This is a bid sheet for RFB 605 2700000041 issued by the State of Kentucky for polypropylene barrier wall construction services in Districts 11 and 12 under an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract structure. The project involves constructing polypropylene barrier walls with multiple components including mobilization, foundation preparation (both non-yielding and yielding), barrier bag installation in various heights (2, 3, 4, 5, and 6 feet), concrete placement, traffic control, and erosion control. District 11 requires estimated quantities including 150 linear feet of non-yielding foundation preparation, 150 linear feet of yielding preparation, and various barrier bag installations totaling 850 linear feet across different heights. District 12 requires significantly higher quantities with 450 linear feet of non-yielding foundation preparation, 450 linear feet of yielding preparation, and 2,200 linear feet of barrier bags across all height categories. Additional bid items include concrete placement via transfer pump or pump truck, traffic control, aggregate stone, channel lining, Class B concrete supply, and long reach trackhoe equipment rental. Vendors may bid on one or both districts and must submit actual bid prices and response times through the e-procurement system.
The bid sheet requires vendors to provide unit prices and extended prices for each line item across both districts. Quantities are specified in various units of measure including lump sum (LS), linear feet (LNFT), hours (HR), days (DAY), tons (TON), and cubic yards (CY). Minimum payment thresholds are established for certain items, such as eight-hour minimums for pump truck operations, mechanical support, and long reach trackhoe services. Specific equipment requirements are mandated, including CAT 320 or equivalent long reach trackhoe with a minimum 40-foot reach capability and pump truck specifications. The bid sheet includes provisions for incidental work such as tree removal, hoe ram operation, and flagger certification under traffic control. Vendors must also specify the number of days required to start work for each district, indicating project timeline expectations and mobilization readiness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to Submit an Online Response - March 2023.pdf | ||
| Final_RFB_605_2700000041_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFB 605 2700000041 Polypropylene Barrier Wall Construction Districts 11 and 12 ID/IQ | |
| Vendor: | Vendor Rep: |
Instructions: Actual bid prices and response time must be entered on this bid sheet and uploaded into the e-procurement system. Vendors shall bid all line items for each district for which they wish to provide services. A vendor is not required to bid all districts.
| District 11 | District 12 | |||||||||
| Bid Item | Extended Description | Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | |
| Line 1 | Mobilization | This item will be for mobiliizing all materials and equipment to construct barrier wall as required in the specs. | 5 | LS | 15 | LS | ||||
| Line 2 | Foundation Preparation-Non-Yeilding | This item includes all equipment, labor and materials needed to excavate project site necessary to install barrier wall. If a hoe ram is needed, it will be incidental to this bid item. Any tree removal will be incidental to this bid item. | 150 | LNFT | 450 | LNFT | ||||
| Line 3 | Foundation Preparation-Yeilding | This item includes all equipment, labor and materials needed to excavate project site necessary to install barrier wall. If a hoe ram is needed, it will be incidental to this bid item. Any tree removal will be incidental to this bid item. | 150 | LNFT | 450 | LNFT | ||||
| Line 4 | 2' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 150 | LNFT | 1000 | LNFT | ||||
| Line 5 | 3' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 500 | LNFT | ||||
| Line 6 | 4' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 300 | LNFT | 500 | LNFT | ||||
| Line 7 | 5' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 200 | LNFT | ||||
| Line 8 | 6' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 200 | LNFT | ||||
| Line 9 | Concrete Placement-Transfer Pump or Other Mechanical Support | This item is for any mechanical means of support to place Class B Concrete such as a transfer line truck, conveyor belt or other mechanical. A pump truck will be paid as a separate line item. Minimum of 8 hours per delivery order. | 25 | HR | 100 | HR | ||||
| Line 10 | Concrete Placement-Pump Truck | This item will be for a pump truck to place Class B Concrete. This item also includes all material, labor, and oversight necessary for operating the pump truck and discharging the material into the polypropylene barrier wall apparatus. Minimum of 8 hours per delivery order will be paid. | 25 | HR | 75 | HR | ||||
| Line 11 | Traffic Control | Provide traffic control that meets most current standards in the KYTC Specifications, MUTCD and Standard Drawing. Flaggers will be incidental to this bid item. Any flaggers must have flagger certification. While traffic is still driving through workzone, vendor shall keep roadway clear of debris. | 10 | DAY | 20 | DAY | ||||
| Line 12 | 6" Minus Stone | aggregate that must pass through a six inch opening. | 400 | TON | 1500 | TON | ||||
| Line 13 | Class III Channel Lining | Will be used for erosion control. Item includes material, labor and equipment to install channel lining. | 150 | TON | 150 | TON | ||||
| Line 14 | Class B Concrete | Must meet most current edition of KYTC Standard Specifications. Item will include materal and coordination for supplying concrete to project site. KYTC still reserves the right to opt to supply the fill material using other master agreements. | 300 | CY | 1000 | CY | ||||
| Line 15 | Long Reach Trackhoe | Shall be a CAT 320 or equivalent. Shall be capable of reaching at least 40 feet. 8 hour minimum per delivery order will be paid. | 50 | HR | 50 | HR | ||||
| TOTAL | TOTAL |
# of Days to Start Work: # of Days to Start Work: