Turshen Mill Remediation Project Manual Summary
This is a project manual for the Turshen Mill Remediation Project located at 459 Church Street, Amston, Connecticut. The project encompasses remediation activities and capping of portions of the site, with bids to be received for a single prime contract on a lump sum and unit price basis as specified in the Bid Form. Addendum No. 1 modified the bid submittal deadline to 2:00 PM local time on Thursday, October 8, 2026. The project manual provides detailed specifications, site conditions, scope requirements, and bid submission procedures necessary for contractors to prepare competitive proposals for this environmental remediation undertaking.
The contract award and project timeline, funding sources, specific pricing terms, and other contractual details are contained within the project manual documentation. Prospective bidders are required to review all manual sections, including technical specifications, site assessment data, and bid requirements, to develop accurate cost estimates and project schedules for submission by the specified deadline.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
FOR
TOWN OF HEBRON
CONNECTICUT
TURSHEN MILL REMEDIATION PROJECT
HEBRON BID No. 2026-12
APRIL 2026
TOWN COUNCIL
TIFFANY V. THIELE, CHAIR
JAN LAWRENCE, VICE CHAIR
KEITH PETIT
CLAUDIA T. RILEY
SEAN FITZGERALD
INTERIM TOWN MANAGER
DONNA LANZA
DIRECTOR OF PLANNING AND DEVELOPMENT
MATTHEW R. BORDEAUX
NATHAN L. JACOBSON & ASSOCIATES, INC.
CONSULTING CIVIL & ENVIRONMENTAL ENGINEERS SINCE 1972
CHESTER, CONNECTICUT
00 01 10-1
NLJA #0648-0110
PROJECT MANUAL TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
Section No. Section Name Page 00 11 16 Invitation to Bid 00 20 00 Instructions to Bidders for Construction Contract 00 22 13 NTC – Environmental Remediation 00 31 46 Permits 00 41 43 Bid Form for Construction Contract Form 00 43 13 Bid Bond Form 00 45 13 Statement of Bidder’s Qualifications Form 00 45 19 Non-Collusion Affidavit of Bidder Form 00 45 20 Certificate of Compliance with Connecticut General Statute Section 31-57b 00 51 00 Notice of Award Form 00 52 13 Agreement between Owner and Contractor for Construction Contract (Stipulated Price)
Form 00 55 00 Notice to Proceed Form 00 61 13 Performance Bond Form 00 61 16 Payment Bond Form 00 62 00 Contractor’s Application for Payment Form 00 65 16 Certificate of Substantial Completion Form 00 65 19 Notice of Acceptability of Work Form 00 70 00 Standard General Conditions of the Construction Contract 00 73 00 Supplementary Conditions of the Construction Contract 00 73 40 Funding Agency Requirements 00 73 43 Prevailing Wage Rate Schedule 00 94 00 Work Change Directive Form 00 94 10 Change Order Form 00 94 20 Field Order Form
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
Section No. Section Name Page 01 00 50 Specification Format 01 11 00 Summary of Work 01 22 00 Measurement and Payment 01 31 19 Project Meetings 01 32 23 Field Engineering and Surveys 01 33 00 Submittal Procedures 01 42 13 Abbreviations and Symbols 01 45 00 Quality Control 01 51 00 Temporary Utilities 01 57 00 Temporary Controls 01 74 00 Cleaning and Waste Management 01 77 00 Closeout Procedures
00 01 10-2
01 78 39 Project Record Documents
SPECIFICATIONS
DIVISION 02 - EXISTING CONDITIONS
Section No. Section Name Page 02 61 13 Excavation, Handling, and Disposal of Excavated Materials
DIVISION 31 - EARTHWORK
Section No. Section Name 31 10 00 Site Preparation 31 22 00 Grading 31 23 16 Excavation 31 23 19 Dewatering 31 23 23 Backfilling 31 25 00 Soil Erosion and Sediment Control
DIVISION 32 - EXTERIOR IMPROVEMENTS
Section No. Section Name 32 05 00 Restoration of Surfaces 32 92 00 Turf Establishment 32 93 00 Plants
00 11 16-1
TOWN OF HEBRON
HEBRON, CONNECTICUT
TURSHEN MILL REMEDIATION PROJECT
INVITATION TO BID
Sealed Bids for the Turshen Mill Remediation Project will be received by the Town of Hebron electronically via the internet bidding service until 2:00 PM local time on Wednesday, September 30, 2026 at which time the Bids received will be publicly opened and read aloud. The Project primarily consists of remediation activities and capping of portions of the site located at 459 Church Street, Amston. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form.
Bidding Documents are available for free download from the Project’s bidding service webpage. To download Bidding Documents: go to the bidding service homepage listed below; select this project’s solicitation; sign in and/or register as directed; and select the Bidding Documents for download. A non-refundable $50 fee to the bidding service is required to submit an electronic Bid. Notify the Issuing Office with questions in this regard. Digital ID is not required for this online bid.
Bidding service homepage: http://www.bidexpress.com/businesses/27674/home
The Issuing Office is the Office of the Town Manager, 15 Gilead Street, Hebron, Connecticut 06248.
Printing Bidding Documents is the responsibility of the prospective Bidder. Printed copies will not be issued by the Town. Neither Owner nor Engineer will be responsible for Bidding Documents that differ from documents available from the Project’s bidding service webpage.
A mandatory pre-bid conference will be held at 10:00 AM local time on Tuesday, September 22, 2026 at the site, located at 456 Church Street, Amston, CT. Bids will be accepted only from Bidders who are recorded as having attended the meeting.
Bids must be accompanied by a Bid Bond in the amount of five percent of the Bid.
The successful Bidder will be required to provide Performance and Payment Bonds each in the amount of one hundred percent of the Contract Price.
The project is funded by the State of Connecticut.
The successful Bidder shall comply with the requirements of Prevailing Wage Rate Laws in accordance with Section 31-53 of the Connecticut General Statutes.
Bidders are advised that valid Registration through the Connecticut Department of Energy and Environmental Protection General Permit to Act as a Contractor to Contain, Remove, or Otherwise Mitigate the Effects of Certain Releases is required. The Approval of Registration must accompany the bid proposal.
The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a- 60, 4a-60g, and 46a-68b through 46a-68f.
This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. There is $ 368,280 in state-funding for this project. State law requires project-specific goals be set for this project based on the project’s needs and available Small Business Enterprises (“SBEs”) and Minority Business Enterprises (“MBEs”). The SBE goal for this project is 9.26%. The MBE goal for this project is 5.56%. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.
The Contract Documents require affirmative action of the Contractor and any subcontractors to ensure equal employment opportunity as noted in Governor's Executive Orders 3 and 17.
The Owner is exempt from payment of Sales and Use Taxes on all materials and equipment to be permanently incorporated in the Work. These taxes shall not be included in the Bid.
Unless provided for by the Instructions to Bidders, no Bid may be withdrawn until sixty (60) days after the Bid Opening. The Town reserves the right to: reject any or all Bids; waive informalities or defects in Bids;
04/2026 1
00 11 16-2 make extensions to review Bids; and accept the Bid(s) that, in the Town’s judgment, will be in its best interests.
An Affirmative Action/Equal Opportunity Employer. Minority/Women’s Business Enterprises are encouraged to apply. This contract is subject to state spending allocation goals and contract compliance requirements.
Owner: Town of Hebron, Connecticut
+ + END OF INVITATION TO BID + +
2 04/2026
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 TOC Page1 of 1
NLJA #0648-0110
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Section Page
Article 1— Defined Terms Article 2— Bidding Documents Article 3— Qualifications of Bidders Article 4— Pre-Bid Conference Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site Article 6— Bidder’s Representations and Certifications Article 7— Interpretations and Addenda Article 8— Bid Security Article 9— Contract Times Article 10— Substitute and “Or Equal” Items Article 11— Subcontractors, Suppliers, and Others Article 12— Preparation of Bid Article 13— Basis of Bid Article 14— Submittal of Bid Article 15— Modification and Withdrawal of Bid Article 16— Opening of Bids Article 17— Bids to Remain Subject to Acceptance Article 18— Evaluation of Bids and Award of Contract Article 19— Bonds and Insurance Article 20— Signing of Agreement Article 21— Sales and Use Taxes Article 22— NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY Article 23— COMPLIANCE WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND CODES
04/2026 3
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 1 of 11
NLJA #0648-0110
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances nor transferred to third parties except as expressly allowed in these Instructions.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 2019 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.04.A above. However, Bidder assumes all risks associated with differences
4 04/2026
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 2 of 11
NLJA #0648-0110
arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 Bidder is to submit the following information with its Bid on the Statement of Bidder’s Qualifications Form to demonstrate Bidder’s qualifications to perform the Work:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Approval of Registration through the Connecticut Department of Energy & Environmental Protection General Permit to Act as a Contractor to Contain, Remove, or Otherwise Mitigate the Effects of Certain Releases.
E. Other required information regarding qualifications.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A non-mandatory mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference;
however, attendance at this conference is not required to submit a Bid.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S
SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of
04/2026 5
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 3 of 11
NLJA #0648-0110
materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make reports referenced above available to Bidders via the Project’s bidding service webpage. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional
6 04/2026
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 4 of 11
NLJA #0648-0110
examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
D. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions. No such Owner safety program shall in any way abrogate or in an way modify the Bidder’s sole and exclusive responsibility for project safety if awarded the Contract.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
04/2026 7
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 5 of 11
NLJA #0648-0110
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
A. Submit questions via the Question and Answer section of the Project’s bidding service webpage.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the
8 04/2026
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 6 of 11
NLJA #0648-0110
Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 Refer to the Supplementary Conditions for limitations on subcontracting Work included in the original Contract Price.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents. An online Bid Form is available on the Project’s bidding service webpage.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
C. Other documents required with the bid submittal are listed in Article 2 of the Bid Form and, if bid online, are available for download from the Project’s bidding service website.
04/2026 9
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 7 of 11
NLJA #0648-0110
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be entered in the Bid Form.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown included.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Unit Price
A. Bidders must submit a Bid on a lump sum and unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each lump sum and unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit
10 04/2026
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 8 of 11
NLJA #0648-0110
Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
13.02 Base Bid with Alternates
A. Bidders must submit a Bid on a lump sum and unit price basis for the base Bid and include a separate price for each alternate described in the Bidding Documents and as provided for in the Bid Form. The price for each alternate will be the amount added to or deleted from the base Bid if Owner selects the alternate.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form.
13.03 Allowances
A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
ARTICLE 14—SUBMITTAL OF BID
14.01 Bids shall be submitted via the Project’s bidding service website from the Bidder’s account and all documents listed on the Project’s bidding service Required Documents List shall be completed and uploaded unless omission terms are met. The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid. and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 Bids may be withdrawn prior to the opening of bids by clicking the ‘Withdraw Bid’ button on the bidding service website. After the Bid is withdrawn, the bidding service sends a notification
04/2026 11
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 9 of 11
NLJA #0648-0110
email to the bidder’s address on file. It is the Bidder’s responsibility to review and confirm that the Bid has been withdrawn successfully. An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 Bids may be modified and resubmitted prior to the Bid opening through the Project’s bidding service website. If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
12 04/2026
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 10 of 11
NLJA #0648-0110
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
18.08 Before award is made to a Bidder not a resident of the State in which the Project is located, such Bidder shall be properly licensed and authorized to do business in Connecticut and shall designate in said State a person on whom service of process can be made in the event of litigation.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation. Delivery of said bonds and insurance is an EXPRESS CONDITION PRECEDENT to the Successful Bidder’s right, but not its obligation, to perform Work.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
19.03 The “Hold Harmless” Indemnification endorsement of the insurance shall include the interest of the Town of Hebron and the State of Connecticut. The Contractor and Subcontractors and other interests shall be so named.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful
04/2026 13
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
00 20 00 Page 11 of 11
NLJA #0648-0110
Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Owner is exempt from State of Connecticut state sales and use taxes on materials and equipment to be permanently incorporated in the Work. (Exemption No. [number]). Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.
ARTICLE 22—NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY
22.01 The Contract Documents provide that the Contractor and his Subcontractors shall not discriminate against any employee or applicant for employment because of race, creed, color, national origin, age, sex, sexual orientation, marital status or physical disability. The successful Bidder must be prepared to comply in all respects with the provisions regarding non-discrimination as set forth in the Contract Documents and all applicable Federal and State laws.
ARTICLE 23—COMPLIANCE WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND CODES
23.01 All applicable Federal, State and Municipal laws, ordinances, rules, regulations and codes of all authorities having jurisdiction over construction work in the locality of the Project shall apply to the Contract throughout and they are deemed to be included in the Contract Documents the same as though written therein.
23.02 Attention is directed to laws and regulations of the State Labor Department with respect to employment conditions and minimum wages.
ARTICLE 24—DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT REQUIREMENTS
24.01 Bidders are advised that valid Registration through the Connecticut Department of Energy and Environmental Protection General Permit to Act as a Contractor to Contain, Remove, or Otherwise Mitigate the Effects of Certain Releases is required. The Approval of Registration must accompany the bid proposal. Failure to supply the Approval of Registration will result in rejection of the bid.
14 04/2026
00 22 13-1
NOTICE TO CONTRACTOR – ENVIRONMENTAL REMEDIATION
The Contractor is hereby notified that the Work under this Contract includes environmental remediation activities including but not limited to contaminated soil excavation, handling, stockpiling, transportation, and disposal; installation of environmental controls and restoration of disturbed areas.
The detailed Scope of Work is contained in Section 01 11 00 – Summary of Work.
The Contractor shall perform all remediation activities in strict accordance with the Contract Documents, and all Federal, State, and local regulations.
The Remedial Action Plan (“RAP”) prepared by One Earth Environmental, LLC, dated March 16, 2026, is incorporated by reference into the Contract Documents. The RAP establishes the regulatory framework, performance criteria, environmental controls, and procedural requirements applicable to the Work.
Nothing in the RAP shall be construed as directing or controlling the Contractor’s means, methods, techniques, sequences, or procedures. The Contractor remains solely responsible for selecting and implementing means and methods that achieve compliance with the RAP, the Contract Documents, and all applicable laws and regulations.
All Contractors and Contractor entities working on this project must be registered under CT DEEP’s General Permit for Registered Existing Release Response Contractors. Registration documentation shall be provided to the Owner and Engineer prior to the start of any remediation work.
04/2026 15
16 04/2026
00 31 46-1
PERMITS
04/2026 17
00 31 46-2
18 04/2026
00 31 46-3
04/2026 19
00 31 46-4
20 04/2026
Generated by eNDDB on:
9/23/2025
John Anderson
NATHAN L. JACOBSON & ASSOCIATES, INCORPORATED
86 Main St Chester, CT 06412 janderson@nlja.com
Subject: Tershen Mill Brownfield Remediation Filing # 133388 NDDB – New Determination Number: 202506948 459 Church St Amston
Expiration Date: 9/23/2027
Current data maintained by the Natural Diversity Database (NDDB) and housed in the DEEP ezFile portal indicates that populations of the following State Endangered, Threatened, or Special Concern species (RCA Sec. 26-306) have been documented within the project area or in close proximity to the proposed Remediation/Contaminated soil remediation, Tershen Mill Brownfield Remediation.
Brook floater (Alasmidonta varicosa) Eastern pearlshell (Margaritifera margaritifera) Eastern hognose snake (Heterodon platirhinos) Spotted turtle (Clemmys guttata) Wood turtle (Glyptemys insculpta)
In accordance with the project information provided in your request submittal, implementation of the following Best Management Practices will avoid negative impacts to listed species:
Common Name Brook floater Scientific Name Alasmidonta varicosa Taxa invertebrate Status1 E General Ecology Habitat: Small to medium-sized rivers, usually in gravel and cobble substrates in swift current.
Host fish include longnose dace (Rhinichthys cataractae), blacknose dace (Rhinichthys atratulus), slimy sculpin (Cottus cognatus), golden shiner (Notemigonus crysoleucas), pumpkinseed sunfish (Lepomis gibbosus), yellow perch (Perca flavescens), and tessellated darter (Etheostoma olmstedi). The brook floater is critically imperiled throughout most of New England, including Connecticut. Remaining populations of brook floaters are found in undisturbed sections of streams in the upper reaches of watersheds that have relatively in-tact upland forest. DEEP Wildlife Division considers all streams with populations of brook floaters to be conservation priorities. Protected riparian buffers should be increased from the standard
00 31 46-5
04/2026 21
100ft to 300ft of streams within 1km upriver of brook floater habitat. Percent forest cover throughout the watershed as well as adjacent to the rivers and streams has been highly correlated with Brook floater persistence, and this buffer will help maintain local habitat characteristics for this sensitive species.
Best Management Practice We do not anticipate significant negative impacts to this species from your Project
Type category selected in this location. Impact from this project can be minimized if you follow any applicable Best Practices and monitoring associated with your project activities and/or permit requirements, minimize impact to and loss of preferred habitat, and include any protection measures included here in the Species General Ecology that relate to your project activities before, during, and after completion.
Common Name Eastern pearlshell Scientific Name Margaritifera margaritifera Taxa invertebrate Status1 SC General Ecology This freshwater mussel species lives buried in clean, stable, mixed substrate in fast-flowing unpolluted streams and rivers. Its host fish include Atlantic salmon (Salmo salar), brook trout (Salvelinus fontinalis), brown trout (Salmo trutta), rainbow trout (Onchorhynchus mykiss). Best habitats are good trout streams that are heavily shaded by a riparian canopy, possess clean cold water with high dissolved oxygen, and have stable channels with substrates of coarse sand, gravel, and cobble. Factors that limit the eastern pearlshell are changes to water quality, including eutrophication, acidification, sedimentation, and increases in water temperature.
Best Management Practice We do not anticipate significant negative impacts to this species from your Project
Type category selected in this location. Impact from this project can be minimized if you follow any applicable Best Practices and monitoring associated with your project activities and/or permit requirements, minimize impact to and loss of preferred habitat, and include any protection measures included here in the Species General Ecology that relate to your project activities before, during, and after completion.
Common Name Eastern hognose snake Scientific Name Heterodon platirhinos Taxa reptile Status1 SC General Ecology In Connecticut, these snakes are found in well-drained forest bottomlands and a matrix of open deciduous forests and early successional habitat, including powerlines. Within the early successional habitat, they preferentially use habitat that consists of sandy soils with medium to high vegetation cover and coarse woody debris. They tend to avoid dense forest, wetlands and developed areas. Paved roads may present a barrier to dispersal and connectivity within populations. Snakes are dormant between November 1 and April 1. They will overwinter in a variety of habitats, preferably at the edges of forest and within open habitats if available. They have been observed to overwinter under areas of tree roots, rodent burrows, rock crevices, or excavate their own dens in sandy soils. Many of these harmless snakes are killed by people who are convinced that they are venomous and dangerous. When confronted, the hognose snake will suck in air, spread the skin around its head and neck like a cobra, hiss, and lunge as if to strike. Take the time to learn about, understand, and respect this reptile, and share your knowledge with others. Being able to identify and educate others about the eastern hog-nosed snake can help conserve this species. The more people that are aware of the physical and behavioral identification of this unique snake, the more individuals that can be spared from unnecessary killing. If you encounter a hog-nosed snake, observe it from a distance and allow it to go on its way. All snakes will retreat from humans if given a chance.
Best Management Practice Apply time of year restrictions as appropriate for the habitat types you will be conducting work.
• Construction that involves ground disturbance in suitable habitat described above should be done during the active season, which is April 1 through Oct. 31 to avoid killing hibernating animals.
• Construction that will be confined to managed turf grass , agricultural fields, 00 31 46-6
22 04/2026 impervious or graveled surfaces, or areas confined to compacted soil can be conducted at any time of year.
For work conducted during the active season (April 1- Oct 31):
• Construction workers should be apprised of the species description and possible presence and that any snakes encountered site should not be killed.
• The immediate work area should be scanned for reptiles before starting work using mechanical equipment
• Any reptiles found should be moved out of the way. These animals are protected by law and should never be taken off site.
• Work conducted during early morning and evening hours should occur with special care not to harm basking individuals.
• No vehicles or heavy machinery should be parked overnight in any sandy areas especially within early successional habitat or along forest edges.
• Areas where excavated or stockpiled materials are stored will be first…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .