2026-10-22 VT WHITEHURST - BID PDFs.pdf
PDF 3 MB Posted
- Attached to
- Whitehurst Hall Piping Replacement
- Solicitation number
- IFB-130697
- Issued by
- Middlesex County, Virginia
About this file
Whitehurst Hall Piping Replacement - Virginia Tech
This document comprises architectural and engineering drawings and specifications for the Whitehurst Hall Piping Replacement project at Virginia Tech in Blacksburg, Virginia, prepared under Project Code 25-699463 with a drawing date of October 22, 2026. The project involves the comprehensive replacement of aging heating water supply and return (HWS/HWR) piping systems in the basement and crawl space of Whitehurst Hall (Building 26), a 42,879-square-foot residential facility constructed as Type IIB construction with an R-2 occupancy classification. The renovation scope encompasses approximately 13,558 square feet of the building's gross area. The work includes demolition and removal of existing piping systems, installation of new copper tubing and black steel piping in various sizes (ranging from 3/4 inch to 4 inches in diameter), replacement and relocation of five in-line heating water pumps (PHWP-11, SHWP-12, SHWP-13, SHWP-14, and SHWP-15), installation of new control systems, piping supports, insulation, and associated HVAC, electrical, and plumbing infrastructure upgrades. The project also includes installation of a sump pump system with alarm capability, crawl space vapor barrier lining, mechanical room floor resurfacing with non-slip urethane concrete coating, and wall painting. The work must comply with the 2021 Virginia Existing Building Code, 2010 ADA Standards, 2023 Virginia Tech Design and Construction Manual, and Virginia Occupational Safety and Health regulations.
The specifications indicate that all contractors must conduct pre-bid site visits to verify existing conditions and determine the full extent of demolition and coordination work required, with no additional compensation allowed for changes due to inadequate site investigation. Materials specified include certified copper tubing (ASTM B88 Type L hard drawn), ASTM A53 Schedule 40 black steel piping, brass and bronze valves meeting MSS and ASME standards, cast iron soil pipe with mechanical or compression-type joints, and fiberglass pipe insulation with thermal conductivity not exceeding 0.27 BTU per inch per hour per square foot per degree Fahrenheit. The project requires contractors to provide extended instruction to the building owner on system operation and maintenance limited to one-half day, guarantee all work free from defective materials or workmanship for one year following final acceptance, coordinate all service interruptions with the owner, maintain circuit continuity during demolition, and ensure quiet system operation without unusual or excessive noise or vibration. No information regarding contract pricing, award dates, term length, funding sources, or set-asides is contained within these technical documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 049302704_Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
REVISION DATE
24101.58 10-22-26
V
IR
G
IN
IA
T
E C
H
W H
IT
E
H U
R S
T H
A
LL
P
IP
IN
G
R E
P
LA
C E
M E
N T
B
LA
C K
S B
U R
G , V
IR
G
IN
IA
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
10/22/26 10/22/26
WHITEHURST HALL
PIPING REPLACEMENT
PROJECT CODE: 25-699463
VICINITY MAP INDEX OF DRAWINGS
T-1 TITLE SHEET
M-001 HVAC LEGEND, GENERAL NOTES, SCHEDULE, AND DETAILS
M-002 HVAC SPECIFICATIONS
MD-101 BASEMENT/CRAWL SPACE DEMOLITION PLANS - HVAC
M-101 BASEMENT/CRAWL SPACE NEW WORK PLANS - HVAC
E-001 GENERAL SPECIFICATIONS, LEGEND, ABBREVIATIONS - ELECTRICAL
E-101 PARTIAL CRAWL AND BASEMENT FLOOR PLAN - DEMOLITION AND NEW
WORK - ELECTRICAL
P-001 SPECIFICATIONS, LEGEND, NOTES AND DETAILS - PLUMBING
PD-101 CRAWL SPACE DEMOLITION PLAN - PLUMBING
P-101 CRAWL SPACE PLAN - PLUMBING
AN ASBESTOS INSPECTION WAS PERFORMED AND NO ACM WAS FOUND. THE
ASBESTOS INSPECTION REPORT IS INCLUDED AND WILL BE PROVIDED WITH
THE DRAWING/BID PACKAGE.
AN INSPECTION TO IDENTIFY LEAD CONTAINING COATED BUILDING
COMPONENTS HAS NOT BEEN CONDUCTED BECAUSE THE BUILDING WAS
CONSTRUCTED AFTER JANUARY 1, 1985 AND THE OWNER HAS NO
KNOWLEDGE OF LEAD CONTAINING OR COATED BUILDING. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH ALL VIRGINIA
OCCUPATIONAL SAFETY AND HEALTH (VOSH) REGULATIONS AS THEY PERTAIN
TO EMPLOYEE EXPOSURES TO LEAD. ALL LEAD AND LEAD-COATED BUILDING
COMPONENTS SHALL BE RECYCLED TO THE EXTENT POSSIBLE.
VICINITY MAP
BLACKSBURG VA.
CODE GOVERNING NEW WORK: 2021 VIRGINIA EXISTING BUILDING CODE (VEBC)
AMERICANS WITH DISABILITIES ACT 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN (ADA 2010), PUBLISHED SEPTEMBER 15, 2010, AND ADOPTED MARCH 1, 2011, AS MODIFIED BY VIRGINIA
CONSTRUCTION & PROFESSIONAL SERVICES MANUAL, SECTION 4.2
ACCESSIBLE AND USABLE BUILDINGS & FACILITIES, INTERNATIONAL CODE COUNCIL STANDARD
A117.1, 2009
2023 VIRGINIA TECH DESIGN AND CONSTRUCTION MANUAL
CONTRACTOR SHALL COMPLY WITH: Virginia Tech's Safety Requirement for Contractors and Subcontractors
Program, WHICH IS INCORPORATED BY REFERENCE. COPIES OF THIS PROGRAM ARE AVAILABLE
FROM THE OWNER OR MAY BE DOWNLOADED FROM WWW.EHSS.VT.EDU.
BUILDING NUMBER 26
CONSTRUCTION TYPE: IIB
OCCUPANT USE GROUP: R-2
BUILDING AREA GROSS 42,879 SF
RENOVATION AREA GROSS: 13,558 SF
FIRE SUPPRESSION: NONE
FIRE ALARM: EXISTING
WHITEHURST HALL
BLDG. 26
T-1
T
IT
LE
S
H E
E T
BRC/MAR/CAD BRC/MAR/CAD
RDF/WAM/MGW LPA
CONNECTION DETAIL
STEAM-TO-WATER CONVERTER
NO SCALE
R
F
EX. CONVERTER
CONDENSATE RETURN
PRESSURE
RELIEF VALVE
HWR
HWS
3/4" HOSE END
DRAIN VALVE
THERMOMETER (TYP.)
FLOOR LINE
STEAM
SUPPLY
(75 PSIG)
PIPE SUPPORT DETAIL
NO SCALE
PIPE
VAPOR BARRIER
(WHERE REQUIRED)
12" LONG, HALF-SECTION OF
HYDROUS CALCIUM SILICATE
AT EACH HANGER SUPPORT
HEAVY DUTY
CLEVIS HANGER
HANGER ROD, SUPPORT
FROM BUILDING STRUCTURE
INSULATION
16 GAGE ZINC COATED
SHEET STEEL SADDLE
AT LEAST 12" LONG
NOTE:
SADDLE AND HALF-SECTION OF HYDROUS CALCIUM SILICATE
SHALL BE INSTALLED AT THE SAME TIME THAT THE PIPE AND
PIPE HANGERS ARE INSTALLED.
SEE SPECIFICATIONS FOR LOCATIONS WHERE HYDROUS
CALCIUM SILICATE SHALL BE REQUIRED.
PIPE INSULATION
(WHERE REQUIRED)
WALL
GALVANIZED STEEL
PIPE SLEEVE
WALL
PIPE
1/4" SPACE BETWEEN
SLEEVE & INSULATION
NOTE:
WHERE PIPES PENETRATE FIRE-RATED WALLS, FILL
SPACE BETWEEN PIPE AND SLEEVE WITH A
FIRE-RESISTANT MATERIAL WITH SUFFICIENT RATING TO
MAINTAIN THE FIRE RATING OF THE WALL. WHERE PIPE
PENETRATE EXTERIOR WALLS, FILL SPACE BETWEEN
PIPE AND SLEEVE WITH FIBERGLASS INSULATION.
WALL PIPE SLEEVE DETAIL
NO SCALE
PIPE ANCHOR TO
CONCRETE SLAB DETAIL
NO SCALE
2"x2"x1/4"
ANGLES
4"x3/8"x12" PLATE
PIPE
45° 45° WELD ANGLES
TOGETHER
WELD ANGLES TO PLATE
AND PLATE TO PIPE
3/4" DIA. ANCHOR BOLTS (TYP.)
CONC. SLAB
3"x3"x1/4"
ANGLES
PUMP
MOTOR
INLINE CIRCULATING
PUMP CONNECTIONS
NO SCALE
UNION TYPE CONNECTION,
PIPE SO PUMP CAN BE
REMOVED FOR SERVICE
HOSE END
DRAIN VALVE
1/4" SHUT-OFF COCK
4" DIAL COMPOUND GAGE.
0"-30" HG.VACUUM 0-60
PSI PRESSURE
4" DIAL, 0-60 PSI
DISCHARGE GAGE
CHECK VALVE
CS
PIPE TO SYSTEM
OFF VALVE
STRAINER BLOW
SECTION ELEVATION/SIDE
VIEW
PIPE GUIDE DETAIL
NO SCALE
SECURE "SPIDER" TO INSULATION
W/ RUGGED BAND CLAMP"SPIDER-TYPE" GUIDE, SPLIT
HOUSING CONSTRUCTION
INSULATION
BOLT HOLDS TOGETHER
THE TWO HOUSING
HALVES (TYP. 2)
PIPE
FOOT, WELDED OR BOLTED
TO STRUCTURE (TYPE. 2)
BALL VALVE (TYP. 2)
EXISTING
SUPPORTING
STRUCTURE
EXISTING
PUMPED
CONDENSATE
EXISTING LOW
PRESSURE STEAM
PIPE PENETRATION FIRESTOP DETAIL
NO SCALE
System No. C-AJ-5090
SECTION A-A
A
A
5B
5A
5B
C
C
LA
SS IF IED
Classified by Underwriters Laboratories, Inc.
to UL 1479 and CAN/ULC-S115
US
1. Floor or Wall Assembly — Min 4-1/2 in. (114 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete.
Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 18 in. (457 mm).
See Concrete Blocks (CAZT) Category in the Fire Resistance Directory for names of manufacturers.
2. Metallic Sleeve — (Optional) — Nom 18 in. (457 mm) diam (or smaller) Schedule 10 (or heavier) steel sleeve cast or grouted into floor or wall assembly, flush with floor or wall surfaces or extending a max of 3 in. (76 mm) above floor or beyond both surfaces of wall.
3. Through Penetrants — One metallic pipe or tubing to be centered within the firestop system. Pipe or tubing to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of metallic pipes or tubing may be used:
A. Steel Pipe — Nom 4 in. (102 mm) diam (or smaller) Schedule 5 (or heavier) steel pipe.
B. Copper Pipe — Nom 4 in. (102 mm) diam (or smaller) Regular (or heavier) copper tubing.
C. Copper Tubing — Nom 4 in. (102 mm) diam (or smaller) Type L (or heavier) copper tubing.
4. Tube Insulation — Plastics+ — Min 1/2 in. (13 mm) to max 3/4 in. (19 mm) thick acrylonitrile butadiene/polyvinyl chloride (AB/PVC) flexible foam furnished in the form of tubing. Nom 1 in. (25 mm) thick AB/PVC flexible foam insulation may be used for max 2 hr F and FH Ratings when max 3 in. (76 mm) diam pipe or tubing is used. The annular space shall be min 1/2 in. (13 mm) to max 12 in. (305 mm). When max annular space exceeds 1-1/2 in. (38 mm) the F and FH Ratings are 2 hr.
See Plastics+ (QMFZ2) Category in the Recognized Component Directory for names of manufacturers. Any Recognized Component tube insulation material meeting the above specifications and having a UL 94 Flammability Classification of 94-5VA may be used.
5. Firestop System — The firestop system shall consist of the following:
A. Packing Material — Min 4 in. (102 mm) thickness of min 4 pcf (64 kg/m3) mineral wool batt insulation firmly packed into opening as a permanent form. Packing material to be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of fill material.
B. Fill, Void or Cavity Material* — Sealant — Min 1/4 in. (6 mm) thickness of fill material applied within the annulus, flush with top surface of floor or with both surfaces of wall. When max annular space exceeds 1-1/2 in. (38 mm) the min thickness of fill material is 1/2 in. (13 mm).
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-One Sealant or FS-ONE MAX Intumescent Sealant
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
ANSI/UL1479 (ASTM E814) CAN/ULC S115
F Ratings — 2 and 3 Hr (See Item 4) F Ratings — 2 and 3 Hr (See Item 4)
T Rating — 0 Hr FT Rating — 0 Hr
L Rating At Ambient — 4 CFM/sq ft FH Ratings — 2 and 3 Hr (See Item 4)
L Rating At 400 F — Less Than 1 CFM/sq ft FTH Rating — 0 Hr
L Rating At Ambient — 4 CFM/sq ft
L Rating At 400 F — Less Than 1 CFM/sq ft R
T
1 1/4" TO DRIP DRAIN FUNNEL
EXISTING
CONVERTOR
EXISTING
EXPANSION
TANK
EXISTING AIRTROL
TANK FITTING
1" GL. VLV.
3/4" CV
3/4" WATER PRESSURE REDUCING VALVE
PRESSURE GAUGE - (0-60 PSI)
1/4" RELIEF VALVE
FILL VALVE ASSEMBLY &
CONVERTOR PIPING DETAIL
NO SCALE
PRIMARY - SECONDARY
LOOP CONNECTIONS DETAIL
NO SCALE
WALL LINE
EXISTING RISERS TO
CONVECTORS
SS-
SR-1
SR-1
3/4" HOSE END
GATE VALVES
(TYP.)
PRIM
ARY R
ET
URN
PRIM
ARY S
UPPL
Y
PR-1
PS-
EXISTING BELL & GOSSETT
FLO-CONTROL VALVES
BRASS DRAIN PLUGS AT
BASE OF RISERS - USE
GRAPHITE AND OIL ON
PLUG TO LUBE AND
FACILITATE REMOVAL
(TYP.)
AAV - AUTOMATIC AIR VENT
VALVES AT END OF MAINS AND
WHERE AIR POCKETS OCCUR.
GATE
VALVE
CROSSOVER
LOOP
EXISTING
SECONDARY
PUMP
BALL VALVE
4"
1"
THERMOSTATIC
CONTROL
4"
1"
EXISTING INLINE PUMP
ABOVE ABV
ABOVE FINISHED FLOOR AFF
ANCHOR
BELOW BEL
CHECK VALVE
CIRCUIT SETTER
DIAMETER DIA
DIRECTION OF FLOW
DOWN DN
PIPING (EXISTING TO REMAIN)
PIPING (EXISTING TO BE REMOVED)
ENTERING WATER TEMPERATURE EWT
EXISTING, REMOVE FROM THIS POINT
EXPANSION JOINT EJ
FLEXIBLE PIPE CONNECTION
FLOAT & THERMOSTATIC TRAP F
FLOOR FL
FROM FRM
GATE VALVE GTV
GLOBE VALVE GBV
HEATING WATER PUMP HWP
HEATING WATER RETURN PIPE HWR HWR
HEATING WATER SUPPLY PIPE HWS HWS
HORSEPOWER HP
NEW CONNECTED TO EXISTING
PIPING INDICATION WITH RESPECT TO FLOW
BOTTOM TAKEOFF
SIDE CONNECTION
TOP TAKEOFF
TURN DOWN OR FROM BELOW
TURN UP OR DOWN
TURN UP OR FROM ABOVE
POUNDS PER SQUARE INCH GAGE PSIG
PRESSURE GAUGE
PRESSURE REDUCING VALVE (FILL VALVE) PRV
PRESSURE RELIEF VALVE
R
SERVICE VALVE
STEAM CONDENSATE PIPE
LOW PRESSURE
STEAM SUPPLY PIPE
LOW PRESSURE
STRAINER
THERMOMETER
THREE-WAY CONTROL VALVE
TWO-WAY CONTROL VALVE
UNION
HVAC LEGEND
M-001
H V
A C
L E
G E
N D
, G E
N E
R A
L N
O T
E S
, S C
H E
D U
LE
S
, A N
D D
E T
A
IL
S
BCR BCR
RDF LPA
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
REVISION DATE
24101.58 10-22-26
V
IR
G
IN
IA
T
E C
H
W H
IT
E
H U
R S
T H
A
LL
P
IP
IN
G
R E
P
LA
C E
M E
N T
B
LA
C K
S B
U R
G , V
IR
G
IN
IA
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
10/22/26
EQUIPMENT SCHEDULES: GENERAL NOTES:
1. ALL PIPES SHALL BE COORDINATED WITH OTHER DUCTS, PIPES, LIGHTS, STRUCTURAL SYSTEM, CEILING SUPPORTS AND FRAMING BEFORE INSTALLATION. MINOR PIPE OFFSETS SHALL BE
PROVIDED AS REQUIRED.
2. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED
INSTRUCTIONS.
3. MATERIALS AND INSTALLATION SHALL COMPLY WITH LOCAL CODES, APPLICABLE PROVISIONS OF
LATEST EDITION OF NATIONAL FIRE PROTECTION ASSOCIATION, LOCAL UTILITY REGULATIONS AND
GOVERNMENTAL DEPARTMENTS HAVING JURISDICTION.
4. CONTRACTOR SHALL SEAL AND FLASH ALL PENETRATIONS IN EXISTING WALLS.
5. VERIFY LOCATIONS OF NEW AND EXISTING EQUIPMENT AND ROUTE OF PIPING WITH EXISTING
CONDITIONS.
6. ALL CUTTING AND PATCHING FOR THE INSTALLATION OF NEW WORK IN EXISTING BUILDING SHALL
BE DONE BY THE GENERAL CONTRACTOR.
7. CONTRACTOR SHALL PROVIDE ALL SUPPORTS REQUIRED TO MOUNT MECHANICAL EQUIPMENT AND
PIPING.
8. WHERE PIPE CONNECTIONS ARE SHOWN CONNECTING TO EXISTING, CONTRACTOR SHALL
DETERMINE EXACT LOCATIONS AND CONNECTION SIZES PRIOR TO INSTALLATION.
9. NEW PIPE INSULATION SHALL MATCH EXISTING. INSULATION THAT IS DAMAGED OR REMOVED FOR
NEW WORK SHALL BE REPLACED, REPAIRED AND SEALED AS REQUIRED.
10. EXPOSED PIPING RUNOUTS SHALL BE INSTALLED IN PRACTICAL ALIGNMENT WITH THE BUILDING
AND SHALL BE ADEQUATELY SECURED TO THE BUILDING STRUCTURE.
11. PROVIDE ACCESS DOORS OF SUFFICIENT SIZE FOR ALL CONCEALED CONTROLS OR ANY ITEMS
REQUIRING ACCESS.
12. CONTRACTOR SHALL VERIFY THAT VFDS ARE PROVIDED WITH INTEGRAL DISCONNECT TO
DISCONNECT POWER TO THE CONTROLLER AND THE MOTOR. VFDS SHALL BE LOCATED WITHIN
SIGHT OF THE MOTOR BEING SERVED.
13. ALL EQUIPMENT SHALL BE SECURED TO CONCRETE HOUSEKEEPING PADS WITH HOLD-DOWN BOLTS
TO PREVENT MOVEMENT.
14. PIPING SHALL NOT BE INSTALLED DIRECTLY ABOVE ELECTRICAL PANELS OR INTEFERE WITH
ELECTRICAL PANEL CLEARANCES. COORDINATE INSTALLATION OF PIPING WITH ELECTRICAL
PANELS WHEN SHOWN NEAR PANELS OR OVER ELECTRICAL ROOMS.
15. INSTRUCT THE OWNER IN THE PROPER OPERATION AND MAINTENANCE OF THE MECHANICAL
SYSTEMS UNTIL THE OWNER IS FULLY PREPARED TO OPERATE AND MAINTAIN THE MECHANICAL
SYSTEM. HOWEVER, LENGTH OF INSTRUCTION TIME SHALL BE LIMITED TO ONE-HALF DAY.
16. SYSTEMS SHALL OPERATE UNDER CONDITIONS OF LOAD WITHOUT UNUSUAL OR EXCESSIVE NOISE
OR VIBRATION. UNUSUAL OR EXCESSIVE NOISE OR VIBRATION SHALL BE CORRECTED.
17. EQUIPMENT, MATERIALS AND LABOR REQUIRED BY THESE CONTRACT DRAWINGS SHALL BE
GUARANTEED TO BE FREE FROM DEFECTIVE MATERIALS OR WORKMANSHIP FOR ONE YEAR AFTER
FINAL ACCEPTANCE OF THE PROJECT UNLESS SPECIFIED OTHERWISE. DEFECTIVE MATERIALS OR
WORKMANSHIP OCCURRING DURING THIS PERIOD SHALL BE CORRECTED AT NO ADDITIONAL COST.
GENERAL DEMOLITION NOTES:
1. THE CONTRACTOR SHALL REMOVE OR ALTER AS NECESSARY ALL EXISTING PIPING, EQUIPMENT, AND APPURTENANCES THAT ARE NOT REQUIRED FOR THE EXISTING SYSTEMS TO REMAIN.
CONTRACTOR SHALL VISIT THE SITE TO REVIEW THE SCOPE OF THIS WORK AND VERIFY EXISTING
CONDITIONS PRIOR TO PRICING.
2. EXISTING EQUIPMENT SHALL BE TURNED OVER TO THE OWNER, UNLESS DIRECTED OTHERWISE
AND LOCATED ON SITE AS DIRECTED BY THE OWNER. ALL OTHER ITEMS TO BE REMOVED SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND REMOVED FROM THE PREMISES.
3. INSULATION ON EXISTING PIPINGTHAT IS DAMAGED OR REMOVED DUE TO THE DEMOLITION WORK
SHALL BE REPLACED AND SEALED AS REQUIRED.
4. THE CONTRACTOR SHALL PROTECT EXISTING SYSTEMS TO REMAIN. SYSTEMS THAT ARE DAMAGED
OR INCORRECTLY REMOVED DUE TO THE DEMOLITION WORK SHALL BE REPAIRED OR REPLACED.
5. THE CONTRACTOR IS CAUTIONED THAT THE EXISTING HVAC SYSTEM LAYOUTS ARE INDICATED AS
ONLY AN APPROXIMATION OF EXISTING CONDITIONS. NOT ALL EXISTING SYSTEMS ARE SHOWN AND
SELECTIVE DEMOLITION IS REQUIRED. THE CONTRACTOR SHALL VERIFY ACTUAL SYSTEM
CONFIGURATIONS IN THE FIELD AND SHALL COORDINATE ACCORDINGLY.
6. CONTRACTOR SHALL REMOVE ALL NEW DEBRIS RESULTING FROM DEMOLITION WORK IN ADDITION
TO ANY EXISTING DEBRIS IN CRAWLSPACE.
EXISTING HEATING WATER PUMPS:
MARK SERVICE PUMP TYPE
CAPACITY,
GPM
HEAD,
FT. H2O
RPM
ELECTRICAL BELL & GOSSET
MODEL NO.
NOTES
MOTOR HP V / Ph
PHWP-11 HEATING WATER IN-LINE 115 16.0 1,750 3/4 220 / 3 PD-37 1
SHWP-12 HEATING WATER IN-LINE 24 9.8 1,725 1/6 120 / 1 2" 1
SHWP-13 HEATING WATER IN-LINE 14 8.0 1,725 1/6 120 / 1 1-1/2" 1
SHWP-14 HEATING WATER IN-LINE 35 13.5 1,725 1/4 120 / 1 2-1/2" 1
SHWP-15 HEATING WATER IN-LINE 40 16.0 1,725 1/3 120 / 1 HD-3" 1
NOTES:
1. EXISTING PERFORMANCE PER EXISTING 1961 SPECIFICATIONS.
FLOOR FINISH NOTES:
SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION INSTRUCTIONS FOR EACH MATERIAL AND
PRODUCT USED. SUBMIT SHOP DRAWINGS AND OTHER SUBMITTALS WHERE INDICATED.
URETHANE CONCRETE FLOORING:
SHERWIN-WILLIAMS FASTOP MULTI TOPFLOOR SL45 - INSTALL PER MANUFACTURER'S INSTRUCTIONS.
1. CONCRETE SURFACES SHALL BE ABRASIVE BLASTED TO REMOVE ALL SURFACE CONTAMINANTS
AND LAITANCE. THE PREPARED CONCRETE SHALL HAVE A SURFACE PROFILE EQUAL TO CSP 4-6.
CONSULT THE SHERWIN-WILLIAMS TECHNICAL SERVICE DEPARTMENT IF OIL OR GREASE IS
PRESENT.
2. APPLY MANUFACTURER SPECIFIED FILLER SYSTEM FOR ALL RANDOM CRACKS.
3. APPLY GP3477 WATER EMULSION PRIMER.
4. APPLY FASTOP MULTI SL45 SLURRY
5. APPLY BROADCAST MATERIAL SPECIFIED BY MANUFACTURER.
6. APPLY MANUFACTURER SPECIFIED TOPCOAT.
AIR SEPERATOR: BELL & GOSSETT
MARK SERVICE
DESIGN FLOW,
GPM
MAX FLOW,
GPM
DESIGN ∆P.,
FT. H2O
MAX ∆P, FT.
H2O
MAX. FLOODED
WEIGHT, LBS
MODEL NO.
AS-1 HEATING WATER 115 190 0.64 1.0 173 RL-3F
NOTES:
1. PROVIDE WITH LIFTING LUGS AND MOUNTING BRACKET.
M-002
H V
A C
S P
E C
IF
IC
A T
IO
N
S
BCR BCR
RDF LPA
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
REVISION DATE
24101.58 10-22-26
V
IR
G
IN
IA
T
E C
H
W H
IT
E
H U
R S
T H
A
LL
P
IP
IN
G
R E
P
LA
C E
M E
N T
B
LA
C K
S B
U R
G , V
IR
G
IN
IA
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
10/22/26
HVAC SPECIFICATIONS:
1. SCOPE OF THE WORK: WORK SHALL INCLUDE COMPLETE HVAC SYSTEMS. PROVIDE SUPERVISION, LABOR, MATERIAL, EQUIPMENT, MACHINERY, PLANT, AND ITEMS NECESSARY FOR COMPLETE SYSTEMS TESTED AND
READY FOR OPERATION.
2. REGULATIONS: MATERIALS AND INSTALLATION SHALL COMPLY WITH LOCAL CODES, APPLICABLE PROVISIONS OF
LATEST EDITION OF NATIONAL FIRE PROTECTION ASSOCIATION, LOCAL UTILITY REGULATIONS AND
GOVERNMENTAL DEPARTMENTS HAVING JURISDICTION.
3. DRAWINGS: THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND
WORK INCLUDED. WHERE VARIANCES OCCUR INCLUDE THE ITEMS OF BETTER QUALITY, GREATER QUANTITY OR
HIGHER COST.
4. COORDINATION OF WORK: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION AND PROPER
RELATION OF HIS WORK TO THE BUILDING STRUCTURE AND TO THE WORK OF OTHER TRADES. CONTRACTOR
SHALL PROVIDE DIMENSIONS AND LOCATIONS OF ALL OPENINGS, SHAFTS AND SIMILAR ITEMS TO THE PROPER
TRADES AND SHALL INSTALL WORK AS REQUIRED SO AS NOT TO DELAY THE BUILDING CONSTRUCTION. THE
CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY HIS WORK OR WORKMEN. REPAIRING OF DAMAGED
WORK SHALL BE DONE BY THE CONTRACTOR AT NO ADDITIONAL COST.
5. VISITING THE SITE: EACH CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE BEFORE PRICING THE
JOB TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS TO BE MET IN THE EXECUTION OF THE WORK
UNDER THIS CONTRACT. NO ADDITIONAL COMPENSATION WILL BE ALLOWED RELATING TO SITE CONDITIONS.
6. INTERRUPTION OF SERVICES: INTERRUPTIONS OF SERVICE TO EXISTING SYSTEMS SHALL BE COORDINATED WITH
THE OWNER AS TO TIME AND DURATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY INTERRUPTIONS TO
SERVICE AND SHALL REPAIR ANY DAMAGES TO EXISTING SYSTEMS CAUSED BY HIS OPERATIONS.
7. WORK IN OCCUPIED AREAS: WORK IN OCCUPIED AREAS SHALL BE COORDINATED WITH THE OCCUPANT AND
OWNER AS TO TIME AND DURATION. THE CONTRACTOR SHALL PROTECT THE OCCUPIED AREA AND SHALL BE
RESPONSIBLE FOR CLEANING AND REPAIRING ANY DAMAGES CAUSED BY HIS WORK. SAFETY OF BUILDING
OCCUPANTS SHALL BE ASSURED AT ALL TIMES. TOOLS, MATERIAL, DIRT AND DEBRIS SHALL BE REMOVED FROM
OCCUPIED AREAS WHENEVER WORK AREAS ARE LEFT UNATTENDED.
8. ACCESSIBILITY: LOCATE EQUIPMENT WHICH MUST BE SERVICED OR MAINTAINED IN FULLY ACCESSIBLE POSITIONS
WHERE POSSIBLE. OTHERWISE, FURNISH ACCESS PANELS OF SUFFICIENT SIZE AND LOCATED SO THAT THE
CONCEALED EQUIPMENT CAN BE SERVICED.
9. FOUNDATION PADS: PROVIDE 4-INCH HIGH CONCRETE FOUNDATION PADS FOR FLOOR-MOUNTED EQUIPMENT.
10. SLEEVES: LOCATE SLEEVES DURING NORMAL COURSE OF WORK. PROVIDE SLEEVES FOR PIPING PASSING
THROUGH CONCRETE FLOOR SLABS AND CONCRETE, MASONRY, TILE AND GYPSUM WALL CONSTRUCTION.
SLEEVES SHALL NOT BE REQUIRED FOR PIPING EMBEDDED IN CONCRETE OR SLAB ON GRADE, EXCEPT THAT
COPPER PIPING SHALL REQUIRE SLEEVES THROUGH SLABS ON GRADE. SLEEVES PLACED IN EXTERIOR WALLS
BELOW GRADE SHALL BE WATERTIGHT. WHERE SLEEVES ARE LOCATED THROUGH FIRE-RATED WALLS OR
FLOORS, THE SLEEVE ASSEMBLIES SHALL MAINTAIN THE FIRE RATING OF THE WALL OR FLOOR. SLEEVES SHALL
BE CONSTRUCTED OF 20 GAUGE GALVANIZED STEEL WITH LOCK SEAM JOINTS FOR ALL SLEEVES SET IN
CONCRETE FLOOR SLABS. ALL OTHER SLEEVES SHALL BE CONSTRUCTED OF GALVANIZED STEEL PIPE.
11. CUTTING AND PATCHING: THE CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING NECESSARY TO
INSTALL HIS WORK. PATCHING SHALL MATCH ADJACENT SURFACES. NO STRUCTURAL MEMBERS SHALL BE CUT
WITHOUT THE APPROVAL OF THE ARCHITECT.
12. CLEANING: EQUIPMENT AND PIPING SHALL BE CLEANED TO REMOVE FOREIGN MATERIALS. PROVIDE TEMPORARY
FILTERS FOR AIR UNITS THAT ARE OPERATED DURING CONSTRUCTION. PLUG OR CAP OPENINGS IN EQUIPMENT, DUCTWORK, PIPING AND MATERIALS UNTIL CONNECTION IS MADE TO THE SYSTEM. REMOVE FROM THE PREMISES
ALL UNUSED MATERIAL AND DEBRIS RESULTING FROM THE PERFORMANCE OF HVAC WORK.
13. WIRING: STARTERS THAT ARE SPECIFIED TO BE FURNISHED AS AN INTEGRAL PART OF THE MECHANICAL
EQUIPMENT SHALL BE COMPLETE WITH PROPERLY SIZED OVERLOAD HEATERS. TEMPERATURE CONTROL WIRING, EQUIPMENT CONTROL WIRING AND CONTROL INTERLOCK WIRING FOR MECHANICAL EQUIPMENT SHALL BE
FURNISHED BY THE MECHANICAL CONTRACTOR. CONTROL WIRING SHALL NOT INCLUDE ANY WIRING WHICH
CARRIES MOTOR CURRENT. ALL WIRING SHALL BE IN METAL CONDUIT AND SHALL COMPLY WITH THE ELECTRICAL
SPECIFICATIONS.
14. QUIET OPERATION: SYSTEMS SHALL OPERATE UNDER CONDITIONS OF LOAD WITHOUT UNUSUAL OR EXCESSIVE
NOISE OR VIBRATION. UNUSUAL OR EXCESSIVE NOISE OR VIBRATION SHALL BE CORRECTED.
15. TESTING AND BALANCING: HVAC CONTRACTOR SHALL BE AVAILABLE TO ESCORT AND ASSIST OWNER PROVIDED
TEST AND BALANCING CONTRACTOR. ALL HVAC EQUIPMENT SHALL BE BALANCED TO ASSURE THAT THE PROPER
SEQUENCE OF CONTROL IS ESTABLISHED AND OPERATING IN A SAFE MANNER. ALL PERSONNEL INVOLVED IN THE
EXECUTION OF THE WORK SHALL BE EXPERIENCED IN THE BALANCING OF MECHANICAL SYSTEMS. THE WATER
QUANTITIES FOR PUMPS SHALL BE BALANCED FOR THE GPM AS INDICATED ON THE SCHEDULE.
16. INSTRUCTIONS TO OWNER: INSTRUCT THE OWNER IN THE PROPER OPERATION AND MAINTENANCE OF THE
MECHANICAL SYSTEMS UNTIL THE OWNER IS FULLY PREPARED TO OPERATE AND MAINTAIN THE SYSTEMS.
HOWEVER, LENGTH OF INSTRUCTION TIME SHALL BE LIMITED TO ONE-HALF DAY.
17. OPERATING AND MAINTENANCE: PROVIDE THE OWNER WITH TWO (2) BOUND SETS OF OPERATING AND
MAINTENANCE INSTRUCTIONS FOR ALL HVAC EQUIPMENT AND CONTROLS.
18. GUARANTEE: EQUIPMENT, MATERIALS AND LABOR REQUIRED BY THESE CONTRACT DRAWINGS SHALL BE
GUARANTEED TO BE FREE FROM DEFECTIVE MATERIALS OR WORKMANSHIP FOR ONE (1) YEAR AFTER FINAL
ACCEPTANCE OF THE PROJECT UNLESS SPECIFIED FOR A LONGER PERIOD IN OTHER PORTIONS OF THE
SPECIFICATIONS. DEFECTIVE MATERIALS OR WORKMANSHIP OCCURRING DURING THIS PERIOD SHALL BE
CORRECTED AT NO ADDITIONAL COST.
19. PAINTING: GENERAL - PAINT MECHANICAL EQUIPMENT AND MATERIALS (WHERE NOT CONCEALED). PAINTING (IN
CONCEALED SPACES) SHALL BE LIMITED TO EQUIPMENT AND MATERIALS NOT OTHERWISE PROTECTED FROM
RUSTING SUCH AS HANGERS AND SUPPORTS. PAINT SHALL BE PRODUCTS OF SHERWIN-WILLIAMS, PITTSBURGH, PRATT-LAMBERT OR EQUAL. SURFACE PREPARATION, PRIMING AND PAINT APPLICATION SHALL BE IN
ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. GALVANIZED SURFACES SHALL BE PRETREATED WITH
A PHOSPHORIC ACID CLEANING SOLUTION AND PRIMED. AFTER PREPARATION EACH ITEM SHALL BE PAINTED, EXCEPT COLOR OF PAINT FOR EQUIPMENT AND MATERIAL WHERE NOT CONCEALED SHALL BE AS SELECTED BY
THE OWNER. ITEMS NOT CONCEALED IN ROOMS SHALL BE PAINTED OF THE SAME COLOR TO MATCH ADJACENT
WALLS OR CEILINGS. PAINTING IS NOT REQUIRED OF ITEMS WITH A FACTORY-FINISH COAT. PATCH PAINTING IS
REQUIRED OF ANY DAMAGED AREAS TO MATCH FACTORY-FINISH COAT. NAMEPLATES ON EQUIPMENT SHALL NOT
BE PAINTED.
20. IDENTIFICATION OF PIPES AND EQUIPMENT: EACH MAJOR PIECE OF EQUIPMENT AND PIPING SHALL BE IDENTIFIED
BY MARKING THAT WILL READ THE SAME AS THE IDENTIFICATION SHOWN ON THE DRAWINGS. DIRECTION OF FLOW
AND ZONE SERVED SHALL BE INDICATED ON PIPING. TYPE OF PIPING SHALL ALSO BE SPECIFIED BY COLOR WITH
GREEN FOR HEATING WATER, BLUE FOR DOMESTIC COLD WATER, AND RED FOR DOMESTIC HOT WATER. STENCIL
LETTERS SHALL BE 2 INCHES HIGH UPPER CASE PAINTED WITH WHITE ENAMEL ON EQUIPMENT AND BLACK
ENAMEL ON PIPING AND CONDUIT. IDENTIFICATION SHALL BE PAINTED ON EACH PIPE OR CONDUIT WHERE
EXPOSED OR ACCESSIBLE AND SHALL BE PLACED EVERY 15 FEET ALONG THE PIPE OR CONDUIT.
21. PIPING
A. STEAM LINES SHALL BE ASTM A53 GRADE B ERW OR SEAMLESS SCHEDULE 40 STANDARD WEIGHT BLACK
STEEL. CONDENSATE LINES SHALL BE ASTM A53 GRADE B ERW OR SEAMLESS SCHEDULE 80 EXTRA HEAVY
BLACK STEEL. FABRICATION SHALL BE THREADED OR WELDED, SUITABLE FOR 125 PSI STEAM SERVICE.
B. HEATED WATER LINES: PIPE 4" AND SMALLER SHALL BE ALL TYPE 'L' HARD DRAWN COPPER TUBING OR ALL
ASTM A53 SCHEDULE 40 STANDARD WEIGHT BLACK STEEL, EXCEPT UNDERGROUND LINES SHALL BE TYPE 'K'
HARD DRAWN COPPER TUBING. PIPE OVER 4" SHALL BE ASTM A53 SCHEDULE 40 STANDARD WEIGHT BLACK
STEEL. ALL FITTINGS SHALL BE SUITABLE FOR 125 PSI WATER SERVICE.
C. SERVICE VALVES: UP TO AND INCLUDING 2 1/2" SHALL BE ALL BRASS, RISING STEM, SOLID WEDGE DISC GATE
VALVES. VALVES OVER 2" FOR WATER SERVICE SHALL BE IRON BODY, RISING STEM, SOLID WEDGE DISC
GATE VALVES. CHAIN OPERATION SHALL BE PROVIDED FOR ALL GATE VALVES LOCATED IN NOT EASILY
ACCESSIBLE AREAS.
D. GLOBE VALVES SHALL BE ALL BRASS WITH BRASS DISC, EXCEPT GLOBE VALVES OVER 2" SIZE MAY BE
BUTTERFLY TYPE.
E. CHECK VALVES SHALL BE BRASS OR IRON BODY, SWING TYPE, RE-GRINDING SEAT.
F. BALANCING COCKS SHALL BE ALL BRASS, SQUARE HEAD OR SCREWDRIVER HEAD WITH CHECK. BALANCING
COCKS OVER 2" SIZE MAY BE IRON BODY.
G. STRAINERS SHALL BE Y TYPE WITH BRONZE BASKET SUITABLE FOR 125 PSI SERVICE.
H. MANUAL AIR VENTS SHALL BE CHROMIUM-PLATED BRASS 1/8" NPT COIN-OPERATED TYPE. PROVIDE
EXTENSION TUBE IF REQUIRED TO MAINTAIN ACCESS TO VENT OPERATOR.
I. AUTOMATIC AIR VENTS SHALL BE HOFFMAN NO. 79, SUITABLE FOR 75 PSI SERVICE, AND SHALL PROVIDE
VENTING OPERATION UNDER ALL CONDITIONS.
J. SAFETY RELIEF VALVES FOR WATER HEATING SYSTEMS SHALL BE WATTS ASME, SERIES 740. VALVES FOR
HEATING SYSTEMS SHALL BE SIZED TO RELIEVE THE FULL HEATING CAPACITY OF THE SYSTEM. SAFETY
RELIEF VALVES FOR COOLING SYSTEMS SHALL BE WATTS ASME SERIES 174A, 3/4" X 3/4". PIPE DISCHARGE
PORTS FULL SIZE TO FLOOR DRAIN.
K. BYPASS RELIEF VALVE SHALL BE ADJUSTABLE SETTING TYPE, BRONZE BODY, MODULATING ACTION
PRESSURE RELIEF VALVE AS MANUFACTURED BY CLA-VAL OR EQUAL. SIZE TO RELIEVE 50% OF PUMP
CAPACITY. SET TO RELIEVE WHEN SYSTEM HEAD IS 5 FOOT W.G. ABOVE SPECIFIED SYSTEM PUMP HEAD.
L. PRESSURE GAUGES SHALL BE 4" DIAL ASHCROFT BOURDON TUBE TYPE SUITABLE FOR 125 PSI SERVICE.
M. CIRCUIT SETTERS SHALL BE BELL AND GOSSETT BRONZE BALANCE VALVE WITH PROVISIONS FOR
CONNECTING A PORTABLE DIFFERENTIAL PRESSURE METER. METER CONNECTIONS SHALL HAVE BUILT-IN
CHECK VALVES. AN INTEGRAL POINTER SHALL REGISTER DEGREE OF VALVE OPENING. EACH BALANCE
VALVE SHALL BE CONSTRUCTED FOR 125 LBS. WORKING PRESSURE AT 250 DEG. F. FURNISH ONE
DIFFERENTIAL METER MODEL RO-5 COMPLETE WITH METER, CUTOFFS, PIPING, FITTING, AND HOSE. THE
VALVE PRESSURE DROP AND THE SETTING SHALL DETERMINE THE ACTUAL SYSTEM FLOW RATE.
N. FLEXIBLE PIPE JOINTS SHALL BE PIPE LINE SIZE, FLANGED, MINIMUM 125 PSI WORKING PRESSURE AT 250
DEG. F, FLEXONICS MODEL PCS.
O. THERMOMETERS SHALL BE WEISS 9" VARI-ANGLE MERCURY TYPE WITH SEPARATE SOCKET.
P. PIPE SUPPORTS: SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY ADJUSTABLE WROUGHT STEEL
CLEVIS HANGERS. ALL SUPPORTS SHALL BE ATTACHED TO THE BUILDING STRUCTURE SPACED 10'-0" ON
CENTER. HANGER RODS SHALL BE 3/8" DIAMETER SIZE FOR PIPES UP THROUGH 2", 1/2" DIAMETER SIZE FOR
2-1/2" THROUGH 3", 5/8" DIAMETER FOR PIPES 4" THROUGH 5" AND 7/8" DIAMETER SIZE FOR 6" THROUGH 12".
PIPE HANGER RODS SHALL BE ATTACHED TO THE TOP CHORD ONLY ON STEEL JOISTS AND BEAMS WITH
CLAMPS. PIPING SHALL BE INSTALLED IN PRACTICAL ALIGNMENT WITH THE BUILDING.
Q. ANCHORS FOR PIPE SHALL BE PROVIDED AS INDICATED OR AS REQUIRED AT THE JOB SITE TO LOCALIZE
EXPANSION AND CONTRACTION OF PIPE.
R. EXPANSION JOINTS SHALL BE FLEXONIC INTERNALLY GUIDED, CORRUGATED BELLOWS, EXPANSION
COMPENSATOR, TYPE HB, 2" MINIMUM STROKE, SUITABLE FOR HOT WATER SERVICE. GROOVED PIPE
COUPLINGS AND EXPANSION COMPENSATORS SHALL PROVIDE FOR EXPANSION IN GROOVED PIPING
SYSTEMS.
S. VERTICAL PIPING SHALL BE GUIDED OR SUPPORTED IN THE CENTER OF EACH RISER AND NOT OVER 15'-0" ON
CENTER AND SHALL BE SUPPORTED AT THE BASE OF EACH RISER.
T. INSTALLATION: ALL PIPING SHALL BE INSTALLED WITH SUFFICIENT PITCH TO INSURE ADEQUATE DRAINAGE
AND VENTING. ALL HIGH POINTS IN WATER LINES SHALL BE PROVIDED WITH AUTO-AIR VENTS, ALL LOW
POINTS WITH DRAINS. STEAM AND CONDENSATE LINES SHALL SLOPE A MINIMUM OF 1" IN 40' IN DIRECTION
OF FLOW UNLESS INDICATED OTHERWISE. LOW POINTS IN STEAM LINES SHALL BE PROVIDED WITH DRIP
STATION. PIPE SIZE CHANGES IN STEAM LINES SHALL BE MADE WITH ECCENTRIC REDUCERS WITH OUTLET
ON BOTTOM. CONDENSATE DRAIN LINES SHALL SLOPE 1/8" PER FOOT IN DIRECTION OF FLOW.
U. DIELECTRIC FITTINGS SUCH AS COUPLINGS, UNIONS OR FLANGES SHALL BE INSTALLED TO ISOLATE PIPES OF
NON-FERROUS METAL WHERE CONNECTION IS MADE TO FERROUS METAL.
22. THERMAL COVERING
A. INSULATION SHALL BE JOHNS MANVILLE, OWENS CORNING, ARMSTRONG OR EQUAL. INSULATION SHALL NOT
BE APPLIED UNTIL AFTER THE EQUIPMENT, PIPES OR DUCTS TO BE INSULATED HAVE PROVEN SATISFACTORY
UNDER TESTS. ALL MATERIALS USED SHALL HAVE COMPOSITE FLAME-SPREAD RATING NOT EXCEEDING 25
AND A SMOKE-DEVELOPED RATING NOT EXCEEDING 50.
B. PIPING: INSULATION SHALL BE INSTALLED IN CONFORMANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
C. FIBERGLASS PIPE INSULATION SHALL HAVE A WHITE KRAFT BONDED TO ALUMINUM FOIL, REINFORCED WITH
FIBERGLASS YARN JACKET. ELASTOMERIC INSULATION SHALL BE CONSTRUCTED OF A CLOSED CELL
STRUCTURE TO EFFECTIVELY RETARD THE FLOW OF MOISTURE VAPOR AND SERVE AS A VAPOR BARRIER.
INSULATION THICKNESS AND TYPE FOR VARIOUS PIPING SYSTEMS SHALL BE AS INDICATED IN THE
FOLLOWING TABLE (PIPE SIZE/INSULATION THICKNESS).
PIPE SIZE/INSULATION THICKNESS(1)
SYSTEM TEMP. LESS THAN 1" TO 1-1/2" 4" TO 8” & INS.
RANGE 1" 1-1/4” TO 3" 6” UP TYPE
(°F) (2)
LOW
PRESSURE 201-250 2.5 2.5 2.5 3.0 3.0 A
STEAM
HEATING
WATER 140-200 1.5 1.5 2.0 2.0 2.0 A
CONDENSATE
DRAIN 45-75 0.5 0.5 1.0 1.0 1.0 A,B
STEAM
CONDENSATE ANY 1.5 1.5 2.0 2.0 2.0 A
NOTES:
(1) MINIMUM THICKNESS FOR INSULATION LISTED IN PRECEDING TABLE IS BASED ON THERMAL CONDUCTIVITY, 'K' NOT EXCEEDING 0.27 BTU PER INCH/HR. X SQ. FT. X DEG. F. BASED ON MEAN TEMPERATURE OF 75 DEG.
F. INSULATION WITH GREATER THERMAL CONDUCTIVITY SHALL HAVE INCREASED THICKNESS TO PROVIDE
SAME PERFORMANCE CHARACTERISTICS AS SPECIFIED.
(2) A - FIBERGLASS TYPE INSULATION; B - ELASTOMERIC TYPE INSULATION.
D. FIBERGLASS PIPE INSULATION FITTINGS SHALL BE COVERED WITH PRE-MOLDED PVC FITTING COVERS.
JACKETS ON FIBERGLASS PIPE INSULATION BELOW 80 DEG. F. SHALL BE VAPOR SEALED USING SELF-SEALING
LAP, LAP SEAL GUN OR ADHESIVE. ALL INSULATION JOINTS, LAPS, VOIDS, PUNCTURES AND END TAPERS
SHALL BE SEALED WITH 1/32" THICKNESS OF VAPOR ADHESIVE. A 12" LONG, 1/2 SECTION OF HYDROUS
CALCIUM SILICATE OR FOAMGLAS INSULATION SHALL BE USED BETWEEN HANGERS AND PIPING. ON PIPE, SIZES 1-1/2" AND BELOW, HYDROUS CALCIUM SILICATE OR FOAMGLAS WILL NOT BE REQUIRED. ALL PIPING
SHALL HAVE LOAD-DISTRIBUTING GALVANIZED 16 GAUGE METAL SHIELDS INSTALLED AROUND THE LOWER
HALF OF THE INSULATION.
E. ELASTOMERIC PIPE INSULATION SEAMS, VOIDS AND BUTT JOINTS SHALL BE SEALED WITH A VAPOR BARRIER
ADHESIVE OR TAPED WITH 1-1/2 INCH WIDE 3M #471 TAPE. FLEXIBLE ELASTOMERIC INSULATION EXPOSED TO
WEATHER SHALL BE COVERED WITH TWO COATS OF ARMSTRONG ARMAFLEX FINISH.
23. TANGENTIAL AIR SEPARATOR (AS-1):
A. BELL AND GOSSETT "ROLAIRTROL" OR EQUAL WITH (ASME) PRESSURE VESSEL CODE CONSTRUCTION, FLANGED TANGENTIAL INLET AND OUTLET CONNECTION, INTERNAL PERFORATED STAINLESS STEEL AIR
COLLECTOR TUBE, AND BOTTOM BLOWDOWN CONNECTION. AIR SEPARATOR SHALL RELEASE AIR WITH BELL
AND GOSSETT MODEL 107A HIGH CAPACITY AIR VENT. AIR SEPARATORS SHALL BE CONSTRUCTED IN
ACCORDANCE WITH SECTION VIII OF THE ASME BOILER AND PRESSURE VESSEL CODE AND STAMPED 125 PSI
MAXIMUM WORKING PRESSURE.
24. TEMPERATURE CONTROL SYSTEM:
A. GENERAL - CONTROLS SHALL BE MANUFACTURED BY SIEMENS AND SHALL BE AN EXTENSION OF THE
EXISTING SIEMENS BUILDING AUTOMATION SYSTEM IN PLACE AT WHITEHURST HALL. THE SYSTEM SHALL BE
PROVIDED WITH ALL EQUIPMENT AND MATERIALS AS REQUIRED TO ACCOMPLISH THE SEQUENCE OF
CONTROL. COMPONENT PARTS OF THE SYSTEM SHALL BE MANUFACTURED BY SIEMENS AND/OR THE
PARTICULAR HVAC EQUIPMENT MANUFACTURER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ACHIEVING
THE SEQUENCE OF CONTROL. THE SYSTEM SHALL BE INSTALLED BY COMPETENT, TRAINED MECHANICS.
