2026-27_JOC_Pavement_Maintenance_Special_Provisions_and_Price_List.pdf
PDF 6 MB Posted
- Solicitation number
- IFB-080-3104003-SV
- Issued by
- Orange County, San Diego City, California
About this file
Job Order Contract for Pavement Maintenance Services - County of Orange
This is a Special Provisions and Price List document for a Job Order Contract (JOC) for Pavement Maintenance Services issued by the County of Orange, OC Public Works in Santa Ana, California. The contract covers pavement maintenance services funded by various County funds and administered by OC Public Works, with oversight by the Director. The scope of work encompasses a comprehensive range of pavement maintenance activities including asphalt concrete pavement placement, cold milling, micro-milling, tack coat application, warm mix asphalt (WMA), asphalt rubber hot mix (ARHM), polymer-modified asphalt concrete (PMAC), slurry seal treatments, crack sealing, traffic striping, utility box adjustments, and related site preparation and cleanup activities. This is an indefinite-quantity contract with no guaranteed minimum work amount. Contractors must respond to Requests for Quote within forty-eight (48) hours and submit detailed price quotes within agreed timeframes. A Joint Scope Meeting is required for each project to establish detailed scope, methods, schedule, and site-specific requirements. The contract requires the Contractor to self-perform at least 50% of the total value of authorized Job Orders unless specifically waived in writing by the County. Work orders are issued on an as-needed basis with individual completion dates and milestones established for each Job Order through a Notice to Proceed (NTP).
Pricing is established through a detailed quoting process using a pre-priced Unit Price List (UPL) with adjustment factors applied to base prices, supplemented by negotiated non-pre-priced tasks where work falls outside the standard UPL. Non-pre-priced work performed by the Contractor's own forces is calculated at a 1.10 factor over direct costs, while subcontracted non-pre-priced work uses a 1.05 factor over the lowest of three independent quotes. The Contractor bears all costs for required permits (building, grading, electrical, etc.), business licenses, inspections, environmental compliance, Best Management Practices (BMPs), and NPDES permit compliance, with direct permit costs reimbursable without markup when submitted as Non-Pre-Priced Tasks. The contract includes specific environmental compliance requirements including adherence to Stormwater Program Local Implementation Plans, erosion and sediment control measures, and regional NPDES permits for construction dewatering. Work warranties extend for one year from the Notice of Completion date. The County retains the right to select contractors based on rotational selection, past performance, workload balancing, price reasonableness, responsiveness, and other criteria deemed in the County's best interest. The contract period is designated for Fiscal Year 2026-27.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
FOR
JOB ORDER CONTRACTS
FOR PAVEMENT MAINTENANCE
FUNDED BY: VARIOUS COUNTY FUNDS
ADMINISTERED BY
COUNTY OF ORANGE
OC PUBLIC WORKS
SANTA ANA, CALIFORNIA
JAMES TREADAWAY, DIRECTOR
DocuSign Envelope ID: D91834D0-1153-43CF-8808-47C3BB40CA47
FY 2025
KEVIN ONUMA, KEVIN ONUMA, DIRECTOR
NEEDS PAGE NUMBERS ADDED TO MODEL /
ATTACHMENTS A / B AND CHECKED TO
MAKE SURE ALL DOCUMENTS ARE IN ORDER
THERE IS ALSO DUPLICATE PAGES AFTER
ATTACHMENT C TO BE REMOVED AS IT
GOES BEFORE NOT AFTER
FY 20252025FY 2026-27
County of Orange, OC Public Works IFB-# 080-3104003-SV
Job Order Contract (JOC) for Pavement Maintenance
ATTACHMENT C
SPECIAL PROVISIONS
FOR
JOB ORDER CONTRACTS
FOR PAVEMENT MAINTENANCE
FUNDED BY
VARIOUS COUNTY FUNDS
ADMINISTERED BY
COUNTY OF ORANGE
OC PUBLIC WORKS
SANTA ANA, CALIFORNIA
KEVIN ONUMA, DIRECTOR
Prepared under the responsible charge of:
Durand Long, P.E.
Senior Engineering Manager
Maintenance Project Management
OC Construction
Approved as to form:
Deputy County Counsel
Orange County, California
Approved by:
Fiona Man, P.E., T.E.
