2026-2027_Vegetation_Management_T&E_Rate_Sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 2026-01
- Issued by
- Florida
About this file
This is a Time and Equipment Rate Sheet template for Glades Electric Cooperative's 2026-2027 Vegetation Management contract opportunity in Florida. The cooperative is soliciting proposals from qualified contractors to provide Right of Way Maintenance services throughout GEC's service territory, which includes right-of-way clearing and vegetation trimming under energized power lines. Services encompass mechanical removal of trees, branches, and shrubbery, with contractors required to load and reasonably compact debris into trucks and trailers. The contract is planned to execute on May 4, 2026, and expire on December 31, 2027. Bidders must submit all proposals through VendorLink and are prohibited from submitting questions or proposals via phone or email. Required submission documents include a Company Overview with executive summary, resume, and letters of reference; Exhibits A through D from the RFP; and completed rates using the provided Excel Rate Sheet Template.
The Rate Sheet template requires bidders to submit hourly labor rates for 2026 and 2027 across standard time, overtime, and double-time categories for positions including supervisors, foremen, trimmers, groundmen, safety personnel, mechanics, and operators. Equipment rates must be provided on an hourly basis for an extensive list of vehicles and machinery, including pickup trucks of various configurations, bucket trucks ranging from 40 to 70 feet, chip trucks, chippers, power saws, hydraulic trimmers, mowers, excavators with mulching heads, spray equipment, and UTVs. Bidders must also specify whether fuel is included in equipment rates and whether iPads are provided to crews for mapping and photo documentation. Additional labor and equipment categories may be added as needed, and bidders must provide clarifications regarding pricing assumptions, such as overtime applicability for storm work or double-time rates for holidays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 and 2027 Rates
| Glades Electric Rate Sheet Template |
| Instructions: Bidders please COMPLETE all items highlighted in YELLOW. Items with an * are mandatory. |
Other items are optional.
| Bid Details | |
| Bid Number: | 2026-01 |
| Bid Name: | 2026-2027 Vegetation Management T&E Contract |
| Planned Execution/Start Date: | 5/4/26 |
| Planned Expiration/Stop Date: | 12/31/27 |
| Vendor Name | |
| *Company Name: | |
| *Corporate Address: | |
| Bid Contact | Please list the individual responsible for answering questions regarding the bid. |
| *Person Name: | |
| *Email: | |
| *Phone #: | |
| Contract Contact | Please list the individual responsible for signing the contract. |
| *Name: | |
| *Email: | |
| *Phone #: |
2026 and 2027 Time and Equipment Rates
| Instructions: Please enter the applicable rates for your company in the template below. |
| Labor Rates |
| 2026 Rates | 2027 Rates | |||||
| Labor Description | ST | OT | DT | ST | OT | DT |
| Supervisor | ||||||
| General Foreman | ||||||
| Foreman | ||||||
| Trimmer A CDL | ||||||
| Trimmer A | ||||||
| Trimmer B | ||||||
| Trimmer C | ||||||
| Groundman | ||||||
| Safety | ||||||
| Mechanic | ||||||
| Operator |
Additional Labor Rates: Please list any other offered equipment below. Insert add additional rows if needed.
| 2026 Rates | 2027 Rates | |||||
| Labor Description | ST | OT | DT | ST | OT | DT |
| Labor Pricing Assumptions and Clarifications |
| Instructions: Using the space below, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays. |
| 2026 and 2027 Equipment Rates |
| Instructions: Please enter the applicable rates for your company in the template below. |
| 2026 Rates | 2027 Rates | |
| Equipment | Rate per Hour | Rate per Hour |
| 1/2 Ton Pick-up Truck 2 WD | ||
| 1/2 Ton Pick-up Truck 4WD | ||
| 3/4 Ton Pick-up Truck 2 WD | ||
| 3/4 Ton Pick-up Truck 4WD | ||
| 1 Ton Truck 2 WD | ||
| 1 Ton Truck 4 WD | ||
| Crew Cab Pick-up Truck 4 WD | ||
| Mechanic Truck | ||
| Backyard Lift 40' | ||
| Bucket Truck 50' | ||
| Bucket Truck 50' 4 WD | ||
| Bucket Truck 60' | ||
| Bucket Truck 60' 4 WD | ||
| Bucket Truck 70' | ||
| Bucket Truck 70' 4 WD | ||
| Chip Truck 2 WD | ||
| Chip Truck 4 WD | ||
| Chipper Disc | ||
| Power Saws | ||
| Hydraulic Trimmer | ||
| Mower | ||
| Mower Trailer | ||
| Small Excavator w/ Mulching Head | ||
| Large Excavator w/ Mulching Head | ||
| UTV w/ Spray Tank | ||
| Spray Truck |
Additional Equipment Rates: Please list any other offered equipment below. Insert add additional rows if needed.
Equipment Type Rate
| Yes/No | |
| Does the contractor provide iPad's to the crews for mapping or to take photos of work completed? | |
| Is fuel included in the equipment rates? |
| Pricing Assumptions and Clarifications |
| Instructions: Using the space below, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays. |
File details come from the government source that posted it. Updated .