item SPV.0060.09

40. Storm Sewer Tap, Item SPV.0060.10

41. Fence Chain Link Polymer-Coated 4-Ft R-13-400, Item SPV.0090.01; Fence Chain Link Polymer-

Coated 4-Ft R-13-401, Item SPV.0090.02

42. Sign Post, Item SPV.0090.03; Reflective Sign Post, Item SPV.0090.04

43. Relocate Wood Fence, Item SPV.0090.05

44. Pipe Underdrain (6-inch) with Geotextile Fabric and Aggregate, Item SPV.0090.06

45. Wall Modular Block Gravity R-13-400, Item SPV.0165.01; Wall Modular Block Gravity R-13-401, Item SPV.0165.02

5993-01-77 3 of 52

STSP’S Revised July 1, 2026

SPECIAL PROVISIONS

1. General.

Perform the work under this construction contract for the following projects:

5993-01-77 City of Middleton, CTH M Pheasant Br Creek Bridge B-13-0905

CTH M

Dane County

Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.

If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.

100-005 (20260701)

2. Scope of Work.

The work under this contract consists of grading, base aggregate dense, select crushed material, HMA pavement, concrete sidewalk, removal of structure B-13-046, erosion control items, storm sewer items, finishing items, traffic signal removal, traffic signal items, structure B-13-0905, R-13-400, R-13-401 and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.

104-005 (20090901)

3. Prosecution and Progress.

Begin work within 10 calendar days after the engineer issues a written notice to do so.

Notice to proceed will not be issued prior to March 15, 2027.

Provide the start date to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Upon approval, the engineer will issue the notice to proceed within ten calendar days before the approved start date.

To revise the start date, submit a written request to the engineer at least two weeks before the intended start date. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.

The contract time for completion is based on an expedited work schedule and may require extraordinary forces and equipment.

Interim Completion and Liquidated Damages – CTH M Closure: 132 Calendar Days At the beginning of Stage 1, close CTH M to through traffic for a maximum of 132 calendar days. Do not reopen until completing the following work: CTH M HMA Pavement, Concrete Curb and Gutter, Concrete Approach Slab, B-13-905, Excavation, Base Aggregate, Storm Sewer.

If the contractor fails to complete the work necessary to reopen CTH M to traffic within 132 calendar days, the department will assess the contractor $4,000 in interim liquidated damages for each calendar day the contract work remains incomplete beyond 132 calendar days. An entire calendar day will be charged for any period of time within a calendar day that the road remains closed beyond 12:01 AM.

If contract time expires prior to completing all work specified in the contract, additional liquidated damages will be affixed according to standard spec 108.11.

5993-01-77 4 of 52

Interim Completion and Liquidated Damages – Branch Street Closure: 31 Calendar Days At the beginning of Stage 2, close Branch Street to through traffic for a maximum of 31 calendar days. Do not reopen until completing the following work: HMA Pavement, Concrete Curb and Gutter, Excavation, Base Aggregate, Storm Sewer, Traffic Signal installation.

If the contractor fails to complete the work necessary to reopen Branch Street to traffic within 31 calendar days, the department will assess the contractor $2,500 in interim liquidated damages for each calendar day the contract work remains incomplete beyond 31 calendar days. An entire calendar day will be charged for any period of time within a calendar day that the road remains closed beyond 12:01 AM.

If contract time expires prior to completing all work specified in the contract, additional liquidated damages will be affixed according to standard spec 108.11.

Migratory Birds Swallow or other migratory bird nests have been observed on or under the existing structure(s) listed below. All active nests (when eggs or young are present) of migratory birds are protected from purposeful take under the federal Migratory Bird Treaty Act. The nesting season for swallows and other birds is from April 15 to August 31.

Either prevent active nests from becoming established or prevent birds from nesting by installing and/or maintaining one suitable deterrent device on the following structure(s) prior to nesting season under the bid item Installing and Maintaining Bird Deterrent System:

• B-13-046

Fish Spawning There shall be no instream disturbance of Pheasant Branch Creek at Station 104+99 EB as a result of construction activity under or for this contract, from March 1 to June 15 both dates inclusive, in order to avoid adverse impacts upon the spawning of and migration of fish and other aquatic organisms.

Any change to this limitation will require submitting a written request by the contractor to the engineer, subsequent review and concurrence by the Department of Natural Resources in the request, and final approval by the engineer. The approval will include all conditions to the request as mutually agreed upon by WisDOT and DNR.

Protection of Endangered Bats Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges, culverts, and other structures. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work, and notify the engineer and the WisDOT Regional Environmental Coordinator

(REC).

Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.

Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.

Tree Clearing/Trimming:

To avoid adverse impacts upon protected bats, do not perform tree clearing/trimming between June 1 and August 15, both dates inclusive. If the required tree clearing/trimming is not completed by May 31, the department will suspend all tree clearing/trimming and associated work directly impacted by clearing/trimming. Tree clearing/trimming is limited to that which is specified in the plans. Contractor means and methods to remove additional trees/branches will not be allowed. If it is determined that additional trees with a 3-inch or greater diameter at breast height (dbh), or branches of any size on those sized trees, need to be removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.

Due to potential for erosion, do not perform grubbing operations at the time of tree clearing unless grading activities will commence in those areas immediately following the tree clearing, or as otherwise

5993-01-77 5 of 52 approved by the engineer. Provide information for the grubbing and grading activities, including the schedule of operations, in the Erosion Control Implementation Plan (ECIP).

Submit a schedule and description of clearing operations with the ECIP 14 days prior to any clearing operations. The department will determine, based on schedule and scope of work, what additional erosion control measures shall be implemented prior to the start of clearing operations, and list those additional measures in the ECIP.

Branch trimming is incidental to other work if no other tree clearing work is necessary.

4. Traffic.

Stage 1 Two weeks prior to road closure, notify City of Middleton to install the pedestrian detour. Close and detour CTH M west of Branch Street. Maintain a single lane of traffic in each direction from the east leg of CTH M to Branch Street. Maintain stop control at the intersection.

Stage 1a Close the existing outside eastbound travel lane on CTH M and northbound right turn lane on Branch Street. Maintain bidirectional traffic on existing westbound lanes east of Branch Street and on Branch Street.

Install temporary pedestrian routing prior to closing sidewalk on the south side of CTH M. Maintain pedestrian access through the work zone on the west side of Branch Street and north side of CTH M through Stage 1a. No access to CTH M from the trail south of the roadway within the project limits.

Stage 1b Maintain a single lane of traffic in each direction from the east leg of CTH M to Branch Street by shifting traffic to the south side of CTH M onto temporary asphalt placed in Stage 1a and existing eastbound lanes. Maintain stop control at the intersection.

Maintain pedestrian access on both sides of Branch Street and the south side of CTH M east of Branch Street. No access to CTH M from the trails both north and south of the roadway within the project limits.

Complete installation of storm sewer Structures 17, 17A, 18, and 22 under flagging operations between 9 AM and 3 PM, see plans for additional information.

Stage 2 Close and detour Branch Street. Maintain a single lane of through traffic in each direction of CTH M by shifting traffic to the proposed westbound lanes installed in Stage 1b. Provide stop control through the intersection at the pedestrian crossing.

Maintain pedestrian access on the north side of CTH M through the project limits and on the south side of CTH M, west of B-13-0905 and east of Branch Street. Maintain pedestrian access on the sidewalk on the east side of Branch Street with a temporary pedestrian crossing provided on the east side of the intersection.

Access Alternate parking areas for businesses and residences along the project are very limited.

Maintain local vehicular access to driveways and side streets at all times during the construction period, unless otherwise defined in this article. Maintain and keep open the access to all commercial driveways and parking lots where alternative access is not available at all times by closing one driveway at a time, building half the driveway at a time and/or plating concrete work. A commercial driveway is any driveway that serves any business or provides access to 4 or more parking spaces. Plating of concrete work, as directed by the engineer, is incidental to the item that is being plated.

If access needs to be eliminated or restricted due to construction operations, notify the Engineer and property owner and occupant of the property at least 2 days (48 hours) prior to closing or restricting access to driveway. Schedule and conduct construction operations in such a manner so as not to deny access to driveways for a period longer than 3 calendar days.

Provide emergency vehicles with adequate access to all properties along the project at all times.

5993-01-77 6 of 52

If the contractor coordinates the closure of any access to a business or private property with the owner(s), provide written documentation of coordination with the owner(s) to the engineer, prior to the start of work regarding the access closure.

Pedestrian Access Maintain pedestrian access, including access to all businesses and residences at all times, in accordance with current Americans with Disabilities Act Accessibility Guidelines (ADAAG), within the project limits by means of existing sidewalk, Temporary Pedestrian Surface bid items, Temporary Pedestrian Curb Ramp bid item, or new sidewalk at a minimum width of 4 feet. Preserve the existing sidewalk as long as practicable to maintain pedestrian access. Provide temporary pedestrian access as detailed in the plans and as directed by the engineer. Place Temporary Pedestrian Barricade as shown in the plans and as directed by the engineer. When required as shown in the plans, close sidewalks according to the standard detail drawing “Traffic Control, Pedestrian Accommodation.”

Maintain pedestrian access to Stagecoach Trail Apartments and Beaver Creek Apartments doors facing CTH M unless active work operations are ongoing adjacent to the property. If pedestrian access needs to be eliminated or restricted to these entrances due to construction operations, notify engineer, property owner and occupants of the property at least 2 days (48 hours) prior to closing or restricting access.

Maintain pedestrian access to Stagecoach Trails Apartments parking lot via the existing driveway at all times.

Advance Notification Notify City of Middleton Police, EMS and Fire Department, Metro Transit, and the Middleton-Cross Plains School District at least 7 days in advance of all closures or staging switches.

Place Portable Changeable Message Signs (PCMS) at the locations shown in the plan at least 7 days prior to and during construction. See plans for department approved messages to be displayed on each

PCMS.

Coordinate with:

• Metro Transit and the City of Middleton to maintain bus route accessibility throughout construction. Contacts for Metro Transit are Tim Sobota, (608) 261-4289 and Mike Cechvala,

(608) 261-9283.

• United States Postal Services for mail delivery.

• Pellitteri Waste Systems to maintain refuse and recycling pick-up. Contact Pellitteri at (608) 257-

Wisconsin Lane Closure System Advance Notification Prior to starting work, provide closure information to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).

Discuss LCS completion dates and provide changes in the schedule to the engineer at project meetings in order to manage closures nearing their completion date.

5. Holiday and Special Event Work Restrictions.

Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying CTH M or Branch Street traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:

- From noon Friday, May 28, 2027 to 6:00 AM Tuesday, June 1, 2027 Memorial Day;

- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027 Independence Day;

- From noon Friday, August 27, 2027 to 6:00 AM Tuesday, August 30, 2027 Middleton Good Neighbor Festival;

- From noon Friday, September 3, 2027 to 6:00 AM Tuesday, September 7, 2027 Labor Day.

- From noon Wednesday, November 24, 2027 to 6:00 AM Monday, November 29, 2027 Thanksgiving Day.

stp-107-005 (20210113)

5993-01-77 7 of 52

6. Utilities.

This contract does not come under the provision of Administrative Rule Trans 220.

The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process or from the project engineer after the contract has been awarded and executed.

Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow-up with a confirmation notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.

stp-107-066 (20240703)

Any utility facility locations (stations, offsets, elevations, depths) listed in this article are approximate.

Charter Communications (Communication) Charter has overhead communication lines that run on the north side of CTH M on MG&E poles located in the existing terrace from the west project limits to the northwest quadrant of the Branch Street intersection with crossings at Station 102+45 EX and at the Branch Street intersection. The overhead communication lines cross CTH M from the northwest to the southeast corner of the Branch Street intersection and continue south on the east side of Branch Street and east on CTH M on MG&E poles located behind the existing sidewalk until the project limits.

Underground communication lines run on both sides of CTH M from Station 102+30 EX to Station 103+60 EX with a crossing at Station 103+60 EX and extend north, perpendicular to the roadway. An underground communication line also runs from the pole in the southeast corner of the CTH M and Branch Street intersection west across Branch Street to provide service to the property in the southwest corner of the intersection.

Prior to construction, Charter plans to relocate their facilities. Overhead utilities will be removed and relocated underground in a new 4-inch duct between the existing MG&E pole at Station 102+50 EB LT and continue east to the proposed joint trench at Station 103+25 EB LT. New 2-inch duct will be buried between a proposed vault located at Station 103+25 EB RT, outside of the proposed sidewalk, and the joint utility trench starting at Station 103+25 EB, 30’ RT. From Station 103+25 EB, 30’ RT, new 4-inch duct will be installed running north perpendicular to the roadway into the City of Middleton trailhead parcel, then continue east under the proposed retaining wall R-13-401, proposed trail and Pheasant Branch Creek into the Pheasant Branch Conservancy. The relocated communication facilities will continue east past the entrance into Pheasant Branch Conservancy before turning south and entering into the project limits perpendicular to CTH M at approximately Station 106+95 EB LT and into the proposed westbound CTH M travel lanes. The communication facilities will then turn east under the westbound travel lanes until Station 107+60 EB where 4-inch duct will continue in 2 directions. One branch will continue east in the joint trench to Station 110+75 EB before crossing under the roadway to connect to overhead facilities on the proposed MG&E pole at Station 110+75 EB RT. The other branch will continue south from Station 107+60 EB to an offset of approximately 36’ RT before turning west and south under the proposed sidewalk to the proposed MG&E pole at Station 11+40 B RT and connect with existing overhead facilities.

A new vault will be installed at 12+60 B RT adjacent to the proposed joint trench and new 2-inch duct will be buried to connect the proposed vault at Station 12+60 B RT and the proposed vault at Station 12+60 B LT.

The existing vault at Station 12+61 B LT will be relocated to Station 12+60 B LT in the proposed sidewalk.

New 2-inch duct will be buried to connect this relocated vault to the proposed vault at Station 105+92 EB RT.

This duct will be buried approximately 9 feet below grade in the area of the proposed storm sewer and signal bases. The existing vault at Station 105+75 EB RT will be relocated to Station 105+92 EB RT in the proposed terrace.

The existing empty 2-inch ducts crossing CTH M at approximately Station 103+50 EB and crossing Branch Street at Station 12+61 B will be discontinued and left-in-place, as well as the empty 2-inch duct between Station 12+61 B LT and Station 105+75 EB RT.

City of Middleton (Sanitary Sewer) City of Middleton underground sewer runs on the south side of CTH M from the west project limits to the east project limits. There are manholes at Station 104+50 EX where it extends south under the existing trail, Station 106+74 EX where it extends down the center of Branch Street, and Stations 108+99 EX and

5993-01-77 8 of 52

111+14 EX. There is an additional sanitary sewer crossing of Pheasant Branch Creek north of the roadway 40 feet north of the existing edge of roadway.

Prior to construction, City of Middleton plans to install new 18 and 21-inch diameter underground sanitary sewer, connecting the line from under the existing trail at Stations 11+40 TU LT to 104+10 EB, 29’ RT and install new sanitary manholes at Stations 11+40 TU LT, 104+10 EB, 29’ RT, 104+40 EB, 62’ LT and 105+75 EB, 26’ RT in the proposed terrace. They will install new 21-inch sanitary sewer between the new manhole at 104+05 EB to the existing manhole at Station 104+42 EB, 67’ LT, and reconstruct the existing manhole at the proposed elevation. Existing sanitary between Stations 104+10 EB RT and 105+75 EB RT and between the new manhole at Station 11+40 TU LT and Station 104+50 EB, 31’ RT will be discontinued after the road crossing is completed at the beginning of Stage 1.

Notify City of Middleton contractor 30 days prior to Stage 1 CTH M road closure so that they can complete the road crossing between Stations 104+10 EB RT and 104+10 EB LT under the closure. Work is anticipated to take up to 7 working days to complete.

Notify the City of Middleton prior to traffic shift for Stage 1a so they can complete work in the southeast quadrant of CTH M and Branch Street. Work includes adjusting the manhole at Station 109+00 EB 17’ RT.

Work is anticipated to take 1 working day to complete.

Notify the City of Middleton prior to traffic shift for Stage 2 so they can adjust the manhole at Station 109+00 EB, 17’ RT and Station 106+75 EB, 27’ RT. Work is anticipated to take 1 working day to complete.

City of Middleton (Water) City of Middleton underground water lines run under the roadway pavement on the north side of CTH M from the west side project limits to Station 104+10 EX where it crosses CTH M and continues on the south side of CTH M, primarily under the…