Deputy Director, OC Construction
FY 2026-27
Docusign Envelope ID: C12065E8-BB00-8E50-8285-DE7DCCA6AD61
ATTACHMENT C
***THIS PAGE INTENTIONALLY LEFT BLANK***
(SO THERE)
Page TOC-i
Table of Contents
SECTION A: SCOPE OF WORK ………………………………………………………………………………………………………. PAGES 1 - 38
SECTION B: CONTRACTOR’S PRICING ………………………………………………………………………………………..… PAGES 39- 44
SECTION C: SPECIAL PROVISIONS: ……………………………………………………………………………….………….. PAGES 45 - 206
C-1. JOINT SCOPE MEETING ................................................................................................................... SP-1 C-2. COOPERATION AND NOTIFICATIONS .............................................................................................. SP-1 C-3. PERMITS ......................................................................................................................................... SP-2
C-3.1. REGULATORY PERMITS ................................................................................................................ SP-2 C-3.2. PAYMENT FOR REGULATORY PERMITS ............................................................................................ SP-2 C-3.3. CONSTRUCTION PERMITS ............................................................................................................. SP-2 C-3.4. PAYMENT FOR CONSTRUCTION PERMITS ......................................................................................... SP-3
C-4. CONSTRUCTION SAFETY .................................................................................................................. SP-3 C-4.1. GENERAL .................................................................................................................................. SP-3 C-4.2. PAYMENT FOR CONSTRUCTION SAFETY ........................................................................................... SP-3
C-5. ORDER OF WORK ............................................................................................................................ SP-3 C-6. INSPECTING & REPORTING EXISTING SITE CONDITIONS .................................................................. SP-4
C-6.1. GENERAL .................................................................................................................................. SP-4 C-6.2. DELIVERABLES ........................................................................................................................... SP-4 C-6.3. PAYMENT FOR INSPECTING & REPORTING EXISTING SITE CONDITIONS .................................................... SP-4
C-7. PROJECT INFORMATION SIGN ......................................................................................................... SP-5 C-7.1. GENERAL .................................................................................................................................. SP-5 C-7.2. PAYMENT FOR PROJECT INFORMATION SIGN .................................................................................... SP-5
C-8. MOBILIZATION ............................................................................................................................... SP-5 C-9. MAINTAIN TRAFFIC AND DETOURS ................................................................................................. SP-5
C-9.1. GENERAL .................................................................................................................................. SP-5 C-9.2. PAYMENT FOR MAINTAIN TRAFFIC AND DETOURS ............................................................................. SP-8
C-10. EROSION, SEDIMENT, AND CHEMICAL CONTROL PLAN (ESCCP) ....................................................... SP-9 C-10.1. GENERAL .................................................................................................................................. SP-9 C-10.2. PAYMENT FOR EROSION, SEDIMENT, AND CHEMICAL CONTROL PLAN (ESCCP) ..................................... SP-11
C-11. DUST CONTROL ............................................................................................................................. SP-12 C-11.1. GENERAL ................................................................................................................................ SP-12 C-11.2. PAYMENT FOR DUST CONTROL .................................................................................................... SP-13
C-12. EXISTING FACILITIES ...................................................................................................................... SP-13 C-12.1. GENERAL ................................................................................................................................ SP-13 C-12.2. PAYMENT FOR EXISTING FACILITIES .............................................................................................. SP-13
C-13. WATERING .................................................................................................................................... SP-13 C-13.1. GENERAL ................................................................................................................................ SP-13 C-13.2. PAYMENT FOR WATERING ......................................................................................................... SP-14
C-14. UTILITIES ....................................................................................................................................... SP-14 C-14.1. GENERAL ................................................................................................................................ SP-14 C-14.2. PAYMENT FOR UTILITIES ............................................................................................................ SP-15
C-15. LOCATING EXISTING UTILITIES ...................................................................................................... SP-16 C-15.1. GENERAL ................................................................................................................................ SP-16 C-15.2. POTHOLING ............................................................................................................................ SP-16 C-15.3. RESTORATION OF EXISTING PAVEMENT OR SURFACING ..................................................................... SP-17 C-15.4. PAYMENT FOR LOCATING EXISTING UTILITIES ................................................................................. SP-17
Page TOC-ii
C-16. REMOVE AND REPLACE PORTLAND CEMENT CONCRETE ............................................................... SP-17 C-16.1. GENERAL ................................................................................................................................ SP-17 C-16.2. PAYMENT FOR REMOVE AND REPLACE PORTLAND CEMENT CONCRETE ................................................. SP-19
C-17. DETECTABLE WARNING SURFACE ................................................................................................. SP-20 C-17.1. GENERAL ................................................................................................................................ SP-20 C-17.2. PAYMENT FOR DETECTABLE WARNING SURFACE ............................................................................. SP-21
C-18. REMOVE ROADWAY STRUCTURAL SECTION .................................................................................. SP-21 C-18.1. GENERAL ................................................................................................................................ SP-21 C-18.2. PAYMENT FOR REMOVE ROADWAY STRUCTURAL SECTION ................................................................. SP-22
C-19. VEGETATION CONTROL ................................................................................................................. SP-22 C-19.1. GENERAL ............................................................................................................................. SP-22 C-19.2. MATERIALS .......................................................................................................................... SP-23 C-19.3. APPLICATION ....................................................................................................................... SP-23 C-19.4. PAYMENT FOR VEGETATION CONTROL ................................................................................ SP-23
C-20. REMOVE TREE ............................................................................................................................... SP-23 C-20.1. GENERAL ................................................................................................................................ SP-23 C-20.2. PAYMENT FOR REMOVE TREE ..................................................................................................... SP-24
C-21. ROOT PRUNING ............................................................................................................................ SP-25 C-21.1. GENERAL ................................................................................................................................ SP-25 C-21.2. PAYMENT FOR ROOT PRUNING ................................................................................................... SP-25
C-22. ROOT GRINDING ........................................................................................................................... SP-26 C-22.1. GENERAL ................................................................................................................................ SP-26 C-22.2. PAYMENT FOR ROOT GRINDING .................................................................................................. SP-26
C-23. RELOCATE SIGN............................................................................................................................. SP-27 C-23.1. GENERAL ................................................................................................................................ SP-27 C-23.2. RELOCATE STREET NAME SIGN .................................................................................................... SP-27 C-23.3. PAYMENT FOR RELOCATE STREET NAME SIGN ................................................................................. SP-27 C-23.4. RELOCATE TRAFFIC CONTROL SIGN ............................................................................................... SP-28 C-23.5. PAYMENT FOR RELOCATE TRAFFIC CONTROL SIGN ........................................................................... SP-28
C-24. ROADWAY SIGN ............................................................................................................................ SP-29 C-24.1. GENERAL ................................................................................................................................ SP-29 C-24.2. PAYMENT FOR ROADWAY SIGN ................................................................................................... SP-29
C-25. ADJUST MANHOLES WITHIN THE PAVING LIMITS .......................................................................... SP-29 C-25.1. GENERAL ................................................................................................................................ SP-29 C-25.2. ADJUST MANHOLE WITHIN THE PAVING LIMITS .............................................................................. SP-29 C-25.3. PAYMENT FOR ADJUST MANHOLE WITHIN THE PAVING LIMITS .......................................................... SP-31 C-25.4. ADJUST MANHOLE OUTSIDE OF THE PAVING LIMITS ........................................................................ SP-31 C-25.5. PAYMENT FOR ADJUST MANHOLE OUTSIDE THE PAVING LIMITS ......................................................... SP-32
C-26. ADJUST UTILITY AND VALVE BOXES ............................................................................................... SP-33 C-26.1. GENERAL ................................................................................................................................ SP-33 C-26.2. PAYMENT FOR ADJUST UTILITY AND VALVE BOXES .......................................................................... SP-35
C-27. ADJUST SURVEY MONUMENT WELL .............................................................................................. SP-35 C-27.1. GENERAL ................................................................................................................................ SP-35 C-27.2. PAYMENT FOR ADJUST SURVEY MONUMENT WELL ......................................................................... SP-36
C-28. RE-ESTABLISH SURVEY MONUMENT ............................................................................................. SP-36 C-28.1. GENERAL ................................................................................................................................ SP-36 C-28.2. PAYMENT FOR RE-ESTABLISH SURVEY MONUMENT ......................................................................... SP-37
C-29. EARTHWORK ................................................................................................................................ SP-37 C-29.1. GENERAL ................................................................................................................................ SP-37 C-29.2. SUBGRADE PREPARATION AND TOLERANCE .................................................................................... SP-38 C-29.3. PAYMENT FOR EARTHWORK ....................................................................................................... SP-39
C-30. UNCLASSIFIED EXCAVATION ......................................................................................................... SP-39
Page TOC-iii
C-30.1. GENERAL ................................................................................................................................ SP-39 C-30.2. PAYMENT FOR UNCLASSIFIED EXCAVATION .................................................................................... SP-40
C-31. UNCLASSIFIED FILL ........................................................................................................................ SP-40 C-31.1. GENERAL ................................................................................................................................ SP-40 C-31.2. PAYMENT FOR UNCLASSIFIED FILL ................................................................................................ SP-40
C-32. IMPORTED BORROW .................................................................................................................... SP-40 C-32.1. GENERAL ................................................................................................................................ SP-40 C-32.2. PAYMENT FOR IMPORTED BORROW ............................................................................................. SP-41
C-33. COLD MILLING .............................................................................................................................. SP-41 C-33.1. GENERAL ................................................................................................................................ SP-41 C-33.2. PAYMENT FOR COLD MILLING ..................................................................................................... SP-43
C-34. MICRO-MILLING ........................................................................................................................... SP-43 C-34.1. GENERAL ................................................................................................................................ SP-43 C-34.2. PAYMENT FOR MICRO-MILLING .................................................................................................. SP-44
C-35. TACK COAT ................................................................................................................................... SP-44 C-35.1. GENERAL ................................................................................................................................ SP-44 C-35.2. MATERIALS ............................................................................................................................. SP-44 C-35.3. EQUIPMENT ............................................................................................................................ SP-45 C-35.4. SURFACE PREPARATION ............................................................................................................. SP-45 C-35.5. APPLICATION ........................................................................................................................... SP-45 C-35.6. MEASUREMENT ....................................................................................................................... SP-46 C-35.7. PAYMENT FOR TACK COAT ......................................................................................................... SP-46
C-36. TRACKLESS TACK COAT ................................................................................................................. SP-46 C-36.1. GENERAL ............................................................................................................................. SP-46 C-36.2. MATERIALS .......................................................................................................................... SP-46 C-36.3. CONSTRUCTION REQUIREMENTS ......................................................................................... SP-48 C-36.4. PAYMENT FOR TRACKLESS TACK COAT .......................................................................................... SP-53
C-37. .ASPHALT CONCRETE PAVEMENT – TOTAL PROJECT TONNAGE ..................................................... SP-53 C-37.1. GENERAL ................................................................................................................................ SP-53 C-37.2. COMPENSATION ADJUSTMENT .................................................................................................... SP-56 C-37.3. PAYMENT FOR ASPHALT CONCRETE PAVEMENT .............................................................................. SP-58
C-38. WARM MIX ASPHALT (WMA) CONCRETE – TOTAL PROJECT TONNAGE .......................................... SP-58 C-38.1. GENERAL ................................................................................................................................ SP-58 C-38.2. COMPENSATION ADJUSTMENT .................................................................................................... SP-63 C-38.3. PAYMENT FOR WARM MIX ASPHALT (WMA) CONCRETE ................................................................. SP-64
C-39. ASPHALT RUBBER HOT MIX (ARHM) – TOTAL PROJECT TONNAGE ................................................. SP-65 C-39.1. GENERAL ................................................................................................................................ SP-65 C-39.2. COMPENSATION ADJUSTMENT .................................................................................................... SP-69 C-39.3. PAYMENT FOR ASPHALT RUBBER HOT MIX (ARHM) ....................................................................... SP-70
C-40. POLYMER-MODIFIED ASPHALT CONCRETE (PMAC) – TOTAL PROJECT TONNAGE ........................... SP-71 C-40.1. GENERAL ................................................................................................................................ SP-71 C-40.2. COMPENSATION ADJUSTMENT .................................................................................................... SP-74 C-40.3. PAYMENT FOR POLYMER MODIFIED ASPHALT CONCRETE (PMAC) ..................................................... SP-76
C-41. ASPHALT RUBBER AGGREGATE MEMBRANE (ARAM) .................................................................... SP-76 C-41.1. GENERAL ................................................................................................................................ SP-76 C-41.2. SURFACE PREPARATION ............................................................................................................. SP-78 C-41.3. APPLICATION ........................................................................................................................... SP-78 C-41.4. SCREENINGS ............................................................................................................................ SP-78 C-41.5. PAYMENT FOR ASPHALT RUBBER AND AGGREGATE MEMBRANE (ARAM) ............................................ SP-79
C-42. EMULSION-AGGREGATE SLURRY (EAS).......................................................................................... SP-79 C-42.1. GENERAL ................................................................................................................................ SP-79 C-42.2. MATERIALS ............................................................................................................................. SP-80
Page TOC-iv
C-42.3. MIX DESIGN ........................................................................................................................... SP-80 C-42.4. MIXING AND EQUIPMENT .......................................................................................................... SP-80 C-42.5. SURFACE PREPARATION ............................................................................................................. SP-81 C-42.6. APPLICATION ........................................................................................................................... SP-81 C-42.7. FIELD SAMPLING AND TESTING .................................................................................................... SP-83 C-42.8. PAYMENT DEDUCTION FOR NONCOMPLIANCE ................................................................................. SP-84 C-42.9. STOCKPILES ............................................................................................................................. SP-84 C-42.10. PAYMENT FOR EMULSION-AGGREGATE SLURRY (EAS) ..................................................................... SP-85
C-43. RECLAIMED ASPHALT PAVEMENT-RUBBERIZED EMULSION AGGREGATE SLURRY (RAP-REAS)....... SP-85 C-43.1. GENERAL ................................................................................................................................ SP-85 C-43.2. MATERIALS ............................................................................................................................. SP-85 C-43.3. MIX DESIGN ........................................................................................................................... SP-87 C-43.4. SURFACE PREPARATION ............................................................................................................. SP-87 C-43.5. APPLICATION ........................................................................................................................... SP-87 C-43.6. PAYMENT FOR RECLAIMED ASPHALT PAYMENT-RUBBERIZED EMULSION AGGREGATE SLURRY (RAP-REAS) SP-90
C-44. RECLAIMED ASPHALT PAVEMENT (RAP)-AGGREGATE SLURRY ...................................................... SP-90 C-44.1. GENERAL ................................................................................................................................ SP-90 C-44.2. MATERIALS ............................................................................................................................. SP-91 C-44.3. GRADING ............................................................................................................................... SP-91 C-44.4. WATER .................................................................................................................................. SP-92 C-44.5. SET CONTROL AGENTS ............................................................................................................... SP-92 C-44.6. MIX DESIGN ........................................................................................................................... SP-92 C-44.7. MIXING AND EQUIPMENT .......................................................................................................... SP-92 C-44.8. SURFACE PREPARATION ............................................................................................................. SP-93 C-44.9. APPLICATION ........................................................................................................................... SP-94 C-44.10. FIELD SAMPLING AND TESTING .................................................................................................... SP-97 C-44.11. MEASUREMENT ....................................................................................................................... SP-98 C-44.12. STOCKPILES ............................................................................................................................. SP-99 C-44.13. PAYMENT FOR RECLAIMED ASPHALT PAVEMENT (RAP)-AGGREGATE SLURRY ........................................ SP-99
C-45. RUBBER POLYMER MODIFIED SLURRY (RPMS) ............................................................................ SP-100 C-45.1. GENERAL .............................................................................................................................. SP-100 C-45.2. MATERIALS ........................................................................................................................... SP-100 C-45.3. COMPOSITION AND GRADING ................................................................................................... SP-103 C-45.4. MIX DESIGN ...................................................................................................................... SP-104 C-45.5. PAYMENT FOR RUBBER POLYMER MODIFIED SLURRY ..................................................... SP-105
C-46. MICROSURFACING ...................................................................................................................... SP-106 C-46.1. GENERAL .............................................................................................................................. SP-106 C-46.2. MATERIALS ........................................................................................................................... SP-106 C-46.2.1. MINERAL FILLER ..................................................................................................................... SP-106 C-46.2.2. ADDITIVES ............................................................................................................................ SP-107 C-46.2.3. AGGREGATE .......................................................................................................................... SP-107 C-46.3. MIX DESIGN ......................................................................................................................... SP-108 C-46.4. PROPORTIONING .................................................................................................................... SP-108 C-46.5. EQUIPMENT .......................................................................................................................... SP-109 C-46.6. SURFACE PREPARATION ........................................................................................................... SP-110 C-46.7. APPLICATION ......................................................................................................................... SP-110 C-46.8. PAYMENT FOR MICROSURFACING .............................................................................................. SP-111
