This is a Project Manual and Construction Documents specification package for the Washington State Department of Enterprise Services (DES) Facility Professional Services on behalf of the Washington State Department of Ecology (ECY). The project, titled "ECY - Phase 2 Parks Move In (Lobby, Walkway, Sign)" (Project No. 2026-711 G (1-1)), involves tenant improvements to reconfigure the entrance lobby and check-in area, establish a new pathway through the building's central atrium, associated electrical and mechanical modifications, and site improvements including a new sidewalk and site monument sign modifications at the Department of Ecology facility located at 300 Desmond Drive SE, Lacey, WA 98503. The project includes two additive bid alternates: Full Atrium Expansion and Partial Atrium Expansion. A pre-bid walk-through is scheduled for 10:00 AM on Thursday, October 1, 2026. Sealed bids are due no later than 1:00 PM on Thursday, October 15, 2026, via the DES Public Procurement Portal (https://deswa.bonfirehub.com), with a virtual public bid opening on Microsoft Teams at approximately 1:30 PM the same day. The contract time for substantial completion is 100 calendar days after the Notice to Proceed, with final completion required within 30 calendar days thereafter. Liquidated damages are assessed at $550 per consecutive calendar day of default.
The estimated bid cost range is $370,000.00 to $585,000.00. A bid guarantee of 5% is required since the project exceeds $35,000. This is a public works project subject to prevailing wage requirements in Thurston County, Washington; bidders must verify current rates on the Department of Labor & Industries website. Voluntary numerical Diverse Business goals have been established at 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans participation. Apprenticeship utilization requirements do not apply as the project is estimated under $1 million. The successful bidder must register in the DES Diversity Compliance program (B2Gnow) and submit monthly payment reporting. Payment and performance bonds are required using AIA form A312 for 100% of the Contract Award Amount plus state sales tax. Contractor liability insurance is required with minimum coverage limits of $1,000,000 per occurrence and $2,000,000 aggregate for contracts in this range. Plans and specifications are available through the DES Public Procurement Portal or from multiple plan centers throughout Washington, Oregon, and Idaho for a $300 deposit.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
906 Columbia Street SW, Suite 400 KMB-architects.com 811 First Avenue, Suite 500
Olympia, WA 98501 360.352.8883 Seattle, WA 98104
Washington State - Department of Ecology ECY – Phase 2 Parks Move In (Lobby, Walkway, Sign) Lacey, WA
State Project No. 2026-711 G (1-1)
Project Manual – Construction Documents
31July, 2026
KMB Project 26011
Project Manual
Department of Ecology (ECY) ECY – Phase 2 Parks Move In (Lobby, Walkway, Sign)
Lacey, WA Project No. 2026-711 G (1-1)
Owner:
State of Washington - Department of Enterprise Services
Project Manager: Michael Tyson
Client Agency:
Washington State Department of Ecology
300 Desmond Drive SE Lacey, WA 98503
Consultant:
906 Columbia Street SW, Suite 400 Olympia, Washington 98501 811 First Avenue Seattle, Washington 98104
Owner Approvals:
Oliver Wu – Assistant Program Manager Date:
Department of Enterprise Services, P&PD
Michael Tyson – Construction Project Coordinator 4 Date:
Department of Enterprise Services, P&PD
James Brown – Facilities Manager
Department of Ecology Date:
er Approvals:
9/21/2026
9-21-2026
Ehsan Niksai
Department of Ecology SECTION 00 0105 ECY – Phase 2 Parks Move In (Lobby, Walkway, Sign) PROJECT DIRECTORY 2026-711 G (1-1)
00 0105 - 1
SECTION 00 0105
PROJECT DIRECTORY
CLIENT AGENCY
WASHINGTON STATE DEPARTMENT OF ECOLOGY
300 Desmond Drive SE
Lacey, Washington 98503
OWNER
STATE OF WASHINGTON DEPARTMENT ENTERPRISE SERVICES
Facility Professional Services
Post Office Box 41476
Olympia, Washington 98504-1476
Project Manager: Michael Tyson (Michael.Tyson@des.wa.gov)
360-277-7592
PROJECT LOCATION & REPRESENTATIVE
DEPARTMENT OF ECOLOGY
300 Desmond Drive SE
Lacey, WA 98503
James Brown, Facilities Manager, (jame461@ecy.wa.gov)
360.789.4299
ARCHITECT
KMB architects
906 Columbia St. SW, Suite 400
Olympia, Washington 98501
Partner: Tony Lindren, PE (TonyLindgren@KMB-architects.com)
Project Manager: Bill Ecker, DBIA, LEEP AP (BillEcker@kmb-architects.com)
360.352.8883
END OF SECTION 00 0105
Department of Ecology ECY – Phase 2 Parks Move In (Lobby, Walkway, Sign) SECTION 00 0110
2026-711 G (1-1) TABLE OF CONTENTS
00 0110 - 1
SECTION DESCRIPTION
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
------------- PROJECT TITLE PAGE / APPROVALS
00 0105 PROJECT DIRECTORY
