2026_Concrete_Proposal_.pdf

PDF 2 MB Posted

Attached to
2026 Concrete Road Work project
Solicitation number
2026-MPW-281
Issued by
Pierce County, Washington

About this file

This is a proposal and contract form for the 2026 Concrete Road Work project issued by Pierce County Planning & Public Works in Tacoma, Washington (Bid No. 2026-MPW-281). The project provides for removal and replacement of approximately 850 square yards of concrete and asphalt sidewalks and driveways, three ADA cement concrete curb ramps, and approximately 300 feet of cement concrete traffic or rolled curb and gutter across various Pierce County roadways. The bid encompasses 14 separate groups of work located in Tacoma, Puyallup, Spanaway, South Hill, Bonney Lake, Lake Tapps, Orting, and Gig Harbor. Work items include mobilization (10% lump sum), removal of existing concrete sidewalks and curb and gutter, crushed surfacing base course, hot mix asphalt, erosion control, inlet protection, traffic control, ADA features, sidewalk and driveway entrance installation, and miscellaneous items such as roadside cleanup, utility coordination, and FDC planning. The bid opening is scheduled for Wednesday, December 9, 2026, at 1:00 p.m., with bid delivery due at the same time. Bidders are required to submit a 5% proposal guaranty in the form of cash, cashier's check, or certified check payable to Pierce County, or as a proposal bond.

Bidders must submit unit prices for all items and calculate total contract amounts for each group and overall. The bid requires completion of multiple certifications including a Certification of Nonsegregated Facilities, Non-Collusion and Debarment Affidavit, Certification of Compliance with Wage Payment Statutes, and a recycled materials proposal. Bidders must also submit a subcontractor list identifying any direct subcontractors for structural steel installation, rebar installation, HVAC, plumbing, and electrical work in compliance with RCW 39.30.060. The project is subject to prevailing wage requirements in accordance with special provisions, and all bids must be typed or entered in ink with prices shown in figures only. No specific set-asides are indicated in the proposal documents. The contract is to be awarded to the lowest responsive bidder, with tied bids potentially broken by recycled materials percentages as outlined in the APWA General Supplemental Provisions.

View the file

Other files

File Type Posted
Plans_14_Groups.pdf PDF
Contract_Specifications_2026_Concrete_work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL AND CONTRACT FORM

2026 CONCRETE ROAD WORK

BID NO 2026-MPW-281

BID OPENING DATE:

Date: WEDNESDAY, DECEMBER 9, 2026 Bid Delivery Time: 1:00 p.m.

Bid Opening Time: 1:00 p.m., or as soon thereafter as possible

PROPOSAL

TO THE PIERCE COUNTY DIRECTOR OF PLANNING & PUBLIC WORKS

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 53 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 73 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

5 41 S.Y. REMOVING CEMENT CONC. PAVEMENT

at . per S.Y. .

SURFACING .

6 6 C.Y. CRUSHED SURFACING BASE COURSE

at . per C.Y. .

HOT MIX ASPHALT

7 0 TON HMA CL. 1/2 IN. PG58H-22

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 1 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 73 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S.

12 20 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 76 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 1 L.S. UTILITY COORDINATION

at per L.S.

21 EST. 1,750 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 1 (BASE BID)

TACOMA (13720 21st Av E and 13527 20th Av Ct E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

5_2026 Concrete Sidewalk Project_EngineersEstimate 11-19-2026.xlsx

P 1 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 60 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 53 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

5 0 S.Y. REMOVING CEMENT CONC. PAVEMENT

SURFACING .

6 4 C.Y. CRUSHED SURFACING BASE COURSE

7 1 TON HMA CL. 1/2 IN. PG58H-22

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 1 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 53 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 40 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 23 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 1 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 2 (BASE BID)

TACOMA (2415 96th St S and 10002 Steele St S)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 2 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 115 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 139 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

SURFACING

6 3 C.Y. CRUSHED SURFACING BASE COURSE

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 2 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 139 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 41 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 74 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 2 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 1 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 2,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 3 (BASE BID)

PUYALLUP (5619 112th St E, 6405 112th St E, 6606/6610/6602 132nd St E 6614 132nd St E, 6619 133rd St E, and 152nd St E and 68th Av E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 3 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 34 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

6 1 C.Y. CRUSHED SURFACING BASE COURSE

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 0 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 9 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 25 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 2 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 4 (BASE BID)

SPANAWAY (21808 65th Av E, 21828 65th Av E, 21820 65th Av E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 4 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 16 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 10 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

6 1 C.Y. CRUSHED SURFACING BASE COURSE

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 0 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 16 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 0 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 5 (BASE BID)

PUYALLUP (19418 74th Av E, 20117 46th Av E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 5 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 27 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 0 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 27 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 0 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 6 (BASE BID)

PUYALLUP (19218 78th Av E, SW corner 194th St E and 78th Av E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 6 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 112 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

6 2 C.Y. CRUSHED SURFACING BASE COURSE

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 1 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 1 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 106 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 2 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 6 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 2 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 2,000 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 7 (BASE BID)

SPANAWAY (SW corner 14th Av E and 176th St E, SW corner 176th St E and 22nd Av E, 215 176th St E, 2113 176th St E, SE corner 176th St E and 28th Av E, SE corner 177th St Ct E and 28th Av E, NE corner 177th St Ct E and 28th Av E, B St E at 182nd St E, B St E at 181st St Ct E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 7 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 133 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 27 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

6 2 C.Y. CRUSHED SURFACING BASE COURSE

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 2 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 8 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 1 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 148 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y.

13 1 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 1 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 6 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 2 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S.

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 2,000 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

GROUP 8 (BASE BID)

SOUTH HILL (10308 144th St E, 13215 Meridian Av E, 12705 86th Av E, 86th Av E Across from 8603 133rd St E, 9916 136th St E, 9707 152nd St E, 8406 148th St Ct

E, 15024 82nd Av E )

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 8 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 23 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

6 0 C.Y. CRUSHED SURFACING BASE COURSE

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 0 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 18 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 5 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 9 (BASE BID)

BONNEY LAKE (10707 211th Av Ct E, 10723 211th Av Ct E, 20621 South Prairie Rd E, 21108 South Prairie Road E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 9 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 86 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 1 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 86 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 0 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 2,000 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 10 (BASE BID)

PUYALLUP (13711 172nd Pl E,11205 186th St Ct E, SE corner 184th St E and Emerald Ridge Blvd E., NW corner 184th St E and 129th Av E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 10 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 12 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 0 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 12 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 0 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL $ .

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 11 (BASE BID)

BONNEY LAKE (18124 133rd St E, Forest Park Blvd E behind 13517 185th Av Ct E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which paym ent will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be com pleted with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 11 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 40 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 3 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 28 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 12 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 12 (BASE BID)

LAKE TAPPS (21403 26th St E, 21415 26th St E, 21807 Quiet Water Loop E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 12 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 19 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 0 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 1 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 19 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 0 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 0 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 13 (BASE BID)

ORTING (13720 142nd Av E)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 13 11/20/2026

TACOMA, WASHINGTON

This certifies that the undersigned has examined the location of

ITEM ITEM DESCRIPTION

NO. at $ . ct $ . ct

PREPARATION

1 LUMP SUM L.S. MOBILIZATION (10%)

at per L.S. .

2 53 S.Y. REMOVING CEMENT CONC. SIDEWALK

at . per S.Y. .

3 24 L.F. REMOVING CEMENT CONC. CURB AND GUTTER

at . per L.F. .

4 0 S.Y. REMOVING ASPHALT CONC. SIDEWALK

at . per S.Y. .

at . per TON .

EROSION CONTROL AND ROADSIDE PLANTING

8 2 EACH INLET PROTECTION

at . per EACH .

TRAFFIC

9 0 L.F. CEMENT CONC. CURB AND GUTTER

at . per L.F. .

10 LUMP SUM L.S. PROJECT TEMPORARY TRAFFIC CONTROL

at per L.S. .

OTHER ITEMS

11 0 L.S. ADA FEATURES SURVEYING

at per L.S. .

12 30 S.Y. CEMENT CONC. SIDEWALK

at . per S.Y. .

13 0 EACH CEMENT CONC. CURB RAMP TYPE PARALLEL

at . per EACH .

14 0 EACH CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION

at . per EACH .

15 23 S.Y. CEMENT CONC. DRIVEWAY ENTRANCE

at . per S.Y. .

16 0 EACH REPLACE JUNCTION BOX

at . per EACH .

17 1 L.S. ROADSIDE CLEANUP

at per L.S. .

18 1 EACH MAILBOX SUPPORT TYPE 1

at . per EACH .

19 1 L.S. FDC PLAN

at per L.S. .

20 0 L.S. UTILITY COORDINATION

at per L.S. .

21 EST. 1,500 DOLLAR MINOR CHANGE

at . per DOLLAR .

CONTRACT TOTAL

LUMP SUM

LUMP SUM

2026 CONCRETE SIDEWALK PROJECT

VARIOUS LOCATIONS

GROUP 14 (BASE BID)

GIG HARBOR (6218 65th Av NW, 2420 53rd St Ct NW, 5207 25th Av Ct NW, 6408 62nd St NW)

QUANTITY UNIT PRICE UNIT TOTAL AMOUNT

LUMP SUM

LUMP SUM

LUMP SUM

LUMP SUM

TOTAL ALL GROUPS

and that the plans, specifications and contract governing the work embraced in this improvement, and the method by which payment will be made for said work is understood. The undersigned hereby proposes to undertake and complete the work embraced in this improvement, or as much thereof as can be completed with the material available in accordance with the said plans, specifications and contract, and the following schedule of rates and prices.

Note: Unit price(s) for all item(s), all extensions, and total amount of bid shall be shown. All entries must be typed or entered in ink.

Show price per unit in figures only. Figures written to the right of the dot (decimal) in the price per unit column shall be interpreted as cents.

P 14 11/20/2026

Project Name 2026 Concrete Road Work various locations

P 15

Proposal--Continued

The bidder is hereby advised that by signature of this proposal he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.

The undersigned hereby agrees to pay not less than the prevailing rates of wages in accordance with the requirements of the special provisions for this project.

A proposal guaranty in an amount of five percent (5%) of the total bid, based upon the approximate estimate of quantities at the above prices and in the form as indicated below, is attached hereto:

CASH IN THE AMOUNT OF

CASHIER'S CHECK

CERTIFIED CHECK ($_________) PAYABLE TO PIERCE COUNTY

PROPOSAL BOND TREASURER IN THE AMOUNT OF 5% OF THE BID

Receipt is hereby acknowledged of addendum(s) No.(s) _____, _____, and _____.

PROPOSAL MUST BE SIGNED

SIGNATURE OF AUTHORIZED OFFICIAL(S)

By: By:

(Print Name) (Print Name)

FIRM NAME

ADDRESS

Street City State Zip

PHONE FAX E-MAIL

The following information is required per RCW 39.04.350

Contractor’s License No. Contractor’s UBI No.

Industrial Insurance Account No. Excise Tax No.

Employment Security Account No.

Signed and sworn to (or affirmed) before me this day of , 20____.

Notary Public in and for the State of Washington

Residing at My Appointment Expires

Note: (1) This proposal form is not transferable, and any alteration of the firm’s name entered hereon without prior permission from the County will be cause for considering the proposal irregular and subsequent rejection of the bid.

(2) Please refer to Section 1-02.6 of the Standard Specifications, re: “Preparation of Proposal.”

various locations

PIERCE COUNTY PLANNING & PUBLIC WORKS

PROPOSAL BOND

KNOW ALL MEN BY THESE PRESENTS, That we of as principal, and the a corporation duly organized under the laws of the State of and authorized to do business in the State of Washington, as surety, are held and firmly bound unto Pierce County, State of Washington, in the full and penal sum of five (5) percent of the total amount of the bid proposal of said principal for the work hereinafter described, pursuant to and in compliance with the provisions of RCW 36.77.030, for the payment of which, well and truly to be made, we bind our heirs, executors, administrators and assigns, and successors and assigns, firmly by these presents.

The conditions of this bond are such, that whereas the principal herein is hereby submitting his/her or its sealed proposal for the following public works construction, to wit:

said bid and proposal, by reference thereto, being made a part hereof.

NOW, THEREFORE, if said proposal bid by said principal be accepted, and the contract be awarded to said principal, said principal shall duly make and enter into and execute said contract and shall furnish bond as required by RCW 36.77.040 within ten (10) days after notice of the award, exclusive of the day of notice, then this obligation shall be null and void, otherwise it shall remain and be in full force and effect.

IN TESTIMONY WHEREOF, the principal and the surety have caused these presents to be signed and sealed this __________________ day of __________________________, 20___.

Principal

Surety

Attorney-in-fact

P

Pierce County Subcontractor List Prepared in compliance with RCW 39.30.060 as amended

To Be Submitted with the Bid Proposal

Project Name ___________________________________________________________________________________________

Failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void.

Subcontractor(s) with whom the bidder will directly subcontract that are proposed to perform the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical as described in Chapter 19.28 RCW must be listed below. The work to be performed is to be listed below the subcontractor(s) name.

To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder.