B. MATERIALS
1. CONTROL VALVES 2" AND SMALLER SHALL BE BRONZE, SCREWED TYPE AND SHALL BE RATED AT 250
PSIG. VALVE BODIES 2-1/2" AND LARGER SHALL BE IRON, FLANGED AND RATED AT 125 PSIG. VALVES
SHALL BE SIZED BY THE CONTROLS MANUFACTURER AND THE MAXIMUM ALLOWABLE PRESSURE DROP
SHALL BE 5 FEET WATER COLUMN. VALVE ACTUATORS SHALL BE ELECTRONIC SPRING RETURN, LOW
VOLTAGE, AND PROPERLY SELECTED FOR VALVE BODY AND SERVICE.
C. COORDINATION OF WORK: ALL WIRING IN CONNECTION WITH THE TEMPERATURE CONTROL SYSTEM SHALL
BE FURNISHED AND INSTALLED BY THE CONTROLS SYSTEM CONTRACTOR. WIRING SHALL BE INSTALLED IN
ACCORDANCE WITH THE ELECTRICAL SPECIFICATION. WIRING WITHOUT CONDUIT SHALL BE PROPERLY
SUPPORTED WITHOUT SAGS. LOOSE WIRES LAYING ON CEILINGS, LIGHTS, OR PIPES WILL NOT BE
ACCEPTABLE AT ANY LOCATION.
D. SERVICE AND GUARANTEE - THE ENTIRE CONTROL SYSTEM SHALL BE SERVICED AND MAINTAINED IN
FIRST-CLASS CONDITION BY THE CONTROL MANUFACTURER FOR A PERIOD OF ONE YEAR AFTER
ACCEPTANCE AT NO EXTRA COST TO THE OWNER.
E. SEQUENCE OF CONTROL:
1. PRIMARY HEATING WATER PUMP (PHWP-11):
a. THE PRIMARY HEATING WATER PUMP SHALL OPERATE IN CONJUNCTION WITH THE EXISTING
CONVERTER HEATING SYSTEM. PHWP-11 SHALL OPERATE AS A PRIMARY CONSTANT VOLUME
PUMP. WHENEVER THE CONVERTER IS SIGNALED TO START, THE HEATING WATER PUMP SHALL
OPERATE. ON THE FAILURE OF THE HEATING WATER PUMP TO OPERATE BASED ON A CURRENT
RELAY FEEDBACK, AN ALARM MESSAGE SHALL BE TRANSMITTED TO THE BAS. THE PRIMARY
HEATING WATER PUMP SHALL OPERATE BASED OFF THE EXISTING ESTABLISHED SEQUENCE OF
CONTROL FOR THE PRIMARY HEATING WATER PUMP.
2. SECONDARY HEATING WATER PUMPS (SHWP-12, SHWP-13, SHWP-14, & SHWP-15):
a. HEATING WATER BOOSTER PUMPS SHALL OPERATE IN CONJUNCTION WITH THE EXISTING
CONVERTER CONTROL SYSTEM. PUMPS SHALL OPERATE BASED ON A CALL FOR HEATING WITHIN
THE ZONE SERVED BY PUMP. ON THE FAILURE OF THE HEATING WATER PUMP TO OPERATE BASED
ON A CURRENT RELAY FEEDBACK, AN ALARM MESSAGE SHALL BE TRANSMITTED TO THE BAS.
BOOSTER (ZONE) PUMPS SHALL OPERATE BASED OFF THE EXISTING ESTABLISHED SEQUENCE OF
CONTROL FOR THE SECONDARY HEATING WATER PUMPS.
CRAWL SPACE CRAWL SPACE
CORRIDOR
STAIR #7
RECREATION RMELEC ROOM
JAN
STORAGE
MECH RM
MD-101
(TYP.)
(TYP.)
(TYP.)
(TYP.)
CRAWL SPACE
CRAWL SPACE
(TYP.)
(TYP.)
EXISTING CONVECTOR
TO REMAIN (TYP. 4)
EXISTING HWS/R PIPING
TO BE REMOVED (TYP.)
EXISTING HWS/R PIPING
TO BE REMOVED (TYP.)
EXISTING HWS/R PIPING
TO BE REMOVED (TYP.)
EXISTING HWS/R PIPING IN
VERTICAL TO REMAIN (TYP.)
EXISTING HWS/R PIPING IN
VERTICAL TO REMAIN (TYP.)
EXISTING HWS/R PIPING IN
VERTICAL TO REMAIN (TYP.)
EXISTING HWS/R PIPING IN
VERTICAL TO REMAIN (TYP.)
EXISTING HEATING WATER
PIPING TO BE REMOVED (TYP.)
EXISTING PIPE ANCHORS
TO REMAIN (TYP.)
EXISTING PIPE ANCHORS
TO REMAIN (TYP.)
2 2
(TYP. 4)
(TYP. 2)
SHWP-13
SHWP-12
3(TYP. 4)
EX. EXPANSION
TANK TO REMAIN
EX. COND. PUMP
TO REMAIN
EXISTING 1 1/4" PUMPED
CONDENSATE TO REMAIN
EX. STEAM TO HW
CONVERTER TO REMAIN
EXISTING 4"
L.P. STEAM
TO REMAIN
EXISTING VENT
TO REMAIN
REMOVE EXISTING
HWS/R PIPING (TYP.)
REMOVE EXISTING
HWS/R PIPING (TYP.)
EXISTING INLINE HW
PUMP TO REMAIN (TYP. 3)PHWP-11 SHWP-14
SHWP-15
EXISTING
CONVERTER
TO REMAIN
EX. COND.
PUMP
EXISTING EXPANSION
TANK TO REMAIN
EXISTING STEAM PIPING
TO REMAIN (TYP.)
EXISTING PRIMARY HEATING
WATER PUMP TO BE REUSED
REMOVE EXISTING
HWS/R PIPING (TYP.)
REMOVE HEATING WATER
FLEX CONNECTIONS
PLAN NOTES:
1. EXISTING HEATING WATER INLINE PUMP SHALL BE REUSED AND RELOCATED. SEE SHEET
M-101 FOR NEW LOCATION.
2. EXISTING PIPE ANCHORS SHALL BE REUSED FOR NEW HWS/R PIPING IF CONDITION IS DEEMED
ACCEPTABLE AFTER FIELD VERIFICATION.
3. EXISTING CONTROL VALVE FOR HEATING PUMP SHALL BE REUSED (TYP.).
GENERAL DEMOLITION NOTES:
1. CONTRACTOR SHALL NOTE ALL EXISTING CONDITIONS INCLUDING HEATING WATER PIPE
ROUTING, VALVE PLACEMENT, AND EQUIPMENT LOCATIONS INCLUDING INLINE PUMPS.
2. EXISTING HWS/R PIPING, VALVES, & EQUIPMENT SHALL BE REMOVED.
3. EXISTING HEATING WATER INLINE PUMPS AND CONTROL VALVES SHALL REMAIN. PUMPS
AND CONTROL VALVES SHALL BE RECONNECTED TO NEW HWS/R PIPING.
4. EXISTING LOCATIONS OF STRAP-ON SIEMENS TEMPERATURE SENSORS SHALL BE NOTED.
IMMERSION WELL TEMPERATURE SENSORS SHALL BE PROVIDED WITHIN NEW HWS/R PIPING
INSTEAD.
5. EXISTING HWS/R PIPING IN VERTICAL SHALL REMAIN FOR ALL RISERS.
6. EXISTING LOW PRESSURE STEAM AND PUMPED CONDENSATE PIPING IN MECHANICAL ROOM
SHALL REMAIN.
7. CONDITION OF EXISTING PIPE HANGERS FOR HEATING WATER SHALL BE FIELD VERIFIED.
PIPE HANGERS SHALL EITHER BE CLEANED AND PAINTED OR REPLACED COMPLETELY
DEPENDING ON CONDITION.
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
REVISION DATE
24101.58 10-22-26
V
IR
G
IN
IA
T
E C
H
W H
IT
E
H U
R S
T H
A
LL
P
IP
IN
G
R E
P
LA
C E
M E
N T
B
LA
C K
S B
U R
G , V
IR
G
IN
IA
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
10/22/26
PARTIAL BASEMENT/CRAWL SPACE DEMOLITION PLAN - HVAC
SCALE: 1/8" = 1'-0"
MD-101
B A
S E
M E
N T
/C R
A W
L S
P A
C E
D E
M O
LI
T
IO
N
P
LA
N S
H
V A
C
BCR BCR
RDF LPA
ENLARGED PLAN - MECHANICAL ROOM - PIPING
SCALE: 1/4" = 1'-0"
MD-101
MECHANICAL ROOM SECTION - HVAC PIPING
SCALE: 1/4" = 1'-0"
MD-101
KEY PLAN
NO SCALE
CRAWL SPACE CRAWL SPACE
CORRIDOR
STAIR #7
RECREATION RMELEC ROOM
JAN
STORAGE
MECH RM
3/4"
1 1/4"
1 1/2"
2"
2 1/2"
2 1/2"
1"
1"
3/4"1 1/2"
1"1" 3/4"
1"
1" 1" 1"1"1"1"
2 1/2"
3/4"
1" 1" 1"
1 1/2" 2 1/2"
2 1/2"
1"1 1/4"
1" 3/4"
2" 1 1/2"
2"1 1/2"
2 1/2"
1"
1"
1"
3/4"
1 1/4"
1 1/2"
1 1/2"
1 1/4"
2"
2"
1 1/4"
1"
2"
3/4"
2"
3/4"1 1/2"
3/4"
1"
1 1/2"
1 1/4" 1"
3/4"
1"
3/4"
1 1/4"
1 1/4"
3/4"
1"
3/4"
1"
3/4"
SHWP-12
1"
3/4"
3/4"
3/4"
2 1/2" 2"
2"
EXISTING
ANCHOR
POINT (TYP.)
2"
1"
3/4"1 1/4"
1 1/4"
3/4"
2 1/2" 2 1/2"
2 1/2"
HWS
HWR
3/4"
HWS
HWR
HWS
M-101
HWS
HWR
HWS
HWR
H W
S H
W R
3/4"
1 1/4"
3/4"
3/4"
3/4"
3/4"
H W
R H
W R
H W
R H
W S
H W
S H
W R
H W
R
H W
S
EXISTING ANCHOR
POINT (TYP.)
1" 1"
H W
R
HWR
(TYP.)
(TYP.)
HWS
HWR
1"
3/4" 1"3/4"
3/4"
(TYP.)
(TYP.)