00 0110 TABLE OF CONTENTS (THIS SECTION)
00 0115 LIST OF DRAWING SHEETS
00 1113 ADVERTISEMENT FOR BIDS
00 1114 PLAN CENTER LIST
---------- PRE-BID WALK-THROUGH AGENDA TEMPLATE
00 4000 INSTRUCTIONS TO BIDDERS
00 4100 BIDDING TERMS AND CONDITIONS
00 7200 GENERAL CONDITIONS FOR WASHINGTON STATE FACILITY CONSTRUCTION
----------- CERTIFICATE OF LIABILITY INSURANCE (EXAMPLE)
----------- INVOICE (EXAMPLE)
01 7318 INVOICE INSTRUCTIONS
---------- Form: PRE-CONSTRUCTION CHECKLIST (EXAMPLE)
00 7343 WAGE RATE REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 1000 SUMMARY
01 1101 SUMMARY OF HAZARDOUS MATERIALS
01 2000 PRICE & PAYMENT PROCEDURES
01 2050 CONTRACT MODIFICATION PROCEDURES
---------- FIELD AUTHORIZATION FORM (FA) (EXAMPLE)
---------- CHANGE ORDER PROPOSAL FORM (COP) (EXAMPLE)
----------- REQUEST FOR EQUITABLE ADJUSTMENT IN CONTRACT TIME (EXAMPLE)
01 2300 ALTERNATES
01 2500 SUBSTITUTION PROCEDURES
----------- SUBSTITUTION REQUEST FORM
01 3000 ADMINISTRATIVE REQUIREMENTS
01 3010 CONSTRUCTION PROGRESS MEETING AGENDA (Template)
01 3020 CONSTRUCTION CLOSEOUT MEETING AGENDA (Template)
---------- REQUEST FOR INFORMATION FORM (RFI) (EXAMPLE)
01 3050 REQUIRED SUBMITTALS SCHEDULE
00 0110 - 2
01 3126.50 ELECTRONIC MEDIA RELEASE FORM
01 3216 CONSTRUCTION PROGRESS SCHEDULE
01 4000 QUALITY REQUIREMENTS
----------- NOTICE OF NON-CONFORMANCE FROM (EXAMPLE)
01 4200 REFERENCES
01 4216 DEFINITIONS
01 5000 TEMPORARY FACILITIES & CONTROLS
01 6000 PRODUCT REQUIREMENTS
01 7000 EXECUTION REQUIREMENTS
01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 7800 CLOSEOUT SUBMITTALS & PROCEDURES
----------- SUBSTANTIAL COMPLETION CHECKLIST (EXAMPLE)
----------- FINAL ACCEPTANCE CHECKLIST (EXAMPLE)
DIVISION 02 – EXISTING CONDITIONS
02 2600 GOOD FAITH SURVEY
02 4119 SELECTIVE DEMOLITION
DIVISION 03 – CONCRETE
03 3053 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 (NOT USED)
DIVISION 05 – METALS
05 5000 METAL FABRICATIONS
05 5213 PIPE AND TUBE RAILINGS
DIVISION 06 – WOODS, PLASTICS AND COMPOSITES
06 4023 INTERIOR ARCHITECTURAL WOODWORK
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 9200 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 1213 HOLLOW METAL FRAMES
08 1416 FLUSH WOOD DOORS
08 5659 SERVICE WINDOW UNITS
00 0110 - 3
08 7100 DOOR HARDWARE
08 8000 GLAZING
DIVISION 09 – FINISHES
09 0561.13 MOISTURE VAPOR EMISSION CONTROL
09 2216 NON-STRUCTURAL METAL FRAMING
09 2900 GYPSUM BOARD
09 5123 ACOUSTIC TILE CEILINGS
09 6513 RESILIENT BASE AND ACCESSORIES
09 6813 TILE CARPETING
09 6913 RIGID-GRID ACCESS FLOORING
09 8100 ACOUSTIC INSULATION
09 9100 PAINTING
09 9600 HIGH-PERFORMANCE COATINGS
DIVISION 10 – SPECIALTIES
10 1419 DIMENSIONAL LETTER SIGNAGE
10 1423 PANEL SIGNAGE
10 1423.16 ROOM-IDENTIFICATION PANEL SIGNAGE
10 2613 CORNER GUARDS
DIVISION 11 (NOT USED)
DIVISION 12 – FURNISHINGS
12 3661.19 QUARTZ AGGLOMERATE COUTERTOPS
DIVISION 13 THROUGH DIVISION 14 (NOT USED)
DIVISION 21 – FIRE SUPPRESSION
21 0000 FIRE SUPPRESSION WORK SPECIFIED IN DIVISION 23
21 1000 AUTOMATIC FIRE SUPPRESSION SYSTEMS
DIVISION 22 (NOT USED)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 0500 GENERAL PROVISIONS
23 0505 PROJECT CLOSEOUT AND SYSTEM START-UP
23 0510 BASIC MATERIALS AND METHODS
00 0110 - 4
23 0512 INDOOR AIR QUALITY -HVAC
23 0520 MECHANICAL DEMOLITION
23 0548 VIBRATION ISOLATION
23 0550 SEISMIC CONTROL
23 0593 TESTING, ADJUSTING, AND BALANCING
23 0700 MECHANICAL INSULATION
23 0810 SYSTEMS TRAINING
23 0820 SYSTEMS OPERATIONS AND MAINENANCE MANUALS
23 0900 AUTOMATIC TEMPERATURE CONTROLS
23 3100 AIR DISTRIBUTION
23 3300 AIR DISTRIBUTION ACCESSORIES
23 3700 AIR DEVICES
DIVISION 25 THROUGH 26 (NOT USED)
DIVISION 27 - COMMUNICATIONS
27 0000 COMMUNICATIONS WORK SPECIFIED IN DIVISION 26
27 1100 TELECOMMUNICATIONS SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 0000 ELECTRONIC SAFETY AND SECURITY WORK SPECIFIED IN DIVISION 26
28 1300 ACCESS CONTROL SYSTEM
28 3111 FIRE ALARM DETECTION
END OF SECTION 00 0110
DEPARTMENT OF ECOLOGY 00 0115
ECY – Phase 2 Parks Move In (Lobby, Walkway, Sign) LIST OF DRAWING SHEETS 2026-711 G (1-1)
00 0115 - 1
END OF SECTION
END OF SECTION
SHEET INDEX
GENERAL
G-101 COVER SHEET
G-201 DESIGN STANDARDS AND CODE INFORMATION
DEMOLITION
AD101 DEMOLITION PLAN - MAIN LOBBY
AD102 DEMOLITION PLAN - ATRIUM ALTERNATES
SITE
AS101 SITE PLAN
ARCHITECTURE
A-111 PARTIAL FLOOR PLANS - MAIN LOBBY
A-112a PARTIAL FLOOR PLANS - ATRIUM ALTERNATES
A-151 PARTIAL REFLECTED CEILING PLAN - MAIN LOBBY
A-251 INTERIOR ELEVATIONS
A-501 ASSEMBLY TYPES
A-511 INTERIOR DETAILS
A-601 WINDOWS, DOOR & FRAME SCHEDULES & DETAILS
A-701 FLOOR FINISH PLAN
A-702a ATRIUM FLOOR FINISH PLAN ALTERNATES
MECHANICAL
M001 MECHANICAL LEGEND & DRAWING INDEX
M002 MECHANICAL ABBREVIATIONS, GENERAL NOTES & SCHEDULES
MD301 PARTIAL HVAC DEMOLITION PLAN
M301 PARTIAL HVAC PLAN
M501 PARTIAL FIRE PROTECTION PLAN
ELECTRICAL
E-802 SECURITY DETAILS
E-001 ELECTRICAL LEGEND & DRAWING INDEX
E-002 ELECTRICAL ABBREVIATIONS, GENERAL NOTES & SCHEDULES
E-003 TELECOM AND SECURITY SCHEDULES
ED-301 ELECTRICAL DEMO PLAN
ED-601 TELECOM DEMO PLAN
E-101 ELECTRICAL SITE PLAN
E-201 PARTIAL LIGHTING PLAN
E201a PARTIAL LIGHTING CONTROL ZONE PLAN
E-301 PARTIAL POWER PLAN
E-302 PARTIAL POWER PLAN - ATRIUM - ALTERNATE
E-600 TELECOM PARTIAL PLAN - BASEMENT
E-601 TELECOM PARTIAL PLAN - BASEMENT
E-602 TELECOM PARTIAL FLOOR PLAN - LOBBY
E-801 TELECOM DETAILS
E-901 PARTIAL ONE-LINE DIAGRAM
SHEET INDEX
GENERAL
G-101 COVER SHEET
G-201 DESIGN STANDARDS AND CODE INFORMATION
DEMOLITION
AD101 DEMOLITION PLAN - MAIN LOBBY
AD102 DEMOLITION PLAN - ATRIUM ALTERNATES
SITE
AS101 SITE PLAN
ARCHITECTURE
A-111 PARTIAL FLOOR PLANS - MAIN LOBBY
A-112a PARTIAL FLOOR PLANS - ATRIUM ALTERNATES
A-151 PARTIAL REFLECTED CEILING PLAN - MAIN LOBBY
A-251 INTERIOR ELEVATIONS
A-501 ASSEMBLY TYPES
A-511 INTERIOR DETAILS
A-601 WINDOWS, DOOR & FRAME SCHEDULES & DETAILS
A-701 FLOOR FINISH PLAN
A-702a FLOOR FINISH PLAN - ATRIUM ALTERNATES
MECHANICAL
M001 MECHANICAL LEGEND & DRAWING INDEX
M002 MECHANICAL ABBREVIATIONS, GENERAL NOTES & SCHEDULES
MD301 PARTIAL HVAC DEMOLITION PLAN
M301 PARTIAL HVAC PLAN
M501 PARTIAL FIRE PROTECTION PLAN
ELECTRICAL
E-802 SECURITY DETAILS
E-001 ELECTRICAL LEGEND & DRAWING INDEX
E-002 ELECTRICAL ABBREVIATIONS, GENERAL NOTES & SCHEDULES
E-003 TELECOM AND SECURITY SCHEDULES
ED-301 ELECTRICAL DEMO PLAN
ED-601 TELECOM DEMO PLAN
E-101 ELECTRICAL SITE PLAN
E-201 PARTIAL LIGHTING PLAN
E201a PARTIAL LIGHTING CONTROL ZONE PLAN
E-301 PARTIAL POWER PLAN
E-302 PARTIAL POWER PLAN - ATRIUM - ALTERNATE
E-600 TELECOM PARTIAL PLAN - BASEMENT
E-601 TELECOM PARTIAL PLAN - BASEMENT
E-602 TELECOM PARTIAL FLOOR PLAN - LOBBY
E-801 TELECOM DETAILS
E-901 PARTIAL ONE-LINE DIAGRAM
ADVERTISEMENT FOR BIDS
Sealed bids will be accepted for the following project:
PROJECT NO.: 2026-711 G (1-1)
TITLE: ECY - Phase 2 Parks Move In (Lobby, Walkway, Sign)
AGENCY: FPS for Dept. of Ecology
PROJECT MANAGER: Ehsan Niksai
ESTIMATED BID COST RANGE: $370,000.00 to $585,000.00
SUBMITTAL
TIME/DATE/LOCATION:
No later than 1:00 PM, Thursday, October 15, 2026.
Submit Online at DES Public Procurement Portal:
https://deswa.bonfirehub.com.
(See additional information below)
Bids should be submitted no later than 1:00 PM for the Virtual Public Bid Opening on Microsoft Teams which will be held at approximately 1:30 PM on Thursday, October 15, 2026
Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 232 943 171 100 Passcode: WPJKXj
Download Teams | Join on the web Or call in (audio only) +1 564-999-2000,,994059963# United States, Olympia
(833) 322-1218,,994059963# United States (Toll-free)
Phone Conference ID: 994 059 963# Find a local number | Reset PIN (See additional information below) https://deswa.bonfirehub.com/ https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2JjZDU0NGUtZmM3NC00OTlhLWE2NWQtOTViYzNiMjg1OTk0%40thread.v2/0?context=%7b%22Tid%22%3a%2211d0e217-264e-400a-8ba0-57dcc127d72d%22%2c%22Oid%22%3a%228276b297-0ea1-4aca-beed-94bf985ec531%22%7d https://www.microsoft.com/en-us/microsoft-teams/download-app https://www.microsoft.com/microsoft-teams/join-a-meeting tel:+15649992000,,994059963#%20 tel:8333221218,,994059963#%20 https://dialin.teams.microsoft.com/811a9140-4f87-4b3b-b4e5-c0df12d33f3f?id=994059963 https://dialin.teams.microsoft.com/usp/pstnconferencing
ADVERTISEMENT Page 2 of 3 Effective May 1, 2026
ISSUED BY: Department of Enterprise Services
Facility Professional Services
PRE-BID WALK-THROUGH:
10:00 A.M. on Thursday, October 1, 2026 at Dept. of Ecology, 300 Desmond Drive SE, Lacey, WA 98503.
For specific directions for an on-site pre-bid meeting or site visit, please contact the Consultant listed below.
All Public Works Bid Openings will be conducted via live stream on Microsoft Teams. A link to the live stream for bid opening can be found above. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process.
If you have questions, please contact the Project Manager, Ehsan Niksai at Ehsan.niksai@des.wa.gov or (360) 701-6947
This link provides support with the Euna Procurement Vendor processes and help:
https://customer.eunasolutions.com/public/s/. Visit site for help and details.
DES Public Procurement Portal is the official platform for accessing plans, specifications and detailed submissions for DES Public Works Projects. These documents can be obtained through the DES Public Procurement Portal https://deswa.bonfirehub.com. Contractors may also obtain plans and specifications from the Plan Centers listed below, or KMB architects, Inc. p.s., 906 Columbia Street SW, Olympia, WA 98501, (360) 352-8883, BillEcker@KMB-architects.com, upon deposit of $300.00.
Please make checks payable to KMB architects, Inc. p.s. Plans must be returned in good condition within seven (7) days following bid date to obtain a refund of deposit. After seven days no refunds will be made.
List of plan centers: Abadan Reprographics & Imaging, Spokane, WA; ARC Document Solutions, Seattle, WA; ARC Document Solutions, Tacoma, WA; Associated Builders & Contractors, Spokane, WA; Associated General Contractors, Boise, ID; Builder’s Exchange of Washington, Everett, WA; Daily Journal of Commerce Plan Center, Portland, OR; Daily Journal of Commerce, Seattle, WA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Milwaukie, OR;
Ridgeline Graphics (Wenatchee Plan Center), Wenatchee, WA; Spokane Regional Plan Center, Spokane, WA; Tri-City Construction Council, Kennewick, WA; Walla Walla Valley Plan Center, Walla Walla, WA; Weekly Construction Reporter, Bellingham, WA; Yakima Plan Center, Yakima, WA.
Please direct questions regarding this project through the DES Public Procurement Portal https://deswa.bonfirehub.com. or to the office of the Consultant.
Bid Results will be available on the DES Public Procurement Portal: https://deswa.bonfirehub.com following the bid opening.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fcustomer-success-links.totango.co%2Fss%2Fc%2Fu001.TEy9vfb3GYVWunjhizp7VGjZ-g44dT_GKOYTPTwI96tVKi_fnbX9vgesvWWVm1KX1eC8pK8dZheL2wi58_kW0w%2F4hh%2FyRW2YWBVR9KTRjjxMMvc8g%2Fh0%2Fh001.CDUxsV3RMP1QHveeJKaYopDffmCQca5yzaXFGPKUA-0&data=05%7C02%7Calissa.north%40des.wa.gov%7C28201d05d299489392ba08ddaf32780f%7C11d0e217264e400a8ba057dcc127d72d%7C0%7C0%7C638859353482580698%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=GkNL9yaDaYh%2Bbuu4E1HA4DCFuWYmuoWH3EF8NRslFPs%3D&reserved=0
ADVERTISEMENT Page 3 of 3 Effective May 1, 2026
The State of Washington prevailing wage rates are applicable for this public works project located in Thurston County. Bidders are responsible to verify and use the most recent prevailing wage rates.
The “Effective Date” for this project is the bid submittal time and date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located at https://secure.lni.wa.gov/wagelookup/.
The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow) at https://des.diversitycompliance.com. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at http://OMWBE.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in B2Gnow at DES diversity compliance program B2Gnow and Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search.
The State reserves the right to accept or reject any or all bids and to waive informalities.
STATE OF WASHINGTON
DEPARTMENT OF ENTERPRISE SERVICES
FACILITY PROFESSIONAL SERVICES
2026711Gbidadlongca https://secure.lni.wa.gov/wagelookup/ https://des.diversitycompliance.com/ http://omwbe.wa.gov/ https://des.diversitycompliance.com/ https://des.diversitycompliance.com/ https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search
Plan Center List
Abadan Reprographics & Imaging 603 E. 2nd Ave.
Spokane, WA 99202 www.abadanplancenter.com www.abadanplanroom.com
(509) 747-2964 planroom@abadanplancenter.com repro@abadanspokane.com
Daily Journal of Commerce Plan Center 921 SW Washington Street, Suite 210 Portland, OR 97205-2810 www.djcoregon.com;
(503) 274-0624, fax (503) 802-7239 plancenter@djcoregon.com
Tri-City Construction Council 20 E Kennewick Avenue Kennewick, WA 99336-3756 www.tricityplancenter.com
(509) 582-7424, fax (509) 582-6815 bidinfo@tcplancenter.com
ARC Document Solutions 632 Broadway Tacoma, WA 98402
(253) 383-6363 www.e-arc.com/location/tacoma/ Tacoma.bidservices@e-arc.com
Daily Journal of Commerce – Seattle 83 Columbia Street, Suite 200 Seattle, WA 98104-1482 www.djc.com
(206) 622-8272, fax (206) 622-7086 plans@djc.com
Walla Walla Valley Plan Center 29 E Sumach Street Walla Walla, WA 99362-0230 www.tricityplancenter.com
(509) 525-0850, fax (509) 522-2038 trichards@wwvchamber.com
ARC Document Solutions 2730 Occidental Avenue S Seattle, WA 98134
(206) 622-6000 www.e-arc.com/location/seattle/ seattle.bid.services@e-arc.com
Hermiston Plan Center 1565 N 1st Street, Suite 8A Hermiston, OR 97838-1368 www.hermistonplancenter.com
(541) 564-0420, fax (541) 564-0396 office@hermistonplancenter.com
Weekly Construction Reporter 2215 Midway Lane, Suite 208 Bellingham, WA 98226-1219 www.wcrinc.com
(360) 738-0370, fax (360) 738-0371 info@wcrinc.com
Associated Builders & Contractors 1760 E. Trent Ave. Spokane, WA 99202 http://www.ipcabc.org/
(509) 534-0826, fax (509) 535-9967 abcplancenter@ipcabc.org
Plan Center NW, Inc.
P.O. Box 2486 Clackamas, OR 97015 www.plancenternw.com
(503) 650-0148 brie@plancenternw.com
Yakima Plan Center 1212 N 16th Avenue, Suite 2 Yakima, WA 98902-1348 www.yakmaplancenter.com
(509) 457-4271, fax (509) 457-0775 jacki@yakimaplancenter.com
Associated General Contractors - Idaho 1649 W Shoreline Dr. Suite 100 Boise, ID 83702 http://www.idahoagc.org/ 208-344-2531, fax (208) 772-6472 planroom@idahoagc.org
Ridgeline Graphics (Wenatchee Plan Center) 962 Valley Mall Pkwy East Wenatchee, WA 98802 www.wenatcheeplancenter.com
(509) 662-6858 ext. 123, fax (509) 663-8530 plancenter@ridgelinegraphics.com mercedes@ridgelinegraphics.com
MBE, WBE or SBE owned plan center
Builders Exchange of Washington 2607 Wetmore Avenue Everett, WA 98201-2926 http://www.bxwa.com/
(425) 258-1303, fax (425) 259-3832 production@bxwa.com
Spokane Regional Plan Center 209 N Havana Street Spokane, WA 99202-4723 www.plancenter.net
(509) 328-9600, fax (509) 328-7279 projectinfo@plancenter.net
Salem Contractors Exchange 2256 Judson ST SE Salem, OR 97302 www.sceonline.org 503-362-7957 plans@sceonline.org
Document updated: 7-1-2026 http://www.abadanplancenter.com/ http://www.abadanplanroom.com/ mailto:planroom@abadanplancenter.com mailto:repro@abadanspokane.com http://www.djcoregon.com/ mailto:plancenter@djcoregon.com http://www.tricityplancenter.com/ mailto:bidinfo@tcplancenter.com http://www.e-arc.com/location/tacoma/ mailto:Tacoma.bidservices@e-arc.com http://www.djc.com/ mailto:plans@djc.com http://www.tricityplancenter.com/ mailto:trichards@wwvchamber.com http://www.e-arc.com/location/seattle/ mailto:seattle.bid.services@e-arc.com http://www.hermistonplancenter.com/ mailto:office@hermistonplancenter.com https://www.wcrinc.com/ https://www.wcrinc.com/ mailto:info@wcrinc.com http://www.ipcabc.org/ mailto:abcplancenter@ipcabc.org http://www.plancenternw.com/ mailto:brie@plancenternw.com http://www.yakmaplancenter.com/ mailto:jacki@yakimaplancenter.com http://www.idahoagc.org/ mailto:kwatson@idahoagc.org http://www.wenatcheeplancenter.com/ mailto:plancenter@ridgelinegraphics.com mailto:mercedes@ridgelinegraphics.com http://www.bxwa.com/ mailto:production@bxwa.com http://www.plancenter.net/ mailto:projectinfo@plancenter.net http://www.sceonline.org/ mailto:plans@sceonline.org
Department of Enterprise Services
Facilities Division, Engineering & Architectural Services
Agenda for Pre-Bid Walk-Through
Date
Project Number:
Project Name:
Location:
Project Manager:
PM Phone & Email: Email:
MODIFY THIS DOCUMENT TO SUIT THE PROJECT
1. Project Manager Introduces Project Team Members
A. Project Manager
B. On-site Representative
C. Plant Manager
D. Architect/Engineer and major subs
E. Other members
Note: During the pre-bid walk-through meeting, all conversations are considered informal and are not contractually binding unless stated in the contract manual, drawings, or modified by a written addendum. The order of precedence is written addendum, project manual, and lastly contract drawings.
2. Route a sign-in sheet to all attendees
3. The Architect/Engineer Presents the General Description of Scope
A. Site Preparation
1) Construction security fencing
2) Unusual storm water controls during construction (if applicable)
3) Earthwork
4) Cautions
B. Infrastructure Improvements
1) Water
2) Sewer
3) Power
4) IT/communications
9/29/2026
2026-711 G (1-1) ECY Phase 2 Parks Move In (Lobby, Walkway, Sign) 300 Desmond Drive SE, Lacey, WA 98503 Ehsan Niksai
360.701.6947 Ehsan.Niksai@des.wa.gov
5) Security electronics
C. Building Description
1) Architectural materials
2) Structure
3) Mechanical systems
4) Alternate power (if applicable)
D. Other Issues
1) Permits
2) LEED requirements (if applicable)
3) Construction Waste Management
4. Construction Site Access and Lay-Down Area
5. Discussion of Security Requirements necessary on this Project (Presented by facility security officer – Refer to Specifications Section – the facility may have their own checklist to use in addition.)
A. Personal Behavior
1) Depending on the project, security clearances and ID badges may be required. Like working on Dept of Health Labs where badges may be required.
a) The badge must be worn at all times
b) The badge must be clearly visible at all times
2) Items: tobacco, currency, cell phones, cameras, etc.
a) State facilities are tobacco free areas
b) Phones and cameras are addressed by the GC’s or Division 1.
3) Respectful conduct
a) At all times
b) Sexual harassment of any kind is cause for removal from the job
4) Work Hours
a) Established there may be limited work hours for access to a facility because sometimes all work is done at night.
b) Advance arrangements required for staying late or coming in early
c) Institutional holidays
5) Work Operations
a) Only company vehicles are allowed on construction site
b) Parking areas for workers are usually established to avoid conflict with faculty, staff and students or occupants
c) Requirements for company vehicles on site (keys, locking gas caps, etc.)
d) Specific equipment not allowed remaining overnight in specified areas.
e) Procedures for delivery vehicles
a. Impact on earth-moving operations
b. Ladders
c. Special equipment
f) Tool inventory/storage requirements if needed.
g) Dumpster requirements
h) Utility outage
i) Interception of materials
j) Flammable materials
k) Medical emergencies – the contractor’s site specific safety plan should address this.
6. Other Projects Currently Occurring on Site
7. Project Manager Outlines Project Schedule, Bid Submittal Process, Contracts, etc.
A. MWBE Requirements
B. Apprenticeship Requirements
C. Supplemental Bidder Responsibility
8. Site Walk
9. Schedule of Addendum Release Instructions
10. Questions and Answers
INSTRUCTIONS TO BIDDERS Effective July 1, 2026
Post Office Box 41476 Olympia, Washington 98504-1476
(360) 902-7272
Instructions to Bidders Effective: July 1, 2026
For Washington State Facility Construction and Small Works
Approved by: _____________________ Kimberly Sockle, Assistant Director
INSTRUCTIONS TO BIDDERS
FOR WASHINGTON STATE FACILITY CONSTRUCTION AND SMALL WORKS
PART 0 – GENERAL CONDITIONS
0.00 EXPLANATION TO PROSPECTIVE BIDDERS
A. In accordance with RCW 39.04.380 effective March 30, 2012, the State of Washington is enforcing a Reciprocal Preference for Resident Contractors. Any public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a comparable percentage disadvantage must be applied to the bid of that nonresident contractor.
A nonresident contractor from a state that provides a percentage bid preference means a contractor that:
1. Is from a state that provides a percentage bid preference to its resident contractors bidding on public works contracts.
2. At the time of bidding on a public works project, does not have a physical office located in
Washington.
The state of residence for a nonresident contractor is the state in which the contractor was incorporated or, if not a corporation, the state where the contractor's business entity was formed.
All nonresident contractors will be evaluated for out-of-state Bidder preference. If the state of the nonresident contractor provides an in-state contractor preference, a comparable percentage disadvantage will be applied to their bid prior to contract award.
This section does not apply to public works procured pursuant to RCW 39.04.155, 39.04.280, or any other procurement exempt from competitive bidding.
B. Any prospective Bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing to the Architect/Engineer (A/E) eight (8) business days before the bid due date or by logging into the DES Public Procurement Portal (https://deswa.bonfirehub.com) and submitting a vendor discussion. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective Bidder concerning a solicitation will be furnished promptly to all other prospective Bidders by addendum to the solicitation if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders.
C. In accordance with the legislative findings and policies set forth in RCW 39.19 the State of Washington encourages participation in all of its contracts by MWBE firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Participation may be either on a direct basis in response to this invitation or as a subcontractor to a Bidder. However, unless required by federal statutes, regulations, grants, or contract terms referenced in the contract documents, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis. Any affirmative action requirements set forth in federal regulations or statutes included or referenced in the contract documents will apply.
D. In accordance with the legislative findings and policies set forth in RCW 43.60A.200, the State of Washington encourages 3% (three percent) participation in all of its contracts by Veteran-owned businesses (defined in RCW 43.60A.010) and located at:
https://dva.wa.gov/veterans-service-members-and-their-families/veteran-owned-businesses.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdva.wa.gov%2Fveterans-service-members-and-their-families%2Fveteran-owned-businesses&data=05%7C02%7Caaron.young%40des.wa.gov%7C385ddd3790c84a1a699f08dec5abe879%7C11d0e217264e400a8ba057dcc127d72d%7C0%7C0%7C639165539394468861%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=L%2BkZT0SpUdwhLrK1jFHc%2FIZfPeLV1oki952VJc1CPDU%3D&reserved=0
E. In order to report payment detail, the Contractor must create an account in the DES Public Works Diversity Tracking & Management System powered by B2GNow or verify if an account has already been created on behalf of the Contractor: https://des.diversitycompliance.com. The DES Public Works Diversity Tracking & Management System is designed to streamline and automate compliance reporting requirements, empowering vendors to maintain accurate contact information and submit contract payment details online.
1. For account login or account creation details, go to the DES Public Works Diversity Tracking
& Management System home page by clicking on the URL listed above and clicking on Information for Vendors.
2. Every month for the duration of the contract, and while the contract is active in the DES Public
Works Diversity Tracking & Management System, submit and accurately maintain the following payment information through the DES Public Works Diversity Tracking & Management System:
(a) Payments received by the prime contractor from the Agency.
(b) Payments paid to each first-tier subcontractor.
(c) Payments paid to each first-tier supplier.
3. The Contractor must also ensure the following information is reported in the DES Public Works
Diversity Tracking & Management System by first tier subcontractors and suppliers for the duration of the contract:
(a) Confirmation of payments from the prime contractor to the subcontractor.
(b) Payment reporting to each supplier.
E. In accordance with RCW 39.04.320, for all public works estimated to cost one million dollars or more, the State of Washington requires no less than 15% of the labor hours be performed by apprentices, unless otherwise stated in the bid advertisement or on the Submittal Questionnaire/Bidding Terms and Conditions. A contractor or subcontractor may not be required to exceed the 15% requirement. On applicable projects, the Bidder shall establish in the DES Public Procurement Portal and the Submittal Questionnaire/Bidding Terms and Conditions a minimum required percentage of apprentice labor hours compared to the total labor hours. The project’s apprenticeship utilization rate is calculated using the approved affidavits from the L&I portal.
Apprenticeship Requirements are not required for Small Works Projects estimated under $350K.
1. Incentives - The Contractor who meets or exceeds this utilization requirement on eligible contracts, will be awarded a monetary incentive described in the Apprentice Utilization Requirements of section 10.12 of the General Conditions.
2. Penalties - The Contractor who fails to meet the utilization requirement and fails to demonstrate a Good Faith Effort, as outlined below, is subject to penalties described in the Apprentice Utilization Requirements section in section 10.12 of the General Conditions.
Contractor will receive an invoice payable to the Owner within 30 days. The contractor will have 30 days to pay the penalty invoice at the time of receipt before the penalty is considered outstanding. Contractors with outstanding apprenticeship penalties may be considered non-responsive.
3. Cost Value - The expected cost value associated with meeting the goal is included in the
Base Bid as described in section 10.12 of the General Conditions.
4. Utilization Plan - The Contractor shall submit an Apprentice Utilization Plan (Plan) using the Supplemental Bidder Responsibility Criteria Form 4 demonstrating how they intend to achieve the Apprenticeship Utilization Requirements. The Plan shall have enough information to track the Contractor’s progress in meeting the utilization requirement. The Contractor shall submit the Plan on the Apprentice Utilization Plan template (on the DES Public Works Forms website).
(a) The Plan shall be submitted to the Project Manager when requested for the Supplemental
Bidder Responsibility Criteria. A Plan that fails to meet the minimum requirements in RCW 39.04.350 may result in the contractor being determined as not responsible.
(b) The Plan shall be uploaded to the Department of Labor & Industries’ (L&I) Prevailing Wage Intents and Affidavit (PWIA) system on L&I’s website within 10 business days of Notice to Proceed of the contract and prior to submitting the first invoice.
(c) It is expected that the Contractor will actively seek out opportunities to meet the
Apprentice Utilization Requirement during construction even if the Plan indicates a shortfall in meeting the requirement.
(d) The Contractor shall provide an updated Plan during the course of construction when there are significant changes to the Plan which may affect their ability to meet the requirement.
(e) If the Plan indicates that the Contractor will not attain the Apprentice Utilization Requirement, then Contractor must submit “Good Faith Effort” (GFE) documentation with their Plan to L&I’s PWIA system.
5 Additional Resource Information
(a) For questions regarding how to complete the Apprentice Utilization Plan template or Good Faith Effort documentation, please contact the Project Manager listed in the Bid Advertisement.
(b) Step-by-step instructions on how to access and navigate the L&I’s PWIA system, including uploading required documents can be found on the L&I website.
(c) Additional information about apprentice utilization on Public Works Project can be found on the L&I website.
0.01 PREPARATION OF BIDS
A. Bidders must be registered as a vendor through the DES Public Procurement Portal (https://deswa.bonfirehub.com). Bid submissions must be submitted through the DES Public Procurement Portal (https://deswa.bonfirehub.com). The individual who has signed/submitted the Bid through the E Portal shall be the authorized designee responsible for bid submissions.
B. All bidders for Small Works Projects must be currently registered on the MRSC Small Works Roster (vendor list) found http://mrscrosters.org/.
C. Bidders are required to submit bid prices for one or more items on various bases through the DES Public Procurement Portal on the BidTable, including: (1) lump sum base bid; (2) lump sum bid alternate prices; (3) unit prices; or (4) any combination of items 1 through 3 above.
D. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, Bidders should indicate “no bid” on the DES Public Procurement Portal BidTable for any item on which no price is submitted.
E. Substitute bid forms will not be considered unless this solicitation authorizes their submission.
http://mrscrosters.org/
0.02 BID GUARANTEE
A. When the sum of the base bid plus all additive bid alternates is $35,000.00 or less, bid security is not required.
When the sum of the base bid plus all additive alternates is greater than $35,000.00, a bid guarantee in the amount of 5% of the base bid amount is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive.
B. Acceptable forms of bid guarantee are A bid bond or postal money order, or certified check or cashier’s check made payable to the Washington State Treasurer. At the time of bid, the bidder must upload an electronic copy of the acceptable bid guarantee to the DES Public Procurement Portal (https://deswa.bonfirehub.com).
If any of the 3 lowest responsive bidders has indicated a cashier’s check as their form of bid security, they will be contacted by DES with instructions on how to submit the original/valid cashier’s check within 48 hours of being notified. The Owner will return bid guarantees (certified check or cashier’s check) to unsuccessful Bidders as soon as practicable, but not sooner than the execution of a contract with the successful Bidder. The successful Bidder’s bid guarantee will be returned to the successful Bidder with its official notice to proceed with the work of the contract.
C. The Bidder will allow 60 days from bid opening date for acceptance of its bid by the Owner.
The Bidder will return to the Owner a signed contract, insurance certificate and bond or bond waiver within 15 days after receipt of the contract. If the apparent successful Bidder fails to sign all contractual documents or provide the bond and insurance as required or return the documents within 15 days after receipt of the contract, the Owner may terminate the award of the contract.
D. In the event a Bidder discovers an error in its bid following the bid opening, the Bidder may request to withdraw its bid under the following conditions:
1. The Bidder must submit written notification of the withdrawal to the Owner within 24 hours following the bid opening.
2. The Bidder provides written documentation of the claimed error to the satisfaction of the
Owner within 72 hours following the bid opening.
3. The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the
Bidder’s request for withdrawal of its bid is approved, the Bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the Bidder’s bid guarantee.
0.03 ADDITIVE OR DEDUCTIVE BID ITEMS
The low Bidder, for purposes of award, shall be the responsive Bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by the Owner, and within funds available for the project.
The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid opening.
0.04 ACKNOWLEDGEMENT OF ADDENDA
Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers on the DES Public Procurement Portal Submittal Questionnaire. Failure to do so shall result in the bid being declared non-responsive.
0.05 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
The Bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to; (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and road; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work.
The Bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner, as well as from the drawings and specifications made a part of this contract. Any failure of the Bidder to take the actions described and acknowledged in this paragraph will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work.
0.06 BID AMOUNTS
A. The bid prices shown for each item on the DES Public Procurement Portal BidTable shall include all labor, material, equipment, overhead and compensation to complete all of the work for that item.
B. The actual cost of building permit (only) and the public utility hookup fees will be a direct reimbursement to the Contractor or paid directly to the permitting agency by the Owner. Fees for these permits should not be included by the Bidder in the bid amount.
C. The Bidder agrees to hold the base bid prices for sixty (60) days from date of bid opening.
0.07 TAXES
The bid amounts shall not include Washington State Sales Tax (WSST). All other taxes imposed by law shall be included in the bid amount. The Owner will include WSST in progress payments. The Contractor shall pay the WSST to the Department of Revenue and shall furnish proof of payment to the Owner if requested.
[NOTE: Contractor must bond for contract amount plus the WSST.]
0.08 SUBMISSION OF BIDS
A. Bids must be submitted on or before the time as specified in the Advertisement for Bids.
B. The Bid shall be submitted electronically through the DES Public Procurement Portal as specified in the Advertisement for Bids.
C. Prior to the bid opening, the Owner’s representative will designate the official bid clock. Any part of the Bid Form, or in the rare situation of a bid modification, not received prior to the specified times, per the designated bid clock, will not be considered and the bid will be returned to the Bidder unopened.
D. A bid may be withdrawn electronically by a Bidder’s authorized representative before the bid submittal date and time specified in the Advertisement for Bids.
E. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, braille, etc.) need to contact the Owner ten (10) business days prior to the scheduled bid opening.
F. In the event the DES Public Procurement Portal is unavailable to all users at the bid submittal deadline, DES will contact the Bidders within 24 hours, and DES will extend the bid submittal time.
G. Neither DES nor DES Public Procurement Portal can guarantee the availability of Internet connectivity or related telecommunication and hosting services and will not be liable or responsible if the Bidder and its representative(s) or designee(s) cannot connect to the DES Public Procurement Portal.
H. The Bidder must comply with the Euna Procurement Portal’s Terms of Service
(https://gobonfire.com/terms-service/) when submitting the Bid through the DES Public Procurement Portal.
0.09 SUBCONTRACTOR LISTING
Pursuant to RCW 39.30.060, when the consultant’s estimated cost of the project, including the base bid and additive alternates, is $1 million or more, bidders shall comply with the following requirements
Subcontractor Listing Requirements are not required for Small Works Projects estimated under $350K.
A. Form A: (HVAC, Plumbing and Electrical) must be submitted at TIME OF BID to the DES Public
Procurement Portal https://deswa.bonfirehub.com with bid submission; late submission will render the bid non-responsive.
1. Failure of the Bidder to submit the NAMES and LICENSE NUMBERS of such subcontractors, or to name itself to perform such work, shall render the bid nonresponsive. (Failure to submit this form will render the bid nonresponsive)
B. Form B: (Structural Steel Installation and Rebar Installation) must be submitted no later than forty-eight (48) hours after bid deadline via email to FPSsubcontractorlist@des.wa.gov.
(Or may be submitted with the bid submittal through the Procurement Portal https://deswa.bonfirehub.com.)
1. Failure of the Bidder to submit the NAMES of such subcontractors, or to name itself to perform such work, shall render the bid nonresponsive. (Failure to submit this form will render the bid nonresponsive)
C. The Bidder can name itself for the performance of the work. Bidders who name themselves to perform the work are expected to perform the work and the Department of Enterprise Services reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.
1. For any listed category not included in the project, the bidder may mark 'Not Applicable' or
'N/A' or leave that category blank, provided the form is signed.
D. Substitution of a listed subcontractor (at any tier) before or after the award of the prime contract is prohibited except for the following reasons:
1. Refusal of the listed subcontractor to sign a contract with the prime contractor,
2. Bankruptcy or insolvency of the listed subcontractor,
3. Inability of the listed subcontractor to perform the requirements of the proposed contract or the project,
4. Inability of the listed subcontractor to obtain the necessary license, bonding, insurance, or other statutory requirements to perform the work detailed in the contract,
5. Refusal or inability to provide a letter of bondability from a surety company, or
6. The listed subcontractor is barred from participating in the project as a result of a court order.
E. The Bidder shall not list more than one Subcontractor for each category of work identified
UNLESS Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate.
https://gobonfire.com/terms-service/ mailto:FPSsubcontractorlist@des.wa.gov
F. Failure of the Bidder to submit Form A with the NAMES and LICENSE NUMBERS of such Subcontractors and Form B with the NAMES of such Subcontractors or to name itself to perform such work within the specified times, shall render the Bidder's bid nonresponsive and, therefore, will be eliminated (withdrawn) from the DES Public Procurement Portal.
G. The Subcontractor List Form A and Form B are intended to discourage bid shopping.
0.10 BID RESULTS
After the Bid Opening, Bidders may obtain bid results from the office of DES Facility Professional Services (FPS) or by logging into the DES Public Procurement Portal (https://deswa.bonfirehub.com) and viewing public notices. Bid results may also be obtained from the A/E.
0.11 BID PROTESTS
A. Bidders may submit a bid protest to easmail@des.wa.gov within 2 business days of the Bid Opening, or within 2 business days after DES provided electronic copies of bid submissions received to those Bidders that timely requesting copies of bids received, if later. To be considered timely for purposes of this Section 0.11, a request for electronic copies of bid submissions received must be made within 2 business days after the bid opening.
1. DES will not acknowledge or accept any bid protest received more than 2 business days after the time set out in (A) above.
2. DES will not accept bid protests from non-bidders.
B. DES will review any bid protest received and shall maintain sole discretion on the merits of and resolution of any bid protest.
C. DES will provide written notice to protesting bidders of an intent to enter upon a Public Works
Contract with anyone other than the protesting bidder as follows:
1. Not less than 2 business days following the Bid Opening, if no bidders request electronic copies of bid submissions received, or
2. Not less than 2 business days following the date on which DES provided electronic copies of the bid submissions received to those bidders requesting electronic copies of bids received.
0.12 LOW RESPONSIBLE BIDDER
A. Mandatory Responsibility Criteria: Before awarding a public works contract, a Bidder must meet the following mandatory responsibility criteria under RCW 39.04.350 (1) & (2) to be considered a responsible Bidder and qualified to be awarded a public works project. The individual who has signed/submitted the Bid through the DES Public Procurement Portal shall be the authorized designee responsible for bid submissions. The Bidder must:
1. At the time of bid submittal, have a certificate of registration in compliance with RCW 18.27, a plumbing contractor license in compliance with RCW 18.106, an elevator contractor license in compliance with RCW 70.87, or an electrical contractor license in compliance with RCW
19.28 as required under the provisions of those chapters.
2. Have a current state unified business identifier number.
3. If applicable, have industrial insurance coverage for the Bidder's employees working in Washington as required in RCW 51; an employment security department number as required in RCW 50; and a state excise tax registration number as required in RCW 82.
4. Not be disqualified from bidding on any public works contract under RCW 39.06.010, or mailto:easmail@des.wa.gov
39.12.065(3).
5. If bidding on a public works project subject to the apprenticeship utilization requirements in
RCW 39.04.320, not have been found out of compliance by the Washington State Apprenticeship and Training Council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under RCW 49.04 for the one-year period immediately preceding the date of the bid solicitation.
6. Public Works and Prevailing Wage Training/Exemption. Bidders shall have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department. The department, in consultation with the prevailing wage advisory committee, must determine the length of the training. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection. The department of labor and industries must keep records of entities that have satisfied the training requirement or are exempt and make the records available on its website. Responsible parties may rely on the records made available by the department regarding satisfaction of the training requirement or exemption.
https://lni.wa.gov/licensing-permits/public-works-projects/contractors-employers/contractor-training
7. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgement entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW 49.46, 49.48, or 49.52. A bidder shall submit a signed Contractor Certification form with the bid or within two (2) business days of request by Owner regarding this wage theft prevention responsible bidder criteria.
B. Supplemental Responsibility Criteria: In addition to the mandatory Bidder responsibility, the
Owner may adopt relevant supplemental criteria for determining Bidder responsibility applicable to a particular project which the Bidder must meet (RCW 39.04.350 (3)).
1. If applicable, the Owner shall consider an overall accounting of the attached supplemental criteria for determining Bidder responsibility “DIVISION 00 SUPPLEMENTAL
RESPONSIBILITY CRITERIA”.
2. At least eight (8) business days prior to the bid submittal deadline, a potential Bidder may request that the Owner modify the supplemental responsibility criteria. The Owner will evaluate the information submitted by the potential Bidder and respond before the bid submittal deadline through the DES Public Procurement Portal. If the evaluation results in a change of criteria, the Owner will issue an addendum to the bidding documents identifying the new criteria. The addendum will be posted as a public notice in the DES Public Procurement Portal.
3. Upon Owner’s request, the apparent low Bidder must supply the requested responsibility information within two (2) business days of request by Owner. Withholding information or failure to submit all the information requested within the time provided may render the bid non-responsive.
4. If the Owner determines that the apparent low Bidder is not responsible, the Owner will notify the Bidder of its preliminary determination in writing.
5. Within three (3) business days after receipt of the preliminary determination, the Bidder may withdraw its bid or…