2026_11-16_Addendum 1-Q&A_Yampa SP-RV Sites.pdf

PDF 186 KB Posted

Attached to
PMAA, RMYA, C25YA1, Yampa SP Seasonal Housing RV Sites
Solicitation number
IFB1 PMAA 2027000047 3
Issued by
Pueblo County, Colorado

About this file

This is an Addendum 1 containing Questions and Answers for a Yampa RV Sites project solicitation issued by the state of Colorado. The addendum addresses inquiries from prospective bidders regarding the scope of work for recreational vehicle sites development. Key procedural details from the Q&A document clarify technical specifications, site conditions, design requirements, and other bidder concerns related to the project. The addendum serves to modify, clarify, or supplement terms contained in the original solicitation documents, ensuring all bidders have consistent information before submitting proposals. The document does not specify an explicit response date, due date, site visit schedule, or award date within the addendum itself, as these dates would have been established in the original solicitation.

The addendum does not contain explicit pricing terms, set-asides, incumbent contractor information, or funding source details. As an Addendum 1 format focused on Q&A clarifications, the document primarily addresses technical and administrative questions raised by bidders rather than establishing new contractual financial terms or socioeconomic preferences. Any pricing requirements, funding allocations, and contract terms would be specified in the base solicitation documents and other supporting exhibits that accompany this addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Northwest Region Office 711 Independent Ave Grand Junction, CO 81505 cpw.state.co.us

ADDENDUM NO. 1 — IFB 2027-047

Project Questions and Answers – 11/16/2026 Yampa River SP – Seasonal Housing RV Sites

IFB1 – 2027*047 Page 1 of 9 C25YA1

QUESTIONS AND ANSWERS ARE HEREBY INCORPORATED WITH THE BID DOCUMENTS

1. Question: The drawings issued with IFB 2027*047 do not show legible electrical information (transformer location, meter/service location, service panel location, pedestal locations, lift station control panel location, conduit routing or run lengths). Please issue an electrical site plan, or a dimensioned utility plan, showing these items so bidders can quantify trenching, conduit, conductor and voltage drop?

Answer: Sheet 5, Utility Plan, depicts the conceptual electrical layout. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor. The Contractor shall be responsible for all work required to install a complete and operational electrical system, including final electrical engineering, plans, layout, permitting, inspections, and all associated materials and labor.

2. Question: The specs make the contractor responsible for "all other drawings necessary for permitting" and for sizing the service conductors. (a) Is there an electrical engineer of record for this project? (b) Is the contractor responsible for the electrical design, load calculations and one-line diagram? (c) Does the State Electrical Permit for this work require PE-stamped drawings? If so, is that cost included in Bid Item 9?

Answer: Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor. The Contractor shall be responsible for all work required to install a complete and operational electrical system, including final electrical engineering, plans, layout, permitting, inspections, and all associated materials and labor. All costs should be included in Bid Item 9 except electrical permit fees which shall be included in Bid Item 1.

3. Question: Bid Item 9 includes "transformer upgrades" and Sec. 16010 requires the contractor to include "any costs to be incurred relative to power service (primary and/or secondary)." Please confirm: (a) the serving utility and a contact; (b) whether the transformer is existing or new, and its size; (c) what "transformer upgrades" means for this project; (d) whether utility charges (line extension, aid-to-construction, transformer, meter fees) are paid by the contractor or the Owner. If paid by the contractor, please provide a utility work order estimate or set an allowance so all bidders carry the same amount.

IFB1 – 2027*047 Page 2 of 9 C25YA1

Answer: Yampa Valley Electric Association (YVEA) is the utility providing electrical service to the site. YVEA recently completed upgrading the existing transformer with the anticipation of this project. YVEA should be contacted for any anticipated fees related to the electrical work.

4. Question: Sec. 16400 specifies one 200A, single-phase service panel "as required to serve the building." Please confirm: (a) which building this panel serves; (b) whether the four RV pedestals and the lift station are fed from this same 200A service or from a separate service/meter; (c) the location of the service panel. Note:

four 50A RV sites calculated per NEC 551.73 (4 x 12,000 VA x 75%) produce about 36,000 VA (150A at 240V) before the lift station or any housing load is added.

Answer: There is not a building anticipated with this project as said building was removed after the previous advertisement in July of 2026. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor.

5. Question: Sec. 16400 lists the panel voltage as "110/240 volts." Please confirm the service is 120/240V, 1-phase, 3-wire. Also provide the available fault current at the service (or the transformer kVA and impedance) so breaker and panel interrupting ratings can be selected per Sec. 16410.?

Answer: It is anticipated that the service is 120/240V, 1-phase, 3-wire. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor.

6. Question: Bid Item 9 lists a C.T. cabinet and meter socket. A 200A single-phase service is normally self-contained metered. Please confirm whether the utility requires C.T. metering for this service and, if so, its location and the utility's metering specification.

Answer: Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor.

7. Question: Bid Item 9 includes "overhead wiring" and "ties," and Sec. 16050 specifies aerial cable with messenger. All other electrical specs describe underground construction. Is any overhead line required on this project? If so, please identify the location, span lengths, pole requirements and who furnishes and sets poles.

Answer: It is not anticipated that overhead lines are required on this project. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor.

IFB1 – 2027*047 Page 3 of 9 C25YA1

8. Question: Bid Items 10–11 serve a "seasonal housing unit," while Bid Item 9 covers the electrical system "up to and including the service panel." Please confirm: (a) whether the housing unit is existing, new by others, or Owner-furnished; (b) whether the feeder and connection from the service panel to the housing unit are in this contract; (c) the unit's required service size and connection point;

(d) whether a building foundation is available for the concrete-encased (rebar) grounding connection called for in Sec. 16400 §7.II.B.

Answer: There is not a building or a foundation anticipated with this project as said building was removed after the previous advertisement in July of 2026. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor.

9. Question: Bid Item 14 includes "electrical controls" for the lift station, while Bid Item 9 includes bringing power to the lift station. Sec. 15150 specifies the pump but no control panel. Please clarify: (a) which bid item carries the control panel and who furnishes it; (b) simplex or duplex control; (c) whether a high-water alarm is required (audible/visual light, remote or auto-dialer); (d) the control panel mounting location and method; (e) whether a separate disconnect is required at the lift station.

Answer: The lift station control panel, float switches, and related control wiring shall be furnished and installed by the Contractor under Bid Item 14. Bid Item 9 covers bringing the feeder power from the service panel to the lift station disconnect/control panel for the simplex control. Mount the control panel in a weatherproof, corrosion-resistant NEMA 4X enclosure on a free-standing galvanized Unistrut/pipe rack set in concrete located outside the hazardous Class I Division 1 wet-well zone. A high-water alarm is required and a separate disconnect is required at the lift station.

10. Question: Please confirm: (a) one Midwest U075CP6010 pedestal per site, four total; (b) no additional pedestals, pedestal lighting or meters are required; (c) the 6x6x6 ft pressure-treated post mounting detail (embedment depth, concrete or compacted backfill); (d) whether pedestals may be loop-fed from a common feeder or must be home-run individually to the service panel.

Answer: One Midwest U075CP6010 pedestal is required at each site, four total. No additional pedestals, pedestal lighting or meters are anticipated. Final electrical

IFB1 – 2027*047 Page 4 of 9 C25YA1 layout and design shall be completed by others and remain the sole responsibility of the Contractor.

11. Question: Sec. 16050 requires annealed copper conductors, while Sec. 16400 calls for pedestal lugs suitable for copper or aluminum. Are aluminum feeder conductors acceptable for the underground pedestal feeders and service, or is copper required throughout?

Answer: Compact-stranded aluminum conductors are acceptable for the main service entrance conductors and underground RV pedestal feeder runs only, provided all terminations are landed on listed dual-rated (AL/CU) lugs using an approved antioxidant compound and torqued per manufacturer specifications. All branch circuits, grounding conductors, and lift station control/pump wiring shall remain annealed copper per Sec. 16050. Contractor remains responsible for sizing all conductors for ampacity, derating, and NEC voltage drop limits as part of their final electrical layout and design.

12. Question: Please confirm: (a) whether electrical trenching and backfill are carried in Bid Item 9 or in Bid Item 4 (Site Grading and Earthwork); (b) whether electrical conduits may share a joint trench with the water and sewer lines and, if so, the required separation; (c) whether detectable warning tape and/or tracer wire are required over electrical conduits (Sec. 02610 addresses pipelines only); (d) the anticipated frost depth for cover below the 24 in. minimum.

Answer: Electrical trenching and backfill should be included in Bid Item 9. The electrical conduit shall be trenched separately. Warning tape and tracer wire are required. 24” minimum buried depth of electrical conduit is anticipated

13. Question: Sec. 16050 includes concrete-encased underfloor duct (Walkerduct), Wiremold G-3000 surface raceway, interior switches, receptacles and cover plates, and Sec. 16010 references ASHRAE 90-75A. No building interior work is shown in the bid items. Please confirm these items are not part of this contract.

Answer: Concrete-encased underfloor duct (Walkerduct), interior Wiremold G- 3000 surface raceway, interior building wiring devices, and ASHRAE 90-75A building envelope/energy provisions listed in Sec. 16010 / Sec. 16050 are standard master-specification provisions for indoor building construction and are not applicable to this site-utility contract.

IFB1 – 2027*047 Page 5 of 9 C25YA1

14. Question: No site lighting, area lighting, telecom/data or low-voltage systems are specified. Please confirm none are required at the RV sites, lift station or housing unit.

Answer: Standalone site/area pole lighting, telecom/data/fiber-optic networks, and low-voltage communication systems are not required. All low-voltage control wiring, float switch circuits, intrinsically safe relays, and audible/visual high-water alarm components required for a complete and operational lift station remain included in the Contractor's scope.

15. Question: Sec. 02050 and 16010 call for a State Electrical Permit and State Electrical Board certification, while Sec. 01010 says local city or county codes govern where they exist. Please confirm the electrical AHJ (Colorado State Electrical Board or Routt County) and the NEC edition to be used.

Answer: The Contractor is solely responsible for final electrical design, code compliance, and obtaining all required permits and inspections for a complete and operational system.

16. Question: The contractor is to provide temporary electric power for all trades. Is an existing park power source available near the work area that may be used for a temporary service, or must temporary power be by generator?

Answer: Temporary electric power shall be the responsibility of the Contractor, and the use of existing park power shall not be anticipated.

17. Question: Tentative NTP is January 1, 2027 with 120 calendar days to complete and liquidated damages of $267.58/day. Underground electrical work in Hayden in January–March will likely face frozen ground. Will the Owner allow a later start or a winter shutdown without the time counting against the contract? If not, should bidders include frost removal/ground thaw costs?

Answer: The anticipated construction schedule shall be approved by the CPW Project Manager. Winter shutdown days that do not count against the contract can be anticipated.

18. Question: Appendix B contains federal wage determination CO20240005 (Residential), while item 35 says State prevailing wages apply at $500,000 or more and refers to rates "attached in Appendix F." Please confirm which wage determination and construction type (Residential, Building or Heavy/Highway) govern this site utility work, and whether prevailing wages apply if the total contract is under $500,000.

IFB1 – 2027*047 Page 6 of 9 C25YA1

Answer: No federal funding is utilized on this project and Federal Davis-Bacon requirements are not applicable. State prevailing wages using the Residential construction type will apply if the awarded contract is $500,000 or more and are attached in Appendix B.

19. Question: Sec. 16410 references NETA ATS Sections 7.5 and 7.6. Is testing by the installing contractor acceptable, or is an independent NETA-certified testing firm required? Is a written test report required as a submittal?

Answer: Testing by the installing contractor is acceptable. A written test report is required.

20. Question: Sec. 16400 calls for GFCI protection only on the 20A duplex receptacle at each pedestal. Depending on the NEC edition adopted, Article 551 may also require GFCI protection on the 30A TT-30R and/or the 50A 14-50R receptacles.

Which NEC edition governs, and should GFCI breakers be provided for the 30A and 50A receptacles?

Answer: It is anticipated that GFCI protection shall be provided for the 30A and 50A receptacles. The Contractor is solely responsible for final electrical design, code compliance, and obtaining all required permits and inspections for a complete and operational system.

21. Question: Please provide the pedestal location and orientation at each spur site (side of pad, distance from pad edge, height to receptacles), or confirm the contractor may locate pedestals per NEC 551.77. Are bollards or other physical protection required at the pedestals?

Answer: See Sheet 11, Details (4) for additional pedestal location information. NEC

551.77 can be referenced. A boulder (min 2’x2’x3’) is to be placed as physical protection near the pedestals.

22. Question: Sec. 16400 calls for bonding to building foundation rebar and to the cold-water pipe with a T&B 3900 clamp. The water service is HDPE (non-metallic), and no foundation is in this contract. What grounding electrode system is required at the service (number and type of ground rods, ground ring, or other)?

Is a resistance test required, and if so to what value?