Subcontractor Name ___________________________________________________________________________________

Work to be performed ___________________________________________________________________________________

Subcontractor Name ___________________________________________________________________________________

Work to be performed ___________________________________________________________________________________

Subcontractor Name ___________________________________________________________________________________

Work to be performed ___________________________________________________________________________________

Subcontractor Name ___________________________________________________________________________________

Work to be performed ___________________________________________________________________________________

Subcontractor Name ___________________________________________________________________________________

Work to be performed ___________________________________________________________________________________

*Bidders are notified that it is the opinion of the enforcement agency that PVC or metal conduit, junction boxes, etc., are considered electrical equipment and therefore considered part of electrical work, even if the installation is for future use and no wiring or electrical current is connected during the project.

DOT Form 271-015A Revised 06/2020

Tacoma Mall Plaza

2702 South 42d Street

Suite 109

Tacoma, WA 98409

Pierce County Planning & Public Works

Various Locations

P 18

CERTIFICATION OF NONSEGREGATED FACILITIES

The contractor certifies that no segregated facilities are maintained and will not be maintained during the execution of this contract at any of contractor’s establishments.

The contractor further certifies that none of the contractor’s employees are permitted to perform their services at any location under the contractor’s control during the life of this contract where segregated facilities are maintained. The contractor certifies further segregated facilities will not be maintained or provided for employees at any of the contractor’s establishments, and that employees will not be permitted to perform their services at any location, under the contractor's control, where segregated facilities are maintained.

The contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term “segregated facilities” means any waiting rooms, work area, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color or national origin, because of habit, local custom, or otherwise.

The contractor agrees that identical certifications from proposed contractors will be obtained prior to the award of any subcontracts. Contractor will retain a copy of any subcontractor’s certification and will send original to Contract Compliance Division.

NON-COLLUSION AND DEBARMENT AFFIDAVIT

State of Washington, County of

As an authorized representative of the firm of , I do hereby certify that said person(s), firm, association or corporation has (have) not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the project for which this proposal is submitted.

I further certify that, except as noted below, the firm, association or corporation or any person in a controlling capacity associated therewith or any position involving the administration of federal funds; is not currently under suspension, debarment, voluntary exclusion, or determination of eligibility by any federal agency;

has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been indicted, convicted or had a civil judgment rendered against said person, firm, association or corporation by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three years.

I further acknowledge that by signing the signature page of the proposal, I am deemed to have signed and have agreed to the provisions of this affidavit.

Note: Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted, indicate above to whom it applies, initiating agency, and dates of action. Providing false information may result in criminal prosecution or administrative sanctions.

“A suspending or debarring official may grant an exception permitting a debarred, suspended, or excluded person to participate in a particular transaction upon a written determination by such official stating the reason(s) for deviating from the Presidential policy established by Executive

Order 12549...” (49CFR Part 29 Section 29.215).

P 19

Proposal for Incorporating Recycled Materials into the Project

In compliance with a new law that went into effect January 1, 2016 (SHB1695), the Bidder shall propose below, the total percent of construction aggregate and concrete materials to be incorporated into the Project that are recycled materials. Calculated percentages must be within the amounts allowed in Section 9-03.21(1)E, Table on Maximum Allowable Percent (By

Weight) of Recycled Material, of the Standard Specifications.

Proposed total percentage: _____________________________ percent.

Note: Use of recycled materials is highly encouraged within the limits shown above, but does not constitute a Bidder Preference, and will not affect the determination of award, unless two or more lowest responsive Bid totals are exactly equal, in which case proposed recycling percentages will be used as a tie-breaker, per the APWA GSP in Section 1-02.6 of the Special

Provisions. Regardless, the Bidder’s stated proposed percentages will become a goal the

Contractor should do its best to accomplish. Bidders will be required to report on recycled materials actually incorporated into the Project, in accordance with the APWA GSP in

Section 1-06.6 of the Special Provisions.

Bidder Name:

Signature of Authorized Official:

Date:

P 20

CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES

The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date (INSERT BID OPENING DATE), the bidder is not a “willful” violator, as defined in RCW

49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.

I declare under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.

Bidder’s Business Name

Signature of Authorized Official*

Printed Name

Title

Date

City

State

Check One:

Sole Proprietorship ☐ Partnership ☐ Joint Venture ☐ Corporation ☐

State of Incorporation, or if not a corporation, State where business entity was formed:

If a co-partnership, give firm name under which business is transacted:

* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.

File details come from the government source that posted it. Updated .