2026-11-17 - KY Court of Appeals - Addendum 02.pdf

PDF 12 MB Posted

Attached to
RFB for the Court of Appeals Building Construction project
Solicitation number
RFB 025 2700000165 4
Issued by
Elliott County, Kentucky

About this file

This is an Addendum 02 issued by the Kentucky Court of Appeals modifying a previous solicitation. The addendum addresses clarifications and modifications to the original procurement request, with responses required by the specified deadline outlined in the addendum. The document serves to update bidders on changes to contract requirements, terms, or specifications that supersede or supplement information contained in the original solicitation documents.

The addendum contains specific revisions to procurement terms, eligibility requirements, or technical specifications that all prospective bidders must acknowledge and incorporate into their proposals. Bidders are required to review this addendum in conjunction with the original solicitation materials to ensure complete compliance with all current requirements. This document is essential for all potential contractors to review prior to submission of bids to the Kentucky Court of Appeals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 02 November 17, 2026

RE: Kentucky Court of Appeals Building

1003 Vandalay Drive

Frankfort, KY 40601

Project No. 23051

FROM: Brandstetter Carroll Inc.

2360 Chauvin Dr.

Lexington, KY 40517

Phone 859-268-1933

TO: Plan Holders

This addendum forms a part of the Construction Documents and modifies the original bidding documents dated September 11, 2026. Each bidder shall acknowledge receipt of this addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.

This Addendum consists of five (5) pages, and the following attachments:

1. Pre-bid Meeting Minutes dated November 4th, 2026

2. Pre-bid Sign-in sheet dated November 4th, 2026.

3. C-300 – Site Grading Plan

4. S-000 – Structural Notes

5. S-401 – Sections & Details

6. I-801 – Interior Finish Plan - Alternate

7. P-101 – Floor Plan – Sanitary Sewer

8. P-201 – Floor Plan – Domestic Water

9. P-503 – Plumbing Risers

10. P-601 – Plumbing Schedules & Details

11. M-101 – Floor Plan – HVAC

12. M-601 – Mechanical Schedules

13. M-702 – Mechanical Controls

14. E-101 – Floor Plan – Lighting

15. 012300 – Alternates

16. 074264 – Metal Composite Material Wall Panels

17. 096623 – Epoxy Thinset Terrazzo

GENERAL ITEMS:

None.

QUESTIONS & CLARIFICATIONS:

1. C-100 shows a new 8-inch C900 DR-14 fire-protection service and an 8-inch utility main extension to the vault. F-001 requires the fire-suppression contractor to hydraulically design and size the main service and sprinkler system. Please confirm the 8-inch site fire service is a fixed design basis/minimum. If hydraulic calculations require a larger service, clarify whether the change is included in the Contractor’s base bid or will be addressed as a design revision.

A. The 8-inch fire line is the design basis.

2. The building-envelope commissioning specifications incorporate a Commissioning Plan and

Appendices and refer to the plan for sampling rates. Please issue the Commissioning

Plan/appendices and confirm the exact minimum test quantities/locations to be included in the base bid for exterior wall water and air leakage testing, including how the stated minimum 30% sampling “of each type” is to be interpreted.

A. At this time, the Owner has not selected a commissioning agent. As such at this time, there is no commissioning plan/appendices. Refer to specifications for all other requirements.

3. Sheet P-101 identifies the water closets in Restrooms 158A and 162A as WC1A (ADA compliant wall-hung), while Sheets P-201, P-502 & P-503 identifies these same fixtures as

WC2A (ADA-compliant floor-mounted). Please clarify which fixture designation is correct for these two restrooms and provide revised drawings as necessary.

A. Water closets in Restrooms 158A & 162A shall be designated as WC2A in lieu of WC1A as shown. See revised sheet P-101 contained within this addendum.

4. Numerous discrepancies exist between the domestic hot and cold water pipe sizes indicated on the floor plans on Sheet P-201 and the corresponding plumbing isometric diagrams on Sheet P-503. These discrepancies occur throughout the building, with identical piping runs shown at different sizes between the two sheets. Please review and coordinate the domestic water distribution systems shown on Sheets P-201 and P-503, clarify which drawings govern for bidding purposes, and issue revised drawings identifying the correct pipe sizes throughout.

A. Refer to attached drawings P-201 and P-503 contained within this addendum.

5. Sheet M-601, Diffuser Schedule Remarks, indicates one (1) 4'-0" plenum box for the 48'-0" linear diffuser. However, Sheet M-101 indicates ten (10) plenum boxes for this diffuser. Please clarify the required quantity and configuration of plenum boxes for bidding purposes and confirm which drawing governs.

A. Within Air Device Schedule, Remarks for R-3 linear return grille should be 6, 12 in lieu of

6,11 shown. See revised sheet M-601 contained within this addendum

6. Sheet M-101 calls for two (2) E-1 exhaust diffusers in Restroom 162A; however, only one (1) exhaust diffuser is shown on the floor plan. Please clarify whether one (1) or two (2) E-1 exhaust diffusers are required in Restroom 162A for bidding purposes.

A. Restroom 162A shall have one (1) exhaust air grille in lieu of two (2) designations shown.

See revised sheet M-101 contained within this addendum.

7. Sheet M-101 indicates that Chief Judge's Office 118 is served by a dedicated VAV-31;

however, no thermostat or room temperature sensor is shown within the office. Please confirm whether a dedicated thermostat or room temperature sensor is required for VAV-31 and identify its intended location for bidding purposes.

A. In Chief Judge’s Office 118, provide wall mounted thermostat controlling VAV Box – 31 at entry door from corridor. See revised sheet M-101 contained within this addendum.

8. The Mini-Split System Schedule on Sheet M-601 identifies CU-01 and WMU-01 as a cooling-only system. However, the Mini-Split System Air Handling Unit Sequence of Operation on

Sheet M-702 references heating setpoints and Heat/Cool operating modes. Please confirm whether the mini-split system is intended to provide cooling only, as scheduled, or whether heating capability is required. If heating is required, please provide the appropriate equipment specifications and revised schedule. Additionally, please confirm that the MS-01 designation listed under CU-01's connected equipment refers to WMU-01.

A. Reference Mini-Split System Air Handling Unit Sequence of Operation and Points list and delete all references to heating – Mini-Split System is to be cooling only system. See revised sheet M-702 contained within this addendum.

9. Sheet M-101 indicates an 8" × 8" supply duct serving Women's Restroom 117; however, no supply diffuser designation or airflow quantity is identified. The adjacent Chief Judge's

Restroom 118A identifies an S-4 diffuser at 25 CFM. Please confirm the required supply-air device type, quantity, and airflow for Women's Restroom 117 for bidding purposes.

A. In Women’s Restroom 117, provide S-4 supply air diffuser rated for 25 CFM. See revised sheet M-101 contained within this addendum.

10. Sheet M-101 contains numerous locations where supply, return, and exhaust ductwork are shown stacked or overlapping, making it difficult to distinguish individual duct runs and their corresponding sizes. Several duct sizes are also not clearly identified. Please review and clarify the duct sizes, routing, and elevations where multiple duct runs overlap. We recommend issuing separate supply air and return/exhaust air ductwork plans, with all duct sizes clearly identified, to provide consistent information for bidding purposes.

A. Miscellaneous ductwork sizing and routings have been clarified. See revised sheet M-101 contained within this addendum.

11. Sheet E-101 indicates 16'-0" linear lighting fixtures designated L16 and L16E in the corridor between Lobby/Waiting 101 and Vestibule 112, adjacent to Courtroom 110. However, Sheet

A-110 indicates the ceiling layout interrupted by two R-2 return-air grilles, resulting in what appear to be two approximately 6'-0" lighting sections rather than a continuous 16'-0" fixture.

Please clarify the required fixture lengths, quantities, and locations, and confirm whether the architectural ceiling layout or electrical lighting plan governs for bidding purposes.

A. See revised Sheet E-101 contained within this addendum for revisions to Lobby 101 lighting as marked.

B. In Lobby / Waiting 101 outside of doors to Courtroom 110, revise location of R-2 return air grilles and related ductwork. See revised sheet M-101 contained within this addendum.

12. Sheet Key Notes #3 Provide power connection for hand dryers. Hand dryers are not shown on the drawing. Have they been eliminated?

A. There are no hand dryers in the project. Remove note #3 from sheet E-201.

13. Confirming that the owner will be responsible for providing all Third Party Testing and

Commissioning contractors. Does this also apply to testing and commissioning of the electrical systems (NETA), and mechanical systems?

A. Correct, all Third-Party Testing will be owner provided.

14. 1) List of frequencies to be covered. 2) Either a donor signal level or the distance to the repeater tower. 3) Equipment install room/location (if nothing specified I will choose best available) 4) BBU run-time requirements and whether or not we should include a remote annunciator panel.

A. ERCES system itself is not specified to be provide in contract documents; specification cover Baseline signal strength testing only that is to be provided by Contractor.

15. Project is not tax exempt across the board, correct?

A. There are no Direct Purchase Orders, all materials and suppliers are to be included in a single Schedule of Values (SOV).

16. Where should bids be delivered?

A. Sealed bids shall be delivered to the front desk of the AOC office.

17. Coordinating with Owner Security Supplier – contact at AOC or mediated through design team?

A. Coordination will be with the Owner/AOC, will be coordinated in a progress meeting.

Cabling is the contractors’ responsibility, the AOC is providing and managing the configuration of the equipment.

B. Storage of security devices will be stored at the AOC and transmitted to the building.

18. Is the budget for the project being released?

A. Budget is not being released for the project

19. Has there been an inspection company selected yet?

A. AOC has not selected a Commissioning Agent or Special Inspections at this time, both will be selected and provided by the Owner/AOC.

20. With the anticipation of hiring a Commissioning Agent, is there a Commissioning Plan prepared?

A. As the Owner/AOC has not selected a Commissioning Agent, there is not at this time a

Commissioning Plan prepared.

21. Will there be any moving management expected to be a part of the GC’s scope?

A. No, the Owner/AOC will handle the moving of furniture and other items to the new building.

22. Temporary access for employees

A. Three entries into the parking area, the AOC anticipates the major impact will be on the

Vandalay entry. Once a delivery plan for staging has been developed, entries will be limited at that point.

23. Are the people coming and going to the AOC main office primarily state employees or public as well?

A. Times where possibly public events will be held at the AOC but will be times where

Judges and other staff will be coming. Once an entrance has been established, the

AOC can notify the guests which entry to use.

24. Who is the Special inspector?

A. Refer to pre-bid meeting minutes.

25. On detail C3 A-702 the 1/2 plywood behind the base when wood paneling above does not indicate that fire treated is required please confirm.

A. No, the blocking identified in C3/A-702 is not required to be fire rated.

26. For upper cabinets not located below soffits are slope tops required?

A. No, slope tops to the cabinet are not required.

27. Will the “Unit Prices” referenced in addendum #1 below, be part of the bid documents? Not found attached to addendum #1.

A. Refer to Bid Specifications for List of Unit Prices to be included as part of Bid submission.

28. Will all materials being supplied for this project be tax exempt or shall materials over a certain dollar amount only be tax exempt?

A. Refer to pre-bid meeting minutes.

29. The attached wall types and elevations call for metal panels, no specification is included in the spec book, please advise.

A. See attached Specification Section 074264 – Metal Composite Material Wall Panels.

30. What is the status of permitting?

A. We have received plumbing approval but are still awaiting building approval from HBC.

31. Is Exterior Mock wall approval required before ordering all exterior finish material?

A. Yes, approval of exterior mock wall will be required prior to releasing the final exterior finish selections.

SUBSTITUTION REQUEST APPROVALS:

All substitutions are still bound by criteria set forth within specification and the drawings. No deviations from requirements will be accepted because of product substitution. Contractor is responsible for burden of proof of compliance with specification.

1. De La Fontaine and Metal Products, Inc. (MPI) are acceptable providers for Hollow Metal

Door and Frames for Specification Section 081113 Hollow Metal Doors and Frames.

CHANGES TO DRAWINGS:

1. C-300 – Site Grading Plan

A. Refer to the Drawings, Drawing C-300. See replacement drawing C-300 for location of 8

Borings performed by Geotechnical Testing Agency and included in Project

Geotechnical Report.

2. S-000 – Structural Notes

A. See revised drawing for a Wind Load Component & Cladding Zones.

3. S-401 – Sections & Details

A. See revised drawing for column size clarification.

4. A-801 – Interior Finish Plan – Alternate

A. See revised drawing for terrazzo alternate.

5. P-101 – Floor Plan – Sanitary Sewer

A. Water closets in Restrooms 158A & 162A shall be designated as WC2A in lieu of WC1A as shown. See revised sheet P-101 contained within this addendum.

6. P-201 – Floor Plan – Domestic Water

A. Refer to attached drawing P-201 for clarifications of water piping sizing.

7. P-503 – Plumbing Risers

A. Refer to attached drawing P-503 for clarifications of water piping sizing.

8. P-601 – Plumbing Schedules & Details

A. Reference Electric Water Heater Piping Detail and note changes made to piping sizes.

See revised sheet P-601 contained within this addendum.

9. M-101 – Floor Plan – HVAC

A. In Lobby / Waiting 101 outside of doors to Courtroom 110, revise location of R-2 return air grilles and related ductwork. See revised sheet M-101 contained within this addendum.

B. Restroom 162A shall have one (1) exhaust air grille in lieu of two (2) designations shown.

See revised sheet M-101 contained within this addendum.

C. In Chief Judge’s Office 118, provide wall mounted thermostat controlling VAV Box – 31 at entry door from corridor. See revised sheet M-101 contained within this addendum.

10. M-601 – Mechanical Schedules

A. Within Air Device Schedule, Remarks for R-3 linear return grille should be 6, 12 in lieu of

6,11 shown. See revised sheet M-601 contained within this addendum.

11. M-702 – Mechanical Controls

A. Reference Mini-Split System Air Handling Unit Sequence of Operation and Points list and delete all references to heating – Mini-Split System is to be cooling only system. See revised sheet M-702 contained within this addendum.

12. E-002 – Site Utilities

A. Refer to General Note B and replace with “B. Charges from the utility company will be paid by the Owner”.

13. E-101 – Floor Plan – Lighting

A. See revised Sheet E-101 contained within this addendum for revisions to Lobby 101 lighting and other revisions as marked.

14. E-201 – Floor Plan – Lighting

A. Remove note #3 in its entirety.

CHANGES TO SPECIFICATIONS:

1. 074264 – Metal Composite Material Wall Panels

A. See attached Specification.

1. 093013 – Ceramic Tiling Section

A. Revise and replace subsections with the following:

i. 2.2.G.1: “Basis-of-Design Product: Subject to compliance with requirements, provide

Fray Hexmark Mosaic by Atlas Concorde USA or comparable product by one of the following”

ii. 2.2.G.4: “Thickness: 9mm”

iii. 2.2.G.5: “Finish: Matte”

iv. 2.2.G.6: “Tile Color: As selected by Architect from manufacturer’s full range”

2. 096623 – Epoxy Thinset Terrazzo

B. See attached specification.

END OF ADDENDUM NO. 02

Kentucky Court of Appeals Building | RFB 025 2700000165 | BCI Project No. 23051 Page 1 of 5

Pre-Bid Conference Memo

Kentucky Court of Appeals Building

Owner Kentucky Court of Justice, Administrative Office of the Courts (AOC)

Solicitation RFB 025 2700000165

Architect Brandstetter Carroll Inc. (BCI Project No. 23051)

Date and time Wednesday, November 4, 2026, 10:00 a.m. Eastern Time

Location Administrative Office of the Courts, 1001 Vandalay Drive, Frankfort, Kentucky 40601

Attendance Optional for prospective Bidders.

Attachments Attendance sheet.

1. Welcome, introductions, and sign-in

1) AOC Division of Procurement: Brandy Cook, Procurement Officer; Ashley Hooker, Division of

Procurement.

2) AOC Department of Court Facilities: Danny Rhodes, Executive Officer; Mark Bannister, Court Facilities

Officer; Jerry Combs, Capital Construction Manager; Chip Oakley, Construction Coordinator.

3) Brandstetter Carroll Inc.: Ben Whitmer, Project Manager; Kayla Spies, Assistant Project Manager;

Monica Sumner, Executive Vice President and COO

4) Sign-in: please print your name, company, telephone, and email on the attendance sheet. The attendance list will be issued with the conference minutes in Addendum 02.

2. Conference purpose and communication rules

1) Today is the only opportunity to ask oral questions. After today, all questions must be submitted in writing.

2) Direct all communication about this RFB to Solicitation@kycourts.net. Phone calls will not be accepted, and inquiries may not be made to the Architect of Record.

3) Until a Contractor is selected and announced, Bidders may not communicate about this RFB with any

KCOJ employee, official, or consultant other than the AOC Division of Procurement. A Bidder who violates this rule may have its Bid rejected.

4) Duty to inquire: ask about any ambiguity, discrepancy, error, omission, or conflict. Bidders are responsible for any patent ambiguity not brought to the AOC's attention.

3. Key dates

All times are Eastern Time (RFB 2.02).

Milestone Date

RFB released October 9, 2026

Pre-Bid Conference November 4, 2026, 10:00 a.m.

Addendum 01 (dated November 2, 2026) Issued November 4, 2026

Addendum 02 (to include the conference minutes) Anticipated by November 10, 2026

Written questions and Attachment B substitution requests due November 20, 2026

Anticipated AOC response to written questions November 30, 2026

Final addendum By December 1, 2026

Bids due and Public Bid opening Tuesday, December 8, 2026, 2:30 p.m.

Bidders notified of award (anticipated) December 9, 2026

Kentucky Court of Appeals Building | RFB 025 2700000165 | BCI Project No. 23051 Page 2 of 5

Milestone Date

Contract execution (anticipated) December 30, 2026

4. Bidding Documents and addenda

1) Obtain Bidding Documents from Lynn Imaging's online planroom. Bidders who use other sources will not be registered as plan holders and may not receive addenda. Identify your role (prime contractor, subcontractor, material supplier, or other) when requesting documents.

2) The Bidding Documents are the Project Manual and the Drawings, both dated September 11, 2026, plus all addenda.

3) Addenda will be posted to the Commonwealth's eProcurement website and issued through Lynn

Imaging’s Planroom to registered plan holders. Each Bidder is responsible for verifying all addenda before submitting its Bid.

4) Addendum 01 is anticipated to be posted to Lynn Imaging’s Planroom by end of day, Wednesday

November 4, 2026.

5) Acknowledge each addendum, by number and date, in Bid Form Section I. Sign the face of the most recent addendum and include it with the Bid.

6) CAD files will not be made available during bidding.

5. Questions and equal-product requests

1) Submit questions in writing to Solicitation@kycourts.net on or before November 20, 2026. The AOC will refer questions to the Architect as appropriate and will answer salient questions by addendum.

2) To request prior approval of an equal product, submit Attachment B, Request for Approval of

Acceptable Products and Certificate of Compliance, with complete product information, to

Solicitation@kycourts.net by November 20, 2026. The burden of proof is on the requester.

3) Approvals will be issued only by addendum. Do not rely on approvals made in any other manner.

4) Products without prior approval may be included in a Bid at the Bidder's risk. If the AOC rejects such an item, the Bidder must provide the specified product or an approved equal at the Bid price.

6. Bid submittal requirements

1) Deliver the sealed Bid to: Department of Financial Services, Division of Procurement, Administrative

Office of the Courts, 1001 Vandalay Drive, Frankfort, KY 40601, ATTN: Brandy Cook (RFB 2.08).

2) Mark the outside of the envelope: "Sealed Request for Bid No: RFB 025 2700000165" and "Bid Receipt

Closing Date: Tuesday, December 8, 2026 - 2:30 p.m. Eastern Time".

3) Bids are time-stamped on receipt. Late Bids will not be considered except under the limited conditions listed in the RFB, and electronic or facsimile Bids will not be considered.

4) Arrange the Bid behind labeled tabs, TAB 1 through TAB 5, as described in the RFB. Failure to do so may result in rejection.

5) Submit only one Bid. Multiple or alternate Bids will be rejected.

6) The Bid must be firm. Do not qualify the Bid or add stipulations to the Bid Form. Note any exceptions in the Transmittal Letter.

7) A Bid may be modified or withdrawn before the closing time by electronic or written notice. An electronic modification may state only a percentage or numerical change, not unit or total prices.

8) To protect proprietary information, mark the specific pages and state the basis. Do not mark the entire

Bid as proprietary.

7. Bid Form (Attachment A)

1) Section I, Addenda: list the number and date of each addendum received.

2) Section II, Lump Sum Base Bid: state the amount in words and figures. Words govern if they differ.

Kentucky Court of Appeals Building | RFB 025 2700000165 | BCI Project No. 23051 Page 3 of 5

3) Section III, Acceptance: the Bid is irrevocable for 60 days after Bid closing. The selected Bidder must execute the Agreement and furnish bonds within 10 days of the Notice of Award.

4) Section IV, Contract Time: the Bid Form states 730 calendar days from Notice to Proceed. Agreement

§6.1.1 states Substantial Completion within 730 days from the Date of Commencement and Final

Completion within 30 days after Substantial Completion.

5) Section V, Change Order Values: state a Daily General Conditions rate. This value is scored in the award.

6) Section VI, List of Materials and Equipment: identify the manufacturer and brand name for all 35 items.

A distributor or dealer name alone, or "as per plans and specifications," is not sufficient, and an incomplete list may result in rejection.

7) Section VII, List of Proposed Subcontractors: complete all branches of work, and state "Prime" where the Bidder will perform the work. Subcontractors are subject to AOC approval. The AOC will review subcontractors on bid opening day and may require the apparent low Bidder to name a replacement by close of business that day. Failure to do so will result in Bid rejection.

8) Section VIII, Notification of Violations: check one box, and attach a list of any final determinations of violations within the past five years.

9) Section IX, Certification: sign the Bid Form. Failure to sign invalidates the Bid. The person who signs the

Transmittal Letter must initial any alteration or erasure in ink.

10) Unit Prices: complete Document 00 43 22, List of Unit Prices, and attach it to the Bid Form. Unit prices include all material, delivery, installation, insurance, overhead, and profit.

11) Alternates and allowances: none are included in this solicitation.

8. Method of Award

1) Award will be made to the lowest responsive, responsible Bidder. The RFB assigns 90 points to Cost

(Lump Sum Base Bid plus Accepted Alternates) and 10 points to Daily General Conditions.

2) Under the RFB, the lowest total receives the maximum points, and other Bidders receive points in proportion to the lowest total.

3) The AOC may investigate any Bidder's responsibility and reserves the right to request a Best and Final

Offer.

4) A foreign entity must provide its certificate of authority or statement of foreign qualification within 14 days after Bids are due.

5) Protests must be filed with the AOC Division of Procurement within two calendar weeks after the protester knows or should have known of the facts.

6) The contract is not effective until it is approved by the Director of the AOC and submitted to the

Legislative Research Commission Government Contract Review Committee. No billable work may begin before the contract is fully executed.

9. Contract terms, bonds, and insurance

1) Sample Agreement: ConsensusDocs 200, Standard Agreement and General Conditions Between

Owner and Constructor, a sample agreement is included in the RFB.

2) Bid security: 10% of the Bid, on AIA Document A310 Bid Bond, with a certified and current power of attorney.

3) Performance and Payment Bonds: each at 100% of the Contract Price, from a surety admitted in

Kentucky on AIA A312-2010 forms.

4) Liquidated damages: $1,500 per day after the Substantial Completion date and $500 per day after the Final Completion date.

5) Retainage: 10% of each progress payment, reduced to 5% of the Contract Price after the Work is 50% complete.

6) Payment: Applications for Payment on AIA G702 and G703. Invoices go to Accounting@kycourts.net, and payment is due within 30 working days of an undisputed invoice. Change Orders on AIA G701.

Kentucky Court of Appeals Building | RFB 025 2700000165 | BCI Project No. 23051 Page 4 of 5

7) Adverse weather: The sample of ConsensusDocs 200 included in the RFB sets the baseline of anticipated weather days per month that do not qualify for a time extension.

8) Permits and fees: building permit responsibility to be confirmed by the AOC. The Contractor obtains the stormwater general permit and the plumbing permit. Utility company charges will be paid by the

Owner.

9) Wage rates: no prevailing wages for the project.

10. Project overview and scope

1) New one-story building of approximately 20,000 gross square feet to house the Kentucky Court of

Appeals. Construction Type IIB, Business (B) occupancy, sprinklered.

2) Location: 1003 Vandalay Drive, Frankfort, Kentucky. The AOC will occupy the site and adjacent building(s) throughout construction.

3) Single prime contract with a lump sum Base Bid.

4) Major work: site demolition (parking lot pavement, curbs, islands, storm structures, site lighting, signage, and trees), milling and resurfacing, earthwork with overexcavation at the building pad, site utilities, paving, and landscape and plaza work; concrete, structural steel, joists, and deck; SBS modified bitumen roofing; curtain wall, storefront, and security windows and glazing; interiors, architectural woodwork, finishes, and wood pews; fire suppression, plumbing, HVAC, electrical, and communications; and electronic safety and security, including judicial security and audio video systems, voice evacuation fire alarm, and emergency radio communications enhancement.

5) Owner work under separate contracts: the Owner will furnish and install audio/visual components and furniture concurrently with the Work. Coordinate Owner-furnished items as indicated on the Drawings.

Security, access control, and courtroom audio/visual responsibilities are defined in the Systems Scope of Work Schedule.

6) Delegated design items, including the hydraulic design of the fire suppression system, are specified in the individual Sections and noted on the Drawings.

7) Commissioning: HVAC and electrical commissioning and building envelope commissioning and functional testing. The Commissioning is being provided by the AOC.

8) Mockup: the exterior mock wall on Sheet A-502 is the full extent of the mockup. The mockup will be used throughout construction as a judge of quality and craftmanship.

11. Site conditions, logistics, and work restrictions

1) Existing conditions information supplements, but does not replace Bidders' own investigations:

a) Endris Engineering survey dated July 20, 2026.

b) Atlas Technical Consultants geotechnical report and addendum.

2) Utilities: Frankfort Plant Board (water, electric, telecom), Columbia Gas, City of Frankfort Sewer, and

AT&T.

3) Use of site: confine operations to the limits of construction shown on the Drawings. Keep driveways, parking, and entrances serving the AOC's premises clear at all times, and do not use them for parking or storage. Construction personnel park in designated areas of the Owner's existing parking. The

Contractor is responsible for temporary easements for its staging areas.

4) The AOC will occupy the site and adjacent building(s) throughout construction. Give at least 72 hours' notice of activities that will affect AOC operations. Utility interruptions and disruptive work (noise, vibration, dust, or odors) require at least two days' notice and the Owner's written permission.

5) Work hours: standard work hours, 8:00 A.M. – 5:00 P.M., are to be utilized. Modified hours require approval of the Owner and authorities having jurisdiction.

6) Temporary facilities, including a common-use field office for the Owner and Architect, temporary utilities, and temporary toilets, are specified in Section 01 50 00. Use of the Owner's toilets is not permitted.

7) Confidentiality: treat AOC and court information encountered during the Work as confidential.

Kentucky Court of Appeals Building | RFB 025 2700000165 | BCI Project No. 23051 Page 5 of 5

12. After award

1) Documents will be exchanged through the Lynn Imaging eComm site. The Architect will conduct a preconstruction conference.

2) Submit a schedule of the Work before the first Application for Payment and a submittal schedule within 30 days of commencing the Work.

13. Owner, consultant, and Architect comments

1) The AOC stated that there will be no Direct Purchase Orders.

2) The AOC requested the contractors to keep all construction activities staged within boundaries of construction site.

3) The AOC reminded all prospective bidders to read the ConsensusDocs sample that was included in the bid.

4) The AOC advised all prospective bidders to read the Geotech reports. Site is unclassified and rock is expected.

14. Bidder questions

1) Questions will be recorded, and salient questions will be answered by addendum. Answers given today are not binding.

2) After today, submit questions in writing to Solicitation@kycourts.net by November 20, 2026.

FFE 777.5

W FP FP FP FP FP FPV

PIV

FDC

CO

SAN

SAN

SAN

SAN

SAN

SAN

SAN

W W W W W W

D N

U P

U P

STOP

ONE WAY

DO NOT

ENTERSTOP

FFE 777.5

+773.30

+ 73.9

4 773

+773.4

76.0

7.

775.2

+775.70

+ 77 7.

+777.2

75.1

+775.3

774.9

775.46

+774.00

+ 775.0

CB 774.15

CB 772.40

CB 774.50CB 774.50CB 774.50

C B 774.20

CB 774.50

774.5

776.30

776.30

+775.80

776.30

776.30

HP

775.4

C B

2.

C

B

2.

H

P

3.

+H P

3.

CB 772.40

H

P

4.

+774.20

.1

776.45

776.35

+776.40

+775.50

+777.20

+777.2

776.70

776.7

+776.7 777.2

774.50

5.

774.6

775.00

775.50

777.10

7.

767.7

HP

+774.3

7.

7.

7.

76.0

776.00

776.00

776.5

776.0

777.50

+HP 776.25

CB

774.50

+HP 776.2

+776.10

+ 77 7.

+7

.6

777.10

6.

6.

+ 77 6.

+ 77 6.

HP 75.7

74.8

775.0 +

+ 773.5

CB

774.35

.1

.2

CB

774.20

+777.5 +777.35

+777.2

777.20

777.35

777.10

+777.40

EJ

EJ

EJ

EJ

EJ

EJ

EJEJ EJEJ

EJ

EJ

EJ

EJ

EJ

EJ

775.8

++775.3

775.8

775.9

+777.3

774776

775 77

75.9

75.5

+75.9

RE

SE

RV

ED

EJ

RE

SE

RV

ED

RE

SE

RV

ED

RE

SE

RV

ED

RE

SE

RV

ED

RE

SE

RV

ED

RE

SE

RV

ED

RE

SE

RV

ED

+775.0

775.0

+ 775.3

774.5

76.3

776.0 776.0

775.8775.7

76.3776.0 776.0

775.5775.8

+ 774.4774.0

773.5

774.0

772.49 ME

72.66

72.8

73.7 73.3

73.4

72.9 73.0

71.5

71.1

71.8

72.4

72.5

72.23 72.0

74.8

+75.4 ME +75.2 ME +75.4ME +75.5ME +75.5ME

75.2 75.2

774.9

74.8

74.8

75.2 75.2

774.9

74.8

74.8

75.2 75.2

774.9

74.9

74.8

75.2 75.1

+775.3

774.2

774.2

+ 774.4

74.1

74.5

+775.3

75.0

75.1

75.1

+ HP

75.2 77

+773.7

3.

+ 77 3.

4.

4.

3.

+74.5

+74.3

775.85

776.1

775.6

775.80

775.85

EJ

EJ

EJ

EJ

EJ

EJ

STOPSTOPSTOPSTOP

STOP

STO

P

ST

O

P

STOP

STOPSTOP

STOP

+74.8

+ 75.0

+ 74.9

+77 4.0

+ 73 .6

3.

++ 771.86 771.85

MEME

ME

ME

ME

ME

ME

774.2

ME

776.3 ME776.3 ME

75.45ME

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

STR

M

ST

R

M

ST

R M

ST

R

M

ST

R M

ST

R

M

STRM

STRM

STRM

STRM

STRM STRM STRM STRM STRM

STRM

STRM

STRM

STRM

STRM

STRM

STRM

ST

R

M

ST

R M

ST

R

M

ST

R M

ST

R

M

ST

R M

ST

R

M

STRM STRM STRM STRM STRM STRM STRM STRM STRM STRM

STRM

STRM

STRM STRM

STRM

STRM STRM STRM STRM STRM STRM STRM STRM STRM STRM STRM

STRM STRM

STRM

STRM

STRM STRM STRM

STRM STRM

ST

R

M

ST

R M

ST

R

M

ST

R M

ST

R

M

ST

R M

STRM

STRM

STRM

STRM

STR

M

STR

M

STRM

STRM

STRM

STRM

STRM

STRM

EJ

J

J

ST

R

M

ST

R M

P-

B-

B-

B-

B-

P-

P-

P-

B-

B-

B-

B-

P-

B-

P-

P-

B-

B-

P-

P-

B-

PROJECT NO.

BRANDSTE R

A ROL IN

TT E

C R L C

ARCHITECTS + ENGINEERS + PLANNERS

www.brandstettercarroll.com

© 2026 Brandstetter Carroll Inc. All rights reserved

ISSUE DATE:

REVISIONS:

2360 Chauvin Drive, Lexington, KY 40517

p. 859.268.1933

23051

1003 VANDALAY DR.

FRANKFORT, KY 40601

09/11/2026

FRANKFORT COURT

OF APPEALS

landscape architecture + civil engineering

GRADING LEGEND

+93.0

991 PROPOSED CONTOUR

PROPOSED SPOT

ELEVATION

ME

GRADING & DRAINAGE NOTES:

A. THE EXISTING TOPOGRAPHIC AND SITE INFORMATION SHOWN IS FROM A

SURVEY PROVIDED BY ENDRIS ENGINEERING THIS INFORMATION IS PROVIDED

FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT SHALL NOT BE

RESPONSIBLE FOR THE ACCURACY OF THE INFORMATION SHOWN THEREON.

CONTRACTOR TO VERIFY ALL INFORMATION SHOWN.CONTRACTOR TO VERIFY

ALL INFORMATION SHOWN.

B. THE DRAWINGS SHOW THE APPROXIMATE LOCATION OF EXISTING AND

PROPOSED UTILITY LINES. THESE LINES HAVE BEEN IDENTIFIED AND LOCATED

AS ACCURATELY AS POSSIBLE USING AVAILABLE INFORMATION; THE

CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ACTUAL LOCATIONS.

C. PROTECT EXISTING TREES FROM POTENTIAL DAMAGE OF CONSTRUCTION

OPERATIONS. STEEPEN GRADES UPHILL FROM EXISTING TREES TO A MAX. OF

2:1 TO AVOID FILLING SOILS ONTO TRUNKS.

D. UNLESS OTHERWISE INDICATED TO BE REMOVED, ALL ITEMS REMAINING

WITHIN THE LIMIT OF CONTRACT ARE TO REMAIN AND BE PROTECTED FROM

DAMAGE DURING CONSTRUCTION.

E. THE CONTRACTOR SHALL MAINTAIN STORM DRAINAGE SYSTEMS TO

FUNCTION THROUGHOUT THE CONSTRUCTION PERIOD.

F. PROPOSED GRADES SHOWN ARE FINISHED GRADES. ELEVATIONS SHOWN

AT CURBS ARE BOTTOM OF CURB UNLESS NOTED TC.

G. LIMIT OF GRADING EXTENTS TO INCLUDE ALL AREAS DISTURBED BY ALL

SITE UTILITY WORK, REFER TO SITE UTILITY DRAWINGS FOR LOCATIONS OF

PROPOSED SITE UTILITIES.

H. REFER TO SPECIFICATION / PROJECT MANUAL FOR ADDITIONAL

REQUIREMENTS.

I. ADJUST RIM ELEVATIONS OF ALL EXISTING STRUCTURES TO MATCH

PROPOSED FINISHED GRADES.

J. GRADE ALL NEW PAVEMENTS TO DRAIN. GRADE ALL NEW WALKS AT MAX.

2% CROSS SLOPE. GRADE ALL NEW WALKS TO MAX. 5% LONGITUDINAL

SLOPE UNLESS OTHERWISE SPECIFICALLY INDICATED ON PLANS TO BE A

RAMP.

GRADING KEYNOTES

1. MATCH EXISTING GRADES AT PAVEMENT EDGES.

2. SLOPED WALKWAY, LONGITUDINAL SLOPE TO BE LESS THAN 5%, CROSS SLOPE TO BE MAX.

2%.

3. FLUSH CURB CONDITION AT DROP OFF / PLAZA AREA.

4. AT ADA PARKING SPACES, SLOPE NOT TO EXCEED 2% IN ANY DIRECTION.

5. AREA OF OVEREXCAVATION OF 1.5' OF POOR SOILS AND REPLACEMENT WITH EITHER

SUITABLE SOIL FILL OR DGA STONE FILL AS DEFINITED IN SPECIFICATIONS 'EARTH MOVING'.

EXTEND LIMITS OF OVEREXCAVATION 5' OUTSIDE OF BUILDING FOOTPRINT.

991 PROPOSED CONTOUR

CATCH BASINCB

DRAINAGE DIRECTION

HIGH POINTHP

TOP OF WALLTW

The new look for Digging Safely in Kentucky

Call 811 Before You Dig.

SITE GRADING PLAN

C-300

SITE GRADING PLAN

W

ESTR

ID

G

E D R

IVE

VANDALAY DRIVE

SEE ENLARGED PLAN SHEET L301

LIMIT OF CONSTRUCTION -

EXTEND TO INCLUDE SITE

UTILITY WORK

1 1 1

1 1

AREA OF OVEREXCAVATION 1.5' AND HAUL OFF

OF POOR SOILS BENEATH PROPOSED BUILDING

FOOTPRINT, EXTEND LIMITS OF

OVEREXCAVATION AND REPLACEMENT TO 5'

OUTSIDE OF BUILDING FOOTPRINT.

SEE KEYNOTE 5

ADDENDUM 1

ADDENDUM 1

ADDENDUM 2

STRUCTURAL QUALITY ASSURANCE PLAN

GENERAL

STRUCTURAL STEEL

The Contractor shall perform the following:

1) The steel fabricator shall be AISC or AWS Certified, refer to Spec. 05120.

2) Submit certified mill test reports for structural steel.

3) Submit manufacturer's certificate of compliance fro high-strength bolting and weld filler materials.

The Special Inspector shall perform the following:

1) Provide continuous inspection to verify compliance of the following:

a. Inspection of slip-critical connections, except periodic inspection may be performed when using torque control bolts (twist off)

b. Complete and partial penetration groove welds. Ultrasonically inspect 100% of the complete penetration welds.

c. Multi-pass fillet welds and single-pass fillet welds greater than 5/16".

2) Provide periodic inspection to verify compliance of the following:

a. Material verification of high-strength bolts, nuts, and washers.

b. Material verification of structural steel.

c. Material verification of weld filler material.

d. Anchor bolt size, configuration, and embedment shall be verified prior to placement of concrete.

e. Visually inspect all field-welded connection. Visual inspection of welded joints includes periodic examination of fitup.

f. Verify stud shear connector spacing and location. Visually inspect welding of stud shear connectors.

3) Weld Inspections

a. Weld inspections shall be in accordance with AWS D1.1.

b. Review and verify compliance of written welding procedures with AWS requirements.

c. Verify that welding procedures are being adhered to during field welding.

d. Verify welder qualifications.

e. Use all means necessary to determine the quality of welds. The inspector may use gamma ray, magnafluz, trepanning, sonics or any other aid to visual inspection that the Special Inspector may deem necessary to be assured of the adequacy of the welding.

f. Keep a systematic record of all welds that include, in addition to other required records, the identification marks of welders, a list of defective welds, and the manner of correcting defects.

4) Bolting inspection and testing shall be in accordance with AISC Specifications for Structural Joints Using ASTM A325 or A490 Bolts.

CAST-IN-PLACE CONCRETE

The Contractor shall perform the following:

1. Establish concrete mix design proportions per ACI 318, Chapter 5. Submit 5 copies (minimum) of the concrete mix designs. Include the following:

a. Type and quantities of materials

b. Slump

c. Air content

d. Fresh unit weight

e. Aggregates sieve analysis

f. Design compressive strength

g. Location of placement in structure

h. Method of placement

i. Method of curing

j. Seven-day and 28-day compressive strengths

2. Submit a certification from each manufacturer or supplier stating that materials meet the requirements of the specified ASTM and ACI standards.

3. Submit certification that the ready-mixed concrete plant complies with the requirements of the National Ready Mix Concrete Association.

The Special Inspector shall perform the following:

1. Verify quantity, location, and placement of reinforcing steel prior to concrete placement.

2. Examine concrete in truck to verify that concrete appears properly mixed.

3. Perform a slump test as deemed necessary for each concrete load. Record if water or admixtures are added to the concrete at the job site. Perform additional slump tests after job site adjustments.

4. Mold four specimens per set for compressive strength testing; one set for each 50 cubic yards (or portion thereof) of each mix design in any one day. For each set

a. Slump

b. Air content

c. Unit weight

d. Temperature, ambient and concrete

e. Location of placement

f. Any pertinent information, such as addition of water, addition of admixtures, etc.

5. Perform one 7-day and two 28-day compressive strength tests. (Use one as a spare to be broken as directed by the Structural Engineer if compressive strengths do not appear adequate.)

6. Reports of compressive strength tests shall contain the project identification name and number, date of concrete placement, concrete design compressive strength, location of concrete placement in structure, concrete mix proportions and materials, compressive breaking strength and type of break.

NON-SHRINK GROUT UNDER STEEL BASE PLATES

The Special Inspector shall perform the following:

1. Compressive strength tests per ASTM C109.

2. Number of Tests: One test for each ten bags of grout used or minimum of one test for each day of grouting.

3. Cube Size: 2-inch x 2-inch.

4. Test Schedule: One cube at 3 days, two cubes at 7 days, three cubes at 28 days.

CONTRACTOR RESPONSIBILITIES

In accordance with Section 1704.4 of the Building Code, the Contractor shall submit to the Building Official and the Architect a written statement of responsibility that contains the following:

1) Acknowledgement of awareness of the special requirements contained within this Structural Quality Assurance Plan.

2) Acknowledgement that control shall be exercised to obtain conformance with the construction documents approved by the Building Official.

3) Procedures for exercising control with the Contractor's organization, the method and frequency of reporting, and the distribution of reports.

4) Identification and qualifications of the person(s) exercising such control and their position(s) in the organization.

The Structural Testing / Inspection Agency that is to act as the Special Inspector will be hired by the Owner.

Contractor shall pay for any additional structural testing/inspection required for work or materials not complying with the Construction Documents due to negligence or nonconformance and shall pay for any additional structural testing/inspection required for his convenience.

The Contractor is responsible to ensure that the Special Inspector is present for all work requiring special inspection. Any work that requires special inspection and is performed without the Special Inspector being present is subject to being demolished and reconstructed.

The Contractor has the following responsibilities to the Special Inspector:

1) Provide copy of Construction Documents to the Special Inspector.

2) Notify the Special Inspector sufficiently in advance of operations to allow assignment of personnel and scheduling of tests.

3) Cooperate with Special Inspector and provide access to work.

4) Provide samples of materials to be tested in required quantities.

5) Provide storage space for the Special Inspector's exclusive use, such as for storing and curing concrete testing samples.

6) Provide labor to assist the Special Inspector in performing tests/inspections.

SPECIAL INSPECTOR RESPONSIBILITIES

The Special Inspector shall maintain records of inspections in accordance with Section

1704.2.4 and shall distribute these records to the Architect and Structural Engineer on a weekly basis. At the conclusion of the project, the Special Inspector shall submit a written statement that the special inspections during construction have complied with this Structural Quality Assurance Plan and that any discrepancies noted during construction have been corrected.

SOILS

The Special Inspector shall perform the following:

1) Verify structural fill complies with specifications and the geotechnical report.

2) Perform field density tests to verify compaction of structural fill. As a minimum, perform one test per lift for every 2500 square feet of fill placed.

THE NEW STRUCTURE TO BE CONSTRUCTED IS ASSIGNED BY THE KENTUCKY BUILDING CODE,

2013 EDITION, TO SEISMIC USE GROUP AND SEISMIC DESIGN AS SPECIFIED. AS SUCH, THE

BUILDING CODE MANDATES SPECIAL INSPECTION (SECTION 1704), SPECIAL INSPECTIONS FOR

(SECTION 1705.11). STRUCTURAL OBSERVATION FOR SEISMIC RESISTANCE (SECTION 1704.5.1)

AND STRUCTURAL OBSERVATIONS FOR WIND REQUIREMENTS (SECTION 1704.5.2). STRUCTURAL

AND THE SPECIAL INSPECTOR IN PERFORMING THE REQUIRED TESTING AND INSPECTION OF THE

STRUCTURAL WORK.

set molded, record:

** If the fabricator is not certified, then the fabricator shall reimburse the owner for the costs of these tests.

WIND RESISTANCE (SECTION 1705.10). SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE

QUALITY ASSURANCE PLAN SPECIFICALLY IDENTIFIES THE RESPONSIBILITIES OF THE CONTRACTOR

3) Inspect all footing trenches, probe subgrade & confirm all footings bear on rock or lean concrete fill to rock allowable soil bearing capacity 5,000psf.

SPECIAL INSPECTIONS PER CHAPTER 17 OF THE

KENTUCKY BUILDING CODE

ITEM

FABRICATORS1704.2.5

SECTION

FABRICATOR IS NOT A.I.S.C. OR AWS

CERTIFIED.

INSPECTION IS REQUIRED IF THE

STEEL FABRICATION SPECIAL

REMARKS

SEISMIC DESIGN CATEGORY "A"

REQUIRED?

YES NO

X

X

EARTHQUAKE DESIGN DATA

RISK CATEGORY

IMPORTANCE FACTOR

S

SEISMIC DESIGN CATEGORY

S

S1

SITE CLASS

SDS

SD1

II

1.0

0.162

A

0.085

B

0.097

0.045

WIND DESIGN DATA

ULTIMATE DESIGN WIND SPEED (Vult)

NOMINAL WIND SPEED (Vasd)

RISK CATEGORY

WIND PRESSURE CATEGORY

COMPONENTS AND CLADDING [H<30 FT]

ROOF 0 TO 7 DEGREES

INTERIOR ZONE

END ZONE

CORNER ZONE

ROOF >7 TO 27 DEGREES

INTERIOR ZONE

END ZONE

CORNER ZONE

ROOF >27 TO 45 DEGREES

INTERIOR ZONE

END ZONE

CORNER ZONE

WALLS

INTERIOR ZONE

END ZONE

115 MPH

89 MPH

II

B

SNOW DESIGN DATA

GROUND SNOW LOAD (P )

IMPORTANCE FACTOR

15 PSF

1.0

1.0 g

FLAT ROOF SNOW LOAD (P ) 15 PSFf

THERMAL FACTOR (C )t

DESIGN LIVE LOADS

X

ROOF 20 PSF

NOTE: NEGATIVE NUMBERS INDICATE A SUCTION/UPLIFT PRESSURE

Vasd = 89mph.

STRUCTURAL OBSERVATION FOR SEISMIC

REQUIREMENTS

1704.5.1

STRUCTURAL OBSERVATION FOR WIND REQUIREMENTS1704.5.2

XSTEEL1705.2 PER AISC 360 & TABLE 1705.2.2

CONCRETE PER TABLE 1705.3X1705.3

MASONRY1705.4 NONEX

WOOD1705.5 NONEX

SOILS1705.6 PER SECTION 1705.6X

DRIVEN DEEP FOUNDATIONS1705.7 NONEX

CAST IN PLACE DEEP FOUNDATIONS1705.8 NONEX

HELICAL PILE FOUNDATIONS1705.9 NONEX

WIND - STRUCTURAL WOOD1705.10.1 Vasd OF 89MPHX

WIND - COLD FORMED STEEL FRAMING1705.10.2 Vasd OF 89MPHX

WIND - WIND RESISTING COMPONENTS1705.10.3 Vasd OF 89MPHX

SEISMIC - STRUCTURAL STEEL1705.11.1 SEISMIC DESIGN CATEGORY "A"X

SEISMIC - STRUCTURAL WOOD1705.11.2 NONEX

SEISMIC - COLD FORMED STEEL FRAMING1705.11.3 NONEX

DESIGNATED SEISMIC SYSTEMS1705.11.4 SEISMIC DESIGN CATEGORY "A"X

SEISMIC - ARCHITECTURAL COMPONENTS -

INTERIOR/EXTERIOR NON-LOAD BEARING WALLS AND

VENEER IN STRUCTURES

1705.11.5

SEISMIC DESIGN CATEGORY "A"X

SEISMIC - MECHANICAL AND ELECTRICAL COMPONENTS1705.11.6 SEISMIC DESIGN CATEGORY "A"X

SEISMIC - STORAGE RACKS AND ACCESS FLOORS1705.11.7 NONEX

SPRAYED FIREPROOFING1705.13 NONEX

MASTIC & INTUMESCENT FIREPROOFING1705.14 NONEX

E.I.F.S.1705.15 NONEX

FIRE RESISTANT PENETRATIONS & JOINTS1705.16 RISK CATEGORY II, NON-HIGH RISEX

SMOKE CONTROL1705.17 NONEX

INTERNAL PRESSURE COEFFICIENT +/- 0.18

(PSF)

13.5

13.5

13.5

-33.3

-55.8

-84.1

19.1

19.1

19.1

-30.5

-50.0

-78.4

30.5

30.5

30.5

-33.3

-38.9

-38.9

EXPOSURE C

25.9

25.9

-28.1

-34.7

1.0SNOW EXPOSURE FACTOR (C )e

FLOOR 100 PSF

BASIC SEISMIC-FORCE RESISTING SYSTEM

SEISMIC RESPONSE COEFFICIENT (C )

RESPONSE MODIFICATION FACTOR

ANALYSIS PROCEDURE

S

ECCENTRICALLY BRACED STEEL FRAMES

0.938

3.25

ELFP

DESIGN BASE SHEAR 0.131 x W (kips)

SEISMIC RESPONSE COEFFICIENT (C )RI 0.886

SEISMIC RESPONSE COEFFICIENT (C )V 0.7

3' - 0"

3' - 0"

3' - 0"

3' - 0"

4' - 0"

4' - 0"

3' - 0"

WIND PRESSURE CATEGORY

INTERNAL PRESSURE COEFFICIENT

COMPONENTS AND CLADDING [H<30 FT]

ROOF 0 TO 7 DEGREES (PSF)

INTERIOR ZONE (ZONE 1)

END ZONE (ZONE 2)

CORNER ZONE (ZONE 3)

-31.2

-47.3

-67.5

ROOF >7 TO 27 DEGREES

EXPOSURE B

120 MPH

B

+/- 0.18

93 MPH

RISK CATEGORY III

WIND DESIGN DATA -ASCE 7-16

NOTE: NEGATIVE NUMBERS INDICATE A SUCTION/UPLIFT PRESSURE

ULTIMATE DESIGN WIND SPEED (Vult)

NOMINAL WIND SPEED (Vasd)

LOADING SHOWN IS ULTIMATE GROSS AND SUBJECT ALLOWABLE

CODE REDUCTIONS

BRANDSTE R

A ROL IN

TT E

C R L C

ARCHITECTS + ENGINEERS + PLANNERS

www.brandstettercarroll.com

© 2025 Brandstetter Carroll Inc. All rights reserved

PROJECT NO.

ISSUE DATE:

REVISIONS:

2360 Chauvin Drive, Lexington, KY 40517

p. 859.268.1933

ENGINEERS

POAGE

& A S S O C I A T E S

880 Sparta Court

Suite 200

Fax: (859) 252-3130

Lexington, KY 40504

Phone: (859) 255-9034

P O

A G

E /2

/2

/B

C V

9/11/26

23051 (P24210)

Structural Notes

1003 VANDALAY DR.

FRANKFORT, KY 40601

9/11/2026

S-000

KENTUCKY COURT OF

APPEALS BUILDING

NUMBER DATE DESCRIPTION

2 2026-11-10 Addendum 02

WIND LOADS - COMPONENTS & CLADDING ZONES

T.O.S.

EL.=SLOPES

BEAM -SEE

PLAN

1½" METAL

ROOF DECK

JOIST -SEE

PLAN

3"

6" METAL STUDS

-SEE ARCH.

SLOTTED TRACK

6" METAL STUDS

-SEE ARCH.

(3)#12 TEK

SCREWS PER

STUD

BENT P 1/4x8x3" (L.L.V.)

L

JOIST-SEE

PLAN

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE PLAN

1½" METAL

ROOF DECK

3"

6" METAL STUDS

-SEE ARCH.

SLOTTED TRACK

6" METAL STUDS

-SEE ARCH.

(3)#12 TEK

SCREWS PER

STUD

BENT P 1/4x6x3" (L.L.V.)

L

JOIST -SEE

PLAN

BEAM -SEE PLAN

JOIST -SEE

PLAN

EL.= T.O.S.

SEE PLAN

1/2" 3/16

1½" METAL

ROOF DECK

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

1½" METAL

ROOF DECK

T.O.S.

EL.=SEE PLAN

JOIST -SEE

PLAN

SLOTTED TRACK

JOIST-SEE

PLAN

BEAM -SEE PLAN

1½" METAL

ROOF DECK

5/8

3' - 7"

1" END OF JOIST

L3x3x1/4" x4" LONG

PT BLOCKING AS

REQ'D -SEE ARCH.

#12 TEK SCREWS

@ 6"o.c.

WINDOW

-SEE ARCH.

BENT P 1/4x6x4" (L.L.V.)

L

(4) PT 2X8"

W/ 5/8" Ø BOLTS @ 24" o.c.

C8x18.75

(2) #12 TEK SCREWS @ 12"o.c.

EL.=116'-4 3/8"

3/16 0

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

JOIST-SEE

PLAN

1½" METAL

ROOF DECK

8" METAL STUDS

-SEE ARCH.

4"

(3)#12 TEK

SCREWS PER

STUD

BENT P 1/4x6x3" (L.L.V.)

L

BLOCKING -SEE ARCH.

(2) #12 TEK SCREWS @ 12" o.c.

EL.=116'-4 3/8"

C8x18.75

L3x3x1/4" x4" LONG

(2) #12 TEK SCREWS @ 12"o.c.

3/16 0

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

3"

1½" METAL ROOF DECK

(2) 2x10 PT

- SEE ARCH

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

#12 TEK SCREWS

@ 6"o.c.

JOIST-SEE

PLAN

1½" METAL

ROOF DECK

L3x3x3/16" CONT.

T.O.S.

EL.=SLOPES

BEAM -SEE PLAN

1½" METAL

ROOF DECK

JOIST -SEE

PLAN

2' - 7"

C3x5

3/16

EL.=116'-4 3/8"

C8x18.75

L3x3x1/4" x4" LONG

PT BLOCKING AS

REQ'D -SEE ARCH.

WINDOW

-SEE ARCH.

3"

SLOTTED TRACK

CONT. BENT P

1/4x6x4" (L.L.V.)

L

(4) PT 2X8"

W/ 5/8" Ø BOLTS @ 24" o.c.

BLOCKING SEE ARCH

2" END OF JOIST

3/16 0

(2) #12 TEK SCREWS @ 12"o.c.

(2) 2x10 PT

- SEE ARCH

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

1½" METAL

ROOF DECK

JOIST -SEE

PLAN

8" METAL STUDS

- SEE ARCH

(3)#12 TEK

SCREWS PER

STUD

BENT P 1/4x8x3" (L.L.V.)

L

HSS6x6 COL.

C3x5 HSS12x4x.25

3/16

3/16

HSS5x5 COL.

BEYOND

EL.=108'-8"

EL.=102'-0"

C5x9

C5x9

L3x3x1/4" x4" LONG

L3x3x1/4" x4" LONG

3/16

3/16

WINDOW

-SEE ARCH.

HSS5x5 COL.

BEYOND

EL.=108'-8"

C5x9

L3x3x1/4" x4" LONG

3/16

3/16BEAM -SEE

PLAN

1½" METAL

ROOF DECK

1"

JOIST BEYOND

-SEE PLAN

1½" METAL

ROOF DECK

BENT P 3/16x2½x4" CONT.

BETWEEN JOISTS

L

3/16

2-12

T.O.S.

EL.=SEE PLAN

JOIST-SEE

PLAN

BEAM -SEE PLAN

1½" METAL

ROOF DECK

BENT P 3/16x4x6" (L.L.V.)

L

5/8

VERIFY w/ARCH.

4' - 0"

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

1½" METAL

ROOF DECK

JOIST -SEE

PLAN

4"

8" METAL STUDS

-SEE ARCH.

(3)#12 TEK

SCREWS PER

STUD

BENT P 1/4x8x3" (L.L.V.)

L

BLOCKING -SEE ARCH.

(2) #12 TEK SCREWS @ 12" o.c.

EL.=116'-4 3/8"

C8x18.75

L3x3x1/4" x4" LONG

3/16 0

T.O.S.

EL.=VARIES SEE PLAN

BEAM -SEE

PLAN

(2) 2x10 PT

- SEE ARCH

JOIST-SEE

PLAN

3"

1½" METAL

ROOF DECK

(2) #12 TEK SCREWS @ 12" o.c.

BRANDSTE R

A ROL IN

TT E

C R L C

ARCHITECTS + ENGINEERS + PLANNERS

www.brandstettercarroll.com

© 2025 Brandstetter Carroll Inc. All rights reserved

PROJECT NO.

ISSUE DATE:

REVISIONS:

2360 Chauvin Drive, Lexington, KY 40517

p. 859.268.1933

ENGINEERS

POAGE

& A S S O C I A T E S

880 Sparta Court

Suite 200

Fax: (859) 252-3130

Lexington, KY 40504

Phone: (859) 255-9034

P O

A G

E /2

/2

/B

C V

9/11/26

23051 (P24210)

Sections & Details

1003 VANDALAY DR.

FRANKFORT, KY 40601

9/11/2026

S-401

KENTUCKY COURT OF

APPEALS BUILDING

SECTION

S-401

E1 SECTION

S-401

E2 SECTION

S-401

E3

SECTION

S-401

E5

SECTION

S-401

E6

SECTION

S-401

C1 SECTION

S-401

C2 DETAIL

S-401

C3

SECTION

S-401

C6

SECTION

S-401

C5

SECTION

S-401

B2 SECTION

S-401

B3

SECTION

S-401

A5

NUMBER DATE DESCRIPTION

2 2026-11-10 Addendum 02

STAFF

ATTORNEY

OFFICE

SECURITY

RENDITION

OFFICE

126 WOMEN'S

RESTROOM

ATTORNEY

ROOM

MEN'S

RESTROOM

LOBBY / WAITING

SECURITY CLOS.

101A

ADMIN

VESTIBULE

RECORD

REVIEWING

MAIL ROOM &

FILE STORAGE

VESTIBULE

ATTORNEY

ROO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .