2026-2027_Vegetation_Management_T&E_Rate_Sheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
2026-2027 Vegetation Management - Time and Equipment Contract
Solicitation number
2026-01
Issued by
Florida

About this file

This is a Time and Equipment Rate Sheet template for Glades Electric Cooperative's 2026-2027 Vegetation Management contract opportunity in Florida. The cooperative is soliciting proposals from qualified contractors to provide Right of Way Maintenance services throughout GEC's service territory, which includes right-of-way clearing and vegetation trimming under energized power lines. Services encompass mechanical removal of trees, branches, and shrubbery, with contractors required to load and reasonably compact debris into trucks and trailers. The contract is planned to execute on May 4, 2026, and expire on December 31, 2027. Bidders must submit all proposals through VendorLink and are prohibited from submitting questions or proposals via phone or email. Required submission documents include a Company Overview with executive summary, resume, and letters of reference; Exhibits A through D from the RFP; and completed rates using the provided Excel Rate Sheet Template.

The Rate Sheet template requires bidders to submit hourly labor rates for 2026 and 2027 across standard time, overtime, and double-time categories for positions including supervisors, foremen, trimmers, groundmen, safety personnel, mechanics, and operators. Equipment rates must be provided on an hourly basis for an extensive list of vehicles and machinery, including pickup trucks of various configurations, bucket trucks ranging from 40 to 70 feet, chip trucks, chippers, power saws, hydraulic trimmers, mowers, excavators with mulching heads, spray equipment, and UTVs. Bidders must also specify whether fuel is included in equipment rates and whether iPads are provided to crews for mapping and photo documentation. Additional labor and equipment categories may be added as needed, and bidders must provide clarifications regarding pricing assumptions, such as overtime applicability for storm work or double-time rates for holidays.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026 and 2027 Rates

Glades Electric Rate Sheet Template
Instructions: Bidders please COMPLETE all items highlighted in YELLOW. Items with an * are mandatory.

Other items are optional.

Bid Details
Bid Number:2026-01
Bid Name:2026-2027 Vegetation Management T&E Contract
Planned Execution/Start Date:5/4/26
Planned Expiration/Stop Date:12/31/27
Vendor Name
*Company Name:
*Corporate Address:
Bid ContactPlease list the individual responsible for answering questions regarding the bid.
*Person Name:
*Email:
*Phone #:
Contract ContactPlease list the individual responsible for signing the contract.
*Name:
*Email:
*Phone #:

2026 and 2027 Time and Equipment Rates

Instructions: Please enter the applicable rates for your company in the template below.
Labor Rates
2026 Rates2027 Rates
Labor DescriptionSTOTDTSTOTDT
Supervisor
General Foreman
Foreman
Trimmer A CDL
Trimmer A
Trimmer B
Trimmer C
Groundman
Safety
Mechanic
Operator

Additional Labor Rates: Please list any other offered equipment below. Insert add additional rows if needed.

2026 Rates2027 Rates
Labor DescriptionSTOTDTSTOTDT
Labor Pricing Assumptions and Clarifications
Instructions: Using the space below, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays.
2026 and 2027 Equipment Rates
Instructions: Please enter the applicable rates for your company in the template below.
2026 Rates2027 Rates
EquipmentRate per HourRate per Hour
1/2 Ton Pick-up Truck 2 WD
1/2 Ton Pick-up Truck 4WD
3/4 Ton Pick-up Truck 2 WD
3/4 Ton Pick-up Truck 4WD
1 Ton Truck 2 WD
1 Ton Truck 4 WD
Crew Cab Pick-up Truck 4 WD
Mechanic Truck
Backyard Lift 40'
Bucket Truck 50'
Bucket Truck 50' 4 WD
Bucket Truck 60'
Bucket Truck 60' 4 WD
Bucket Truck 70'
Bucket Truck 70' 4 WD
Chip Truck 2 WD
Chip Truck 4 WD
Chipper Disc
Power Saws
Hydraulic Trimmer
Mower
Mower Trailer
Small Excavator w/ Mulching Head
Large Excavator w/ Mulching Head
UTV w/ Spray Tank
Spray Truck

Additional Equipment Rates: Please list any other offered equipment below. Insert add additional rows if needed.

Equipment Type Rate

Yes/No
Does the contractor provide iPad's to the crews for mapping or to take photos of work completed?
Is fuel included in the equipment rates?
Pricing Assumptions and Clarifications
Instructions: Using the space below, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays.

File details come from the government source that posted it. Updated .