Answer: A building foundation is not included in the scope of this project. The Contractor shall design and install a complete grounding electrode system in full compliance with NEC Article 250 (Part III) and Yampa Valley Electric Association (YVEA) service standards. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor. The Contractor shall

IFB1 – 2027*047 Page 7 of 9 C25YA1 be responsible for all work required to install a complete and operational electrical system, including final electrical engineering, plans, layout, permitting, inspections, and all associated materials and labor.

23. Question: Is the lift station wet well classified as a hazardous (classified) location? If so, what classification (Class I, Division 1 or 2) applies, and what are the requirements for seal fittings, the junction box and the control panel location?

Sec. 15150 requires gas-tight sealing at panel entries but gives no classification.

Answer: Final hazardous-location boundary dimensions, seal fitting locations, and code compliance shall be detailed by the Contractor on their electrical layout/shop drawings. The Contractor is solely responsible for final electrical design, code compliance, and obtaining all required permits and inspections for a complete and operational system.

24. Question: The pump has a 30 ft SOW cord. Must the cord run continuously to the control panel (limiting the panel to within about 30 ft of the pump), or is a junction box at the wet well with a field splice to the control panel acceptable? If a junction box is allowed, please specify its type and mounting location.

Answer: Where the lift station control panel is located beyond the reach of the pump's factory 30-foot SOW cord, terminating the factory cord in a dedicated exterior junction box near the wet well and transitioning to standard NEC-compliant conductors in conduit to the control panel is acceptable. Splicing of pump or float cords inside the wet well is prohibited. Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor

25. Question: Are there existing electrical lines, services, pedestals or equipment in the work area that must be removed, relocated, protected or tied into? If the new service ties to existing park electrical facilities, please identify them. Will power outages to existing park facilities be needed, and are there restrictions on when they can occur?

Answer: The known existing utilities are depicted on Sheet 5, Utility Plan. The Contractor is responsible for 811 utility locates prior to digging. Any required power outage to the existing park facilities must be coordinated in advance with the CPW Project Manager.

26. Question: Sec. 02050 (Mobilization, Bid Item 1) includes obtaining all permits, including the State Electrical Permit. Bid Item 9 also includes obtaining the Electrical Permit. Which bid item should carry the electrical permit fee and permit drawings?

IFB1 – 2027*047 Page 8 of 9 C25YA1

Answer: Bid Item 1

27. Question: Must "approved equal" RV pedestals (and other specified electrical products) be approved before bid, or may equals be submitted for approval after award?

Item 33 states the award will be based on the products identified in the plans.

Answer: Approved equal products shall be submitted during the post-award shop drawing/submittal phase.

28. Question: Are spare conduits, pull boxes or panel capacity required for future RV sites or other future loads? The service panel requires 20 blank spaces; please confirm the number of circuits to be installed versus left spare.

Answer: Spare conduits and pull boxes for future loads are not required. Final electrical layout and design, including the 20 black spaces, shall be completed by others and remain the sole responsibility of the Contractor. The Contractor shall be responsible for all work required to install a complete and operational electrical system, including final electrical engineering, plans, layout, permitting, inspections, and all associated materials and labor.

29. Question: If pedestals are loop-fed, please confirm the maximum conductor size the U075CP6010 loop-feed lugs must accept, and whether a separate feeder breaker per pedestal or a single feeder breaker for all pedestals is required at the service panel.

Answer: Final electrical layout and design shall be completed by others and remain the sole responsibility of the Contractor. The Contractor shall be responsible for all work required to install a complete and operational electrical system, including final electrical engineering, plans, layout, permitting, inspections, and all associated materials and labor.

30. Question: Sec. 16050 specifies Type THW for feeders and branch circuits. Is THWN-2 or XHHW-2 acceptable in place of THW for underground conduit?

Answer: Yes

31. Question: Engraved nameplates are required for panels and disconnects. Are nameplates or site numbers also required on each RV pedestal? Is arc-flash or other warning labeling required at the service?

Answer: Yes

IFB1 – 2027*047 Page 9 of 9 C25YA1

32. Question: Sec. 01720 requires underground electrical locations referenced to two permanent surface points or project coordinates. Is a field-measured record by the contractor acceptable, or is a licensed surveyor's survey of the electrical lines required?

Answer: A field-measured record by the contractor is acceptable.

33. Question: What warranty period applies to the electrical work and equipment (one year from final acceptance, or longer)? Are extended manufacturer warranties required on the pedestals, panel or lift station controls?

Answer: See the CPW General Conditions for Capital Construction dated October of 2026 for warranty period information.