2026-12-03 Bid Manual for Refuse Collection.pdf

PDF 390 KB Posted

Attached to
SOLID REFUSE AND WASTE COLLECTION AND DISPOSAL SERVICES
Solicitation number
2140708
Issued by
Broome County, New York

About this file

Summary

This Bid Manual is a formal invitation to bid issued by the Binghamton-Johnson City Joint Sewage Board for solid refuse and waste collection and disposal services at their treatment facility located at 4480 Vestal Road, Vestal, New York. The scope of work includes placement, maintenance, collection, and transport of roll-off waste containers and recycling bins containing four categories of waste—grit/barscreen, rags/finescreen, construction and demolition (C&D) trash, and recyclables—to the Broome County Landfill and approved recycling facilities. Based on historical data, the contractor is expected to perform approximately 48 grit/barscreen trips, 48 rags/finescreen trips, 12 C&D trash trips, and provide ongoing monthly recyclables collection. Sealed bids were due by 2:00 p.m. local time on December 3, 2026, with public opening and reading of bids at that same date and time. The contract term runs from January 1, 2027, through December 31, 2027, with two optional renewal periods available for successive one-year terms at no changes to terms and conditions, contingent upon mutual agreement. Bidders were encouraged to visit the site prior to submission to evaluate container placement and accessibility.

Bidders must submit unit pricing for each of the four service categories on the Bid Pricing Worksheet, with the total bid price calculated by multiplying estimated quantities by unit prices. The Board is exempt from New York State and local sales taxes, and bidders shall not include such taxes in their bids. The Board will pay tipping fees charged by the Broome County Landfill directly, provided the contractor submits dated and time-stamped weigh tickets; however, the contractor assumes responsibility for all C&D material tipping fees and any fees associated with loads lacking weigh tickets. No fuel surcharge may be added to invoices. Bid security of five percent of the total bid amount, in the form of a certified check or notarized bid bond, is required. The contractor must procure and maintain workers' compensation insurance, public liability and property damage insurance of $2 million combined single limit, and automobile liability insurance of $2 million combined single limit, naming the Board as an additional insured. The contractor must respond to service calls within four hours or by 10:00 a.m. the following business day and may conduct pickups and drop-offs only between 6:00 a.m. and 2:00 p.m., excluding Sundays and days when facilities are closed.

View the file

Other files

File Type Posted
Landfill Guide-Updated 1225.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID MANUAL

for

SOLID REFUSE AND WASTE COLLECTION AND

DISPOSAL SERVICES

December 3, 2026 Binghamton-Johnson City Joint Sewage Board

4480 Vestal Road

Vestal, New York 13850

Phone: 607-729-2975

Fax: 607-729-3041

LEGAL ADVERTISEMENT

INVITATION TO BID – SOLID REFUSE AND WASTE COLLECTION AND

DISPOSAL SERVICES

Notice is hereby given that sealed Bids will be received by the Binghamton-Johnson City Joint

Sewage Board (“Board”) for SOLID REFUSE AND WASTE COLLECTION AND DISPOSAL

SERVICES.

Summary of Scope: Placement of suitable roll-off waste dumpsters/containers and recycling bins at the Binghamton-Johnson City Joint Sewage Treatment Plant (“Plant”), 4480 Vestal Road, Vestal, NY, collection of the loaded containers and bins, transport to county waste management areas and miscellaneous waste collection at the Plant site. This contract does not include stabilized sludge.

To be considered in response to this Bid Invitation, the bidder must submit one (1) paper original of each of the following: 1) Bidder’s signed Bid Pricing Worksheet, 2) Statement of Non-

Collusion, 3) Qualifications Questionnaire, and 4) Bid Security (if required). The documents shall be submitted in a sealed envelope, with the bid name “Refuse Collection” plainly written on the outside. The sealed envelope shall be addressed to: Douglas Jensen, Business Manager, Binghamton-Johnson City Joint Sewage Treatment Plant, 4480 Vestal Road, Vestal NY 13850.

To be considered by the Board, the documents must be received by the Business Manager no later than 2:00 pm local time, December 3, 2026. All Bids received shall be publicly opened and read aloud at such place and time. No Bidder may withdraw its Bid within 45 days after the Bid

Opening.

A Bid Manual, which contains specifications, general conditions, and other contract documents may be reviewed at the Plant Office, 4480 Vestal Road, Vestal, NY, by going to Bids and RFPs |

Binghamton - Johnson City Wastewater Treatment Plant website (bjcwwtp.org) and/or obtained from the Business Manager (djensen@bjcwwtop.com), to whom all questions regarding this bid opportunity should be directed. The successful Bidder will be required to perform all services as outlined in the Bid Manual.

Bidders are encouraged to visit the site before submitting bids to evaluate the placing and accessibility of the containers.

Contract Period: January 1st, 2027, through December 31st, 2027.

There will be option(s) to renew for two successive like time periods WITH NO CHANGES IN

TERMS AND/OR CONDITIONS, upon mutual agreement between the Board and the successful

Bidder.

http://bjcwwtp.org/bidrfp http://bjcwwtp.org/bidrfp

SPECIFICATIONS

The successful Bidder (also referred to as the “Contractor”) will be called upon, for time to time, to collect and transport solid waste and recycling from within the Binghamton-Johnson City Joint

Sewage Treatment Plant (“Plant” or “JSTP”) to Broome County waste facilities. The categories of waste to be handled are: Bar Screen, Rags, Grit, and C&D (Trash). Also, recyclables which are defined as any items identified by the Broome County Division of Solid Waste as items which haulers are required to accept from households and recycle. This contract does not include stabilized sludge, which is addressed in a separate contract.

Waste Collection and Disposal

The waste is to be collected in roll off containers at the Plant. In the past two years the activity in dump trips for roll off containers approximately 11 c.y. in volume, by type of waste has been as follows:

Estimated Trips

Grit/Barscreen 48

Rags/Finescreen 48

C&D (Trash) 12

Note that these are very weather dependent and subject to storm sewer surges. A wet year may significantly increase the volume and frequency of trips required.

The successful Bidder shall provide at least four roll-off containers, one for each type of waste, and each at least 11 cubic yards in volume; dimensions not to exceed: 12 ft. length, 8 ft. width &

4 ft. height. Up to 4 containers shall be at the Plant at all times. Plant employees shall direct the

Contractor to the place(s) at the Plant where the containers are to be to be dropped. The successful

Bidder will provide and be responsible for the maintenance and upkeep of the containers. The Plant requires containers which will fit in available collection areas. The Plant is currently using four container sites which each hold one 11-yard roll-off.

Plant personnel will place a liner in the empty roll-off containers after they have been placed by the successful Bidder. Waste, separated by type, will be loaded into the containers by Plant employees to the approximate limit of the containers, by volume or weight.

Once Plant personnel determine it is time to remove and replace one or more of the containers, the successful Bidder will be notified by telephone or email. The Bidder will take control of the waste and load the container(s) onto its vehicle(s) for immediate transport to the Broome County Landfill, 286 Knapp Rd., Binghamton, NY 13905. The vehicle’s operator is responsible for ascertaining that the maximum tonnage of each load is not exceeded. The vehicle’s operator is responsible for taking measures, if any, necessary to secure the load so that the waste remains on the vehicle during transport. At the Landfill, the vehicle’s operator will dump the waste at areas designated by the

Landfill’s operators. The successful Bidder will dispose of the waste at the landfill and immediately return or replace the container(s) to the Plant.

The successful Bidder must respond to a telephone or e-mail notification from the Plant within four (4) hours of notification; or, if the telephone/e-mail notification is received after 2:00PM local time, the successful Bidder shall respond before 10:00AM the following day, except if that day falls on a Sunday or other days when the Landfill is closed, the container(s) will be picked up by

10:00 am the following Monday, or the next business day the Landfill is open.

The successful Bidder may pick up or drop off containers at the Plant only between the hours of

6:00 AM and 2:00PM, all days of the week except Sundays or other days when the Landfill is closed.

The successful Bidder is to provide all vehicles and operators necessary to collect and legally haul the empty and loaded containers over the public roads.

The successful Bidder is solely responsible for hauling the waste to the Broome County Landfill;

including any cleanup costs for spillage, for litter control, for any liabilities arising out of accidents, and for any fees or fines connected with pick-up procedures, transport or unloading.

Recyclables Collection and Disposal

Recyclables are to be collected in bins located near entrance gate(s). In the past two years the activity in recyclables has been as follows: plastics, cardboard, county acceptable non-food waste.

The successful Bidder will be expected to also place and maintain bins or dumpster/overhead receptacles for cardboard and other recyclables generated by the office and staff of the Plant.

Currently there are six 90-gallon recycling receptacles (covered with lids) provided by hauler in two locations and one cardboard-only 4-yard dumpster. These or an equivalent solution must be provided by Bidder. All equivalent solutions must be approved by the Plant Superintendent in advance of implementation.

Plant employees shall direct the successful Bidder to the place(s) at the Plant where the bins are to be to be dropped. The successful Bidder will provide and be responsible for the maintenance and upkeep of the bins. The Plant requires bins which will fit in available collection areas.

Recyclables will be loaded into the bins by Plant employees, to the approximate limit of the bins, by volume or weight. Once Plant personnel determine it is time to remove and replace one or more of the bins, the successful Bidder will be notified by telephone or e-mail. The successful Bidder will take control of the recyclables and load the bins or their contents onto its vehicle(s) for immediate transport to Broome Recycling Co., Inc., 29 Broad St, Binghamton, NY 13904 or another County approved site. The vehicle’s operator is responsible for ascertaining that the maximum tonnage of each load is not exceeded. The vehicle’s operator is responsible for taking measures, if any, necessary to secure the load so that the recyclables remain on the vehicle during transport. At the recycling center, the vehicle’s operator will dump the recyclables at areas designated by the recycling center’s operators. The successful Bidder will dispose of the recyclables at a County approved recycling center and immediately return or replace the bins to the Plant.

The successful Bidder must respond to a telephone or e-mail notification from the Plant within four (4) hours of notification; or, if the telephone or e-mail notification is received after 2:00 PM local time, the successful Bidder shall respond before 10:00AM the following day, except if that day falls on a Sunday or other days when the recycling center is closed, the bins will be picked up by 10:00 am the following Monday, or the next business day the recycling center is open.

The successful Bidder may pick-up or drop off bins at the Plant only between the hours of 6:00

AM and 2:00PM, all days of the week except Sundays or other days when the recycling center is closed.

The successful Bidder is to provide all vehicles and operators necessary to collect and legally haul the recyclables over the public roads.

The successful Bidder is solely responsible for hauling the recyclables to the recycling center;

including any cleanup costs for spillage, for litter control, for any liabilities arising out of accidents, and for any fees or fines connected with pick-up procedures, transport or unloading.

Permits, Licenses, Manifests, and Vehicle Logs

The successful Bidder is responsible for obtaining all licenses and permits necessary to operate the vehicles necessary to transport the waste and recyclables on the public roads and to enter onto and dump the waste at the Landfill and the recyclables at the recycling plant. All vehicle operators shall be licensed to operate the vehicles assigned to them by the successful Bidder. The successful

Bidder is responsible for the preparation, completion, storage and retention of all required manifests and vehicle logs pertaining to the work.

Exemption from Sales and Use Taxes

The Board is exempt from paying New York State or local sales taxes on any material which it purchases. In computing the Bid, as well as in rendering billings, a Bidder shall not include sales taxes or compensating use taxes of the State of New York or of any city and/or county in the State of New York for any materials to be delivered which are exempt from such taxes.

Payment by Board of Tipping Fees Charged by the Landfill

The Board has made arrangements to pay the Tipping Fees charged by the Landfill, as such may be negotiated between the Board and County from time to time, directly to the Broome County government provided that the successful Bidder includes with each corresponding invoice the dated and time-stamped weigh ticket(s) issued by the Landfill for each load of waste delivered to and dumped at the Landfill. The successful Bidder will be responsible for payment of the Tipping

Fees for all Construction & Demolition (C&D) materials delivered to and dumped at the Landfill, but also for ANY material for which no Landfill weigh ticket is provided. The Board will not provide reimbursement to the successful Bidder for any such Tipping Fees it may be required to pay due to failure to furnish a Landfill weigh ticket.

Payment to the successful Bidder

The Contractor will be paid in accordance with Section 3 of the Agreement and Article 4 of the

General Conditions. The Board will not pay for overtime. The Contractor will provide a number of operators so that overtime is not required; alternatively, the Contractor shall pay overtime to the operators as required by law but shall not charge the Board an additional amount on account thereof.

The successful Bidder is expected to submit one invoice monthly that will list by date and contents the hauling actions taken and provide copies of the processing facility tickets showing the weight of the material offloaded at the facility. Bidder may use the Plant’s dump permit for Grit, Rags, and Bar Screenings but must pay their own landfill fee for the Construction & Demolition (C&D) materials. This should be invoiced with copies of the dated landfill receipts for reimbursement.

NO FUEL SURCHARGE should be added to the invoices. Such will not be paid by Plant. Bids should have that cost factored in. A copy of the latest Broome County Landfill fee and use guide is attached.

Should the County change their no-charge recyclable policy the Board must be notified by the successful Bidder and that cost will be allowed as an additional payment at no mark-up by the

Bidder provided that the successful Bidder includes with each corresponding invoice evidence satisfactory to the Plant Superintendent of the dates of delivery and the quantity and type of recyclables delivered to the Recycling Center on each date.

The Contractor is not entitled to any payments other than as identified in the provisions referenced above.

Contract Term

Project services will commence on January 1st, 2027, and conclude on December 31st, 2027.

There will be option(s) to renew for two successive like time periods WITH NO CHANGES IN

TERMS AND/OR CONDITIONS, upon mutual agreement between the Board and the successful

Bidder.

(end of Specifications section)

INSTRUCTIONS TO BIDDERS

IMPORTANT NOTICES TO POTENTIAL BIDDERS

Your receipt of the Bid Manual and other bid documents does not indicate that the Board has pre-determined your qualifications to receive a contract award. Such a determination will be made after the Bid Opening and will be based on the Board’s evaluation of your Bid submission compared to the specific requirements and qualifications contained in the Bid Manual and other bid documents.

The Board will not be responsible in any manner for verbal answers to any inquiries regarding the meaning of the specifications which may be given prior to the awarding of the Contract.

The Board will regard all Bids received as an agreement by the Bidder to conform to all items of the Bid Manual and other bid documents, unless specific exemptions are deemed to be in the best interests of the Plant.

By submitting its Bid proposal, a Bidder represents that it is in compliance with the Immigration and Nationality Act, 8 U.S.C. §1324A, et. seq., and that it will remain so throughout the term of the Contract. In addition, any subcontractor hired by Bidder shall be required to rep- resent that it is in compliance with the Immigration and Nationality Act, 8 U.S.C. §1324A, et. seq. Any violation of this representation shall constitute a breach of the Contract, and, among other things, the Board may terminate the Contract in accordance with the default provisions herein.

The Board reserves the right to reject all Bids at the Board’s sole discretion, regardless of the number of qualified Bidders submitting conforming proposals, if such an action is deemed to be in the best interest of the Board or the Plant. An irregular or informal Bid may also be rejected.

Award of a Contract will be made to the lowest responsible Bidder whose Bid conforms to all the provisions required to render it formal and legally binding, and whose record of performance, if any, with the Board has been satisfactory.

All information and materials submitted will become the property of the Board. Bidders should not submit proprietary or confidential business information unless it is believed such information is critical to their presentation. Such information should be clearly identified as such. The Board will protect such proprietary or confidential information to the extent the law allows.

This bid request does not commit the Board to award a contract or contracts or to pay any cost incurred in the preparation of a bid in response to this request. The Board reserves the right for any reason at its sole discretion to accept or reject any or all bids received as a result of this request.

Following receipt of bids, the Board may request clarifications and additional information pertaining to the bid(s).

This request and/or the selection of any bid does not create any contractual rights whatsoever with the Board whether by this request or pursuant to any other understanding, written or oral.

BID PROCEDURES

The following procedures shall apply to all Bid submissions:

1. BID PREPARATION:

a) All documents shall be typewritten or printed legibly in ink.

b) Erasures or corrections, if any, shall be initialed in ink.

c) Ambiguous or illegible terms or markings may result in REJECTION of a Bid.

d) Signatures on original documents shall be made in ink.

e) Failure to submit some documents (or the required number of copies of a document), failure to complete all required items on any documents, and/or failure to sign documents required to be signed may result in REJECTION of a Bid.

f) Addition of terms and/or conditions not required by the Bid Manual or bid documents may result in REJECTION of a Bid.

2. BID DOCUMENTS TO BE SUBMITTED: There shall be submitted simultaneously:

a) One (1) paper original and two (2) paper copies of the completed, signed Bid Pricing

Worksheet, on the form provided in the Bid Manual, or a copy thereof with original signature;

b) one (1) paper original and two (2) paper copies of the completed, signed

Statement of Non-Collusion, on the form provided;

c) one (1) paper original and two (2) paper copies of the completed, signed

Statement of the Qualifications of Bidder, on the form provided;

d) Bid Security in the form of a CERTIFIED CHECK or BID BOND payable to the order of the “Binghamton-Johnson City Joint Sewage Board” in the sum of FIVE PERCENT

(5%) of the Total Bid amount of bid amount shown on Bidder’s Bid Pricing Worksheet.

All bonds and signatures on bonds must be notarized and, in a form, acceptable to Board

Co-Counsel. Unless a Bidder’s Bid is rejected, the Bid Security will be held without interest by the Board as a guaranty that the Bidder whose Bid is accepted will enter into a

Contract with the Board to the satisfaction of Board Co-Counsel. Upon execution of such Contract, the Bid Security will be returned.

3. BID ENVELOPES AND PACKAGES: A sealed envelope and/or package containing the

Bid submission documents shall be clearly marked with the bid name “REFUSE

COLLECTION” plainly written on the outside.

4. BID DELIVERY:

a) Bidders assume all risks for timely, properly submitted deliveries. The Board shall bear no responsibility for delays in receipt of any Bid.

b) Sealed bid submissions shall be received until 2:00 p.m. local time, November 19, 2026 at which time bids will be publicly opened and read aloud.

Bid submission documents shall be submitted simultaneously and must be enclosed in a sealed envelope, delivered to the Binghamton-Johnson City Joint Sewage Treatment

Plant Office, 4480 Vestal Road, Vestal, New York 13850. E-mail bid submissions are not acceptable and will not be considered.

5. BID WITHDRAWAL OR REVOCATION: Bid submissions shall be non-revocable for

45 days from the Bid Opening date.

LOW BIDDER

The Board seeks Bids for unit price services. The Bid Pricing Worksheet contains spaces for four services, each requiring the bidder to submit a unit price. The Bidder must provide a unit price for each of the services. Bid Pricing Worksheets submitted by Bidders, which do not contain unit prices for each of the four services, are subject to REJECTION. For purposes of bidding, the

Board has established the number of units of each service. However, the actual number of units for each service will vary based upon the operational needs of the Plant. The use of the number of units stated in the Bid Pricing Worksheet is for Bid comparison purposes only and does not obligate the Plant to request any given number of units of service be performed by the successful Bidder.

The actual number of units of service may be greater or less than the units stated in the Bid Pricing

Worksheet.

For purposes of determining the low bidder, the four unit prices submitted by each bidder (Column

“D” on the Bid Pricing Worksheet) will be multiplied by number of units (Column “C” on the Bid

Pricing Worksheet), to arrive at the “Bid Price” for each service (Column “E” on the

Bid Pricing Worksheet). Then, the four “Bid Prices” will be added to arrive at the Bidder’s

“Total Bid Price”. The low bidder will be the bidder with the lowest “Total Bid Price”

CONTRACT

The successful Bidder must enter into a written contract with the Board. The form Agreement that will be used for the contract is included in this Bid Manual. The General Conditions found in this

Bid Manual, among other things, are incorporated into the Agreement.

(end of Instructions to Bidder section)

GENERAL CONDITIONS

1.0 BASIC PROVISIONS

1.1 The Project: SOLID REFUSE AND WASTE COLLECTION AND DISPOSAL

SERVICES.

1.2 Date of Commencement: January 1st, 2027

1.3 Date of Completion: December 31st, 2027

A. This agreement may be renewed for two successive like time periods WITH NO

CHANGES IN TERMS AND/OR CONDITIONS, upon mutual agreement between the Board and the successful Bidder.

1.4 Retainage: n/a

1.5 Liquidated Damages: n a

1.6 Insurance:

Worker’s Compensation Statutory

Public Liability and Property Damage $2 Million, Combined Single Limit

Automobile Liability $2 Million, Combined Single Limit

The Board shall be named an additional insured on all liability policies. All policies shall be non-cancelable without thirty (30) days prior written notice to the Board. The

Contractor shall deliver to the Board, within ten (10) days of the Date of Commencement, a certificate of insurance demonstrating that such insurance is in effect.

1.7 Contractor: As used in these General Conditions, the term “Contractor” refers to the Bidder to whom a contract is awarded for the Project.

2.0 CONTRACTOR’S SERVICES

2.1 Scope of Services

The services to be rendered under this Agreement shall include all of the labor, materials, and equipment necessary to complete the work described in the Specifications.

2.2 Revision of Scope of Services

The Board may, at any time, by written order, make changes within the scope of services.

If the Contractor claims that such changes will cause an increase or decrease in the cost of, or time required for, performance of its services, the Contractor may apply for an equitable adjustment to the fee and/or the Date at Completion. Any claim of the Contractor for such adjustment must be asserted in accordance with Section 2.3. No services for which additional compensation will be charged shall be furnished without the written authorization of the Board. All orders to the Contractor directing changes in the scope of services, authorizing payments representing increases or decreases in compensation due to changes or revisions, or modifying the Date at Completion, shall be made only by the

Board.

2.3 Claims and Disputes

A. If the Contractor claims (i) that any work it has been ordered to do is outside the scope of services, or (ii) that any action or omission of the Board is contrary to the terms and provisions of this Agreement, it shall within five (5) working days after being ordered to perform the work claimed by it to be revised work, or within five (5) working days after the act or omission to act by the Board complained of, request consultation with the Chairperson of the Board regarding such claim. Within five (5) working days after receipt of such request the Chairperson or the Chairperson’s designee, shall meet with the Contractor for the purpose of negotiating, in good faith, changes, if any be required, in the scope of services, the compensation, the Date of Completion, or other resolution of Contractor’s claim. If, as a result of such consultation, the Contractor and the

Chairperson (or the Chairperson designee), agree to proposed changes in the scope of services or compensation required under this Agreement, such proposed changes shall be set forth in writing on a document signed and dated by both the Contractor and the

Chairperson (or designee), and then submitted to the Board for approval. Pending

Board approval, the Contractor shall promptly comply with the Board’s order, unless the Chairperson gives written directions to the Contractor to await Board approval. In the event that: i) the Consultant and the Contractor (or the designee) are unable to agree on mutually acceptable changes in the scope of services, compensation, Date of

Completion, or such other resolution of Contractor’s claim, or (iii) the Board fails to approve the proposed changes agreed to by the Contractor and the Chairperson (or the designee) within thirty (30) calendar days at the date of the document setting forth the proposed changes is signed by the Contractor and the Chairperson (or the designee) (if more than one date, then the later of the dates), the Contractor shall:

(i) Promptly comply or continue to comply with such order,

(ii) File with the Board, within i) thirty (30) working days after being ordered to perform the work claimed by it to be revised work, or ii) thirty (30) working days after the claimed action or omission on the part of the Board occurred, or iii) forty five (45) working days after the date of the document setting forth proposed changes negotiated by the

Contractor and the Chairperson (or designee) is signed by the Contractor and the

Chairperson (or the designee) (if more than one date, then the later of the dates), whichever date is latest, a written, verified detailed statement, with documentary evidence, of the items and basis of its claim;

(iii) Produce for the Board’s examination, upon notice from the Board, all its books of account, bills, invoices, payrolls, subcontracts, time books, progress records, daily reports, bank deposit books, bank statements, checkbooks and canceled checks, showing all of its actions and transactions in connection with or relating to or arising by reason of its claim, and submit itself and persons in its employ and in its subcontractor's employ, if appropriate, for examination under oath by any person designated by the Board to investigate any claims made against the Board under this Agreement, such examination to be made at a place in Broome County designated by the Board.

(iv) Proceed diligently, pending and subsequent to the determination of the Board with respect to any such disputed matter, with the performance of this Agreement and in accordance with all instructions of the Board.

B. The value of any work which the Contractor is required to do as a result of either

(i) an order of the Board requiring work outside the scope of services; or ii) an act or omission of the request of the Board which is contrary to the terms and provisions of this Agreement, shall be determined by the methods set forth in Section 4.3.

C. The Contractor's failure to comply with any or all parts of Subsection A of this section shall be deemed to be:

(i) A conclusive and binding determination on the Contractor’s part that said order, work, action or omission does not involve revised work and it is not contrary to the terms and provisions of this Agreement; and

(ii) A waiver by the Contractor of all claims for additional compensation or damages as a result of said order, work, action or omission. The provisions of Section 2.3 are for the purpose of enabling the Board to avoid waste of public funds by affording it promptly the opportunity to cancel or revise any work, change its plans, mitigate or remedy the effects or circumstances giving rise to a claim, or take such other action as may seem desirable, and to verify any claimed expenses or circumstances as they occur. Compliance with such provisions is essential whether or not the Board is aware of the circumstances of any work or other circumstances which might constitute a basis for a claim, and whether or not the Board has indicated it will consider a claim in connection therewith.

D. No person has power to waive or modify any of the foregoing provisions. In any action against the Board to recover the sum claimed by the Contractor to be due under or by reason of this Agreement, the Contractor must allege in its complaint and prove at trial compliance with the provisions of this section.

E. Nothing contained in this section shall in any way affect the Board’s right to obtain discovery in any action that might be instituted by or against the Board.

2.4 Responsibility of the Contractor

A. The Contractor shall be responsible for the quality, technical accuracy, timely completion, and the coordination of all plans, studies, designs, drawings, specifications, reports and other services furnished by the Contractor. The Contractor shall, without additional compensation, correct or revise any errors, omissions or other deficiencies in its plans, studies, designs, drawings, specifications, reports and other services.

B. The Contractor shall ensure that all its vehicles, subcontractors, agents and employees comply with all DOT and OSHA/PESH regulations applicable to the work, including any requirements for personal protective equipment/clothing. Provision of all personal protective gear, devices, equipment, and clothing for all personnel involved with the work shall be the responsibility of the Contractor.

C. Approval by the Board of plans, studies, designs, specifications, reports, and incidental work furnished hereunder shall not in any way relieve the Contractor of responsibility for the technical adequacy of its work. The Board’s approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

D. The Contractor shall be and remain liable in accordance with applicable law for all damages to the Board to the extent caused by the Contractor’s negligent performance of any of the services, except for errors, omissions or other deficiencies to the extent attributable to the Board, Board-furnished data or any third party employed by the

Board to provide said services to the Contractor.

3.0 TIME OF PERFORMANCE

3.1 Date of Commencement and Completion

The Contractor agrees that it will begin work upon the Date of Commencement stated in

Section 1.2, and that it will diligently proceed with said work such that the same shall be completed by the Date of Completion stated in Section 1.3.

3.2 Best Efforts

The Contractor acknowledges that the services to be performed are essential to the effective operation of the Board’s functions, and that, therefore, the Contractor will exercise its best efforts to complete the services called for in the minimum time possible. In the event that the Contractor, for good cause shown, cannot complete the services within the time agreed to, the Contractor shall make a written request to the Board, in accordance with the sections which follow.

3.3 Applications for Modification of The Date of Completion

A. If the Contractor claims that adjustment of the Date of Completion is warranted on account of

(i) work that has been ordered to do is outside the scope of services, or

(ii) an action or omission of the Board is contrary to the terms and provisions of this

Agreement, the Contractor shall proceed in accordance with section 2.3.

B. If the Contractor claims that, on account of conditions other than those stated in

Subsection A above, adjustment of the Date of Completion is warranted, the Contractor shall proceed in accordance with Sections 3.4 and 3.5.

3.4 Notice of Conditions Causing Delay

A. Within five (5) working days after the commencement of any condition which is causing or may cause delay in completion, the Contractor shall notify the Board in writing of the effect, if any, of such condition upon the Date of Completion, and shall state why and in what respects, if any, the condition is causing or may cause such delay.

B. Failure to strictly comply with this requirement may, in the discretion of the Board, be deemed sufficient cause to deny any extension of time arising out of or resulting from such a condition.

3.5 Extension of Time

A. An extension or extensions of time for the completion of the work may be granted by the Board, but only upon written application therefor by the Consultant to the Board.

B. An application for an extension of time shall set forth in detail the source and nature of each alleged cause of delay in the completion of the work, the date upon which each such cause of delay began, ended, or will end, and the number of days delay attributable to each of such causes. Such application shall be submitted prior to completion of the work.

C. If such an application is made, the Contractor shall be entitled to an extension of time for delay and completion of the work caused solely:

(i) By the acts or omissions of the Board, its officers, agents or employees; or

(ii) By unforeseeable supervening conditions entirely beyond the control of the

Contractor, such as, but not limited to, Acts of God or the public enemy, war or other national emergency making performance temporarily impossible, and strikes or labor disputes.

D. The Contractor shall be entitled to an extension of time for such causes only for the number of calendar days of delay which the Board may determine to be due solely to such causes, and then only if the Consultant shall have strictly complied with all the requirements of this section and Section 3.4. The Board shall make such determination within thirty (30) calendar days after receipt of the Contractor's application for an extension of time, provided, however, said application complies with the requirements of this section and Section 3.4.

E. The Contractor shall not be entitled to receive a separate extension of time for each one of several causes of delay operating concurrently, but, if at all, only for the actual period of delay in completion of the work as determined by the Board, irrespective of the number of causes contributing to produce such delay. If one of several causes of delay operating concurrently results from any act, fault, or omission of the Contractor or of its subcontractor, if any, and would of itself (irrespective of the concurrent causes) have delayed the work, no extension of time will be allowed for the period of delay resulting from such act, fault or omission.

F. The granting of an application for an extension of time for causes of delay other than those herein referred to shall be entirely within the discretion of the Board.

3.6 Delay Claims

By submitting its bid, the Contractor represents and warrants that the provisions herein contained for extension of time are fair and adequate; that the Contractor has had an opportunity to make provision for any and all delays within the contemplation of the parties; and that the Contractor shall not have or assert any claim for damages, or prosecute any suit, action, cause of action, arbitration claim or other proceeding against the Board for such damages arising from any delay or hindrance in the completion of its services due to any act or omission on the part of the Board its agents, servants and employees, or otherwise.

3.7 Liquidated Damages

By submitting its bid, the Contractor acknowledges that the services to be performed are essential to the effective operation of the Board’s functions; that it is difficult, if not impossible, to assess the value of the damage the Board will experience in the event the

Contractor fails to complete its services within the time allowed; and that therefore, to liquidate those damages, if the Contractor’s vehicle(s) and operator(s) fail to arrive at the

Binghamton-Johnson City Joint Sewage Treatment Plant, for the purpose of hauling refuse, at the time designated by the Board or its representative by written notice delivered by mail, fax or email at least twenty-four (24) hours prior to the designated time the Contractor shall pay to the Board the Liquidated Damages set forth in Section 1.5.

The payment of liquidated damages shall be in addition to other remedies available to the

Board pursuant to its Agreement with the Board, at law, or in equity. The Board may unilaterally elect to take payment of the liquidated damages, in whole or in part, as a credit against any amount owed by the Board to the Contractor pursuant to this Agreement.

4.0 COMPENSATION TO THE CONTRACTOR

4.1 Amount of Compensation

For the faithful performance of the work of this Agreement and its acceptance by the Board, the Board shall pay to the Consultant in accordance herewith and in accordance with the

Contractor’s bid. The compensation includes, but is not limited to, compensation for personnel time, equipment, materials, insurance, travel expenses, overhead and any other expenses which the Contractor incurs during the performance of said work.

4.2 Method of Payment

A. The Contractor shall, no more than once in each calendar month, submit to the Board a requisition for payment for services performed, provided the services were not included in an earlier requisition. Each requisition shall include: i) the Consultant’s written invoice, which shall include a detailed statement of the services for which payment is requisitioned, and ii) a fully completed and signed voucher on a form

(known as a “Claim for Payment”) available from the Board. The quantity of services completed, and the value thereof, as indicated in the requisition for payment, shall be subject to verification by the Board. Payment by the Board will be made within sixty

(60) days of the last day of the calendar month in which a requisition is received by the

Board, provided that the Board verifies the quality of services and the value thereof, and the Boards’ Fiscal Officer is satisfied that the requisition is complete, and that payment is due the Contractor in the amount stated in the requisition. The Board will pay the Consultant all verified amount less the retainage set for in Section 1.4.

B. Final payment for all services, including payment of the retainage, shall be made upon completion of services, provided final payment for said services is authorized by the

Board and further provided, no lawful or proper direction given by the Board regarding said services remains non-compliant. Prior to final payment for said services, or prior settlement upon termination of the Agreement, and as a condition precedent thereto, the Contractor shall execute and deliver to the Board a release of all claims against the

Board arising under and by virtue of the Agreement, other than such claims, if any, as may be specifically reserved by the Consultant from the operation of the release in stated amounts to be set forth therein.

4.3 Value of Additional Work

A. The amount by which the Agreement consideration is to be increased or decreased by any revision of the scope of services or an act or omission of the Board resulting in additional work of the Contractor, by one or more of the following methods:

(i) By accepting an amount agreed upon by the parties; or

(ii) By estimating the fair and reasonable cost of (1) labor, including all wages, required wage supplements and insurance required by law (Workers'

Compensation, Social Security, Disability, Unemployment, etc.) employed pursuant to the work; (2) reasonable and necessary technical subcontractors and

(3) three reimbursable expenses; or

(iii) By determining the actual cost of the revision in the same manner as in the above

Subdivision (ii) except that actual costs of the Contractor shall be utilized in lieu of estimated costs.

B. Irrespective of the method used or to be used by in determining the value of a revision, the Contractor, within thirty (30) working days after a request for the same, must submit to the Board a detailed breakdown of the Contractor's estimate of the value of the revision.

C. Unless otherwise specifically provided for in a revision, the compensation specified therein for revised work includes full payment for both the revised work covered thereby and for any damage or expense caused the Contractor by any delays to other work to be done under the Agreement resulting from or on account of said revised work, and the Contractor waives all rights to any other compensation for said revised work, damage or expense.

5.0 INSURANCE

The Contractor shall procure and thereafter maintain until final acceptance of the Project keep in full force and effect insurance of the kind and in the amounts specified in Section

1.9.

6.0 TERMINATION

6.1 Termination for Cause

The Contractor’s services may be terminated in whole or in part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under the

Agreement through no fault of the terminating party, provided, that no such termination may be effected unless the other party is given (i) not less than seven (7) calendar days notice of intent to terminate, and (ii) an opportunity for consultation with the terminating party prior to termination.

6.2 Termination For Convenience

The Contractor’s service may be terminated in whole or in part in writing by the Board for its convenience, provided, that such termination is for good cause and that the Contractor is given; (i) not less than seven (7) calendar days’ notice of intent to terminate, and (ii) an opportunity for consultation with the Board prior to termination.

6.3 Adjustments Upon Termination

A. If termination for cause is effected by the Board, an equitable adjustment in the fee provided for in the Agreement shall be made, but: (i) no amount shall be allowed for anticipated profits on unperformed services; and (ii) any payment due to the Contractor at the time of termination may be adjusted to the extent of any additional costs occasioned to the Board by reason of the Contractor's default. If termination for cause is effected by the Contractor, or if termination for convenience is effected by the Board, an equitable adjustment in the fee shall be made, including a reasonable profit on unperformed services. The equitable adjustment for any termination shall provide for payment to the Contractor for services rendered and reimbursable expenses incurred prior to the termination.

B. Upon termination either for cause or convenience, the Board may take over the Project and prosecute the same to completion, by agreement with another party or otherwise.

Any work taken over by the Board for completion will be completed at the Board’s risk, and the Board will hold harmless the Contractor from all claims and damages arising out of improper use of the Contractor's work.

C. If, after termination by the Board, for cause, it is determined that the Board did not have cause to terminate, the termination shall be deemed to have been effected for the convenience of the Board.

6.4 Postponement Or Suspension Of Commencement Of The Project. The Board may postpone commencement of the Project or suspend work on all or part of the Project, provided, that no such postponement or suspension may be affected unless the Board gives the Contractor

(i) not less than seven (7) calendar days written notice of its intention, and (ii) an opportunity for consultation with the Board prior to postponement or suspension. If such suspension is affected by the Board after commencement of the Contractor's performance of services hereunder, an equitable adjustment in the price provided for in the Agreement shall be made as if the services had been terminated by the Board for its convenience. If, after a substantial lapse of time, the Board directs the resumption of performance of services by the Contractor, the Contractor if it is caused to do extra work which it would not have otherwise had to do, will be entitled to an equitable adjustment to be made in accordance with Section 4.3 of the Agreement.

6.5 The Contractor’s Obligations Upon Termination, Postponement or Suspension Either upon giving notice of termination to the Board, or receiving from the Board a notice of termination, postponement or suspension, the Contractor shall (i) promptly discontinue all services effected (unless the Board directs otherwise), and (ii) deliver or otherwise make available to the Board all data, plans, studies, drawings, specifications, reports, estimates, summaries and such other information as may have been accumulated by the Contractor in performing this Agreement, whether completed or in process.

7.0 ACTIONS AND PROCEEDINGS

7.1 Limitation of Action

A. No action or proceeding shall lie or be maintained by the Contractor, or anyone claiming under or through the Contractor, against the Board upon any claim arising out of or based upon the Agreement or any breach hereof or by reason of any act or omission or requirement of the Board or its individual members, agents, servants or employees, unless:

(i) Such action or proceeding is instituted in a court of competent jurisdiction in the

State of New York; and

(ii) The Contractor or the person claiming under or through it shall have strictly complied with all requirements relating to the giving of notices and information with respect to such claim; and

(iii) If the Agreement is terminated for cause of for convenience, such action is commenced within six (6) months after the date of such termination. Otherwise, such action or proceeding shall be commenced within one (1) year after the submission to the Board of the final application for payment or, if the claim is based upon monies retained for any period after the date of the final application for payment, such action is commenced within six (6) months after such monies become due and payable under the terms of the Agreement.

B. Notwithstanding anything in the laws of the State of New York to the contrary, the

Contractor or anyone claiming under or through the Contractor, shall not be entitled to any additional time to begin anew any other action if an action commenced within the times herein specified be dismissed or discontinued for any reason whatsoever.

7.3 No Estoppel or Waiver

A. The Board shall not be precluded or estopped by an inspection, acceptance, application for payment, final or otherwise, issued or made under the Agreement or otherwise issued or made by it, or any member, agent or employee of the Board, from showing at any time the true amount and character of the work performed, or form showing that nay such inspection, acceptance, application or payment or payments is incorrect, or was improperly issued or made; and the Board shall not be precluded or estopped, notwithstanding any such inspection, acceptance, application for payment or payments, from recovering from the Contractor any damages which it may sustain by reason of any monies which may be paid to it or for its account in access of those to which it is lawfully entitled.

B. Neither the Board’s acceptance of all or any part of the work covered by this

Agreement, nor any payment therefor, nor any payment by the Board, nor any permission or direction by the Board for the Contractor to continue with the performance of the Agreement before or after the Date of Completion, nor any performance by the Board of any of the Contractor’s duties or obligations, nor any aid lent to the Contractor by the Board in its performance of such duties or obligations, nor any delay or omission by the Board to exercise a right or remedy accruing to it under the terms of the Agreement or existing at law or in equity or by statute or otherwise, nor any other thing done or omitted to be done by the Board, its members, agents, or employees, shall be deemed to be a release to the Contractor from any obligations, liabilities, or undertakings in connection with the Agreement, or a waiver of any provision of the Agreement or of any rights or remedies to which the Board may be entitled because of any breach thereof, expecting only a written instrument expressly providing for such release or waiver. No termination, revision or annulment hereof, in whole or as to any part of the Agreement, because of any breach hereof, shall be deemed a waiver of any damages to which the Board may be entitled because of such breach.

No waiver by the Board of any breach of the Agreement shall be deemed to be a waiver of any other or any subsequent breach.

7.2 Indemnification

The Contractor shall indemnify and hold the Board and its members, agents, servants and employees free and harmless from and against any and all losses, penalties, damages, settlements, costs, charges, professional fees or other expenses or liabilities of every kind and character arising out of or relating to any and all claims, liens, demands, obligations, actions, proceedings or causes of action of every kind and character in connection with, or arising directly or indirectly out of, errors and/or omissions and/or negligent acts by the

Contractor (including its employees, agents and/or contractors) in the performance of the

Agreement. Without limiting the generality of the foregoing, any and all such claims, etc., relating to personal injury, death, damage to property, or any actual or alleged violation of any applicable statute, ordinance, administrative order, rule or regulation, or decree of any court, in connection with, or arising directly or indirectly out of, errors and/or negligent acts by the Contractor, as aforesaid, shall be included in the indemnity hereunder. The

Contractor further agrees to investigate, handle, respond to, provide defense for and defend any such claim at its sole expense even if such claim is groundless, false or fraudulent. In any case in which such indemnification would violate Section 5-322.1 of the New York

General Obligations Law, or any other applicable legal prohibition, the foregoing provisions concerning indemnification shall not be construed to indemnify the Board for damage arising out of bodily injury to persons or damage to property contributed to, caused by or…

This is the start of the file's text. The full file is on GovTribe.