2026-10-22 VT WHITEHURST - BID PDFs.pdf

PDF 3 MB Posted

Attached to
Whitehurst Hall Piping Replacement
Solicitation number
IFB-130697
Issued by
Middlesex County, Virginia

About this file

Whitehurst Hall Piping Replacement - Virginia Tech

This document comprises architectural and engineering drawings and specifications for the Whitehurst Hall Piping Replacement project at Virginia Tech in Blacksburg, Virginia, prepared under Project Code 25-699463 with a drawing date of October 22, 2026. The project involves the comprehensive replacement of aging heating water supply and return (HWS/HWR) piping systems in the basement and crawl space of Whitehurst Hall (Building 26), a 42,879-square-foot residential facility constructed as Type IIB construction with an R-2 occupancy classification. The renovation scope encompasses approximately 13,558 square feet of the building's gross area. The work includes demolition and removal of existing piping systems, installation of new copper tubing and black steel piping in various sizes (ranging from 3/4 inch to 4 inches in diameter), replacement and relocation of five in-line heating water pumps (PHWP-11, SHWP-12, SHWP-13, SHWP-14, and SHWP-15), installation of new control systems, piping supports, insulation, and associated HVAC, electrical, and plumbing infrastructure upgrades. The project also includes installation of a sump pump system with alarm capability, crawl space vapor barrier lining, mechanical room floor resurfacing with non-slip urethane concrete coating, and wall painting. The work must comply with the 2021 Virginia Existing Building Code, 2010 ADA Standards, 2023 Virginia Tech Design and Construction Manual, and Virginia Occupational Safety and Health regulations.

The specifications indicate that all contractors must conduct pre-bid site visits to verify existing conditions and determine the full extent of demolition and coordination work required, with no additional compensation allowed for changes due to inadequate site investigation. Materials specified include certified copper tubing (ASTM B88 Type L hard drawn), ASTM A53 Schedule 40 black steel piping, brass and bronze valves meeting MSS and ASME standards, cast iron soil pipe with mechanical or compression-type joints, and fiberglass pipe insulation with thermal conductivity not exceeding 0.27 BTU per inch per hour per square foot per degree Fahrenheit. The project requires contractors to provide extended instruction to the building owner on system operation and maintenance limited to one-half day, guarantee all work free from defective materials or workmanship for one year following final acceptance, coordinate all service interruptions with the owner, maintain circuit continuity during demolition, and ensure quiet system operation without unusual or excessive noise or vibration. No information regarding contract pricing, award dates, term length, funding sources, or set-asides is contained within these technical documents.

View the file

Other files

File Type Posted
IFB 049302704_Project Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGNED DRAWN

APPROVEDCHECKED

COMM. NO. DATE

SHEET

REVISION DATE

24101.58 10-22-26

V

IR

G

IN

IA

T

E C

H

W H

IT

E

H U

R S

T H

A

LL

P

IP

IN

G

R E

P

LA

C E

M E

N T

B

LA

C K

S B

U R

G , V

IR

G

IN

IA

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

10/22/26 10/22/26

WHITEHURST HALL

PIPING REPLACEMENT

PROJECT CODE: 25-699463

VICINITY MAP INDEX OF DRAWINGS

T-1 TITLE SHEET

M-001 HVAC LEGEND, GENERAL NOTES, SCHEDULE, AND DETAILS

M-002 HVAC SPECIFICATIONS

MD-101 BASEMENT/CRAWL SPACE DEMOLITION PLANS - HVAC

M-101 BASEMENT/CRAWL SPACE NEW WORK PLANS - HVAC

E-001 GENERAL SPECIFICATIONS, LEGEND, ABBREVIATIONS - ELECTRICAL

E-101 PARTIAL CRAWL AND BASEMENT FLOOR PLAN - DEMOLITION AND NEW

WORK - ELECTRICAL

P-001 SPECIFICATIONS, LEGEND, NOTES AND DETAILS - PLUMBING

PD-101 CRAWL SPACE DEMOLITION PLAN - PLUMBING

P-101 CRAWL SPACE PLAN - PLUMBING

AN ASBESTOS INSPECTION WAS PERFORMED AND NO ACM WAS FOUND. THE

ASBESTOS INSPECTION REPORT IS INCLUDED AND WILL BE PROVIDED WITH

THE DRAWING/BID PACKAGE.

AN INSPECTION TO IDENTIFY LEAD CONTAINING COATED BUILDING

COMPONENTS HAS NOT BEEN CONDUCTED BECAUSE THE BUILDING WAS

CONSTRUCTED AFTER JANUARY 1, 1985 AND THE OWNER HAS NO

KNOWLEDGE OF LEAD CONTAINING OR COATED BUILDING. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH ALL VIRGINIA

OCCUPATIONAL SAFETY AND HEALTH (VOSH) REGULATIONS AS THEY PERTAIN

TO EMPLOYEE EXPOSURES TO LEAD. ALL LEAD AND LEAD-COATED BUILDING

COMPONENTS SHALL BE RECYCLED TO THE EXTENT POSSIBLE.

VICINITY MAP

BLACKSBURG VA.

CODE GOVERNING NEW WORK: 2021 VIRGINIA EXISTING BUILDING CODE (VEBC)

AMERICANS WITH DISABILITIES ACT 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN (ADA 2010), PUBLISHED SEPTEMBER 15, 2010, AND ADOPTED MARCH 1, 2011, AS MODIFIED BY VIRGINIA

CONSTRUCTION & PROFESSIONAL SERVICES MANUAL, SECTION 4.2

ACCESSIBLE AND USABLE BUILDINGS & FACILITIES, INTERNATIONAL CODE COUNCIL STANDARD

A117.1, 2009

2023 VIRGINIA TECH DESIGN AND CONSTRUCTION MANUAL

CONTRACTOR SHALL COMPLY WITH: Virginia Tech's Safety Requirement for Contractors and Subcontractors

Program, WHICH IS INCORPORATED BY REFERENCE. COPIES OF THIS PROGRAM ARE AVAILABLE

FROM THE OWNER OR MAY BE DOWNLOADED FROM WWW.EHSS.VT.EDU.

BUILDING NUMBER 26

CONSTRUCTION TYPE: IIB

OCCUPANT USE GROUP: R-2

BUILDING AREA GROSS 42,879 SF

RENOVATION AREA GROSS: 13,558 SF

FIRE SUPPRESSION: NONE

FIRE ALARM: EXISTING

WHITEHURST HALL

BLDG. 26

T-1

T

IT

LE

S

H E

E T

BRC/MAR/CAD BRC/MAR/CAD

RDF/WAM/MGW LPA

CONNECTION DETAIL

STEAM-TO-WATER CONVERTER

NO SCALE

R

F

EX. CONVERTER

CONDENSATE RETURN

PRESSURE

RELIEF VALVE

HWR

HWS

3/4" HOSE END

DRAIN VALVE

THERMOMETER (TYP.)

FLOOR LINE

STEAM

SUPPLY

(75 PSIG)

PIPE SUPPORT DETAIL

NO SCALE

PIPE

VAPOR BARRIER

(WHERE REQUIRED)

12" LONG, HALF-SECTION OF

HYDROUS CALCIUM SILICATE

AT EACH HANGER SUPPORT

HEAVY DUTY

CLEVIS HANGER

HANGER ROD, SUPPORT

FROM BUILDING STRUCTURE

INSULATION

16 GAGE ZINC COATED

SHEET STEEL SADDLE

AT LEAST 12" LONG

NOTE:

SADDLE AND HALF-SECTION OF HYDROUS CALCIUM SILICATE

SHALL BE INSTALLED AT THE SAME TIME THAT THE PIPE AND

PIPE HANGERS ARE INSTALLED.

SEE SPECIFICATIONS FOR LOCATIONS WHERE HYDROUS

CALCIUM SILICATE SHALL BE REQUIRED.

PIPE INSULATION

(WHERE REQUIRED)

WALL

GALVANIZED STEEL

PIPE SLEEVE

WALL

PIPE

1/4" SPACE BETWEEN

SLEEVE & INSULATION

NOTE:

WHERE PIPES PENETRATE FIRE-RATED WALLS, FILL

SPACE BETWEEN PIPE AND SLEEVE WITH A

FIRE-RESISTANT MATERIAL WITH SUFFICIENT RATING TO

MAINTAIN THE FIRE RATING OF THE WALL. WHERE PIPE

PENETRATE EXTERIOR WALLS, FILL SPACE BETWEEN

PIPE AND SLEEVE WITH FIBERGLASS INSULATION.

WALL PIPE SLEEVE DETAIL

NO SCALE

PIPE ANCHOR TO

CONCRETE SLAB DETAIL

NO SCALE

2"x2"x1/4"

ANGLES

4"x3/8"x12" PLATE

PIPE

45° 45° WELD ANGLES

TOGETHER

WELD ANGLES TO PLATE

AND PLATE TO PIPE

3/4" DIA. ANCHOR BOLTS (TYP.)

CONC. SLAB

3"x3"x1/4"

ANGLES

PUMP

MOTOR

INLINE CIRCULATING

PUMP CONNECTIONS

NO SCALE

UNION TYPE CONNECTION,

PIPE SO PUMP CAN BE

REMOVED FOR SERVICE

HOSE END

DRAIN VALVE

1/4" SHUT-OFF COCK

4" DIAL COMPOUND GAGE.

0"-30" HG.VACUUM 0-60

PSI PRESSURE

4" DIAL, 0-60 PSI

DISCHARGE GAGE

CHECK VALVE

CS

PIPE TO SYSTEM

OFF VALVE

STRAINER BLOW

SECTION ELEVATION/SIDE

VIEW

PIPE GUIDE DETAIL

NO SCALE

SECURE "SPIDER" TO INSULATION

W/ RUGGED BAND CLAMP"SPIDER-TYPE" GUIDE, SPLIT

HOUSING CONSTRUCTION

INSULATION

BOLT HOLDS TOGETHER

THE TWO HOUSING

HALVES (TYP. 2)

PIPE

FOOT, WELDED OR BOLTED

TO STRUCTURE (TYPE. 2)

BALL VALVE (TYP. 2)

EXISTING

SUPPORTING

STRUCTURE

EXISTING

PUMPED

CONDENSATE

EXISTING LOW

PRESSURE STEAM

PIPE PENETRATION FIRESTOP DETAIL

NO SCALE

System No. C-AJ-5090

SECTION A-A

A

A

5B

5A

5B

C

C

LA

SS IF IED

Classified by Underwriters Laboratories, Inc.

to UL 1479 and CAN/ULC-S115

US

1. Floor or Wall Assembly — Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete.

Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 18 in. (457 mm).

See Concrete Blocks (CAZT) Category in the Fire Resistance Directory for names of manufacturers.

2. Metallic Sleeve — (Optional) — Nom 18 in. (457 mm) diam (or smaller) Schedule 10 (or heavier) steel sleeve cast or grouted into floor or wall assembly, flush with floor or wall surfaces or extending a max of 3 in. (76 mm) above floor or beyond both surfaces of wall.

3. Through Penetrants — One metallic pipe or tubing to be centered within the firestop system. Pipe or tubing to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of metallic pipes or tubing may be used:

A. Steel Pipe — Nom 4 in. (102 mm) diam (or smaller) Schedule 5 (or heavier) steel pipe.

B. Copper Pipe — Nom 4 in. (102 mm) diam (or smaller) Regular (or heavier) copper tubing.

C. Copper Tubing — Nom 4 in. (102 mm) diam (or smaller) Type L (or heavier) copper tubing.

4. Tube Insulation — Plastics+ — Min 1/2 in. (13 mm) to max 3/4 in. (19 mm) thick acrylonitrile butadiene/polyvinyl chloride (AB/PVC) flexible foam furnished in the form of tubing. Nom 1 in. (25 mm) thick AB/PVC flexible foam insulation may be used for max 2 hr F and FH Ratings when max 3 in. (76 mm) diam pipe or tubing is used. The annular space shall be min 1/2 in. (13 mm) to max 12 in. (305 mm). When max annular space exceeds 1-1/2 in. (38 mm) the F and FH Ratings are 2 hr.

See Plastics+ (QMFZ2) Category in the Recognized Component Directory for names of manufacturers. Any Recognized Component tube insulation material meeting the above specifications and having a UL 94 Flammability Classification of 94-5VA may be used.

5. Firestop System — The firestop system shall consist of the following:

A. Packing Material — Min 4 in. (102 mm) thickness of min 4 pcf (64 kg/m3) mineral wool batt insulation firmly packed into opening as a permanent form. Packing material to be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of fill material.

B. Fill, Void or Cavity Material* — Sealant — Min 1/4 in. (6 mm) thickness of fill material applied within the annulus, flush with top surface of floor or with both surfaces of wall. When max annular space exceeds 1-1/2 in. (38 mm) the min thickness of fill material is 1/2 in. (13 mm).

HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-One Sealant or FS-ONE MAX Intumescent Sealant

* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.

ANSI/UL1479 (ASTM E814) CAN/ULC S115

F Ratings — 2 and 3 Hr (See Item 4) F Ratings — 2 and 3 Hr (See Item 4)

T Rating — 0 Hr FT Rating — 0 Hr

L Rating At Ambient — 4 CFM/sq ft FH Ratings — 2 and 3 Hr (See Item 4)

L Rating At 400 F — Less Than 1 CFM/sq ft FTH Rating — 0 Hr

L Rating At Ambient — 4 CFM/sq ft

L Rating At 400 F — Less Than 1 CFM/sq ft R

T

1 1/4" TO DRIP DRAIN FUNNEL

EXISTING

CONVERTOR

EXISTING

EXPANSION

TANK

EXISTING AIRTROL

TANK FITTING

1" GL. VLV.

3/4" CV

3/4" WATER PRESSURE REDUCING VALVE

PRESSURE GAUGE - (0-60 PSI)

1/4" RELIEF VALVE

FILL VALVE ASSEMBLY &

CONVERTOR PIPING DETAIL

NO SCALE

PRIMARY - SECONDARY

LOOP CONNECTIONS DETAIL

NO SCALE

WALL LINE

EXISTING RISERS TO

CONVECTORS

SS-

SR-1

SR-1

3/4" HOSE END

GATE VALVES

(TYP.)

PRIM

ARY R

ET

URN

PRIM

ARY S

UPPL

Y

PR-1

PS-

EXISTING BELL & GOSSETT

FLO-CONTROL VALVES

BRASS DRAIN PLUGS AT

BASE OF RISERS - USE

GRAPHITE AND OIL ON

PLUG TO LUBE AND

FACILITATE REMOVAL

(TYP.)

AAV - AUTOMATIC AIR VENT

VALVES AT END OF MAINS AND

WHERE AIR POCKETS OCCUR.

GATE

VALVE

CROSSOVER

LOOP

EXISTING

SECONDARY

PUMP

BALL VALVE

4"

1"

THERMOSTATIC

CONTROL

4"

1"

EXISTING INLINE PUMP

ABOVE ABV

ABOVE FINISHED FLOOR AFF

ANCHOR

BELOW BEL

CHECK VALVE

CIRCUIT SETTER

DIAMETER DIA

DIRECTION OF FLOW

DOWN DN

PIPING (EXISTING TO REMAIN)

PIPING (EXISTING TO BE REMOVED)

ENTERING WATER TEMPERATURE EWT

EXISTING, REMOVE FROM THIS POINT

EXPANSION JOINT EJ

FLEXIBLE PIPE CONNECTION

FLOAT & THERMOSTATIC TRAP F

FLOOR FL

FROM FRM

GATE VALVE GTV

GLOBE VALVE GBV

HEATING WATER PUMP HWP

HEATING WATER RETURN PIPE HWR HWR

HEATING WATER SUPPLY PIPE HWS HWS

HORSEPOWER HP

NEW CONNECTED TO EXISTING

PIPING INDICATION WITH RESPECT TO FLOW

BOTTOM TAKEOFF

SIDE CONNECTION

TOP TAKEOFF

TURN DOWN OR FROM BELOW

TURN UP OR DOWN

TURN UP OR FROM ABOVE

POUNDS PER SQUARE INCH GAGE PSIG

PRESSURE GAUGE

PRESSURE REDUCING VALVE (FILL VALVE) PRV

PRESSURE RELIEF VALVE

R

SERVICE VALVE

STEAM CONDENSATE PIPE

LOW PRESSURE

STEAM SUPPLY PIPE

LOW PRESSURE

STRAINER

THERMOMETER

THREE-WAY CONTROL VALVE

TWO-WAY CONTROL VALVE

UNION

HVAC LEGEND

M-001

H V

A C

L E

G E

N D

, G E

N E

R A

L N

O T

E S

, S C

H E

D U

LE

S

, A N

D D

E T

A

IL

S

BCR BCR

RDF LPA

DESIGNED DRAWN

APPROVEDCHECKED

COMM. NO. DATE

SHEET

REVISION DATE

24101.58 10-22-26

V

IR

G

IN

IA

T

E C

H

W H

IT

E

H U

R S

T H

A

LL

P

IP

IN

G

R E

P

LA

C E

M E

N T

B

LA

C K

S B

U R

G , V

IR

G

IN

IA

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

10/22/26

EQUIPMENT SCHEDULES: GENERAL NOTES:

1. ALL PIPES SHALL BE COORDINATED WITH OTHER DUCTS, PIPES, LIGHTS, STRUCTURAL SYSTEM, CEILING SUPPORTS AND FRAMING BEFORE INSTALLATION. MINOR PIPE OFFSETS SHALL BE

PROVIDED AS REQUIRED.

2. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED

INSTRUCTIONS.

3. MATERIALS AND INSTALLATION SHALL COMPLY WITH LOCAL CODES, APPLICABLE PROVISIONS OF

LATEST EDITION OF NATIONAL FIRE PROTECTION ASSOCIATION, LOCAL UTILITY REGULATIONS AND

GOVERNMENTAL DEPARTMENTS HAVING JURISDICTION.

4. CONTRACTOR SHALL SEAL AND FLASH ALL PENETRATIONS IN EXISTING WALLS.

5. VERIFY LOCATIONS OF NEW AND EXISTING EQUIPMENT AND ROUTE OF PIPING WITH EXISTING

CONDITIONS.

6. ALL CUTTING AND PATCHING FOR THE INSTALLATION OF NEW WORK IN EXISTING BUILDING SHALL

BE DONE BY THE GENERAL CONTRACTOR.

7. CONTRACTOR SHALL PROVIDE ALL SUPPORTS REQUIRED TO MOUNT MECHANICAL EQUIPMENT AND

PIPING.

8. WHERE PIPE CONNECTIONS ARE SHOWN CONNECTING TO EXISTING, CONTRACTOR SHALL

DETERMINE EXACT LOCATIONS AND CONNECTION SIZES PRIOR TO INSTALLATION.

9. NEW PIPE INSULATION SHALL MATCH EXISTING. INSULATION THAT IS DAMAGED OR REMOVED FOR

NEW WORK SHALL BE REPLACED, REPAIRED AND SEALED AS REQUIRED.

10. EXPOSED PIPING RUNOUTS SHALL BE INSTALLED IN PRACTICAL ALIGNMENT WITH THE BUILDING

AND SHALL BE ADEQUATELY SECURED TO THE BUILDING STRUCTURE.

11. PROVIDE ACCESS DOORS OF SUFFICIENT SIZE FOR ALL CONCEALED CONTROLS OR ANY ITEMS

REQUIRING ACCESS.

12. CONTRACTOR SHALL VERIFY THAT VFDS ARE PROVIDED WITH INTEGRAL DISCONNECT TO

DISCONNECT POWER TO THE CONTROLLER AND THE MOTOR. VFDS SHALL BE LOCATED WITHIN

SIGHT OF THE MOTOR BEING SERVED.

13. ALL EQUIPMENT SHALL BE SECURED TO CONCRETE HOUSEKEEPING PADS WITH HOLD-DOWN BOLTS

TO PREVENT MOVEMENT.

14. PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE ELECTRICAL PANELS OR INTEFERE WITH

ELECTRICAL PANEL CLEARANCES. COORDINATE INSTALLATION OF PIPING WITH ELECTRICAL

PANELS WHEN SHOWN NEAR PANELS OR OVER ELECTRICAL ROOMS.

15. INSTRUCT THE OWNER IN THE PROPER OPERATION AND MAINTENANCE OF THE MECHANICAL

SYSTEMS UNTIL THE OWNER IS FULLY PREPARED TO OPERATE AND MAINTAIN THE MECHANICAL

SYSTEM. HOWEVER, LENGTH OF INSTRUCTION TIME SHALL BE LIMITED TO ONE-HALF DAY.

16. SYSTEMS SHALL OPERATE UNDER CONDITIONS OF LOAD WITHOUT UNUSUAL OR EXCESSIVE NOISE

OR VIBRATION. UNUSUAL OR EXCESSIVE NOISE OR VIBRATION SHALL BE CORRECTED.

17. EQUIPMENT, MATERIALS AND LABOR REQUIRED BY THESE CONTRACT DRAWINGS SHALL BE

GUARANTEED TO BE FREE FROM DEFECTIVE MATERIALS OR WORKMANSHIP FOR ONE YEAR AFTER

FINAL ACCEPTANCE OF THE PROJECT UNLESS SPECIFIED OTHERWISE. DEFECTIVE MATERIALS OR

WORKMANSHIP OCCURRING DURING THIS PERIOD SHALL BE CORRECTED AT NO ADDITIONAL COST.

GENERAL DEMOLITION NOTES:

1. THE CONTRACTOR SHALL REMOVE OR ALTER AS NECESSARY ALL EXISTING PIPING, EQUIPMENT, AND APPURTENANCES THAT ARE NOT REQUIRED FOR THE EXISTING SYSTEMS TO REMAIN.

CONTRACTOR SHALL VISIT THE SITE TO REVIEW THE SCOPE OF THIS WORK AND VERIFY EXISTING

CONDITIONS PRIOR TO PRICING.

2. EXISTING EQUIPMENT SHALL BE TURNED OVER TO THE OWNER, UNLESS DIRECTED OTHERWISE

AND LOCATED ON SITE AS DIRECTED BY THE OWNER. ALL OTHER ITEMS TO BE REMOVED SHALL

BECOME THE PROPERTY OF THE CONTRACTOR AND REMOVED FROM THE PREMISES.

3. INSULATION ON EXISTING PIPINGTHAT IS DAMAGED OR REMOVED DUE TO THE DEMOLITION WORK

SHALL BE REPLACED AND SEALED AS REQUIRED.

4. THE CONTRACTOR SHALL PROTECT EXISTING SYSTEMS TO REMAIN. SYSTEMS THAT ARE DAMAGED

OR INCORRECTLY REMOVED DUE TO THE DEMOLITION WORK SHALL BE REPAIRED OR REPLACED.

5. THE CONTRACTOR IS CAUTIONED THAT THE EXISTING HVAC SYSTEM LAYOUTS ARE INDICATED AS

ONLY AN APPROXIMATION OF EXISTING CONDITIONS. NOT ALL EXISTING SYSTEMS ARE SHOWN AND

SELECTIVE DEMOLITION IS REQUIRED. THE CONTRACTOR SHALL VERIFY ACTUAL SYSTEM

CONFIGURATIONS IN THE FIELD AND SHALL COORDINATE ACCORDINGLY.

6. CONTRACTOR SHALL REMOVE ALL NEW DEBRIS RESULTING FROM DEMOLITION WORK IN ADDITION

TO ANY EXISTING DEBRIS IN CRAWLSPACE.

EXISTING HEATING WATER PUMPS:

MARK SERVICE PUMP TYPE

CAPACITY,

GPM

HEAD,

FT. H2O

RPM

ELECTRICAL BELL & GOSSET

MODEL NO.

NOTES

MOTOR HP V / Ph

PHWP-11 HEATING WATER IN-LINE 115 16.0 1,750 3/4 220 / 3 PD-37 1

SHWP-12 HEATING WATER IN-LINE 24 9.8 1,725 1/6 120 / 1 2" 1

SHWP-13 HEATING WATER IN-LINE 14 8.0 1,725 1/6 120 / 1 1-1/2" 1

SHWP-14 HEATING WATER IN-LINE 35 13.5 1,725 1/4 120 / 1 2-1/2" 1

SHWP-15 HEATING WATER IN-LINE 40 16.0 1,725 1/3 120 / 1 HD-3" 1

NOTES:

1. EXISTING PERFORMANCE PER EXISTING 1961 SPECIFICATIONS.

FLOOR FINISH NOTES:

SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION INSTRUCTIONS FOR EACH MATERIAL AND

PRODUCT USED. SUBMIT SHOP DRAWINGS AND OTHER SUBMITTALS WHERE INDICATED.

URETHANE CONCRETE FLOORING:

SHERWIN-WILLIAMS FASTOP MULTI TOPFLOOR SL45 - INSTALL PER MANUFACTURER'S INSTRUCTIONS.

1. CONCRETE SURFACES SHALL BE ABRASIVE BLASTED TO REMOVE ALL SURFACE CONTAMINANTS

AND LAITANCE. THE PREPARED CONCRETE SHALL HAVE A SURFACE PROFILE EQUAL TO CSP 4-6.

CONSULT THE SHERWIN-WILLIAMS TECHNICAL SERVICE DEPARTMENT IF OIL OR GREASE IS

PRESENT.

2. APPLY MANUFACTURER SPECIFIED FILLER SYSTEM FOR ALL RANDOM CRACKS.

3. APPLY GP3477 WATER EMULSION PRIMER.

4. APPLY FASTOP MULTI SL45 SLURRY

5. APPLY BROADCAST MATERIAL SPECIFIED BY MANUFACTURER.

6. APPLY MANUFACTURER SPECIFIED TOPCOAT.

AIR SEPERATOR: BELL & GOSSETT

MARK SERVICE

DESIGN FLOW,

GPM

MAX FLOW,

GPM

DESIGN ∆P.,

FT. H2O

MAX ∆P, FT.

H2O

MAX. FLOODED

WEIGHT, LBS

MODEL NO.

AS-1 HEATING WATER 115 190 0.64 1.0 173 RL-3F

NOTES:

1. PROVIDE WITH LIFTING LUGS AND MOUNTING BRACKET.

M-002

H V

A C

S P

E C

IF

IC

A T

IO

N

S

BCR BCR

RDF LPA

DESIGNED DRAWN

APPROVEDCHECKED

COMM. NO. DATE

SHEET

REVISION DATE

24101.58 10-22-26

V

IR

G

IN

IA

T

E C

H

W H

IT

E

H U

R S

T H

A

LL

P

IP

IN

G

R E

P

LA

C E

M E

N T

B

LA

C K

S B

U R

G , V

IR

G

IN

IA

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

10/22/26

HVAC SPECIFICATIONS:

1. SCOPE OF THE WORK: WORK SHALL INCLUDE COMPLETE HVAC SYSTEMS. PROVIDE SUPERVISION, LABOR, MATERIAL, EQUIPMENT, MACHINERY, PLANT, AND ITEMS NECESSARY FOR COMPLETE SYSTEMS TESTED AND

READY FOR OPERATION.

2. REGULATIONS: MATERIALS AND INSTALLATION SHALL COMPLY WITH LOCAL CODES, APPLICABLE PROVISIONS OF

LATEST EDITION OF NATIONAL FIRE PROTECTION ASSOCIATION, LOCAL UTILITY REGULATIONS AND

GOVERNMENTAL DEPARTMENTS HAVING JURISDICTION.

3. DRAWINGS: THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND

WORK INCLUDED. WHERE VARIANCES OCCUR INCLUDE THE ITEMS OF BETTER QUALITY, GREATER QUANTITY OR

HIGHER COST.

4. COORDINATION OF WORK: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION AND PROPER

RELATION OF HIS WORK TO THE BUILDING STRUCTURE AND TO THE WORK OF OTHER TRADES. CONTRACTOR

SHALL PROVIDE DIMENSIONS AND LOCATIONS OF ALL OPENINGS, SHAFTS AND SIMILAR ITEMS TO THE PROPER

TRADES AND SHALL INSTALL WORK AS REQUIRED SO AS NOT TO DELAY THE BUILDING CONSTRUCTION. THE

CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY HIS WORK OR WORKMEN. REPAIRING OF DAMAGED

WORK SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL COST.

5. VISITING THE SITE: EACH CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE BEFORE PRICING THE

JOB TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS TO BE MET IN THE EXECUTION OF THE WORK

UNDER THIS CONTRACT. NO ADDITIONAL COMPENSATION WILL BE ALLOWED RELATING TO SITE CONDITIONS.

6. INTERRUPTION OF SERVICES: INTERRUPTIONS OF SERVICE TO EXISTING SYSTEMS SHALL BE COORDINATED WITH

THE OWNER AS TO TIME AND DURATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY INTERRUPTIONS TO

SERVICE AND SHALL REPAIR ANY DAMAGES TO EXISTING SYSTEMS CAUSED BY HIS OPERATIONS.

7. WORK IN OCCUPIED AREAS: WORK IN OCCUPIED AREAS SHALL BE COORDINATED WITH THE OCCUPANT AND

OWNER AS TO TIME AND DURATION. THE CONTRACTOR SHALL PROTECT THE OCCUPIED AREA AND SHALL BE

RESPONSIBLE FOR CLEANING AND REPAIRING ANY DAMAGES CAUSED BY HIS WORK. SAFETY OF BUILDING

OCCUPANTS SHALL BE ASSURED AT ALL TIMES. TOOLS, MATERIAL, DIRT AND DEBRIS SHALL BE REMOVED FROM

OCCUPIED AREAS WHENEVER WORK AREAS ARE LEFT UNATTENDED.

8. ACCESSIBILITY: LOCATE EQUIPMENT WHICH MUST BE SERVICED OR MAINTAINED IN FULLY ACCESSIBLE POSITIONS

WHERE POSSIBLE. OTHERWISE, FURNISH ACCESS PANELS OF SUFFICIENT SIZE AND LOCATED SO THAT THE

CONCEALED EQUIPMENT CAN BE SERVICED.

9. FOUNDATION PADS: PROVIDE 4-INCH HIGH CONCRETE FOUNDATION PADS FOR FLOOR-MOUNTED EQUIPMENT.

10. SLEEVES: LOCATE SLEEVES DURING NORMAL COURSE OF WORK. PROVIDE SLEEVES FOR PIPING PASSING

THROUGH CONCRETE FLOOR SLABS AND CONCRETE, MASONRY, TILE AND GYPSUM WALL CONSTRUCTION.

SLEEVES SHALL NOT BE REQUIRED FOR PIPING EMBEDDED IN CONCRETE OR SLAB ON GRADE, EXCEPT THAT

COPPER PIPING SHALL REQUIRE SLEEVES THROUGH SLABS ON GRADE. SLEEVES PLACED IN EXTERIOR WALLS

BELOW GRADE SHALL BE WATERTIGHT. WHERE SLEEVES ARE LOCATED THROUGH FIRE-RATED WALLS OR

FLOORS, THE SLEEVE ASSEMBLIES SHALL MAINTAIN THE FIRE RATING OF THE WALL OR FLOOR. SLEEVES SHALL

BE CONSTRUCTED OF 20 GAUGE GALVANIZED STEEL WITH LOCK SEAM JOINTS FOR ALL SLEEVES SET IN

CONCRETE FLOOR SLABS. ALL OTHER SLEEVES SHALL BE CONSTRUCTED OF GALVANIZED STEEL PIPE.

11. CUTTING AND PATCHING: THE CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING NECESSARY TO

INSTALL HIS WORK. PATCHING SHALL MATCH ADJACENT SURFACES. NO STRUCTURAL MEMBERS SHALL BE CUT

WITHOUT THE APPROVAL OF THE ARCHITECT.

12. CLEANING: EQUIPMENT AND PIPING SHALL BE CLEANED TO REMOVE FOREIGN MATERIALS. PROVIDE TEMPORARY

FILTERS FOR AIR UNITS THAT ARE OPERATED DURING CONSTRUCTION. PLUG OR CAP OPENINGS IN EQUIPMENT, DUCTWORK, PIPING AND MATERIALS UNTIL CONNECTION IS MADE TO THE SYSTEM. REMOVE FROM THE PREMISES

ALL UNUSED MATERIAL AND DEBRIS RESULTING FROM THE PERFORMANCE OF HVAC WORK.

13. WIRING: STARTERS THAT ARE SPECIFIED TO BE FURNISHED AS AN INTEGRAL PART OF THE MECHANICAL

EQUIPMENT SHALL BE COMPLETE WITH PROPERLY SIZED OVERLOAD HEATERS. TEMPERATURE CONTROL WIRING, EQUIPMENT CONTROL WIRING AND CONTROL INTERLOCK WIRING FOR MECHANICAL EQUIPMENT SHALL BE

FURNISHED BY THE MECHANICAL CONTRACTOR. CONTROL WIRING SHALL NOT INCLUDE ANY WIRING WHICH

CARRIES MOTOR CURRENT. ALL WIRING SHALL BE IN METAL CONDUIT AND SHALL COMPLY WITH THE ELECTRICAL

SPECIFICATIONS.

14. QUIET OPERATION: SYSTEMS SHALL OPERATE UNDER CONDITIONS OF LOAD WITHOUT UNUSUAL OR EXCESSIVE

NOISE OR VIBRATION. UNUSUAL OR EXCESSIVE NOISE OR VIBRATION SHALL BE CORRECTED.

15. TESTING AND BALANCING: HVAC CONTRACTOR SHALL BE AVAILABLE TO ESCORT AND ASSIST OWNER PROVIDED

TEST AND BALANCING CONTRACTOR. ALL HVAC EQUIPMENT SHALL BE BALANCED TO ASSURE THAT THE PROPER

SEQUENCE OF CONTROL IS ESTABLISHED AND OPERATING IN A SAFE MANNER. ALL PERSONNEL INVOLVED IN THE

EXECUTION OF THE WORK SHALL BE EXPERIENCED IN THE BALANCING OF MECHANICAL SYSTEMS. THE WATER

QUANTITIES FOR PUMPS SHALL BE BALANCED FOR THE GPM AS INDICATED ON THE SCHEDULE.

16. INSTRUCTIONS TO OWNER: INSTRUCT THE OWNER IN THE PROPER OPERATION AND MAINTENANCE OF THE

MECHANICAL SYSTEMS UNTIL THE OWNER IS FULLY PREPARED TO OPERATE AND MAINTAIN THE SYSTEMS.

HOWEVER, LENGTH OF INSTRUCTION TIME SHALL BE LIMITED TO ONE-HALF DAY.

17. OPERATING AND MAINTENANCE: PROVIDE THE OWNER WITH TWO (2) BOUND SETS OF OPERATING AND

MAINTENANCE INSTRUCTIONS FOR ALL HVAC EQUIPMENT AND CONTROLS.

18. GUARANTEE: EQUIPMENT, MATERIALS AND LABOR REQUIRED BY THESE CONTRACT DRAWINGS SHALL BE

GUARANTEED TO BE FREE FROM DEFECTIVE MATERIALS OR WORKMANSHIP FOR ONE (1) YEAR AFTER FINAL

ACCEPTANCE OF THE PROJECT UNLESS SPECIFIED FOR A LONGER PERIOD IN OTHER PORTIONS OF THE

SPECIFICATIONS. DEFECTIVE MATERIALS OR WORKMANSHIP OCCURRING DURING THIS PERIOD SHALL BE

CORRECTED AT NO ADDITIONAL COST.

19. PAINTING: GENERAL - PAINT MECHANICAL EQUIPMENT AND MATERIALS (WHERE NOT CONCEALED). PAINTING (IN

CONCEALED SPACES) SHALL BE LIMITED TO EQUIPMENT AND MATERIALS NOT OTHERWISE PROTECTED FROM

RUSTING SUCH AS HANGERS AND SUPPORTS. PAINT SHALL BE PRODUCTS OF SHERWIN-WILLIAMS, PITTSBURGH, PRATT-LAMBERT OR EQUAL. SURFACE PREPARATION, PRIMING AND PAINT APPLICATION SHALL BE IN

ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. GALVANIZED SURFACES SHALL BE PRETREATED WITH

A PHOSPHORIC ACID CLEANING SOLUTION AND PRIMED. AFTER PREPARATION EACH ITEM SHALL BE PAINTED, EXCEPT COLOR OF PAINT FOR EQUIPMENT AND MATERIAL WHERE NOT CONCEALED SHALL BE AS SELECTED BY

THE OWNER. ITEMS NOT CONCEALED IN ROOMS SHALL BE PAINTED OF THE SAME COLOR TO MATCH ADJACENT

WALLS OR CEILINGS. PAINTING IS NOT REQUIRED OF ITEMS WITH A FACTORY-FINISH COAT. PATCH PAINTING IS

REQUIRED OF ANY DAMAGED AREAS TO MATCH FACTORY-FINISH COAT. NAMEPLATES ON EQUIPMENT SHALL NOT

BE PAINTED.

20. IDENTIFICATION OF PIPES AND EQUIPMENT: EACH MAJOR PIECE OF EQUIPMENT AND PIPING SHALL BE IDENTIFIED

BY MARKING THAT WILL READ THE SAME AS THE IDENTIFICATION SHOWN ON THE DRAWINGS. DIRECTION OF FLOW

AND ZONE SERVED SHALL BE INDICATED ON PIPING. TYPE OF PIPING SHALL ALSO BE SPECIFIED BY COLOR WITH

GREEN FOR HEATING WATER, BLUE FOR DOMESTIC COLD WATER, AND RED FOR DOMESTIC HOT WATER. STENCIL

LETTERS SHALL BE 2 INCHES HIGH UPPER CASE PAINTED WITH WHITE ENAMEL ON EQUIPMENT AND BLACK

ENAMEL ON PIPING AND CONDUIT. IDENTIFICATION SHALL BE PAINTED ON EACH PIPE OR CONDUIT WHERE

EXPOSED OR ACCESSIBLE AND SHALL BE PLACED EVERY 15 FEET ALONG THE PIPE OR CONDUIT.

21. PIPING

A. STEAM LINES SHALL BE ASTM A53 GRADE B ERW OR SEAMLESS SCHEDULE 40 STANDARD WEIGHT BLACK

STEEL. CONDENSATE LINES SHALL BE ASTM A53 GRADE B ERW OR SEAMLESS SCHEDULE 80 EXTRA HEAVY

BLACK STEEL. FABRICATION SHALL BE THREADED OR WELDED, SUITABLE FOR 125 PSI STEAM SERVICE.

B. HEATED WATER LINES: PIPE 4" AND SMALLER SHALL BE ALL TYPE 'L' HARD DRAWN COPPER TUBING OR ALL

ASTM A53 SCHEDULE 40 STANDARD WEIGHT BLACK STEEL, EXCEPT UNDERGROUND LINES SHALL BE TYPE 'K'

HARD DRAWN COPPER TUBING. PIPE OVER 4" SHALL BE ASTM A53 SCHEDULE 40 STANDARD WEIGHT BLACK

STEEL. ALL FITTINGS SHALL BE SUITABLE FOR 125 PSI WATER SERVICE.

C. SERVICE VALVES: UP TO AND INCLUDING 2 1/2" SHALL BE ALL BRASS, RISING STEM, SOLID WEDGE DISC GATE

VALVES. VALVES OVER 2" FOR WATER SERVICE SHALL BE IRON BODY, RISING STEM, SOLID WEDGE DISC

GATE VALVES. CHAIN OPERATION SHALL BE PROVIDED FOR ALL GATE VALVES LOCATED IN NOT EASILY

ACCESSIBLE AREAS.

D. GLOBE VALVES SHALL BE ALL BRASS WITH BRASS DISC, EXCEPT GLOBE VALVES OVER 2" SIZE MAY BE

BUTTERFLY TYPE.

E. CHECK VALVES SHALL BE BRASS OR IRON BODY, SWING TYPE, RE-GRINDING SEAT.

F. BALANCING COCKS SHALL BE ALL BRASS, SQUARE HEAD OR SCREWDRIVER HEAD WITH CHECK. BALANCING

COCKS OVER 2" SIZE MAY BE IRON BODY.

G. STRAINERS SHALL BE Y TYPE WITH BRONZE BASKET SUITABLE FOR 125 PSI SERVICE.

H. MANUAL AIR VENTS SHALL BE CHROMIUM-PLATED BRASS 1/8" NPT COIN-OPERATED TYPE. PROVIDE

EXTENSION TUBE IF REQUIRED TO MAINTAIN ACCESS TO VENT OPERATOR.

I. AUTOMATIC AIR VENTS SHALL BE HOFFMAN NO. 79, SUITABLE FOR 75 PSI SERVICE, AND SHALL PROVIDE

VENTING OPERATION UNDER ALL CONDITIONS.

J. SAFETY RELIEF VALVES FOR WATER HEATING SYSTEMS SHALL BE WATTS ASME, SERIES 740. VALVES FOR

HEATING SYSTEMS SHALL BE SIZED TO RELIEVE THE FULL HEATING CAPACITY OF THE SYSTEM. SAFETY

RELIEF VALVES FOR COOLING SYSTEMS SHALL BE WATTS ASME SERIES 174A, 3/4" X 3/4". PIPE DISCHARGE

PORTS FULL SIZE TO FLOOR DRAIN.

K. BYPASS RELIEF VALVE SHALL BE ADJUSTABLE SETTING TYPE, BRONZE BODY, MODULATING ACTION

PRESSURE RELIEF VALVE AS MANUFACTURED BY CLA-VAL OR EQUAL. SIZE TO RELIEVE 50% OF PUMP

CAPACITY. SET TO RELIEVE WHEN SYSTEM HEAD IS 5 FOOT W.G. ABOVE SPECIFIED SYSTEM PUMP HEAD.

L. PRESSURE GAUGES SHALL BE 4" DIAL ASHCROFT BOURDON TUBE TYPE SUITABLE FOR 125 PSI SERVICE.

M. CIRCUIT SETTERS SHALL BE BELL AND GOSSETT BRONZE BALANCE VALVE WITH PROVISIONS FOR

CONNECTING A PORTABLE DIFFERENTIAL PRESSURE METER. METER CONNECTIONS SHALL HAVE BUILT-IN

CHECK VALVES. AN INTEGRAL POINTER SHALL REGISTER DEGREE OF VALVE OPENING. EACH BALANCE

VALVE SHALL BE CONSTRUCTED FOR 125 LBS. WORKING PRESSURE AT 250 DEG. F. FURNISH ONE

DIFFERENTIAL METER MODEL RO-5 COMPLETE WITH METER, CUTOFFS, PIPING, FITTING, AND HOSE. THE

VALVE PRESSURE DROP AND THE SETTING SHALL DETERMINE THE ACTUAL SYSTEM FLOW RATE.

N. FLEXIBLE PIPE JOINTS SHALL BE PIPE LINE SIZE, FLANGED, MINIMUM 125 PSI WORKING PRESSURE AT 250

DEG. F, FLEXONICS MODEL PCS.

O. THERMOMETERS SHALL BE WEISS 9" VARI-ANGLE MERCURY TYPE WITH SEPARATE SOCKET.

P. PIPE SUPPORTS: SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY ADJUSTABLE WROUGHT STEEL

CLEVIS HANGERS. ALL SUPPORTS SHALL BE ATTACHED TO THE BUILDING STRUCTURE SPACED 10'-0" ON

CENTER. HANGER RODS SHALL BE 3/8" DIAMETER SIZE FOR PIPES UP THROUGH 2", 1/2" DIAMETER SIZE FOR

2-1/2" THROUGH 3", 5/8" DIAMETER FOR PIPES 4" THROUGH 5" AND 7/8" DIAMETER SIZE FOR 6" THROUGH 12".

PIPE HANGER RODS SHALL BE ATTACHED TO THE TOP CHORD ONLY ON STEEL JOISTS AND BEAMS WITH

CLAMPS. PIPING SHALL BE INSTALLED IN PRACTICAL ALIGNMENT WITH THE BUILDING.

Q. ANCHORS FOR PIPE SHALL BE PROVIDED AS INDICATED OR AS REQUIRED AT THE JOB SITE TO LOCALIZE

EXPANSION AND CONTRACTION OF PIPE.

R. EXPANSION JOINTS SHALL BE FLEXONIC INTERNALLY GUIDED, CORRUGATED BELLOWS, EXPANSION

COMPENSATOR, TYPE HB, 2" MINIMUM STROKE, SUITABLE FOR HOT WATER SERVICE. GROOVED PIPE

COUPLINGS AND EXPANSION COMPENSATORS SHALL PROVIDE FOR EXPANSION IN GROOVED PIPING

SYSTEMS.

S. VERTICAL PIPING SHALL BE GUIDED OR SUPPORTED IN THE CENTER OF EACH RISER AND NOT OVER 15'-0" ON

CENTER AND SHALL BE SUPPORTED AT THE BASE OF EACH RISER.

T. INSTALLATION: ALL PIPING SHALL BE INSTALLED WITH SUFFICIENT PITCH TO INSURE ADEQUATE DRAINAGE

AND VENTING. ALL HIGH POINTS IN WATER LINES SHALL BE PROVIDED WITH AUTO-AIR VENTS, ALL LOW

POINTS WITH DRAINS. STEAM AND CONDENSATE LINES SHALL SLOPE A MINIMUM OF 1" IN 40' IN DIRECTION

OF FLOW UNLESS INDICATED OTHERWISE. LOW POINTS IN STEAM LINES SHALL BE PROVIDED WITH DRIP

STATION. PIPE SIZE CHANGES IN STEAM LINES SHALL BE MADE WITH ECCENTRIC REDUCERS WITH OUTLET

ON BOTTOM. CONDENSATE DRAIN LINES SHALL SLOPE 1/8" PER FOOT IN DIRECTION OF FLOW.

U. DIELECTRIC FITTINGS SUCH AS COUPLINGS, UNIONS OR FLANGES SHALL BE INSTALLED TO ISOLATE PIPES OF

NON-FERROUS METAL WHERE CONNECTION IS MADE TO FERROUS METAL.

22. THERMAL COVERING

A. INSULATION SHALL BE JOHNS MANVILLE, OWENS CORNING, ARMSTRONG OR EQUAL. INSULATION SHALL NOT

BE APPLIED UNTIL AFTER THE EQUIPMENT, PIPES OR DUCTS TO BE INSULATED HAVE PROVEN SATISFACTORY

UNDER TESTS. ALL MATERIALS USED SHALL HAVE COMPOSITE FLAME-SPREAD RATING NOT EXCEEDING 25

AND A SMOKE-DEVELOPED RATING NOT EXCEEDING 50.

B. PIPING: INSULATION SHALL BE INSTALLED IN CONFORMANCE WITH THE MANUFACTURER'S

RECOMMENDATIONS.

C. FIBERGLASS PIPE INSULATION SHALL HAVE A WHITE KRAFT BONDED TO ALUMINUM FOIL, REINFORCED WITH

FIBERGLASS YARN JACKET. ELASTOMERIC INSULATION SHALL BE CONSTRUCTED OF A CLOSED CELL

STRUCTURE TO EFFECTIVELY RETARD THE FLOW OF MOISTURE VAPOR AND SERVE AS A VAPOR BARRIER.

INSULATION THICKNESS AND TYPE FOR VARIOUS PIPING SYSTEMS SHALL BE AS INDICATED IN THE

FOLLOWING TABLE (PIPE SIZE/INSULATION THICKNESS).

PIPE SIZE/INSULATION THICKNESS(1)

SYSTEM TEMP. LESS THAN 1" TO 1-1/2" 4" TO 8” & INS.

RANGE 1" 1-1/4” TO 3" 6” UP TYPE

(°F) (2)

LOW

PRESSURE 201-250 2.5 2.5 2.5 3.0 3.0 A

STEAM

HEATING

WATER 140-200 1.5 1.5 2.0 2.0 2.0 A

CONDENSATE

DRAIN 45-75 0.5 0.5 1.0 1.0 1.0 A,B

STEAM

CONDENSATE ANY 1.5 1.5 2.0 2.0 2.0 A

NOTES:

(1) MINIMUM THICKNESS FOR INSULATION LISTED IN PRECEDING TABLE IS BASED ON THERMAL CONDUCTIVITY, 'K' NOT EXCEEDING 0.27 BTU PER INCH/HR. X SQ. FT. X DEG. F. BASED ON MEAN TEMPERATURE OF 75 DEG.

F. INSULATION WITH GREATER THERMAL CONDUCTIVITY SHALL HAVE INCREASED THICKNESS TO PROVIDE

SAME PERFORMANCE CHARACTERISTICS AS SPECIFIED.

(2) A - FIBERGLASS TYPE INSULATION; B - ELASTOMERIC TYPE INSULATION.

D. FIBERGLASS PIPE INSULATION FITTINGS SHALL BE COVERED WITH PRE-MOLDED PVC FITTING COVERS.

JACKETS ON FIBERGLASS PIPE INSULATION BELOW 80 DEG. F. SHALL BE VAPOR SEALED USING SELF-SEALING

LAP, LAP SEAL GUN OR ADHESIVE. ALL INSULATION JOINTS, LAPS, VOIDS, PUNCTURES AND END TAPERS

SHALL BE SEALED WITH 1/32" THICKNESS OF VAPOR ADHESIVE. A 12" LONG, 1/2 SECTION OF HYDROUS

CALCIUM SILICATE OR FOAMGLAS INSULATION SHALL BE USED BETWEEN HANGERS AND PIPING. ON PIPE, SIZES 1-1/2" AND BELOW, HYDROUS CALCIUM SILICATE OR FOAMGLAS WILL NOT BE REQUIRED. ALL PIPING

SHALL HAVE LOAD-DISTRIBUTING GALVANIZED 16 GAUGE METAL SHIELDS INSTALLED AROUND THE LOWER

HALF OF THE INSULATION.

E. ELASTOMERIC PIPE INSULATION SEAMS, VOIDS AND BUTT JOINTS SHALL BE SEALED WITH A VAPOR BARRIER

ADHESIVE OR TAPED WITH 1-1/2 INCH WIDE 3M #471 TAPE. FLEXIBLE ELASTOMERIC INSULATION EXPOSED TO

WEATHER SHALL BE COVERED WITH TWO COATS OF ARMSTRONG ARMAFLEX FINISH.

23. TANGENTIAL AIR SEPARATOR (AS-1):

A. BELL AND GOSSETT "ROLAIRTROL" OR EQUAL WITH (ASME) PRESSURE VESSEL CODE CONSTRUCTION, FLANGED TANGENTIAL INLET AND OUTLET CONNECTION, INTERNAL PERFORATED STAINLESS STEEL AIR

COLLECTOR TUBE, AND BOTTOM BLOWDOWN CONNECTION. AIR SEPARATOR SHALL RELEASE AIR WITH BELL

AND GOSSETT MODEL 107A HIGH CAPACITY AIR VENT. AIR SEPARATORS SHALL BE CONSTRUCTED IN

ACCORDANCE WITH SECTION VIII OF THE ASME BOILER AND PRESSURE VESSEL CODE AND STAMPED 125 PSI

MAXIMUM WORKING PRESSURE.

24. TEMPERATURE CONTROL SYSTEM:

A. GENERAL - CONTROLS SHALL BE MANUFACTURED BY SIEMENS AND SHALL BE AN EXTENSION OF THE

EXISTING SIEMENS BUILDING AUTOMATION SYSTEM IN PLACE AT WHITEHURST HALL. THE SYSTEM SHALL BE

PROVIDED WITH ALL EQUIPMENT AND MATERIALS AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF

CONTROL. COMPONENT PARTS OF THE SYSTEM SHALL BE MANUFACTURED BY SIEMENS AND/OR THE

PARTICULAR HVAC EQUIPMENT MANUFACTURER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACHIEVING

THE SEQUENCE OF CONTROL. THE SYSTEM SHALL BE INSTALLED BY COMPETENT, TRAINED MECHANICS.

B. MATERIALS

1. CONTROL VALVES 2" AND SMALLER SHALL BE BRONZE, SCREWED TYPE AND SHALL BE RATED AT 250

PSIG. VALVE BODIES 2-1/2" AND LARGER SHALL BE IRON, FLANGED AND RATED AT 125 PSIG. VALVES

SHALL BE SIZED BY THE CONTROLS MANUFACTURER AND THE MAXIMUM ALLOWABLE PRESSURE DROP

SHALL BE 5 FEET WATER COLUMN. VALVE ACTUATORS SHALL BE ELECTRONIC SPRING RETURN, LOW

VOLTAGE, AND PROPERLY SELECTED FOR VALVE BODY AND SERVICE.

C. COORDINATION OF WORK: ALL WIRING IN CONNECTION WITH THE TEMPERATURE CONTROL SYSTEM SHALL

BE FURNISHED AND INSTALLED BY THE CONTROLS SYSTEM CONTRACTOR. WIRING SHALL BE INSTALLED IN

ACCORDANCE WITH THE ELECTRICAL SPECIFICATION. WIRING WITHOUT CONDUIT SHALL BE PROPERLY

SUPPORTED WITHOUT SAGS. LOOSE WIRES LAYING ON CEILINGS, LIGHTS, OR PIPES WILL NOT BE

ACCEPTABLE AT ANY LOCATION.

D. SERVICE AND GUARANTEE - THE ENTIRE CONTROL SYSTEM SHALL BE SERVICED AND MAINTAINED IN

FIRST-CLASS CONDITION BY THE CONTROL MANUFACTURER FOR A PERIOD OF ONE YEAR AFTER

ACCEPTANCE AT NO EXTRA COST TO THE OWNER.

E. SEQUENCE OF CONTROL:

1. PRIMARY HEATING WATER PUMP (PHWP-11):

a. THE PRIMARY HEATING WATER PUMP SHALL OPERATE IN CONJUNCTION WITH THE EXISTING

CONVERTER HEATING SYSTEM. PHWP-11 SHALL OPERATE AS A PRIMARY CONSTANT VOLUME

PUMP. WHENEVER THE CONVERTER IS SIGNALED TO START, THE HEATING WATER PUMP SHALL

OPERATE. ON THE FAILURE OF THE HEATING WATER PUMP TO OPERATE BASED ON A CURRENT

RELAY FEEDBACK, AN ALARM MESSAGE SHALL BE TRANSMITTED TO THE BAS. THE PRIMARY

HEATING WATER PUMP SHALL OPERATE BASED OFF THE EXISTING ESTABLISHED SEQUENCE OF

CONTROL FOR THE PRIMARY HEATING WATER PUMP.

2. SECONDARY HEATING WATER PUMPS (SHWP-12, SHWP-13, SHWP-14, & SHWP-15):

a. HEATING WATER BOOSTER PUMPS SHALL OPERATE IN CONJUNCTION WITH THE EXISTING

CONVERTER CONTROL SYSTEM. PUMPS SHALL OPERATE BASED ON A CALL FOR HEATING WITHIN

THE ZONE SERVED BY PUMP. ON THE FAILURE OF THE HEATING WATER PUMP TO OPERATE BASED

ON A CURRENT RELAY FEEDBACK, AN ALARM MESSAGE SHALL BE TRANSMITTED TO THE BAS.

BOOSTER (ZONE) PUMPS SHALL OPERATE BASED OFF THE EXISTING ESTABLISHED SEQUENCE OF

CONTROL FOR THE SECONDARY HEATING WATER PUMPS.

CRAWL SPACE CRAWL SPACE

CORRIDOR

STAIR #7

RECREATION RMELEC ROOM

JAN

STORAGE

MECH RM

MD-101

(TYP.)

(TYP.)

(TYP.)

(TYP.)

CRAWL SPACE

CRAWL SPACE

(TYP.)

(TYP.)

EXISTING CONVECTOR

TO REMAIN (TYP. 4)

EXISTING HWS/R PIPING

TO BE REMOVED (TYP.)

EXISTING HWS/R PIPING

TO BE REMOVED (TYP.)

EXISTING HWS/R PIPING

TO BE REMOVED (TYP.)

EXISTING HWS/R PIPING IN

VERTICAL TO REMAIN (TYP.)

EXISTING HWS/R PIPING IN

VERTICAL TO REMAIN (TYP.)

EXISTING HWS/R PIPING IN

VERTICAL TO REMAIN (TYP.)

EXISTING HWS/R PIPING IN

VERTICAL TO REMAIN (TYP.)

EXISTING HEATING WATER

PIPING TO BE REMOVED (TYP.)

EXISTING PIPE ANCHORS

TO REMAIN (TYP.)

EXISTING PIPE ANCHORS

TO REMAIN (TYP.)

2 2

(TYP. 4)

(TYP. 2)

SHWP-13

SHWP-12

3(TYP. 4)

EX. EXPANSION

TANK TO REMAIN

EX. COND. PUMP

TO REMAIN

EXISTING 1 1/4" PUMPED

CONDENSATE TO REMAIN

EX. STEAM TO HW

CONVERTER TO REMAIN

EXISTING 4"

L.P. STEAM

TO REMAIN

EXISTING VENT

TO REMAIN

REMOVE EXISTING

HWS/R PIPING (TYP.)

REMOVE EXISTING

HWS/R PIPING (TYP.)

EXISTING INLINE HW

PUMP TO REMAIN (TYP. 3)PHWP-11 SHWP-14

SHWP-15

EXISTING

CONVERTER

TO REMAIN

EX. COND.

PUMP

EXISTING EXPANSION

TANK TO REMAIN

EXISTING STEAM PIPING

TO REMAIN (TYP.)

EXISTING PRIMARY HEATING

WATER PUMP TO BE REUSED

REMOVE EXISTING

HWS/R PIPING (TYP.)

REMOVE HEATING WATER

FLEX CONNECTIONS

PLAN NOTES:

1. EXISTING HEATING WATER INLINE PUMP SHALL BE REUSED AND RELOCATED. SEE SHEET

M-101 FOR NEW LOCATION.

2. EXISTING PIPE ANCHORS SHALL BE REUSED FOR NEW HWS/R PIPING IF CONDITION IS DEEMED

ACCEPTABLE AFTER FIELD VERIFICATION.

3. EXISTING CONTROL VALVE FOR HEATING PUMP SHALL BE REUSED (TYP.).

GENERAL DEMOLITION NOTES:

1. CONTRACTOR SHALL NOTE ALL EXISTING CONDITIONS INCLUDING HEATING WATER PIPE

ROUTING, VALVE PLACEMENT, AND EQUIPMENT LOCATIONS INCLUDING INLINE PUMPS.

2. EXISTING HWS/R PIPING, VALVES, & EQUIPMENT SHALL BE REMOVED.

3. EXISTING HEATING WATER INLINE PUMPS AND CONTROL VALVES SHALL REMAIN. PUMPS

AND CONTROL VALVES SHALL BE RECONNECTED TO NEW HWS/R PIPING.

4. EXISTING LOCATIONS OF STRAP-ON SIEMENS TEMPERATURE SENSORS SHALL BE NOTED.

IMMERSION WELL TEMPERATURE SENSORS SHALL BE PROVIDED WITHIN NEW HWS/R PIPING

INSTEAD.

5. EXISTING HWS/R PIPING IN VERTICAL SHALL REMAIN FOR ALL RISERS.

6. EXISTING LOW PRESSURE STEAM AND PUMPED CONDENSATE PIPING IN MECHANICAL ROOM

SHALL REMAIN.

7. CONDITION OF EXISTING PIPE HANGERS FOR HEATING WATER SHALL BE FIELD VERIFIED.

PIPE HANGERS SHALL EITHER BE CLEANED AND PAINTED OR REPLACED COMPLETELY

DEPENDING ON CONDITION.

DESIGNED DRAWN

APPROVEDCHECKED

COMM. NO. DATE

SHEET

REVISION DATE

24101.58 10-22-26

V

IR

G

IN

IA

T

E C

H

W H

IT

E

H U

R S

T H

A

LL

P

IP

IN

G

R E

P

LA

C E

M E

N T

B

LA

C K

S B

U R

G , V

IR

G

IN

IA

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

10/22/26

PARTIAL BASEMENT/CRAWL SPACE DEMOLITION PLAN - HVAC

SCALE: 1/8" = 1'-0"

MD-101

B A

S E

M E

N T

/C R

A W

L S

P A

C E

D E

M O

LI

T

IO

N

P

LA

N S

H

V A

C

BCR BCR

RDF LPA

ENLARGED PLAN - MECHANICAL ROOM - PIPING

SCALE: 1/4" = 1'-0"

MD-101

MECHANICAL ROOM SECTION - HVAC PIPING

SCALE: 1/4" = 1'-0"

MD-101

KEY PLAN

NO SCALE

CRAWL SPACE CRAWL SPACE

CORRIDOR

STAIR #7

RECREATION RMELEC ROOM

JAN

STORAGE

MECH RM

3/4"

1 1/4"

1 1/2"

2"

2 1/2"

2 1/2"

1"

1"

3/4"1 1/2"

1"1" 3/4"

1"

1" 1" 1"1"1"1"

2 1/2"

3/4"

1" 1" 1"

1 1/2" 2 1/2"

2 1/2"

1"1 1/4"

1" 3/4"

2" 1 1/2"

2"1 1/2"

2 1/2"

1"

1"

1"

3/4"

1 1/4"

1 1/2"

1 1/2"

1 1/4"

2"

2"

1 1/4"

1"

2"

3/4"

2"

3/4"1 1/2"

3/4"

1"

1 1/2"

1 1/4" 1"

3/4"

1"

3/4"

1 1/4"

1 1/4"

3/4"

1"

3/4"

1"

3/4"

SHWP-12

1"

3/4"

3/4"

3/4"

2 1/2" 2"

2"

EXISTING

ANCHOR

POINT (TYP.)

2"

1"

3/4"1 1/4"

1 1/4"

3/4"

2 1/2" 2 1/2"

2 1/2"

HWS

HWR

3/4"

HWS

HWR

HWS

M-101

HWS

HWR

HWS

HWR

H W

S H

W R

3/4"

1 1/4"

3/4"

3/4"

3/4"

3/4"

H W

R H

W R

H W

R H

W S

H W

S H

W R

H W

R

H W

S

EXISTING ANCHOR

POINT (TYP.)

1" 1"

H W

R

HWR

(TYP.)

(TYP.)

HWS

HWR

1"

3/4" 1"3/4"

3/4"

(TYP.)

(TYP.)

CRAWL SPACE

CRAWL SPACE

4'-0"

4'-6"

PIPE

GUIDES

(TYP.)

4'-0"

4'-6"

4'-0"

4'-6"

HWR

HWS

HWR

HWR

HWR

HWS

HWR

HWR

(TYP.)

2 1/2"

2 1/2"

AUTOMATIC AIR

VENT (AAV)

3/4"

AAV

HWS

HWR

1 1/2"

2"

2"

2" 1 1/2"1 1/4"

3/4" 3/4"

1 1/4"

1"

3/4"3/4"3/4"

1"

HWS

HWR

1 1/2"

1 1/2"

1"3/4"

1"

1"1"

1"

1"

(TYP.)

(TYP.)

3/4"

3/4"

3/ 4"

1" 3 3

3 3

SHWP-13

H W

R

H W

S H

W R

1"

1 1/2"

1 1/2"

1 1/4"

1 1/4"

HWS

HWR

1 1/2"

AAV

2"

HWS

HWR

1 1/2"

1/

2"

2"

2 1/2"

HWR

HWS

9 6

1"

1 1/4"

2" 2"

1 1/2"

2"

H W

R H

W S

AAV

1 1/4"

SS-2

SR-2

S R

-1

SS-1

SS-3

SR-3

1 1/4"

2 1/2"

PR

PS

SR-3

SR-4

2 1/2"

2 1/2"

2 1/2"

1 1/4"

1 1/2"

EX. EXPANSION TANK

EX. COND. PUMP

EXISTING 1 1/4"

PUMPED

CONDENSATE

PHWP-11

SHWP-14

SHWP-15

EX. 2 1/2" CV

(TYP. 4)

3"

3"

EX. STEAM TO

HW CONVERTER

2 1/2"

2 1/2"

2 1/2"

SS-3

2 1/2"

2 1/2"

3"

2 1/2"2 1/2"

4"

SS-3

SR-3

EXISTING 4"

L.P. STEAM

EXISTING VENT

BALL VALVE

(TYP. 2)

MECHANICAL

ROOM

S R

-4

S S

-4

1 1/2"

2 1/2"

HWR

HWS

2 1/2" HWS

1 1/2" HWR

S R

-4

S S

-4

1 1/2"

2 1/2"

EX. HW PUMP

(TYP. 3)

5 5

AS-1

4"

4"

4"

4" FLEX CONN.

THERMOSTATIC

CONTROL

1 1/4" DRAIN VALVE

EX. CONVERTER

EX. COND.

PUMP

THERMOMETER (TYP.)

STRAINER

EX. EXPANSION

TANK

EX. STEAM

PIPING

1 1/4"

EX. DRIP DRAIN

1"

4" HWS

4"

4" HWR

PLAN NOTES:

1. CONNECT HWS/R TO EXISTING CONVECTOR.

2. INSTALL 13'-0" MINIMUM EXPANSION LOOP.

3. PIPE GUIDES SPACED 9' UPSTREAM AND DOWNSTREAM FROM CENTER OF EXPANSION LOOP.

4. GATE VALVES IN HARD TO REACH LOCATIONS TO BE RAISING STEM VALVES WITH PULL CHAIN

OPERATION (TYP.).

5. EXISTING CONTROL VALVE SHALL BE REINSTALLED AND CONNECTED TO NEW HWS/R PIPING (TYP.).

6. EXISTING INLINE PUMP TO BE REINSTALLED AND CONNECTED TO NEW HWS/R PIPING (TYP.).

7. HEATING WATER REFILL SHALL BE SUPPLIED FROM DOMESTIC HOT WATER.

8. 3/4" HWS/R PIPING RUNOUT.

9. INSTALL BALL VALVE (TYP. 2) IN HEATING WATER PIPING.

GENERAL NOTES:

1. EXISTING HEATING WATER SYSTEM INCLUDING PIPING AND VALVES ARE TO BE REPLACED IN KIND

UNLESS NOTED OTHERWISE. EXISTING INLINE HEATING WATER PUMPS AND CONTROL VALVES SHALL

REMAIN AND BE RECONNECTED TO NEW HEATING WATER SYSTEM.

2. NEW HWS/R RUNOUTS TO RISERS SHALL CONNECT TO EXISTING VERTICAL HEATING WATER PIPING.

HWS/R PIPING RUNOUTS SHALL UTILIZE BUTTERFLY VALVES.

3. NEW HWS/R PIPING SHALL BE ROUTED THROUGH EXISTING WALL PENETRATIONS.

4. EXISTING ANCHOR POINTS SHALL BE REUSED FOR NEW HWS/R PIPING IF CONDITION IS DEEMED

ACCEPTABLE.

5. INSULATION ON EXISTING PIPING (LOW PRESSURE STEAM AND PUMPED CONDENSATE), FITTINGS, VALVES, AND STEAM CONVERTER IN MECHANICAL ROOM SHALL BE REMOVED AND REPLACED.

6. GATE VALVES IN HARD TO REACH LOCATIONS TO BE RAISING STEM VALVES WITH PULL CHAIN

OPERATION.

7. PROVIDE AN IMMERSION WELL TEMPERATURE SENSOR AT ANY LOCATION WHERE A SIEMENS STRAP

ON TEMPERATURE SENSOR WAS PREVIOUSLY LOCATED.

8. PROVIDE FIRE STOPPING FOR ALL NEW AND EXISTING PIPE PENETRATIONS THROUGH MECHANICAL

ROOM WALLS. SEE DETAIL ON SHEET M-001.

9. MECHANICAL ROOM FLOOR SHALL BE REFINISHED TO BE NON-SLIP. THE FLOORING PRODUCT TO USE

ON THE FLOOR IS SHERMIN-WILLIAMS FASTOP MULTITOP FLOOR SL45 (OR EQUAL), WHICH IS A SELF

LEVELING URETHANE CONCRETE TO BE APPLIED AT 3/16" THICKNESS. PREPARE FLOOR PER

MANUFACTURER'S INSTRUCTIONS BEFORE APPLYING PRODUCT. REFER TO FLOOR FINISHING

INSTRUCTIONS ON SHEET M-001.

10. MECHANICAL ROOM WALL SHALL BE PAINTED WITH BENJAMIN MOORE ULTRA SPEC SCUFF-X

INTERIOR SEMI-GLOSS FINISH 486 PAINT (OR EQUAL). THE PAINT COLOR SHALL BE 2015 HOKIE WHITE

SEMI-GLOSS. PREPARE WALL SURFACE PER MANUFACTURER'S INSTRUCTIONS BEFORE PAINTING.

11. CRAWL SPACE SHALL BE LINED WITH 20 MIL POLYETHYLENE VAPOR BARRIER. LINING SHALL EXTEND

2 FEET UP FOUNDATION WALLS. LINING SHOULD BE ROLLED AROUND A 2x2 BATTEN AND

MECHANICALLY AFFIXED TO WALL WITH EITHER TAPCONS OR RAMSET. LINED COVE BASES SHALL

NOT HAVE ANY GAPS.

12. ENTIRE CRAWLSPACE SHALL BE CLEANED OUT OF ALL TRASH AND DEBRIS TO PREVENT NEW LINING

FROM BEING PUNCTURED.

DESIGNED DRAWN

APPROVEDCHECKED

COMM. NO. DATE

SHEET

REVISION DATE

24101.58 10-22-26

V

IR

G

IN

IA

T

E C

H

W H

IT

E

H U

R S

T H

A

LL

P

IP

IN

G

R E

P

LA

C E

M E

N T

B

LA

C K

S B

U R

G , V

IR

G

IN

IA

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

10/22/26

PARTIAL BASEMENT/CRAWL SPACE NEW WORK PLAN - HVAC

SCALE: 1/8" = 1'-0"

M-101

B A

S E

M E

N T

/C R

A W

L S

P A

C E

N E

W W

O R

K P

LA

N

S

H V

A C

BCR BCR

RDF LPA

ENLARGED PLAN - MECHANICAL ROOM - PIPING

SCALE: 1/4" = 1'-0"

M-101

MECHANICAL ROOM SECTION - HVAC PIPING

SCALE: 1/4" = 1'-0"

M-101

DESIGNED DRAWN

APPROVEDCHECKED

COMM. NO. DATE

SHEET

REVISION DATE

24101.58 10-22-26

V

IR

G

IN

IA

T

E C

H

W H

IT

E

H U

R S

T H

A

LL

P

IP

IN

G

R E

P

LA

C E

M E

N T

B

LA

C K

S B

U R

G , V

IR

G

IN

IA

C O M M O

N W

EA

LTH OF

V

IR

G I N I A

P R O

F E

SS IONAL E

N G

IN

E R E

10/22/26

E-001

G E

N E

R A

L S

P E

C

IF

IC

A

T

IO

N S

, L E

G E

N D

, A B

B R

E V

IA

T

IO

N

S E

LE

C

T R

IC

A

L

MAR MAR

WAM LPA

SCCR SHORT CIRCUIT CURRENT RATING

1. ALL ABBREVIATIONS LISTED MAY NOT APPLY TO THIS PROJECT. REFER TO OTHER ABBREVIATION LISTS

NOTE (ELECTRICAL ABBREVIATIONS):

ELSEWHERE IN THESE DOCUMENTS FOR ABBREVIATIONS NOT LISTED HERE.

GF OR GFI

HPF

HZ

HP

HID

HOA

GND

GEN

HIGH INTENSITY DISCHARGE

HORSEPOWER OR HEAT PUMP

HIGH POWER FACTOR

HAND-OFF-AUTOMATIC

HERTZ

GROUND

GENERATOR

GROUND FAULT INTERRUPTER

TRANSFORMER

TRANSFER

XFMR

XFER

VOLT-AMPERE

UNDERGROUND

UNLESS NOTED OTHERWISE

VOLTV

VA

TYPICAL

UG

UNO

TYP

SYMMETRICAL

SWITCHBOARD

SOLID NEUTRAL

SWITCHGEAR

SYM

SN

SWGR

SWBD

SECONDARYSEC

COMB

E OR EMER

ENG

ER

EQUIP

ENCL

EMT

EML

EM

EMN

ELEC

EL

CTRL

DC

DISC

CU

COND

CONT

CONN

CND

CNTR

EXIST RELOCATED TO THIS LOCATION

EXIST REMOVED

EXIST REMOVED AND NEW INSTALLED

ELECTRICAL METALLIC TUBING

EXIST TO REMAIN

EQUIPMENT

ENCLOSURE

ENGINE

EMERGENCY

ELECTRIC OR ELECTRICAL

CONTROL

DISCONNECT

DIRECT CURRENT

COPPER

CONTACTOR

CONNECTION

CONDUCTOR

COMBINATION

CENTER

CONDUIT

BRKR

AWG

CKT

CLG

CB

CAB

CA

ATS

AIC

AFF

ABV

AFD

AC

ACB

A OR AMP

AMERICAN WIRE GAGE

CIRCUIT BREAKER

CIRCUIT

CEILING

BREAKER

CABINET

CABLE

ADJUSTABLE FREQUENCY DRIVE

ABOVE FINISHED FLOOR

ALTERNATING CURRENT

ABOVE COUNTER BACKSPLASH

AMPERES INTERRUPTING CAPACITY

AUTOMATIC TRANSFER SWITCH

ABOVE

AMPERE

PBS PUSHBUTTON STATION

PANELBOARD

POLYVINYL CHLORIDE

RIGID GALVANIZED STEEL CONDUITRGS

POWER

PANEL OR PANELBOARD

PHASE

PRIMARY

PVC

PWR

PRI

PNLBRD

PH

PNL

PULL BOX OR PUSHBUTTON

NATIONAL ELECTRICAL CODE

POLE

NUMBER

PB

P

NO

NEUTRALNEUT

NEC

MAIN LUGS ONLY

MAIN CIRCUIT BREAKER

MLO

MANUAL

MAGNETIC

MAN

MCB

MAG

JUNCTION BOX

KILOWATT-HOUR

KILOVOLT-AMPERE

KILOVOLT-AMPERE REACTIVE

KILOWATT

KWH

KVAR

KW

KVA

KILOVOLT

THOUSAND CIRCULAR MILS

JB

KCMIL

KV

C COUNTERTOP

ELEV ELEVATOR

UNDERWRITERS' LABORATORIESUL

HGT HEIGHT

DIM DIMENSION

MINIMUMMIN

DWG DRAWING

ARC FAULT INTERRUPTERAF OR AFI

SURGE PROTECTIVE DEVICESPDEXIST REMOVED AND RELOCATED

ELECTRICAL ABBREVIATIONS

SB SOUNDER BASE

KNOCKOUTKO

NORMALN OR NORM

UNDERCOUNTERUC

S/O SPACE ONLY

SPECIAL PURPOSESP

ECNC EXIST CND AND NEW CONDS

ABD ABANDONED

GFP GROUND FAULT PROTECTION/PROTECTED

MAXIMUM OVER CURRENT PROTECTIONMOCP

MINIMUM CIRCUIT AMPACITY MCA

GTD GENERATOR TRANSFER DEVICE

GENERAL NOTES:

1. CAREFULLY COORDINATE ALL ELECTRICAL EQUIPMENT LOCATIONS WITH DUCTWORK, PIPING AND MECHANICAL EQUIPMENT. MAINTAIN

ALL CLEARANCES AND SPACES REQUIRED BY THE NEC.

2. WHERE MULTIPLE CIRCUITS ARE COMBINED IN A SINGLE CONDUIT, DERATE CONDUCTORS PER THE NEC.

3. SEE SPECIFICATION SECTION 260519 FOR REQUIREMENTS REGARDING OVERSIZING CONDUCTORS FOR 1-POLE 15- AND 20-AMP CIRCUITS

TO REDUCE VOLTAGE DROP. OVERSIZED CONDUCTORS FOR VOLTAGE DROP ON OTHER CIRCUITS ARE INDICATED IN THE PANEL

SCHEDULES.

4. WHERE RE-USE OF EXISTING CONDUIT, WIRING AND/OR OUTLET BOXES IS INDICATED, ALSO PROVIDE NEW MATERIALS IF NECESSARY. IF

NEW EXPOSED MATERIALS ARE NEEDED, USE SURFACE RACEWAY (SINGLE-CHANNEL EXCEPT WHERE SPECIFICALLY INDICATED

OTHERWISE), EXCEPT EXPOSED CONDUIT AND BOXES MAY BE USED IN UNFINISHED AREAS (MECHANICAL/ELECTRICAL/IT ROOMS, STORAGE AND HOUSEKEEPING CLOSETS, ETC.).

5. MODIFY EXISTING PANEL SCHEDULES TO ACCURATELY REFLECT ALL CHANGES MADE AS PART OF THIS CONTRACT, PROVIDE A NEW

"TYPED" PANEL SCHEDULE. PANEL SCHEDULES REVISED WITH PENCIL, PEN, OR MARKER OF ANY TYPE WILL NOT BE ACCEPTED.

6. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING BID IN ORDER TO VERIFY ALL EXISTING CONDITIONS, TO DETERMINE THE

FULL EXTENT OF DEMOLITION WORK REQUIRED, AND TO DETERMINE THE FULL EXTENT OF RELOCATION AND MODIFICATION WORK

REQUIRED FOR ELECTRICAL WORK (DUE TO OTHER DISCIPLINES INTERFERING OR ANY OTHER REASON). EXISTING SPACE IS TIGHT IS

MANY AREAS (PARTICULARLY ABOVE CEILINGS), AND THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO COORDINATE ALL ELECTRICAL

WORK WITH BOTH NEW AND EXISTING PIPING, DUCTWORK, ETC. NO CHANGE ORDERS WILL BE APPROVED FOR ADDITIONAL WORK DUE TO

THE CONTRACTOR NEGLECTING TO VISIT THE SITE AND GATHER ALL NECESSARY INFORMATION.

7. ALL NEW ACT CEILINGS SHALL BE INSTALLED AT THE SAME HEIGHT AS THE EXISTING ACT CEILINGS BEING REMOVED. CONTRACTOR

SHALL NOTIFY ENGINEER IMMEDIATELY IF EXISTING CEILING HEIGHTS CONFLICT WITH THE INSTALLATION OF THE NEW RECESSED LIGHT

FIXTURES EITHER DUE TO STRUCTURE ABOVE THE CEILING OR EXISTING MECHANICAL OR PLUMBING EQUIPMENT ABOVE THE CEILING.

8. ONLY DEMOLISH THE ITEMS SPECIFICALLY SHOWN WITH DASHED LINES OR NOTED TO BE DEMOLISHED ON THE DRAWINGS - ALL OTHER

EXISTING ITEMS SHALL REMAIN. COORDINATE WITH THE OWNER FOR WHICH ITEMS ARE TO BE TURNED OVER TO THE OWNER AND WHICH

ITEMS THE CONTRACTOR MAY KEEP AND REMOVE FROM THE JOB SITE.

9. THE CONTRACTOR SHALL PROVIDE COVERPLATES ON ALL EXISTING JUNCTION BOXES ABOVE THE ACCESSIBLE CEILING SPACES AND

ANY WALL MOUNTED BOXES IN THE AREA OF RENOVATIONS WHERE EXISTING COVERPLATES ARE MISSING. THE CONTRACTOR SHALL

ALSO PROVIDE ADDITIONAL SUPPORTS FOR EXISTING CONDUIT AND JUNCTION BOXES IN THE AREA OF RENOVATIONS THAT CURRENTLY

DO NOT MEET CODE REQUIREMENTS.

10. WHERE EXISTING CEILING MOUNTED LIGHT FIXTURES IN THE RENOVATION AREA ARE REMOVED AND REINSTALLED (DUE TO HVAC WORK)

IN AN ACCESSIBLE CEILING GRID AND THEY ARE NOT PROVIDED WITH SEPARATE STRUCTURAL SUPPORT FROM THE BUILDING

STRUCTURAL FRAMING MEMBERS ABOVE, THE CONTRACTOR SHALL PROVIDE LIGHT FIXTURE SUPPORTS FOR THESE EXISTING LIGHT

FIXTURES THAT MEET THE CODE.

11. ALL EXTERIOR WALL PENERATIONS SHALL BE WEATHER/WATER TIGHT.

12. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE, PATCHING TO EXTERIOR AND INTERIOR WALLS, CEILING, CEILING TILES, FLOORS, DUCTBANKS, ETC. THAT WAS DAMAGED UNDER THIS SCOPE OF WORK.

13. THE CONTRACTOR SHALL PROVIDE FIRE STOPS PRODUCT SYSTEM WHEN PENETRATING AN FIRE RATED ASSEMBLY.

GENERAL DEMOLITION NOTES:

1. SCOPE : THE SCOPE OF ELECTRICAL DEMOLITION IS DEFINED IN THE FOLLOWING NOTES AND IN LIMITED FASHION ON THE

DRAWINGS; THE DRAWINGS ARE ONLY INTENDED TO BE A PARTIAL REPRESENTATION OF THE ACTUAL DEMOLITION WORK REQUIRED.

THESE NOTES ONLY APPLY TO THE AREAS OF RENOVATION. IN GENERAL, THE DEMOLITION SCOPE IS THE REMOVAL OF ALL EXISTING

ELECTRICAL SYSTEMS IN THE AREAS OF RENOVATION, EXCEPT AS NOTED OTHERWISE IN THESE NOTES AND ON THE DRAWINGS.

2. FIRE ALARM SYSTEM : THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN. ALL ITEMS ASSOCIATED WITH THE EXISTING SYSTEM

(DEVICES, CONTROL PANELS, POWER SUPPLIES, WIRING, ETC.) SHALL BE REMAIN, EXCEPT WHERE SPECIFICALLY INDICATED

OTHERWISE. CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AS NOTED ON THE CONTRACT DOCUMENTS COVERED UNDER THIS

SCOPE OF WORK.

3. ELECTRICAL SERVICE : THE EXISTING ELECTRICAL SERVICE SHALL BE RE-USED, BUT SOME DOWNTIME WILL LIKELY STILL BE

REQUIRED. ALL ELECTRICAL SERVICE DOWNTIME REQUIRED SHALL BE COORDINATED WITH OWNER AND SHALL BE AT THE OWNER'S

CONVENIENCE. DOWNTIME SHALL BE KEPT TO THE MINIMUM. ALL EXTENDED DOWNTIME REQUIRED SHALL BE COORDINATED WITH

OWNER AND SHALL BE OUTSIDE OF NORMAL SCHOOL HOURS.

4. PANELBOARDS : ALL EXISTING PANELBOARDS SHALL REMAIN, NO NEW LOADS OR ADDITIONAL LOADS WITH THE REPLACEMENT IN

KIND MECHANICAL EQUIPMENT.

5. CONDUIT : WHERE EXISTING CONDUIT IS EXPOSED DUE TO DEMOLITION OF WALLS, CONDUIT SHALL BE REMOVED, UNLESS INDICATED

TO REMAIN OR NECESSARY TO MAINTAIN SERVICE TO EXISTING ITEMS TO REMAIN. WHERE CONDUIT RISES FROM FLOOR TO FEED

REMOVED ITEMS, CUT CONDUIT FLUSH WITH FLOOR AND FILL IT WITH GROUT. FINISH TO MATCH FLOOR SURFACE. ALL ACCESSIBLE

UNUSED CONDUIT SHALL BE REMOVED; ALL INACCESSIBLE UNUSED CONDUIT SHALL BE ABANDONED. ALL CONDUIT TO NEW DEVICES

AND EQUIPMENT SHALL BE NEW, UNLESS NOTED OTHERWISE.

6. MAINTAIN CIRCUIT CONTINUITY AS NECESSARY IN ALL DEMOLITION WORK.

7. THE CONTRACTOR SHALL INFORM THE OWNER'S REPRESENTATIVE OF ELECTRICAL EQUIPMENT REMOVED FROM THE BUILDING. IF

THE OWNER DESIRES TO RETAIN EQUIPMENT, HE WILL REMOVE IT FROM THE SITE. ALL EQUIPMENT NOT RETAINED BY THE OWNER

SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. DISPOSAL OF ALL EQUIPMENT

CONTAINING HAZARDOUS MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AND THE COST OF DISPOSAL SHALL BE

INCLUDED.

8. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING RED AND SHALL VERIFY ALL DEMOLITION REQUIRED. ADDITIONAL

COMPENSATION WILL NOT BE ALLOWED FOR DEMOLITION DUE TO CONTRACTOR NOT VISITING SITE AND DETERMINING FULL SCOPE

OF DEMOLITION REQUIRED.

9. SEE THE DEMOLITION FLOOR PLANS FOR ADDITIONAL DEMOLITION REQUIREMENTS. ON THE DEMOLITION FLOOR PLANS AND RISERS, ALL DASHED ITEMS SHALL BE REMOVED AND ALL SOLID ITEMS SHALL REMAIN, UNLESS NOTED OTHERWISE. SOME DEMOLITION ITEMS

ARE AFFECTED BY ADDITIVE BID ITEM, AS INDICATED IN THE FLOOR PLANS. NEW WORK FLOOR PLANS MAY CONTAIN ADDITIONAL

DEMOLITION INFORMATION IN SOME LOCATIONS.

MTG. HGT. SYMBOL DESCRIPTION

ELECTRICAL LEGEND

PLAN NOTE DESIGNATION.1

2 DEMOLITION PLAN NOTE DESIGNATION.

SCCR SHORT CIRCUIT CURRENT RATING

1. ALL ABBREVIATIONS LISTED MAY NOT APPLY TO THIS PROJECT. REFER TO OTHER ABBREVIATION LISTS

NOTE (ELECTRICAL ABBREVIATIONS):

ELSEWHERE IN THESE DOCUMENTS FOR ABBREVIATIONS NOT LISTED HERE.

GF OR GFI

HPF

HZ

HP

HID

HOA

GND

GEN

HIGH INTENSITY DISCHARGE

HORSEPOWER OR HEAT PUMP

HIGH POWER FACTOR

HAND-OFF-AUTOMATIC

HERTZ

GROUND

GENERATOR

GROUND FAULT INTERRUPTER

TRANSFORMER

TRANSFER

XFMR

XFER

VOLT-AMPERE

UNDERGROUND

UNLESS NOTED OTHERWISE

VOLTV

VA

TYPICAL

UG

UNO

TYP

SYMMETRICAL

SWITCHBOARD

SOLID NEUTRAL

SWITCHGEAR

SYM

SN

SWGR

SWBD

SECONDARYSEC

COMB

E OR EMER

ENG

ER

EQUIP

ENCL

EMT

EML

EM

EMN

ELEC

EL

CTRL

DC

DISC

CU

COND

CONT

CONN

CND

CNTR

EXIST RELOCATED TO THIS LOCATION

EXIST REMOVED

EXIST REMOVED AND NEW INSTALLED

ELECTRICAL METALLIC TUBING

EXIST TO REMAIN

EQUIPMENT

ENCLOSURE

ENGINE

EMERGENCY

ELEC…