20261013012proposal.pdf
PDF 3 MB Posted
- Attached to
- Asphalt Improvements
- Solicitation number
- 20261013012
- Issued by
- Calumet County, Wisconsin
About this file
This is a proposal document and bidding instructions issued by the Wisconsin Department of Transportation for construction contract 4085-66-71, involving improvements to State Highway 32 in the Chilton-Hilbert area of Calumet County. The project consists of removing asphaltic surface milling, HMA pavement, culvert replacements, guardrail replacements, curb ramp replacements, pavement marking, and associated incidental work as shown on project plans and specifications. Contractors must submit proposals using electronic bidding through the Bid Express system or request a waiver for paper submission with an accompanying $75 administrative fee. Proposals must be received by 11:45 AM on the last business day preceding the letting. Contractors awarded the contract must begin work within 10 calendar days of written notification and must complete all work during the 2027 construction season. The contract requires submission of a proposed schedule within one month of contract execution and at least 14 days before the preconstruction conference. Specific work restrictions include prohibition of flagging operations between 3:00 PM and 5:00 PM Monday through Friday on STH 32, maintenance of minimum 16-foot travel lanes, and completion of culvert replacements and milling within defined timeframes. Holiday and special event work restrictions apply during Memorial Day, Independence Day, and Labor Day periods in 2027.
The bidder must provide a proposal guaranty in proper form and amount, payable to the State of Wisconsin, to be retained if the contractor fails to execute the contract and performance bond within 14 days of notification. All bidders must have a properly executed annual bid bond on file with the department and a digital ID enabled through Info Tech Inc. for electronic submission. The proposal includes certification requirements regarding debarment, suspension, and non-discrimination in employment compliance with Wisconsin Statutes Section 779.14 and Chapter 102. Contractors must comply with the Standard Specifications for Road and Bridge Construction (2025 Edition), with special provisions addressing traffic control, utility coordination, railroad insurance and coordination with Wisconsin Central Ltd (CN), environmental protections including stormwater management under WPDES permit coverage, archaeological site protection, and HMA pavement quality management procedures requiring test strip volumetric and density testing with specified PWL acceptance thresholds. The work involves coordination with multiple utility companies including Spectrum Mid-America, Bug Tussel Wireless, Village of Hilbert water and sewer departments, and compliance with fish spawning restrictions from March 1 to June 15 on specified stream segments and endangered bat protection measures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!#��$�%��!����#�#��!"%�&�����'�������())(�*��+,-����(�.#�#��/�/0��1 2010�����1 ���304/�10�4���/��5 ������� 4�65/�7�8&9))9,� �:.;�����,��, ;<��#�!9=���
@�.#9.%=���7 .%=��A� ;�� @�B#< ���C!
D�#<#< �@E F
��E �$������D��G$��#< �����E ��C!�# @���H �D�#<�#< @����������I F !#���!@�;�!@�#��!�(���������J ���!#B�I F @���B��� !#��$�%��!����#�#��!K���>���(�� L##� <����������J
���!#B��!��� G��$�#<����LJM(?�@�.
�+N� ���%�� -�O #�� ���A>����)��������;�!#�� #�;���� 7&����G�!C�"�B�L���C!
@�"���@E�!#�C ���M!# �J��� �P Q���� �� >�L@@� ��>�;�#B>�.#�# >�R���;�@ S �����E ���C<#(%<�� ���C!
�B�D��!>���!� #<���T !#�#�E @���E U#<�##< S���!
��B�� ���!�>=�C<D�B���G��������>�!@����@@ G ���##�!C#<��������������@U�!@#<�##< ����C ����B
�<�E #�B���!@�� #�B> @�!#��!B�C�
@�!�!B ��� �D�� #�G !�!B� #��!�!�
#�#�E ��@@�!C�! �!!
#��!D�#<#<��������������@(1V�WVX�YZ[W\�WVX]̂Z_̀\�V̂�YabcZX�XdZY��Z[de]f��V̂g��̂VhVY]i�ed̀W�YabcZXXZW[�]W�̀ìjX̂VWZj�bZk�VW�Xd̀��WX̀ Ŵ̀Xl.
@��!@��D��!�#��� �mmmmmmmmmmmmmmm+.�C!�# >� �#��B�� ��$���� �!��!-+���!#����%B�
| � | �� |
| >� | �#��B�� |
�;��������!�MS���
��.�C!�# -+���!#����%B� -2V̂�1̀ h]̂Xc ẀX�6Ỳ��Wif/fh̀�Vn��V̂go �#�
��$�LD��@�"�#
�J ���!#B�I @ �#��B�.
��p��05�/�2���q�11�5���6����0�
I ��E���>�r����!C>�J��@�!C>�LCC� C�# ���E !#>�L��<��#���E �E ����!@�J D��G>?
���J ��@>�M�����!�;�!#���>�� !#�.�C!�!C>�%��$$� �;�!#���>���E !#�r��G�!C>�I
PLEASE ATTACH
PROPOSAL GUARANTY HERE
Effective with November 2007 Letting Proposal Requirements
PROPOSAL REQUIREMENTS AND CONDITIONS
The bidder, signing and submitting this proposal, agrees and declares as a condition thereof, to be bound by the following conditions and requirements.
If the bidder has a corporate relationship with the proposal design engineering company, the bidder declares that it did not obtain any facts, data, or other information related to this proposal from the design engineering company that was not available to all bidders.
The bidder declares that they have carefully examined the site of, and the proposal, plans, specifications and contract forms for the work contemplated, and it is assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the specifications, special provisions and contract. It is mutually agreed that submission of a proposal shall be considered conclusive evidence that the bidder has made such examination.
The bidder submits herewith a proposal guaranty in proper form and amount payable to the party as designated in the advertisement inviting proposals, to be retained by and become the property of the owner of the work in the event the undersigned shall fail to execute the contract and contract bond and return the same to the office of the engineer within fourteen (14) days after having been notified in writing to do so;
otherwise to be returned.
The bidder declares that they understand that the estimate of quantities in the attached schedule is approximate only and that the attached quantities may be greater or less in accordance with the specifications.
The bidder agrees to perform the said work, for and in consideration of the payment of the amount becoming due on account of work performed, according to the unit prices bid in the following schedule, and to accept such amounts in full payment of said work.
The bidder declares that all of the said work will be performed at their own proper cost and expense, that they will furnish all necessary materials, labor, tools, machinery, apparatus, and other means of construction in the manner provided in the applicable specifications and the approved plans for the work together with all standard and special designs that may be designed on such plans, and the special provisions in the contract of which this proposal will become a part, if and when accepted. The bidder further agrees that the applicable specifications and all plans and working drawings are made a part hereof, as fully and completely as if attached hereto.
The bidder, if awarded the contract, agrees to begin the work not later than ten (10) days after the date of written notification from the engineer to do so, unless otherwise stipulated in the special provisions.
The bidder declares that if they are awarded the contract, they will execute the contract agreement and begin and complete the work within the time named herein, and they will file a good and sufficient surety bond for the amount of the contract for performance and also for the full amount of the contract for payment.
Effective with November 2007 Letting Proposal Requirements
The bidder, if awarded the contract, shall pay all claims as required by Section 779.14, Statutes of Wisconsin, and shall be subject to and discharge all liabilities for injuries pursuant to Chapter 102 of the Statutes of Wisconsin, and all acts amendatory thereto. They shall further be responsible for any damages to property or injury to persons occurring through their own negligence or that of their employees or agents, incident to the performance of work under this contract, pursuant to the Standard Specifications for Road and Bridge Construction applicable to this contract.
In connection with the performance of work under this contract, the contractor agrees to comply with all applicable state and federal statutes relating to non-discrimination in employment. No otherwise qualified person shall be excluded from employment or otherwise be subject to discrimination in employment in any manner on the basis of age, race, religion, color, gender, national origin or ancestry, disability, arrest or conviction record (in keeping with s.111.32), sexual orientation, marital status, membership in the military reserve, honesty testing, genetic testing, and outside use of lawful products. This provision shall include, but not be limited to the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The contractor further agrees to ensure equal opportunity in employment to all applicants and employees and to take affirmative action to attain a representative workforce.
The contractor agrees to post notices and posters setting forth the provisions of the nondiscrimination clause, in a conspicuous and easily accessible place, available for employees and applicants for employment.
If a state public official (section 19.42, Stats.) or an organization in which a state public official holds at least a 10% interest is a party to this agreement, this contract is voidable by the state unless appropriate disclosure is made to the State of Wisconsin Ethics Board.
Effective with August 2015 Letting Bid Preparation
BID PREPARATION
Preparing the Proposal Schedule of Items A. General
(1) Obtain bidding proposals as specified in section 102 of the standard specifications prior to 11:45 AM of the last business day preceding the letting. Submit bidding proposals using one of the following methods:
1. Electronic bid on the internet.
2. Electronic bid on a printout with accompanying diskette or CD ROM.
3. Paper bid under a waiver of the electronic submittal requirements.
(2) Bids submitted on a printout with accompanying diskette or CD ROM or paper bids submitted under a waiver of the electronic submittal requirements govern over bids submitted on the internet.
(3) The department will provide bidding information through the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
The contractor is responsible for reviewing this web site for general notices as well as information regarding proposals in each letting. The department will also post special notices of all addenda to each proposal through this web site no later than 4:00 PM local time on the Thursday before the letting. Check the department’s web site after 5:00 PM local time on the Thursday before the letting to ensure all addenda have been accounted for before preparing the bid. When bidding using methods 1 and 2 above, check the Bid ExpressΤΜ on-line bidding exchange at http://www.bidx.com/ after 5:00 PM local time on the Thursday before the letting to ensure that the latest schedule of items Expedite file (*.ebs or *.00x) is used to submit the final bid.
(4) Interested parties can subscribe to the Bid ExpressΤΜ on-line bidding exchange by following the instructions provided at the www.bidx.com web site or by contacting:
Info Tech Inc.
5700 SW 34th Street, Suite 1235 Gainesville, FL 32608-5371 email: mailto:customer.support@bidx.com
(5) The department will address equipment and process failures, if the bidder can demonstrate that those failures were beyond their control.
(6) Contractors are responsible for checking on the issuance of addenda and for obtaining the addenda. Notice of issuance of addenda is posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx or by calling the department at (608) 266-1631. Addenda can ONLY be obtained from the department’s web site listed above or by picking up the addenda at the Bureau of Highway Construction, 4th floor, 4822 Madison Yards Way, Madison, WI, during regular business hours.
(7) Addenda posted after 5:00 PM on the Thursday before the letting will be emailed to the eligible bidders for that proposal. All eligible bidders shall acknowledge receipt of the addenda whether they are bidding on the proposal or not. Not acknowledging receipt may jeopardize the awarding of the project.
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx http://www.bidx.com/ http://www.bidx.com/ mailto:customer.support@bidx.com
B. Submitting Electronic Bids B.1 On the Internet
(1) Do the following before submitting the bid:
4. Have a properly executed annual bid bond on file with the department.
5. Have a digital ID on file with and enabled by Info Tech Inc. Using this digital ID will constitute the bidder's signature for proper execution of the bidding proposal.
(2) In lieu of preparing, delivering, and submitting the proposal as specified in 102.6 and 102.9 of the standard specifications, submit the proposal on the internet as follows:
1. Download the latest schedule of items reflecting all addenda from the Bid ExpressΤΜ web site.
2. Use ExpediteΤΜ software to enter a unit price for every item in the schedule of items.
3. Submit the bid according to the requirements of ExpediteΤΜ software and the Bid ExpressΤΜ web site. Do not submit a bid on a printout with accompanying diskette or CD ROM or a paper bid. If the bidder does submit a bid on a printout with accompanying diskette or a paper bid in addition to the internet submittal, the department will disregard the internet bid
4. Submit the bid before the hour and date the Notice to Contractors designates
5. Do not sign, notarize, and return the bidding proposal described in 102.2 of the standard specifications.
(3) The department will not consider the bid accepted until the hour and date the Notice to Contractors designates.
B.2 On a Printout with Accompanying Diskette or CD ROM
(1) Download the latest schedule of items from the Wisconsin pages of the Bid Express web site reflecting the latest addenda posted on the department’s web site at:
https://wisconsindot.gov/Pages/doing-bus/contractors/hcci/bid-let.aspx
Use ExpediteΤΜ software to prepare and print the schedule of items. Provide a valid amount for all price fields. Follow instructions and review the help screens provided on the Bid ExpressΤΜ web site to assure that the schedule of items is prepared properly.
(2) Staple an 8 1/2 by 11 inch printout of the Expedite generated schedule of items to the other proposal documents submitted to the department as a part of the bidder's sealed bid. As a separate submittal, not in the sealed bid envelop but due at the same time and place as the sealed bid, also provide the ExpediteΤΜ generated schedule of items on a 3 1/2 inch computer diskette or CD ROM. Label each diskette or CD ROM with the bidder's name, the 4 character department-assigned bidder identification code from the top of the bidding proposal, and a list of the proposal numbers included on that diskette or CD ROM as indicated in the following example:
Bidder Name
BN00
Proposals: 1, 12, 14, & 22
(3) If bidding on more than one proposal in the letting, the bidder may include all proposals for that letting on one diskette or CD ROM. Include only submitted proposals with no incomplete or other files on the diskette or CD ROM.
(4) The bidder-submitted printout of the Expedite generated schedule of items is the governing contract document and must conform to the requirements of section 102 of the standard specifications. If a printout needs to be altered, cross out the printed information with ink or typewriter and enter the new information and initial it in ink. If there is a discrepancy between the printout and the diskette or CD ROM, the department will analyze the bid using the printout information.
(5) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The check code printed on the bottom of the printout of the ExpediteΤΜ generated schedule of items is not the same on each page.
2. The check code printed on the printout of the ExpediteΤΜ generated schedule of items is not the same as the check code for that proposal provided on the diskette or CD ROM.
3. The diskette or CD ROM is not submitted at the time and place the department designates.
B Waiver of Electronic Submittal
(1) The bidder may request a waiver of the electronic submittal requirements. Submit a written request for a waiver in lieu of bids submitted on the internet or on a printout with accompanying diskette or CD ROM. Use the waiver that was included with the paper bid document sent to the bidder or type up a waiver on the bidder’s letterhead. The department will waive the electronic submittal requirements for a bidding entity (individual, partnership, joint venture, corporation, or limited liability company) for up to 4 individual proposals in a calendar year. The department may allow additional waivers for equipment malfunctions.
(2) Submit a schedule of items on paper conforming to section 102 of the standard specifications.
The department charges the bidder a $75 administrative fee per proposal, payable at the time and place the department designates for receiving bids, to cover the costs of data entry. The department will accept a check or money order payable to: "Wisconsin, Dept. of Transportation."
(3) In addition to the reasons specified in section 102 of the standard specifications, proposals are irregular and the department may reject them for one or more of the following:
1. The bidder fails to provide the written request for waiver of the electronic submittal requirements.
2. The bidder fails to pay the $75 administrative fee before the time the department designates for the opening of bids unless the bidder requests on the waiver that they be billed for the $75.
3. The bidder exceeds 4 waivers of electronic submittal requirements within a calendar year.
(4) In addition to the reasons specified in section 102 of the standard specifications, the department may refuse to issue bidding proposals for future contracts to a bidding entity that owes the department administrative fees for a waiver of electronic submittal requirements.
PROPOSAL BID BOND Wisconsin Department of Transportation
DT1303 1/2006
Proposal Number Project Number Letting Date
Name of Principal
Name of Surety State in Which Surety is Organized
We, the above-named Principal and the above-named Surety, are held and firmly bound unto the State of Wisconsin in the sum equal to the Proposal Guaranty for the total bid submitted for the payment to be made; we jointly and severally bind ourselves, our heirs, executors, administrators, successors and assigns. The condition of this obligation is that the Principal has submitted a bid proposal to the State of Wisconsin acting through the Department of Transportation for the improvement designated by the Proposal Number and Letting Date indicated above.
If the Principal is awarded the contract and, within the time and manner required by law after the prescribed forms are presented for signature, enters into a written contract in accordance with the bid, and files the bond with the Department of Transportation to guarantee faithful performance and payment for labor and materials, as required by law, or if the Department of Transportation shall reject all bids for the work described, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.
In the event of failure of the Principal to enter into the contract or give the specified bond, the Principal shall pay to the Department of Transportation within 10 business days of demand a total equal to the Proposal Guaranty as liquidated damages; the liability of the Surety continues for the full amount of the obligation as stated until the obligation is paid in full.
The Surety, for value received, agrees that the obligations of it and its bond shall not be impaired or affected by any extension of time within which the Department of Transportation may accept the bid; and the Surety does waive notice of any such extension.
IN WITNESS, the Principal and Surety have agreed and have signed by their proper officers and have caused their corporate seals to be affixed this date: (DATE MUST BE ENTERED)
PRINCIPAL
(Company Name) (Affix Corporate Seal)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
(Company Name)
(Signature and Title)
NOTARY FOR PRINCIPAL
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
(Name of Surety) (Affix Seal)
(Signature of Attorney-in-Fact)
NOTARY FOR SURETY
(Date)
State of Wisconsin ) ) ss.
County )
On the above date, this instrument was acknowledged before me by the named person(s).
(Signature, Notary Public, State of Wisconsin)
(Print or Type Name, Notary Public, State of Wisconsin)
(Date Commission Expires)
Notary Seal
IMPORTANT: A certified copy of Power of Attorney of the signatory agent must be attached to the bid bond.
CERTIFICATE OF ANNUAL BID BOND Wisconsin Department of Transportation
DT1305 8/2003
Time Period Valid (From/To)
Name of Surety
Name of Contractor
Certificate Holder Wisconsin Department of Transportation
This is to certify that an annual bid bond issued by the above-named Surety is currently on file with the Wisconsin Department of Transportation.
This certificate is issued as a matter of information and conveys no rights upon the certificate holder and does not amend, extend or alter the coverage of the annual bid bond.
Cancellation: Should the above policy be cancelled before the expiration date, the issuing surety will give thirty (30) days written notice to the certificate holder indicated above.
(Signature of Authorized Contractor Representative) (Date)
Effective with March 2010 Letting
LIST OF SUBCONTRACTORS
Section 66.0901(7), Wisconsin Statutes, provides that as a part of the proposal, the bidder also shall submit a list of the subcontractors the bidder proposes to contract with and the class of work to be performed by each. In order to qualify for inclusion in the bidder's list a subcontractor shall first submit a bid in writing, to the general contractor at least 48 hours prior to the time of the bid closing. The list may not be added to or altered without the written consent of the municipality. A proposal of a bidder is not invalid if any subcontractor and the class of work to be performed by the subcontractor has been omitted from a proposal; the omission shall be considered inadvertent or the bidder will perform the work personally.
No subcontract, whether listed herein or later proposed, may be entered into without the written consent of the Engineer as provided in Subsection 108.1 of the Standard Specifications.
Name of Subcontractor Class of Work Estimated Value
Effective with December 2000 Letting Debarment Certification
CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER
RESPONSIBILITY MATTERS - PRIMARY COVERED TRANSACTIONS
Instructions for Certification
1. By signing and submitting this proposal, the prospective contractor is providing the certification set out below.
2. The inability of a person to provide the certification required below will not necessarily result in denial of participation in this covered transaction. The prospective contractor shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective contractor to furnish a certification or an explanation shall disqualify such person from participation in this transaction.
3. The certification in this clause is a material representation of fact upon which reliance was placed when the department determined to enter into this transaction. If it is later determined that the contractor knowingly rendered an erroneous certification in addition to other remedies available to the Federal Government the department may terminate this transaction for cause or default.
4. The prospective contractor shall provide immediate written notice to the department to whom this proposal is submitted if at any time the prospective contractor learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.
5. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction," "participant," "person," "primary covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of the rules implementing Executive Order 12549. You may contact the department to which this proposal is being submitted for assistance in obtaining a copy of those regulations.
6. The prospective contractor agrees by submitting this proposal that, should this contract be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department entering into this transaction.
7. The prospective contractor further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," which is included as an addendum to PR- 1273 - "Required Contract Provisions Federal Aid Construction Contracts," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.
8. The contractor may rely upon a certification of a prospective subcontractor/materials supplier that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A contractor may decide the method and frequency by which it determines the eligibility of its principals. Each contractor may, but is not required to, check the Disapproval List (telephone # 608/266/1631).
Effective with December 2000 Letting Debarment Certification
9. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
10. Except for transactions authorized under paragraph 6 of these instructions, if a contractor in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department may terminate this transaction for cause or default.
Certification Regarding Debarment, Suspension, and Other Responsibility Matters - Primary Covered Transactions
1. The prospective contractor certifies to the best of its knowledge and belief, that it and its principals:
(a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency;
(b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property;
(c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offense enumerated in paragraph (1)(b) of this certification; and
(d) Have not within a three-year period preceding this proposal had one or more public transactions (Federal, State or local) terminated for cause or default.
2. Where the prospective contractor is unable to certify to any of the statements in this certification, such prospective contractor shall attach an explanation to this proposal.
4085-66-71 1 of 34
Special Provisions Table of Contents
Article Description Page #
1. General
2. Scope of Work
3. Prosecution and Progress
4. Traffic
5. Holiday and Special Event Work Restrictions
6. Utilities
7. Railroad Insurance and Coordination - Wisconsin Central Ltd (CN)
8. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit
9. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm
Water Discharges
10. Environmental Protection, By-Pass Pumping
11. Environmental Protection, Dewatering
12. Environmental Protection, Aquatic Exotic Species Control
13. Notice to Contractor – Electronic Load Tickets
14. Archaeological Site
15. Coordination for Floodplain Work
16. Removing Apron Endwalls, Item 204.9060.S
17. Temporary Lane Shift During Culvert Work, Item 208.1500.S
18. HMA Percent Within Limits (PWL) Test Strip Volumetrics, Item 460.0105.S; HMA Percent Within
Limits (PWL) Test Strip Density, Item 460.0110.S
19. HMA Pavement Percent Within Limits (PWL) QMP
20. Appendix A
21. HMA Pavement Longitudinal Joint Density
22. Asphaltic Surface
23. Traffic Control
24. Locating No-Passing Zones, Item 648.0100
25. Foundation Backfill, Item SPV.0035.01
26. Adjusting Water Valve Boxes, Item SPV.0060.01
27. Salvage and Reinstall RRFB System, Item SPV.0060.02
28. Salvage and Reset Landscape Rock, Item SPV.0165.01
4085-66-71 2 of 34
STSP’S Revised April 1, 2026
SPECIAL PROVISIONS
1. General.
Perform the work under this construction contract for the following projects:
4085-66-71 Chilton - Hilbert Breed Street – STH 114
STH 32
Calumet County
Perform the work as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, Standard Specifications for Highway and Structure Construction, 2025 Edition, as published by the department, and these special provisions.
If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the department will pay for the work as bid in the US standard system.
100-005 (20260401)
2. Scope of Work.
The work under this contract consists of removing asphaltic surface milling, HMA pavement, culvert replacements, guardrail replacements, curb ramp replacements, pavement marking, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
104-005 (20090901)
3. Prosecution and Progress.
Begin work within 10 calendar days after the engineer issues a written notice to do so.
Provide the time frame for construction of the project within the 2027 construction season to the engineer in writing within a month after executing the contract but at least 14 calendar days before the preconstruction conference. Assure that the time frame is consistent with the contract completion time.
Upon approval, the engineer will issue the notice to proceed within ten calendar days before the beginning of the approved time frame.
To revise the time frame, submit a written request to the engineer at least two weeks before the beginning of the intended time frame. The engineer will approve or deny that request based on the conditions cited in the request and its effect on the department’s scheduled resources.
Culvert Replacements and Schneider Rd Intersection Complete the culvert pipe replacements and full depth repair near Schneider Rd in continuous daily operations until complete. Place aggregate at the same level of the surface layer if left overnight. Place asphaltic surface by the end of each work week.
Milling Do not allow a milled surface open to through traffic to remain in place longer than 96 hours or during the periods included in the holidays and special events restrictions unless adverse weather prevents placement of the asphalt layer and as authorized by the engineer.
Fish Spawning There shall be no instream disturbance of Killsnake River at Station 195+25, and unnamed stream at STA 302+20, an unnamed stream at STA 352+28, and an unnamed stream at STA 387+80 as a result of construction activity under or for this contract, from March 1 to June 15 both dates inclusive, in order to avoid adverse impacts upon the spawning of fish species.
4085-66-71 3 of 34
Any change to this limitation will require submitting a written request by the contractor to the engineer, subsequent review and concurrence by the Department of Natural Resources in the request, and final approval by the engineer. The approval will include all conditions to the request as mutually agreed upon by WisDOT and DNR.
Protection of Endangered Bats Federally protected bats have the potential to inhabit the project limits because they roost in trees, bridges, culverts, and other structures. Roosts may not have been observed on this project, but conditions to support the species exist. The species and all active roosts are protected by the federal Endangered Species Act. If an individual bat or active roost is encountered during construction operations, stop work, and notify the engineer and the WisDOT Regional Environmental Coordinator
(REC).
Ensure all operators, employees, and subcontractors working in areas of known or presumed bat habitat are aware of environmental commitments and avoidance and minimization measures (AMMs) to protect both bats and their habitat.
Direct temporary lighting, if used, away from wooded areas during the bat active season April 15 to October 31, both dates inclusive.
Contractor means and methods to remove trees will not be allowed. If it is determined that trees with a 3-inch or greater diameter at breast height (dbh) need to be removed beyond contractor means and methods, notify the engineer to coordinate with the WisDOT REC to determine if consultation with United States Fish and Wildlife Service (USFWS) is required. The contractor must be aware that the WisDOT REC and/or USFWS may not permit modifications.
4. Traffic.
General Construct STH 32 under traffic.
Maintain a minimum of one travel lane 16-foot wide, except during curb ramp work in Hilbert when a 12-foot (min) width restriction is allowed as shown on plans during work hours. Flagging operations from the beginning project limit to CTH E are not permitted between the hours of 3:00 PM and 5:00 PM, Monday through Friday. During these hours and non-working hours maintain STH 32 with one travel lane in each direction open to traffic.
At structure B-08-0014 (Killsnake River Bridge) do not close both shoulders at the same time. One shoulder closure may remain during non-working hours.
Maintain local and emergency traffic on STH 32 at all times.
Maintain existing lane configurations on side roads when work is not occurring.
Maintain access to all private and commercial entrances on a minimum of a base aggregate surface at all times. Notify the property owners at least seven calendar days prior to impacting driveway access.
Pedestrian Accommodation Construction Staging Temporary pedestrian accommodations do not need to be provided in Chilton. Pedestrians in Hilbert will be accommodated with temporary curb ramps and alternate routes during the curb ramp reconstruction to bypass the work areas. Where no work is taking place, pedestrians will be accommodated on existing sidewalks. The construction stages shown in the plans are intended to complete the curb ramp work while maintaining side road traffic. An alternate staging sequence may be provided to maintain traffic if approved by the department.
1. Stage 1A – Right Side of STH 32. Construct sidewalk, utilities, storm sewer, curb & gutter, and patching on the right side of STH 32. During this stage, at Greve Crt, W Main St, and W Cedar St, construct only the southeast curb ramps to maintain side road traffic during construction.
2. Stage 1B – Right Side of STH 32. Construct sidewalk, utilities, storm sewer, curb & gutter, and patching on the right side of STH 32. During this stage, at Greve Crt, W Main St, and W Cedar St, construct only the northeast curb ramps to maintain side road traffic during construction.
4085-66-71 4 of 34
3. Stage 2A – Left Side of STH 32. Construct sidewalk, utilities, storm sewer, curb & gutter, and patching on the left side of STH 32. During this stage, at W Main St, construct only the southwest curb ramps to maintain side road traffic during construction.
4. Stage 2B – Left Side of STH 32. Construct sidewalk, utilities, storm sewer, curb & gutter, and patching on the left side of STH 32. During this stage, at W Main St, construct only the northwest curb ramps to maintain side road traffic during construction.
Temporary Work Zone Clear Zone Working Restrictions.
Park equipment and store materials, including stockpiles, a minimum of 15-feet from the edge of the traveled way unless protected by concrete barrier temporary precast.
If the contractor is unsure whether an individual work operation will meet the safety requirements for working within the clear zone, review the proposed work operation with the engineer before proceeding with the work.
ner-104-005 (20200227)
Portable Changeable Message Signs (PCMS) After coordinating with department construction field staff, notify the Northeast Region Traffic Section at 920-366-8033 (secondary contact number is 920-360-3107) 3 business days before deploying or changing a message on a PCMS to obtain approval of the proposed message. The Northeast Region Traffic Unit will review the proposed message and either approve the message or make necessary changes. PCMS boards must be deployed 7 days before the closure of STH 32.
ner-643-035 (20171213)
Wisconsin Lane Closure System Advance Notification Provide the following advance notification to the engineer for incorporation into the Wisconsin Lane Closure System (LCS).
TABLE 108-1 CLOSURE TYPE AND REQUIRED MINIMUM ADVANCE NOTIFICATION
Closure type with height, weight, or width restrictions (available width, all lanes in one direction < 16 feet) MINIMUM NOTIFICATION
Lane and shoulder closures 7 calendar days
Full roadway closures 7 calendar days
Ramp closures 7 calendar days
Detours 7 calendar days
Closure type without height, weight, or width restrictions (available width, all lanes in one direction > 16 feet) MINIMUM NOTIFICATION
Shoulder Closures 3 calendar days
Lane closures 3 business days
Ramp closures 3 business days
Modifying all closure types 3 business days
Discuss LCS completion dates and provide changes in the schedule to the engineer at weekly project meetings in order to manage closures nearing their completion date.
5. Holiday and Special Event Work Restrictions.
Do not perform work on, nor haul materials of any kind along or across any portion of the highway carrying STH 32 traffic, and entirely clear the traveled way and shoulders of such portions of the highway of equipment, barricades, signs, lights, and any other material that might impede the free flow of traffic during the following holiday and special event periods:
- From noon Friday, May 28, 2027 to 6:00 AM Tuesday, June 1, 2027 Memorial Day;
- From noon Friday, July 2, 2027 to 6:00 AM Tuesday, July 6, 2027 Independence Day;
- From noon Friday, September 3, 2027 to 6:00 AM Tuesday, September 7, 2027 Labor Day.
4085-66-71 5 of 34 stp-107-005 (20210113)
6. Utilities.
This contract comes under the provision of Administrative Rule Trans 220.
The utility work plan includes additional detailed information regarding the location of known discontinued, relocated, or removed utility facilities. These can be requested from the department during the bid preparation process, or from the project engineer after the contract has been awarded and executed.
Some of the utility work described below is dependent on prior work being performed by the contractor at a specific site. In such situations, provide the engineer and the affected utility a good faith notice of when the utility is to start work at the site. Provide this notice 14 to 16 calendar days in advance of when the prior work will be completed and the site will be available to the utility. Follow-up with a confirmation notice to the engineer and the utility not less than 3 working days before the site will be ready for the utility to begin its work.
stp-107-065 (20240703)
Bug Tussel Wireless, LLC (communication) – The location of the fiber optic line is based on utility-provided construction plans and has not been field verified. Arrange for an observer to be on site during the culvert work at Station 157+21 and Station 457+78 by notifying Bug Tussel Wireless, LLC prior to the culvert work.
Spectrum Mid-America, LLC (communication) has underground fiber optic lines along the left side of STH 32 from Station 405+00 to 407+00.
Spectrum Mid-America, LLC plans to construct new facilities prior to construction on the left side of STH 32 from the beginning of the project to Station 321+00 and from Station 349+00 to Station 421+00, on the right side of STH 32 from Station 321+00 to Station 349+00, and crossing STH 32 at Station 321+00 and 421+00.
Village of Hilbert (sewer) has underground sewer main along STH 32 from Station 460+00 to Station 485+00 and from Station 487+00 to Station 501+75. Adjust the manholes as shown on the plans to match the finished pavement elevation. Perform this work according to the requirements of the Adjusting Manhole Covers bid item. Arrange for an observer to be on site during the sanitary manhole adjustments by notifying the Village of Hilbert prior to adjusting the manholes.
Village of Hilbert (water) has underground water facilities along STH 32 from Station 460+50 to Station 505+00, generally on the right side of the roadway with crossings throughout. Adjust the water valves as shown on the plans to match the finished pavement elevation. Perform this work according to the requirements of the Adjusting Water Valve Boxes bid item. Arrange for an observer to be on site during the water valve box adjustments by notifying the Village of Hilbert prior to adjusting the water valves.
The following utility companies have facilities within the project area; however, no adjustments are anticipated:
City of Chilton (sewer) No conflicts anticipated.
City of Chilton (water) No conflicts anticipated.
Frontier Communication of WI, LLC. (communication) No conflicts anticipated.
WE Energies (electricity) No conflicts anticipated.
Wisconsin Public Service Corporation (electricity) No conflicts anticipated.
4085-66-71 6 of 34
7. Railroad Insurance and Coordination - Wisconsin Central Ltd (CN).
A. Description
Comply with standard spec 107.17 for all work affecting Wisconsin Central Ltd (CN) property and any existing tracks.
A.1 Railroad Insurance Requirements
In addition to standard spec 107.26, provide railroad protective liability insurance coverage as specified in standard spec 107.17.3 Insurance is filed in the name of Wisconsin Central Ltd and Its Parents (CN).
Notify evidence of the required coverage, and duration to Suzanne Crueger, Senior Officer, Public Works, 1625 Depot Street, Stevens Point, WI 55481; Telephone (715) 572-7803; E-mail:
suzanne.crueger@cn.ca
Also send a copy to the following: NE Region Railroad Coordinator; 944 Vanderperren Way, Green Bay, WI 54304; Telephone (920) 492-7713; E-mail: DOTDTSDNERRailroadCoordination@dot.wi.gov.
Include the following information on the insurance document:
- Project ID: 4085-66-71
- Work Performed on or within 50’ of RR ROW: Traffic control.
# Route Name City/County Crossing ID RR Subdivision RR Milepost
1 STH 32 Hillbert/Calumet 690287E Manitowoc 16.90
2 STH 32 Hillbert/Calumet 386706P Chilton 170.65
A.2 Train Operation
# Passenger
Train Volume Passenger
Train Speed
Freight Train
Volume
Freight Train Speed
Frequency Switch Train Comment*
1 Na Na 4 35 Daily There are switch trains in addition to through trains
2 Na Na 0 0 Monthly There are switch trains in addition to through trains
* Switch trains are in addition to freight and passenger trains.
A.3 Names and Addresses of Railroad Representatives for Consultation and Coordination
Construction Contact Suzanne Crueger, Senior Officer, Public Works, 1625 Depot Street, Stevens Point, WI 55481; Telephone
(715) 572-7803; E-mail: suzanne.crueger@cn.ca for consultation on railroad requirements during construction.
Amend standard spec 108.4 to include the railroad in the distribution of the initial bar chart, and monthly schedule updates. The bar chart shall specifically show work involving coordination with the railroad.
Flagging Contact Submit by US Mail a "Request for Flagging Services and Cable Location" form with prepayment to:
Flagging-US, 17641 South Ashland Avenue, Homewood, IL 60430; Flagging_US@CN.CA .
The form can be obtained at: https://www.cn.ca/en/safety/utility-installations/
Requests for flagging and cable locates can take up to five business days after the railroad receives the paperwork. Reference the Wisconsin Milepost and Subdivision located in A.1. Advise Wisconsin Central Ltd (CN) that the flagging services are to be billed at the rate for a public highway project.
Cable Locate Contact In addition to contacting Diggers Hotline, follow the procedure listed under Flagging Contact.
mailto:suzanne.crueger@cn.ca mailto:DOTDTSDNERRailroadCoordination@dot.wi.gov mailto:suzanne.crueger@cn.ca mailto:Flagging_US@CN.CA https://www.cn.ca/en/safety/utility-installations/
4085-66-71 7 of 34
Wisconsin Central Ltd (CN) will only locate railroad owned facilities buried in the railroad right-of-way. The railroad does not locate any other utilities.
cc: WisDOT Region Railroad Coordinator referenced in A.1 on all written correspondence with the railroads.
A.4 Work by Railroad
The railroad will perform the work described in this section, except for work described in other special provisions, and will be accomplished without cost to the contractor. None.
A.5 Temporary Grade Crossing
If a temporary grade crossing is desired, submit a written request to the railroad representative named in A.3 at least 40 days prior to the time needed. Approval is subject to the discretion of the railroad. The department has made no arrangements for a temporary grade crossing.
stp-107-026 (20260101)
8. Information to Bidders, U.S. Army Corps of Engineers Section 404 Permit.
The department has assumed coverage under the U.S. Army Corps of Engineers Section 404 Transportation Regional General Permit (TRGP). The department has determined that a pre-construction notification (permit application) to U.S. Army Corps of Engineers and their written verification of TRGP coverage is not necessary for this project.
A copy of the Section 404 Transportation Regional General Permit can be obtained on USACE’s website:
https://www.mvp.usace.army.mil/Portals/57/docs/regulatory/RGP/Transportation.pdf
If the contractor requires work outside the proposed slope intercepts, based on their method of operation to construct the project, it is the contractor’s responsibility to determine whether a pre-construction notification (permit application) and written verification from U.S. Army Corps of Engineers under the Section 404 Transportation Regional General permit is required. If written verification under the TRGP is necessary, submit a pre-construction notification to U.S. Army Corps of Engineers and obtain written verification of permit coverage prior to beginning construction operations requiring the permit. No time extensions as discussed in standard spec 108.10 will be granted for the time required to apply for and obtain the written verification of permit coverage. The contractor must be aware that the U.S. Army Corps of Engineers may not grant the permit request.
Information on USACE Section 404 permits is available on the USACE’s website:
https://www.mvp.usace.army.mil/Missions/Regulatory.aspx stp-107-054 (20230629)
9. Information to Bidders, WPDES Transportation Construction General Permit (TCGP) for Storm Water Discharges.
The calculated land disturbance for the project site is 2 acres.
The department has obtained permit coverage through the Wisconsin Department of Natural Resources to discharge storm water associated with land disturbing construction activities under this contract.
Conform to all permit requirements for the project.
This permit is the Wisconsin Pollutant Discharge Elimination System, Transportation Construction General Permit, (WPDES Permit No. WI-S066796-2). The permit can be found at:
https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
A “Certificate of Permit Coverage” is available from the regional office by contacting Brian Heiden at 920- 492-3503. Post the “Certificate of Permit Coverage” in a conspicuous place at the construction site.
Permit coverage for additional land disturbing construction activities related to contractor means and methods will be considered as part of the ECIP review and approval process. Coverage under the TCGP for additional land disturbance areas will be considered if the areas meet all of the following:
• Must meet the permit’s applicability criteria.
https://www.mvp.usace.army.mil/Portals/57/docs/regulatory/RGP/Transportation.pdf?ver=5-1zbQT8_g_a1pSEGBP2Dg%3d%3d https://www.mvp.usace.army.mil/Missions/Regulatory.aspx https://widnr.widen.net/s/s5mwp2gd7s/finalsignedwisdotcsgp
4085-66-71 8 of 34
• Must be for the exclusive use of a WisDOT project.
• Land disturbance first commences after the ECIP approval, and the areas are fully restored to meet the final stabilization criteria of the permit upon completion of the work.
The contractor is responsible for obtaining any permits for areas that are not approved by the department for coverage under the TCGP.
stp-107-056 (20250108)
10. Environmental Protection, By-Pass Pumping.
Add the following to standard spec 107.18:
If by-pass pumping is required, the means and methods proposed to be used during construction shall be submitted for approval as part of the Erosion Control Implementation Plan for each location it is required.
The submittal shall include how the intake will be managed to not cause an increase in the background level turbidity during pumping; equipment pumping rate capabilities; discharge energy dissipation; and erosion controls. For by-pass pumping that will extend beyond one working day, the submittal should also include how the work zone will be managed and protected should the pump fail; be shut down due to unacceptable water quality; or storm water flows exceed the pumping rate of equipment. After setup of the approved by-pass pumping operation, the contractor shall demonstrate that the means and methods will pump the water at an acceptable water quality before starting work that necessitates the by-pass pumping. The cost of all work and materials associated with by-pass pumping is incidental to the bid items the work is associated with. Erosion control devices beyond the discharge energy dissipation point will be paid for at the contract unit prices for the items that are included in the plan.
ner-107-035 (20180212)
11. Environmental Protection, Dewatering.
Add the following to standard spec 107.18:
If dewatering is required, treat the water to remove suspended sediments by filtration, settlement or other appropriate best management practice before discharge. The means and methods proposed to be used during construction shall be submitted for approval as part of the Erosion Control Implementation Plan for dewatering at each location it is required. The submittal shall also include the details of how the intake will be managed to not cause an increase in the background level turbidity before treatment and any additional erosion controls necessary to prevent sediments from reaching the project limits or wetlands and waterways. Guidance on dewatering can be found on the Wisconsin Department of Natural Resources website located in the Storm Water Construction Technical Standards, Dewatering Code #1061, “Dewatering”. This document can be found at the WisDNR website:
http://dnr.wi.gov/topic/stormwater/standards/const_standards.html The cost of all work and materials associated with water treatment and/or dewatering is incidental to the bid items the work is associated.
ner-…
This is the start of the file's text. The full file is on GovTribe.