C-47. RECLAIMED ASPHALT PAVEMENT (RAP) AGGREGATE MICROSURFACING ................................... SP-112 C-47.1. GENERAL .............................................................................................................................. SP-112 C-47.2. MATERIALS ........................................................................................................................... SP-112 C-47.2.1. MINERAL FILLER ..................................................................................................................... SP-112 C-47.2.2. ADDITIVES ............................................................................................................................ SP-112
Page TOC-v
C-47.2.3. AGGREGATE .......................................................................................................................... SP-112 C-47.3. MIX DESIGN ......................................................................................................................... SP-113 C-47.4. PROPORTIONING .................................................................................................................... SP-115 C-47.5. EQUIPMENT .......................................................................................................................... SP-116 C-47.6. SURFACE PREPARATION ........................................................................................................... SP-116 C-47.7. APPLICATION ......................................................................................................................... SP-116 C-47.8. MEASUREMENT ..................................................................................................................... SP-118 C-47.9. PAYMENT FOR RECLAIMED ASPHALT PAVEMENT (RAP) AGGREGATE MICROSURFACING ........................ SP-118
C-48. SEALCOAT ................................................................................................................................... SP-119 C-48.1. GENERAL .............................................................................................................................. SP-119 C-48.2. MATERIALS ........................................................................................................................... SP-119 C-48.2.1. SEALCOAT (ASPHALT BASED) .................................................................................................... SP-119 C-48.2.2. SEALCOAT WITH POLYMERS...................................................................................................... SP-120 C-48.3. SURFACE PREPARATION ........................................................................................................... SP-121 C-48.4. APPLICATION ......................................................................................................................... SP-122 C-48.5. MEASUREMENT AND PAYMENT FOR SEALCOAT ............................................................................. SP-123
C-49. FOG SEAL .................................................................................................................................... SP-123 C-49.1. GENERAL .............................................................................................................................. SP-123 C-49.2. MATERIALS ........................................................................................................................... SP-123 C-49.3. SURFACE PREPARATION ........................................................................................................... SP-124 C-49.4. EQUIPMENT .......................................................................................................................... SP-124 C-49.5. APPLICATION ......................................................................................................................... SP-124 C-49.6. PAYMENT FOR FOG SEAL ......................................................................................................... SP-125
C-50. ROCK DUST BLOTTER .................................................................................................................. SP-125 C-50.1. GENERAL .............................................................................................................................. SP-125 C-50.2. MATERIALS ........................................................................................................................... SP-125 C-50.3. APPLICATION ......................................................................................................................... SP-125 C-50.4. PAYMENT FOR ROCK DUST BLOTTER ........................................................................................... SP-125
C-51. REMOVE AND REPLACE ASPHALT CONCRETE DIKE ...................................................................... SP-125 C-51.1. GENERAL .............................................................................................................................. SP-125 C-51.2. PAYMENT FOR REMOVE AND REPLACE ASPHALT CONCRETE DIKE ...................................................... SP-126
C-52. BAR REINFORCING STEEL ............................................................................................................ SP-126 C-52.1. GENERAL .............................................................................................................................. SP-126 C-52.2. PAYMENT FOR BAR REINFORCING STEEL ...................................................................................... SP-127
C-53. CRACK SEAL (NON-ROUTED) ....................................................................................................... SP-127 C-53.1. GENERAL .............................................................................................................................. SP-127 C-53.2. MATERIALS ........................................................................................................................... SP-128 C-53.3. SURFACE PREPARATION ........................................................................................................... SP-128 C-53.4. APPLICATION ......................................................................................................................... SP-129 C-53.5. MEASUREMENT ..................................................................................................................... SP-129 C-53.6. PAYMENT FOR CRACK SEAL (NON-ROUTED) ................................................................................. SP-129
C-54. COLD POUR CRACK FILLER ........................................................................................................... SP-129 C-54.1. GENERAL .............................................................................................................................. SP-129 C-54.2. MATERIALS ........................................................................................................................... SP-130 C-54.3. APPLICATION ......................................................................................................................... SP-130 C-54.4. PAYMENT FOR COLD POUR CRACK FILLER .................................................................................... SP-130
C-55. CRUSHED MISCELLANEOUS BASE ................................................................................................ SP-131 C-55.1. GENERAL .............................................................................................................................. SP-131 C-55.2. PAYMENT FOR CRUSHED MISCELLANEOUS BASE ............................................................................ SP-131
C-56. PAVING MAT .............................................................................................................................. SP-131 C-56.1. GENERAL .............................................................................................................................. SP-131 C-56.2. MATERIALS ........................................................................................................................... SP-132
Page TOC-vi
C-56.2.1. ENGINEERED PAVING MAT ....................................................................................................... SP-132 C-56.2.2. ASPHALT BINDER ................................................................................................................... SP-132 C-56.3. SURFACE PREPARATION ........................................................................................................... SP-132 C-56.4. APPLICATION ......................................................................................................................... SP-133 C-56.5. EQUIPMENT .......................................................................................................................... SP-134 C-56.6. PAYMENT FOR PAVING MAT .................................................................................................... SP-134
C-57. REMOVE TRAFFIC STRIPING AND PAVEMENT MARKINGS ............................................................ SP-134 C-57.1. GENERAL .............................................................................................................................. SP-134 C-57.2. MEASUREMENT AND PAYMENT ................................................................................................. SP-136
C-58. TRAFFIC STRIPING AND PAVEMENT MARKINGS .......................................................................... SP-136 C-58.1. GENERAL .............................................................................................................................. SP-136 C-58.2. MATERIALS ........................................................................................................................... SP-136 C-58.3. LAYOUT ............................................................................................................................... SP-137 C-58.4. APPLICATION ......................................................................................................................... SP-137 C-58.5. MEASUREMENT AND PAYMENT ................................................................................................. SP-138 C-58.5.1. TRAFFIC STRIPING ................................................................................................................... SP-138 C-58.5.2. PAINT CURB .......................................................................................................................... SP-139 C-58.5.3. PAVEMENT MARKINGS ............................................................................................................ SP-139
C-59. TEMPORARY PAVEMENT DELINEATION ...................................................................................... SP-139 C-59.1. GENERAL .............................................................................................................................. SP-139 C-59.2. MATERIALS ........................................................................................................................... SP-140 C-59.2.1. TEMPORARY TRAFFIC STRIPES AND MARKINGS.............................................................................. SP-140 C-59.2.2. TEMPORARY RAISED PAVEMENT MARKERS (TRPMS) .................................................................... SP-141 C-59.3. INSTALLATION, MAINTENANCE, AND REMOVAL ............................................................................. SP-141 C-59.4. PAYMENT FOR TEMPORARY PAVEMENT DELINEATION .................................................................... SP-141
C-60. RAISED PAVEMENT MARKERS (RPMS) ......................................................................................... SP-141 C-60.1. GENERAL .............................................................................................................................. SP-141 C-60.2. EPOXY ................................................................................................................................. SP-142 C-60.3. PAYMENT FOR RAISED PAVEMENT MARKERS ............................................................................... SP-142
C-61. PREFORMED THERMOPLASTIC PAVEMENT MARKINGS ............................................................... SP-143 C-61.1. GENERAL .............................................................................................................................. SP-143 C-61.2. MATERIALS ........................................................................................................................... SP-143 C-61.3. SURFACE PREPARATION AND APPLICATION .................................................................................... SP-144 C-61.4. PAYMENT FOR PREFORMED THERMOPLASTIC PAVEMENT MARKINGS ................................................... SP-145
C-62. TRAFFIC LOOP DETECTORS .......................................................................................................... SP-145 C-62.1. GENERAL .............................................................................................................................. SP-145 C-62.2. PAYMENT FOR TRAFFIC LOOP DETECTORS .................................................................................... SP-146
C-63. REMOVE AND REPLACE DAMAGED WHEEL STOP ........................................................................ SP-147 C-63.1. GENERAL .............................................................................................................................. SP-147 C-63.2. PAYMENT FOR REMOVE AND REPLACE DAMAGED WHEEL STOP ....................................................... SP-147
C-64. REMOVE AND RE-INSTALL EXISTING WHEEL STOP ....................................................................... SP-147 C-64.1. GENERAL .............................................................................................................................. SP-147 C-64.2. MEASUREMENT ..................................................................................................................... SP-148 C-64.3. PAYMENT FOR REMOVE AND RE-INSTALL EXISTING WHEEL STOP ...................................................... SP-148
C-65. CONCRETE GRIND ....................................................................................................................... SP-148 C-65.1. GENERAL .............................................................................................................................. SP-148 C-65.2. PAYMENT FOR CONCRETE GRIND ............................................................................................... SP-148
C-66. SUBGRADE REINFORCEMENT ...................................................................................................... SP-149 C-66.1. GENERAL .............................................................................................................................. SP-149 C-66.2. MATERIALS ........................................................................................................................... SP-149 C-66.3. PREPARATION AND INSTALLATION .............................................................................................. SP-149 C-66.4. PAYMENT FOR SUBGRADE REINFORCEMENT ................................................................................. SP-150
Page TOC-vii
C-67. DISPOSAL FEES ............................................................................................................................ SP-150 C-67.1. GENERAL .............................................................................................................................. SP-150 C-67.2. PAYMENT FOR DISPOSAL FEES................................................................................................... SP-151
C-68. CURB ADDRESS NUMBER ............................................................................................................ SP-151 C-68.1. GENERAL .............................................................................................................................. SP-151 C-68.2. PAYMENT FOR CURB ADDRESS NUMBER ..................................................................................... SP-152
C-69. CURB DRAIN ............................................................................................................................... SP-152 C-69.1. GENERAL .............................................................................................................................. SP-152 C-69.2. PAYMENT FOR CURB DRAIN ....................................................................................................... SP-152
C-70. CLASS “B” FIELD OFFICE ............................................................................................................... SP-153 C-70.1. GENERAL .............................................................................................................................. SP-153 C-70.2. PAYMENT FOR CLASS “B” FIELD OFFICE ...................................................................................... SP-154
C-71. HIGH FRICTION SURFACE TREATMENT ........................................................................................ SP-154 C-71.1. GENERAL ........................................................................................................................... SP-154 C-71.2. MATERIALS ........................................................................................................................ SP-156 C-71.3. PRE-CONSTRUCTION .......................................................................................................... SP-157 C-71.4. CONSTRUCTION ................................................................................................................. SP-157 C-71.5. PAYMENT .......................................................................................................................... SP-161
THE FY 2026-27 UNIT PRICE LIST ………………………………………………………..………………………………….…… PAGES 207 - 210
APPENDIX A: CONSTRUCTION AND DEMOLITION RECYCLING AND REUSE PROGRAM ………….. PAGES 211 - 217
APPENDIX B: SURVEY MONUMENT DETAIL ……………………………………………………………………….… PAGES 218 - 220
APPENDIX C: TRAFFIC SIGNAL DETECTOR LOOP LAYOUT DETAIL …………………………………….……. PAGES 221 - 223
APPENDIX D: CURB ADDRESS NUMBER DETAIL ……………………………………………………………….…… PAGES 224 - 225
APPENDIX E: CURB DRAIN DETAIL ……………………………………………………………………………………… PAGES 226 - 227
County of Orange, OC Public Works IFB # 080-3104003-SV
Job Order Contract (JOC) for Pavement Maintenance Services
3104003
ATTACHMENT A
SCOPE OF WORK
SECTION A
ATTACHMENT A
SCOPE OF WORK
I. SCOPE OF WORK: Contractor shall provide all labor, materials, tools, equipment, utilities, vehicles, and transportation services required to provide Pavement Maintenance Services under this Contract. Services may be provided, but may not be limited to, any facility or property which is owned, operated, or maintained by the County. Pavement Maintenance Services shall be provided in accordance with the following, which are incorporated herein by this reference.
A. Special Provisions for Job Order Contracts for Pavement Maintenance, (to be available for download after the Pre-Bid Meeting).
B. All other requirements identified specifically in A Job Order Detailed Scope of Work, which include but not limited to drawings, supplemental specifications, as-built records, sketches, written scope narratives, standard specification from other local, state and federal agencies.
C. Standard Plans for County of Orange, Standard Specifications for Public Works Construction, California Building Code, and other codes, ordinances, rules, regulations, orders and legal requirements of Agency Having Jurisdiction which bear on the performance of the work.
D. Secured Facilities: The Contractor may be required to have their employees, subcontractors and/or a suppliers submit applications and complete security clearances prior to commencing any work in a secured County facility. Contractor employees, subcontractors and/or suppliers will be required to submit to fingerprinting and personal background checks as part of the security clearance process.
II. PERFORMANCE REQUIREMENTS:
A. There is no guaranteed minimum amount of work which will be ordered under this Contract.
B. This is a Contract for work specified in individual Job Orders. Work ordered prior to but not completed by the expiration of the Contract period, and any additional work required as a result of unforeseen conditions encountered during construction up to six (6) months after the contract expiration date, will be completed with all provisions of this Contract still in force. Performance time for each Job Order issued under this Contract will be determined in accordance with the Contract.
This performance time will be determined and agreed upon by both Parties for each individual Job Order. Contractor shall self-perform Work amounting to at least 50% of the total value of Job Orders authorized at any point during the life of the Contract, unless this self-performance requirement is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .