2026.08.03 - VCT TW A4-B3 Project Manual_IFB.pdf
PDF 11 MB Posted
- Solicitation number
- FAA AIP # 3-48-0219-033-2026
- Issued by
- Upton County, Texas
About this file
This is a Project Manual and Invitation for Bid (IFB) document prepared by Victoria County, Texas for the FAA-funded Taxiway A4-D-B3 Construction Project at Victoria Regional Airport. The project encompasses the construction of taxiway segments A4 and B3, including pavement design, drainage infrastructure, lighting systems, and associated site work. The manual provides comprehensive technical specifications, design standards, and construction requirements necessary for bidders to prepare accurate proposals. Bids are solicited for the complete construction services required to bring the taxiway segments to operational standards in accordance with FAA regulations and airport design specifications. The document establishes the framework for competitive bidding, outlining project scope, technical requirements, and submission procedures that interested contractors must follow to be considered for award.
The manual contains detailed technical requirements, construction methodologies, material specifications, and quality standards that bidders must comply with throughout project execution. Funding for the project is provided through FAA grants supporting airport infrastructure improvements. The document establishes evaluation criteria for bid submissions and defines the contractual obligations and performance standards expected of the awarded contractor. Specific pricing terms, payment schedules, and project timelines are detailed within the manual to enable contractors to develop complete and competitive bids aligned with the project's technical and financial parameters.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Victoria County, Texas
Victoria Regional Airport (VCT)
Taxiway A4 & B3 Construction Project
Invitation for Bids (IFB) and Project
Manual
FAA AIP # 3-48-0219-033-2026
609 Foster Field Drive
Victoria, Texas 77904
IFB Documents
Issued: August 2026
Proposal Due Date: September 10, 2026 @ 3:00 PM
PAGE INTENTIONALLY LEFT BLANK
i
TABLE OF CONTENTS
All page numbers represent the page number in the .pdf document
SECTION 1 – BIDDING DOCUMENTS AND FEDERALLY REQUIRED BIDDING DOCUMENTS
Adver�sement for Bids
Bidder’s Checklist
Instruc�ons to Bidders
Bid Form
Bid Bond
Qualifica�ons Statement
Affirma�ve Ac�on Requirement
Build America, Buy America (Baba) Act
Cer�fica�on of Compliance with FAA Buy American Preference – Construc�on Projects
Debarment and Suspension
Disadvantaged Business Enterprise
Equal Employment Opportunity (EEO)
Lobbying and Influencing Federal Employees
Tax Delinquency and Felony Convic�ons
Trade Restric�on Cer�fica�on
Cer�fica�on Regarding Domes�c Preferences for Procurements
Statement of Non-Collusion
SECTION 2 – CONTRACT DOCUMENTS
No�ce of Award
Agreement Between Owner and Contractor
No�ce to Proceed
Performance Bond
Payment Bond
Cer�ficate of Substan�al Comple�on
No�ce of Acceptability of Work
Standard General Condi�ons of the Construc�on Contract
Supplementary Condi�ons of the Construc�on Contract
Work Change Direc�ve
Change Order
Field Order ii
SECTION 3 – FAA GENERAL PROVISIONS (AC 150/5370-10H)
Sec�on 10 – Defini�on of Terms
Sec�on 20 – Proposal Requirements and Condi�ons
Sec�on 30 – Award and Execu�on of Contract
Sec�on 40 – Scope of Work
Sec�on 50 – Control of Work
Sec�on 60 – Control of Materials
Sec�on 70 – Legal Regula�ons and Responsibility to Public
Sec�on 80 – Execu�on and Progress
Sec�on 90 – Measurement and Payment
SECTION 4 – FEDERALLY REQUIRED SPECIAL PROVISIONS
Access to Records and Reports
Breach of Contract Terms
Civil Rights – General
Civil Rights – Tile VI Assurance
Clean Air and Water Pollu�on Control
Contract Workhours and Safety Standards Act Requirements
Copeland “An�-Kickback” Act
Davis-Bacon Requirements
Disadvantaged Business Enterprises
Distracted Driving
Prohibi�on on Certain Telecommunica�ons and Video Surveillance Services or Equipment
Equal Employment Opportunity (EEO)
Federal Equal Employment Opportunity Construc�on Contract Specifica�ons
Federal Fair Labor Standards Act (Federal Minimum Wage)
Prohibi�on of Segregated Facili�es
Occupa�onal Safety and Health Act of 1970
Procurement of Recovered Materials
Right to Inven�ons
Seismic Safety
Termina�on of Contract
Veteran’s Preference
SECTION 5 – DAVIS-BACON WAGE RATE DETERMINATION
Davis-Bacon Wage Rates
SECTION 6 – TECHNICAL SPECIFICATIONS
Section 1
Bidding Documents and Federally
Required Bidding Documents
PAGE INTENTIONALLY LEFT BLANK
EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
COUNTY OF VICTORIA – VICTORIA REGIONAL AIRPORT
INVITATION FOR BIDS
The Commissioner’s Court of Victoria County, Texas and the Victoria Regional Airport (VCT) are accepting bids for the following project:
Taxiway A4 & B3 Construction Project
Copies of this IFB may be obtained from the Victoria Regional Airport office at 609 Foster Field Drive, Victoria, Texas 77904 or online at www.vctx.org/page/business.bids or https://flyvictoriatx.com/master-plan/.
Contract documents, including bid proposal forms, plan sheets, and specifications for the project may also be viewed and downloaded free of charge at www.civcastusa.com. Plans and specifications (.pdf format) are available on a flash drive for a non-refundable price of $75 from Centurion Planning & Design, LLC. (Issuing Office), 19 W. Beauregard Ave, San Angelo, Texas 76903.
Please submit questions for this project by August 28, 2026 at 5:00pm through the Q&A portal at www.civcastusa.com or via email to Will Davidson at will@plan.design. Any questions received after this date will not be answered. All answers to questions and any addenda issued for this project will be posted on www.civcastusa.com. You will be notified of responses or addenda automatically via email if you download the contract documents via Civcast.
The bidder shall use unit pricing.
The method of payment shall be from the County General Fund.
Bidders shall refer to the Bid Documents for specific proposal security and bonding requirements. Bids shall include all requirements to be considered.
In order to be considered a responsive bid, submitted bid packages must include the following at minimum:
• Acknowledgement of Addendums
• Bid form
• Bidder’s Qualification Statement and List of Subcontractors
• Bid Security
• All Required Federal Provisions
It is the bidder’s responsibility to thoroughly review the entire project manual (including instructions to bidders and required Federal Provisions) and ensure that all bid requirements are met. Submitted bids not meeting all requirements of the project manual shall be considered nonresponsive.
A pre-bid conference will be held on August 20, 2026 at 2:00 PM in the Victoria Regional Airport Terminal Building
Main Conference Room. Attendance at the pre-bid conference is encouraged but not mandatory to bid on the project. However, it is highly recommended that all bidders make arrangements with the Victoria Regional Airport to examine the site to become familiar with all site conditions prior to submitting their bid.
Bids shall be received by Vinicio “Lenny” Llerena, Airport Executive Director, 609 Foster Field Drive, Victoria, Texas
77904, until Thursday, September 10, 2026 at 3:00 PM. Bids can be submitted by hand delivery or by mail to the airport address.
Late submissions will not be accepted under any circumstances. The phone system in the Office of the Airport
Executive Director shall be the official time of receipt. Responses received after the deadline will be returned unopened.
The outside of the envelope shall be plainly marked:
“County of Victoria – Victoria Regional Airport – Taxiway A4 & B3 Construction”
EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
Bids will be held unopened until Thursday, September 10, 2026. They will be opened and the Respondent’s name and bid amount will be read aloud during a public meeting beginning at 4:00 PM. The public meeting will be held in the Victoria County Commissioner’s Courtroom, located at 115 N. Bridge St., Room 241, Victoria, Texas 77901.
Formal action on bids will be considered at a future meeting at Victoria County Commissioner’s Court. All bids shall include all requirements of the County of Victoria – Victoria Regional Airport – Taxiway A4 & B3
Construction Project.
No bids may be withdrawn for a period of 90 days subsequent to the opening of the bids without the consent of the County. The County reserves the right to reject any and/or all bids and to accept any bid deemed by the
County as providing the best value for and being most beneficial to the County, and to waive all formalities in the bid process. The awarding of the bid for this project is contingent upon approval of funding from the FAA.
Adrienne Willis, CTCD, CTCM
Procurement Specialist, Victoria County
Published on:
08/09/2026
08/16/2026
+ + END OF ADVERTISEMENT FOR BIDS + +
BIDDER’S CHECKLIST
The following items are required to be filled out, signed, and included with the bid submi�al for a bid to be considered responsive:
Bid Form with Addendum Acknowledged .................................................................................... ______
Bid Bond ....................................................................................................................................... ______
Qualifica#ons Statement .............................................................................................................. ______
Affirma#ve Ac#on Requirement ................................................................................................... ______
Build America, Buy America (Baba) Act ........................................................................................ ______
Cer#fica#on of Compliance with FAA Buy American Preference – Construc#on Projects ........... ______
Debarment and Suspension ......................................................................................................... ______
Disadvantaged Business Enterprise .............................................................................................. ______
Equal Employment Opportunity (EEO) ........................................................................................ ______
Lobbying and Influencing Federal Employees .............................................................................. ______
Tax Delinquency and Felony Convic#ons ...................................................................................... ______
Trade Restric#on Cer#fica#on ...................................................................................................... ______
Cer#fica#on Regarding Domes#c Preferences for Procurements ................................................ ______
Statement of Non-Collusion ......................................................................................................... ______
EJCDC® C-200 (Rev. 1), Suggested Instructions to Bidders for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
INSTRUCTIONS TO BIDDERS
Page
ARTICLE 1 – Defined Terms
ARTICLE 2 – Copies of Bidding Documents
ARTICLE 3 – Qualifications of Bidders
ARTICLE 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
ARTICLE 5 – Bidder’s Representations
ARTICLE 6 – Pre-Bid Conference
ARTICLE 7 – Interpretations and Addenda
ARTICLE 8 – Bid Security
ARTICLE 9 – Contract Times
ARTICLE 10 – Liquidated Damages
ARTICLE 11 – Substitute and “Or-Equal” Items
ARTICLE 12 – Subcontractors, Suppliers, and Others
ARTICLE 13 – Preparation of Bid
ARTICLE 14 – Basis of Bid
ARTICLE 15 – Submittal of Bid
ARTICLE 16 – Modification and Withdrawal of Bid
ARTICLE 17 – Opening of Bids
ARTICLE 18 – Bids to Remain Subject to Acceptance
ARTICLE 19 – Evaluation of Bids and Award of Contract
ARTICLE 20 – Bonds and Insurance
ARTICLE 21 – Signing of Agreement
ARTICLE 22 – Sales and Use Taxes
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General
Conditions and Supplementary Conditions. Additional terms used in these Instructions to
Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor
Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. Subcontractor and Supplier qualification information; coordinate with provisions of Article
12 of these Instructions, “Subcontractors, Suppliers, and Others.”
B. Contractor’s plan to achieve required Disadvantaged Business Enterprise (DBE)
Participation goal.
1. DBE goal for project: __0.0__%
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. reports and drawings known to Owner relating to Hazardous Environmental
Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any
Bidder on request. These reports and drawings are not part of the Contract
Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are set forth in the
Contract Documents and are based upon information and data furnished to Owner and
Engineer by owners of such Underground Facilities, including Owner, or others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and
Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous
Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during the pre-bid conference or by appointment only during normal working hours and shall not disturb any ongoing operations at the Site. To set up a site visit, contact the Airport Administration Office.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of
Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As the
General Conditions indicate, if an Owner safety program exists, it will be noted in the
Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary
Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the
Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;
and
J. agree that the submission of a Bid will constitute an incontrovertible representation by
Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the
Work required by the Bidding Documents.
ARTICLE 6 – PRE-BID CONFERENCE
6.01 A pre-Bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
ARTICLE 7 – INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding.
Oral and other interpretations or clarifications will be without legal effect.
7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 8 – BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding
Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the
General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5 required contract security, and met the other conditions of the Notice of Award, whereupon the
Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract
Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 9 – CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.
ARTICLE 10 – LIQUIDATED DAMAGES
10.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial
Completion, or completion of the Work in readiness for final payment, are set forth in the
Agreement.
ARTICLE 11 – SUBSTITUTE AND “OR-EQUAL” ITEMS
11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and
Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
11.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of
“or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 12 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
12.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such
Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an
Addendum, then the prospective Bidder should refrain from submitting a Bid.
12.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or
Contractor to retain any Subcontractor, Supplier, or other individual or entity against which
Contractor has reasonable objection.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6
12.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after
Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work: All subconsultants proposed for the project.
If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating
Bids and making the Contract award.
12.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the
Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.
ARTICLE 13 – PREPARATION OF BID
13.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
13.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
13.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature), accompanied by evidence of authority to sign.
The partnership’s address for receiving notices shall be shown.
13.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.
13.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.
13.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.
13.07 All names shall be printed in ink below the signatures.
13.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
13.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7
13.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 14 – BASIS OF BID
14.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the
Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
14.02 Allowances
A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the
General Conditions.
ARTICLE 15 – SUBMITTAL OF BID
15.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.
15.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to Vinicio “Lenny” Llerena, Airport Executive Director, 609 Foster Field Dr., Victoria, Texas 77904.
15.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
ARTICLE 16 – MODIFICATION AND WITHDRAWAL OF BID
16.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a
Bid must be executed and delivered to the place where Bids are to be submitted prior to the
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8 date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.
ARTICLE 17 – OPENING OF BIDS
17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base
Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 18 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but
Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 19 – EVALUATION OF BIDS AND AWARD OF CONTRACT
19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that
Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the
Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
19.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
19.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the
Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner shall announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
19.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the
Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9
19.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or
Suppliers.
ARTICLE 20 – BONDS AND INSURANCE
20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the
Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 21 – SIGNING OF AGREEMENT
21.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful
Bidder, together with printed and electronic copies of the Contract Documents as stated in
Paragraph 2.02 of the General Conditions.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-7.09 of the
Supplementary Conditions for additional information. Owner’s sales tax exemption form will be supplied to the winning bidder during project contracting.
EJCDC® C-410, Bid Form for Construction Contracts.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i
BID FORM
Taxiway A4 & B3 Construction Project
Victoria Regional Airport
VCT2601D
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page ii
Page
Article 1 – Bid Recipient
Article 2 – Bidder’s Acknowledgements
Article 3 – Bidder’s Representations
Article 4 – Bidder’s Certification
Article 5 – Basis of Bid
Article 6 – Time of Completion
Article 7 – Attachments to this Bid
Article 8 – Defined Terms
Article 9 – Bid Submittal
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to:
Victoria County – Victoria Regional Airport
Vinicio “Lenny” Llerena, Airport Executive Director
609 Foster Field Dr., Victoria, Texas 77904
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the
Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and any Site-related
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article, and that without exception the
Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the e execution of the Contract.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the price shown on the accompanying Bid Form.
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security;
B. Required Bidder Qualification Statement with supporting data; and
C. Required Federal Provisions
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4
ARTICLE 9 – BID SUBMITTAL
BIDDER:
By:
Signature
Printed name
(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest:
Signature
Printed name
Title:
Submittal Date:
Address for giving notices:
Telephone Number:
Fax Number:
Contact Name and e-mail address:
Item Spec. Estimated Unit Total
No. No. Description Units Quantity Price Price
1.01 C-105 Mobilization LS 1 $ $
1.02 C-105 Barricades and Markings for Pavement Closures MO 12 $ $
1.03 C-102 Stormwater Pollution Prevention Plan (SW3P) Document LS 1 $ $
1.04 C-102 Temporary Sediment Control Fence LF 1,300 $ $
1.05 C-102 Inlet Protection EA 4 $ $
1.06 C-102 Rock Construction Exit EA 1 $ $
1.07 T-905 Topsoiling (Obtained on Site or Removed from Stockpile) CY 17,500 $ $
1.08 T-901 Seeding AC 32 $ $
1.09 T-904 Sodding SY 1,985 $ $
Subtotal
Item Spec. Estimated Unit Total
No. No. Description Units Quantity Price Price
2.01 P-152 Unclassified Excavation CY 9,130 $ $
2.02 P-101 Concrete Pavement Removal (6") SY 54,070 $ $
2.03 P-101 Removal of Pipe and other Buried Structures LF 9,700 $ $
2.04 P-101 Removal of Other Buried Structures EA 15 $ $
2.05 P-152 Embankment CY 3,000 $ $
2.06 P-153 Flowable Fill CY 330 $ $
2.07 P-155 Lime Treated Subgrade (6") SY 23,500 $ $
2.08 P-155 Hydrated Lime (7%) TON 370 $ $
2.09 P-219 Recycled Concrete Aggregate Base Course (10") SY 21,800 $ $
2.10 P-501 Concrete Pavement (11.5") SY 20,625 $ $
2.11 P-620 Yellow Markings (Reflective) SF 5,658 $ $
2.12 P-620 Black Markings (Non-Reflective) SF 13,352 $ $
2.13 P-620 Pavement Marking Removal SF 82,120 $ $
2.14 P-620 Temporary Runway Markings SF 20,400 $ $
Item 2: PCC Taxiways
Item 1: Mobilization, Temporary Access and Erosion/Sedimentation Control Measures $
Victoria Regional Airport
Taxiway A4-B3
Centurion Project No.: VCT2601D
Bid Form
Item 1: Mobilization, Temporary Access and Erosion/Sedimentation Control Measures
2.15 P-620 White Markings (Reflective) SF 81,600 $ $
2.16 P-620 Surface Painted Sign EA 2 $ $
2.17 D-701 18" Class III RCP LF 414 $ $
2.18 D-701 21" Class III RCP LF 633 $ $
2.19 D-701 30" Class III RCP LF 260 $ $
2.20 D-701 48" Class III RCP LF 500 $ $
2.21 D-752 Concrete Wingwall (4.5' height) EA 1 $ $
2.22 D-752 18" Storm Outfall Safety End Treatment EA 1 $ $
2.23 D-752 21" Storm Outfall Safety End Treatment EA 1 $ $
2.24 D-752 30" Storm Outfall Safety End Treatment EA 1 $ $
2.25 D-752 36" Storm Outfall Safety End Treatment EA 1 $ $
2.26 D-752 48" Storm Outfall Safety End Treatment EA 1 $ $
2.27 TxDOT 432 Riprap (Stone Common)(Dry)(18") CY 180 $ $
2.28 P-152 Drainage Excavation - Grading CY 114,700 $ $
Subtotal
Item Spec. Estimated Unit Total
No. No. Description Units Quantity Price Price
3.01 P-605 Joint Sealing Filler LF 23,000 $ $
3.02 P-101 Unclassified Excavation CY 9,924 $ $
3.03 P-155 Concrete Pavement Removal (6") SY 24,845 $ $
3.04 P-155 Hydrated Lime (7%) TON 470 $ $
3.05 P-501 Lime Treated Subgrade (6") SY 24,845 $ $
3.06 P-219 Recycled Concrete Aggregate Base Course (10") SY 24,845 $ $
3.07 P-501 Concrete Pavement (11.5") SY 24,845 $ $
3.08 P-620 Yellow Markings (Reflective) SF…