CRAWL SPACE
CRAWL SPACE
4'-0"
4'-6"
PIPE
GUIDES
(TYP.)
4'-0"
4'-6"
4'-0"
4'-6"
HWR
HWS
HWR
HWR
HWR
HWS
HWR
HWR
(TYP.)
2 1/2"
2 1/2"
AUTOMATIC AIR
VENT (AAV)
3/4"
AAV
HWS
HWR
1 1/2"
2"
2"
2" 1 1/2"1 1/4"
3/4" 3/4"
1 1/4"
1"
3/4"3/4"3/4"
1"
HWS
HWR
1 1/2"
1 1/2"
1"3/4"
1"
1"1"
1"
1"
(TYP.)
(TYP.)
3/4"
3/4"
3/ 4"
1" 3 3
3 3
SHWP-13
H W
R
H W
S H
W R
1"
1 1/2"
1 1/2"
1 1/4"
1 1/4"
HWS
HWR
1 1/2"
AAV
2"
HWS
HWR
1 1/2"
1/
2"
2"
2 1/2"
HWR
HWS
9 6
1"
1 1/4"
2" 2"
1 1/2"
2"
H W
R H
W S
AAV
1 1/4"
SS-2
SR-2
S R
-1
SS-1
SS-3
SR-3
1 1/4"
2 1/2"
PR
PS
SR-3
SR-4
2 1/2"
2 1/2"
2 1/2"
1 1/4"
1 1/2"
EX. EXPANSION TANK
EX. COND. PUMP
EXISTING 1 1/4"
PUMPED
CONDENSATE
PHWP-11
SHWP-14
SHWP-15
EX. 2 1/2" CV
(TYP. 4)
3"
3"
EX. STEAM TO
HW CONVERTER
2 1/2"
2 1/2"
2 1/2"
SS-3
2 1/2"
2 1/2"
3"
2 1/2"2 1/2"
4"
SS-3
SR-3
EXISTING 4"
L.P. STEAM
EXISTING VENT
BALL VALVE
(TYP. 2)
MECHANICAL
ROOM
S R
-4
S S
-4
1 1/2"
2 1/2"
HWR
HWS
2 1/2" HWS
1 1/2" HWR
S R
-4
S S
-4
1 1/2"
2 1/2"
EX. HW PUMP
(TYP. 3)
5 5
AS-1
4"
4"
4"
4" FLEX CONN.
THERMOSTATIC
CONTROL
1 1/4" DRAIN VALVE
EX. CONVERTER
EX. COND.
PUMP
THERMOMETER (TYP.)
STRAINER
EX. EXPANSION
TANK
EX. STEAM
PIPING
1 1/4"
EX. DRIP DRAIN
1"
4" HWS
4"
4" HWR
PLAN NOTES:
1. CONNECT HWS/R TO EXISTING CONVECTOR.
2. INSTALL 13'-0" MINIMUM EXPANSION LOOP.
3. PIPE GUIDES SPACED 9' UPSTREAM AND DOWNSTREAM FROM CENTER OF EXPANSION LOOP.
4. GATE VALVES IN HARD TO REACH LOCATIONS TO BE RAISING STEM VALVES WITH PULL CHAIN
OPERATION (TYP.).
5. EXISTING CONTROL VALVE SHALL BE REINSTALLED AND CONNECTED TO NEW HWS/R PIPING (TYP.).
6. EXISTING INLINE PUMP TO BE REINSTALLED AND CONNECTED TO NEW HWS/R PIPING (TYP.).
7. HEATING WATER REFILL SHALL BE SUPPLIED FROM DOMESTIC HOT WATER.
8. 3/4" HWS/R PIPING RUNOUT.
9. INSTALL BALL VALVE (TYP. 2) IN HEATING WATER PIPING.
GENERAL NOTES:
1. EXISTING HEATING WATER SYSTEM INCLUDING PIPING AND VALVES ARE TO BE REPLACED IN KIND
UNLESS NOTED OTHERWISE. EXISTING INLINE HEATING WATER PUMPS AND CONTROL VALVES SHALL
REMAIN AND BE RECONNECTED TO NEW HEATING WATER SYSTEM.
2. NEW HWS/R RUNOUTS TO RISERS SHALL CONNECT TO EXISTING VERTICAL HEATING WATER PIPING.
HWS/R PIPING RUNOUTS SHALL UTILIZE BUTTERFLY VALVES.
3. NEW HWS/R PIPING SHALL BE ROUTED THROUGH EXISTING WALL PENETRATIONS.
4. EXISTING ANCHOR POINTS SHALL BE REUSED FOR NEW HWS/R PIPING IF CONDITION IS DEEMED
ACCEPTABLE.
5. INSULATION ON EXISTING PIPING (LOW PRESSURE STEAM AND PUMPED CONDENSATE), FITTINGS, VALVES, AND STEAM CONVERTER IN MECHANICAL ROOM SHALL BE REMOVED AND REPLACED.
6. GATE VALVES IN HARD TO REACH LOCATIONS TO BE RAISING STEM VALVES WITH PULL CHAIN
OPERATION.
7. PROVIDE AN IMMERSION WELL TEMPERATURE SENSOR AT ANY LOCATION WHERE A SIEMENS STRAP
ON TEMPERATURE SENSOR WAS PREVIOUSLY LOCATED.
8. PROVIDE FIRE STOPPING FOR ALL NEW AND EXISTING PIPE PENETRATIONS THROUGH MECHANICAL
ROOM WALLS. SEE DETAIL ON SHEET M-001.
9. MECHANICAL ROOM FLOOR SHALL BE REFINISHED TO BE NON-SLIP. THE FLOORING PRODUCT TO USE
ON THE FLOOR IS SHERMIN-WILLIAMS FASTOP MULTITOP FLOOR SL45 (OR EQUAL), WHICH IS A SELF
LEVELING URETHANE CONCRETE TO BE APPLIED AT 3/16" THICKNESS. PREPARE FLOOR PER
MANUFACTURER'S INSTRUCTIONS BEFORE APPLYING PRODUCT. REFER TO FLOOR FINISHING
INSTRUCTIONS ON SHEET M-001.
10. MECHANICAL ROOM WALL SHALL BE PAINTED WITH BENJAMIN MOORE ULTRA SPEC SCUFF-X
INTERIOR SEMI-GLOSS FINISH 486 PAINT (OR EQUAL). THE PAINT COLOR SHALL BE 2015 HOKIE WHITE
SEMI-GLOSS. PREPARE WALL SURFACE PER MANUFACTURER'S INSTRUCTIONS BEFORE PAINTING.
11. CRAWL SPACE SHALL BE LINED WITH 20 MIL POLYETHYLENE VAPOR BARRIER. LINING SHALL EXTEND
2 FEET UP FOUNDATION WALLS. LINING SHOULD BE ROLLED AROUND A 2x2 BATTEN AND
MECHANICALLY AFFIXED TO WALL WITH EITHER TAPCONS OR RAMSET. LINED COVE BASES SHALL
NOT HAVE ANY GAPS.
12. ENTIRE CRAWLSPACE SHALL BE CLEANED OUT OF ALL TRASH AND DEBRIS TO PREVENT NEW LINING
FROM BEING PUNCTURED.
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
REVISION DATE
24101.58 10-22-26
V
IR
G
IN
IA
T
E C
H
W H
IT
E
H U
R S
T H
A
LL
P
IP
IN
G
R E
P
LA
C E
M E
N T
B
LA
C K
S B
U R
G , V
IR
G
IN
IA
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
10/22/26
PARTIAL BASEMENT/CRAWL SPACE NEW WORK PLAN - HVAC
SCALE: 1/8" = 1'-0"
M-101
B A
S E
M E
N T
/C R
A W
L S
P A
C E
N E
W W
O R
K P
LA
N
S
H V
A C
BCR BCR
RDF LPA
ENLARGED PLAN - MECHANICAL ROOM - PIPING
SCALE: 1/4" = 1'-0"
M-101
MECHANICAL ROOM SECTION - HVAC PIPING
SCALE: 1/4" = 1'-0"
M-101
DESIGNED DRAWN
APPROVEDCHECKED
COMM. NO. DATE
SHEET
REVISION DATE
24101.58 10-22-26
V
IR
G
IN
IA
T
E C
H
W H
IT
E
H U
R S
T H
A
LL
P
IP
IN
G
R E
P
LA
C E
M E
N T
B
LA
C K
S B
U R
G , V
IR
G
IN
IA
C O M M O
N W
EA
LTH OF
V
IR
G I N I A
P R O
F E
SS IONAL E
N G
IN
E R E
10/22/26
E-001
G E
N E
R A
L S
P E
C
IF
IC
A
T
IO
N S
, L E
G E
N D
, A B
B R
E V
IA
T
IO
N
S E
LE
C
T R
IC
A
L
MAR MAR
WAM LPA
SCCR SHORT CIRCUIT CURRENT RATING
1. ALL ABBREVIATIONS LISTED MAY NOT APPLY TO THIS PROJECT. REFER TO OTHER ABBREVIATION LISTS
NOTE (ELECTRICAL ABBREVIATIONS):
ELSEWHERE IN THESE DOCUMENTS FOR ABBREVIATIONS NOT LISTED HERE.
GF OR GFI
HPF
HZ
HP
HID
HOA
GND
GEN
HIGH INTENSITY DISCHARGE
HORSEPOWER OR HEAT PUMP
HIGH POWER FACTOR
HAND-OFF-AUTOMATIC
HERTZ
GROUND
GENERATOR
GROUND FAULT INTERRUPTER
TRANSFORMER
TRANSFER
XFMR
XFER
VOLT-AMPERE
UNDERGROUND
UNLESS NOTED OTHERWISE
VOLTV
VA
TYPICAL
UG
UNO
TYP
SYMMETRICAL
SWITCHBOARD
SOLID NEUTRAL
SWITCHGEAR
SYM
SN
SWGR
SWBD
SECONDARYSEC
COMB
E OR EMER
ENG
ER
EQUIP
ENCL
EMT
EML
EM
EMN
ELEC
EL
CTRL
DC
DISC
CU
COND
CONT
CONN
CND
CNTR
EXIST RELOCATED TO THIS LOCATION
EXIST REMOVED
EXIST REMOVED AND NEW INSTALLED
ELECTRICAL METALLIC TUBING
EXIST TO REMAIN
EQUIPMENT
ENCLOSURE
ENGINE
EMERGENCY
ELECTRIC OR ELECTRICAL
CONTROL
DISCONNECT
DIRECT CURRENT
COPPER
CONTACTOR
CONNECTION
CONDUCTOR
COMBINATION
CENTER
CONDUIT
BRKR
AWG
CKT
CLG
CB
CAB
CA
ATS
AIC
AFF
ABV
AFD
AC
ACB
A OR AMP
AMERICAN WIRE GAGE
CIRCUIT BREAKER
CIRCUIT
CEILING
BREAKER
CABINET
CABLE
ADJUSTABLE FREQUENCY DRIVE
ABOVE FINISHED FLOOR
ALTERNATING CURRENT
ABOVE COUNTER BACKSPLASH
AMPERES INTERRUPTING CAPACITY
AUTOMATIC TRANSFER SWITCH
ABOVE
AMPERE
PBS PUSHBUTTON STATION
PANELBOARD
POLYVINYL CHLORIDE
RIGID GALVANIZED STEEL CONDUITRGS
POWER
PANEL OR PANELBOARD
PHASE
PRIMARY
PVC
PWR
PRI
PNLBRD
PH
PNL
PULL BOX OR PUSHBUTTON
NATIONAL ELECTRICAL CODE
POLE
NUMBER
PB
P
NO
NEUTRALNEUT
NEC
MAIN LUGS ONLY
MAIN CIRCUIT BREAKER
MLO
MANUAL
MAGNETIC
MAN
MCB
MAG
JUNCTION BOX
KILOWATT-HOUR
KILOVOLT-AMPERE
KILOVOLT-AMPERE REACTIVE
KILOWATT
KWH
KVAR
KW
KVA
KILOVOLT
THOUSAND CIRCULAR MILS
JB
KCMIL
KV
C COUNTERTOP
ELEV ELEVATOR
UNDERWRITERS' LABORATORIESUL
HGT HEIGHT
DIM DIMENSION
MINIMUMMIN
DWG DRAWING
ARC FAULT INTERRUPTERAF OR AFI
SURGE PROTECTIVE DEVICESPDEXIST REMOVED AND RELOCATED
ELECTRICAL ABBREVIATIONS
SB SOUNDER BASE
KNOCKOUTKO
NORMALN OR NORM
UNDERCOUNTERUC
S/O SPACE ONLY
SPECIAL PURPOSESP
ECNC EXIST CND AND NEW CONDS
ABD ABANDONED
GFP GROUND FAULT PROTECTION/PROTECTED
MAXIMUM OVER CURRENT PROTECTIONMOCP
MINIMUM CIRCUIT AMPACITY MCA
GTD GENERATOR TRANSFER DEVICE
GENERAL NOTES:
1. CAREFULLY COORDINATE ALL ELECTRICAL EQUIPMENT LOCATIONS WITH DUCTWORK, PIPING AND MECHANICAL EQUIPMENT. MAINTAIN
ALL CLEARANCES AND SPACES REQUIRED BY THE NEC.
2. WHERE MULTIPLE CIRCUITS ARE COMBINED IN A SINGLE CONDUIT, DERATE CONDUCTORS PER THE NEC.
3. SEE SPECIFICATION SECTION 260519 FOR REQUIREMENTS REGARDING OVERSIZING CONDUCTORS FOR 1-POLE 15- AND 20-AMP CIRCUITS
TO REDUCE VOLTAGE DROP. OVERSIZED CONDUCTORS FOR VOLTAGE DROP ON OTHER CIRCUITS ARE INDICATED IN THE PANEL
SCHEDULES.
4. WHERE RE-USE OF EXISTING CONDUIT, WIRING AND/OR OUTLET BOXES IS INDICATED, ALSO PROVIDE NEW MATERIALS IF NECESSARY. IF
NEW EXPOSED MATERIALS ARE NEEDED, USE SURFACE RACEWAY (SINGLE-CHANNEL EXCEPT WHERE SPECIFICALLY INDICATED
OTHERWISE), EXCEPT EXPOSED CONDUIT AND BOXES MAY BE USED IN UNFINISHED AREAS (MECHANICAL/ELECTRICAL/IT ROOMS, STORAGE AND HOUSEKEEPING CLOSETS, ETC.).
5. MODIFY EXISTING PANEL SCHEDULES TO ACCURATELY REFLECT ALL CHANGES MADE AS PART OF THIS CONTRACT, PROVIDE A NEW
"TYPED" PANEL SCHEDULE. PANEL SCHEDULES REVISED WITH PENCIL, PEN, OR MARKER OF ANY TYPE WILL NOT BE ACCEPTED.
6. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING BID IN ORDER TO VERIFY ALL EXISTING CONDITIONS, TO DETERMINE THE
FULL EXTENT OF DEMOLITION WORK REQUIRED, AND TO DETERMINE THE FULL EXTENT OF RELOCATION AND MODIFICATION WORK
REQUIRED FOR ELECTRICAL WORK (DUE TO OTHER DISCIPLINES INTERFERING OR ANY OTHER REASON). EXISTING SPACE IS TIGHT IS
MANY AREAS (PARTICULARLY ABOVE CEILINGS), AND THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO COORDINATE ALL ELECTRICAL
WORK WITH BOTH NEW AND EXISTING PIPING, DUCTWORK, ETC. NO CHANGE ORDERS WILL BE APPROVED FOR ADDITIONAL WORK DUE TO
THE CONTRACTOR NEGLECTING TO VISIT THE SITE AND GATHER ALL NECESSARY INFORMATION.
7. ALL NEW ACT CEILINGS SHALL BE INSTALLED AT THE SAME HEIGHT AS THE EXISTING ACT CEILINGS BEING REMOVED. CONTRACTOR
SHALL NOTIFY ENGINEER IMMEDIATELY IF EXISTING CEILING HEIGHTS CONFLICT WITH THE INSTALLATION OF THE NEW RECESSED LIGHT
FIXTURES EITHER DUE TO STRUCTURE ABOVE THE CEILING OR EXISTING MECHANICAL OR PLUMBING EQUIPMENT ABOVE THE CEILING.
8. ONLY DEMOLISH THE ITEMS SPECIFICALLY SHOWN WITH DASHED LINES OR NOTED TO BE DEMOLISHED ON THE DRAWINGS - ALL OTHER
EXISTING ITEMS SHALL REMAIN. COORDINATE WITH THE OWNER FOR WHICH ITEMS ARE TO BE TURNED OVER TO THE OWNER AND WHICH
ITEMS THE CONTRACTOR MAY KEEP AND REMOVE FROM THE JOB SITE.
9. THE CONTRACTOR SHALL PROVIDE COVERPLATES ON ALL EXISTING JUNCTION BOXES ABOVE THE ACCESSIBLE CEILING SPACES AND
ANY WALL MOUNTED BOXES IN THE AREA OF RENOVATIONS WHERE EXISTING COVERPLATES ARE MISSING. THE CONTRACTOR SHALL
ALSO PROVIDE ADDITIONAL SUPPORTS FOR EXISTING CONDUIT AND JUNCTION BOXES IN THE AREA OF RENOVATIONS THAT CURRENTLY
DO NOT MEET CODE REQUIREMENTS.
10. WHERE EXISTING CEILING MOUNTED LIGHT FIXTURES IN THE RENOVATION AREA ARE REMOVED AND REINSTALLED (DUE TO HVAC WORK)
IN AN ACCESSIBLE CEILING GRID AND THEY ARE NOT PROVIDED WITH SEPARATE STRUCTURAL SUPPORT FROM THE BUILDING
STRUCTURAL FRAMING MEMBERS ABOVE, THE CONTRACTOR SHALL PROVIDE LIGHT FIXTURE SUPPORTS FOR THESE EXISTING LIGHT
FIXTURES THAT MEET THE CODE.
11. ALL EXTERIOR WALL PENERATIONS SHALL BE WEATHER/WATER TIGHT.
12. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE, PATCHING TO EXTERIOR AND INTERIOR WALLS, CEILING, CEILING TILES, FLOORS, DUCTBANKS, ETC. THAT WAS DAMAGED UNDER THIS SCOPE OF WORK.
13. THE CONTRACTOR SHALL PROVIDE FIRE STOPS PRODUCT SYSTEM WHEN PENETRATING AN FIRE RATED ASSEMBLY.
GENERAL DEMOLITION NOTES:
1. SCOPE : THE SCOPE OF ELECTRICAL DEMOLITION IS DEFINED IN THE FOLLOWING NOTES AND IN LIMITED FASHION ON THE
DRAWINGS; THE DRAWINGS ARE ONLY INTENDED TO BE A PARTIAL REPRESENTATION OF THE ACTUAL DEMOLITION WORK REQUIRED.
THESE NOTES ONLY APPLY TO THE AREAS OF RENOVATION. IN GENERAL, THE DEMOLITION SCOPE IS THE REMOVAL OF ALL EXISTING
ELECTRICAL SYSTEMS IN THE AREAS OF RENOVATION, EXCEPT AS NOTED OTHERWISE IN THESE NOTES AND ON THE DRAWINGS.
2. FIRE ALARM SYSTEM : THE EXISTING FIRE ALARM SYSTEM SHALL REMAIN. ALL ITEMS ASSOCIATED WITH THE EXISTING SYSTEM
(DEVICES, CONTROL PANELS, POWER SUPPLIES, WIRING, ETC.) SHALL BE REMAIN, EXCEPT WHERE SPECIFICALLY INDICATED
OTHERWISE. CONTRACTOR IS RESPONSIBLE FOR ALL TESTING AS NOTED ON THE CONTRACT DOCUMENTS COVERED UNDER THIS
SCOPE OF WORK.
3. ELECTRICAL SERVICE : THE EXISTING ELECTRICAL SERVICE SHALL BE RE-USED, BUT SOME DOWNTIME WILL LIKELY STILL BE
REQUIRED. ALL ELECTRICAL SERVICE DOWNTIME REQUIRED SHALL BE COORDINATED WITH OWNER AND SHALL BE AT THE OWNER'S
CONVENIENCE. DOWNTIME SHALL BE KEPT TO THE MINIMUM. ALL EXTENDED DOWNTIME REQUIRED SHALL BE COORDINATED WITH
OWNER AND SHALL BE OUTSIDE OF NORMAL SCHOOL HOURS.
4. PANELBOARDS : ALL EXISTING PANELBOARDS SHALL REMAIN, NO NEW LOADS OR ADDITIONAL LOADS WITH THE REPLACEMENT IN
KIND MECHANICAL EQUIPMENT.
5. CONDUIT : WHERE EXISTING CONDUIT IS EXPOSED DUE TO DEMOLITION OF WALLS, CONDUIT SHALL BE REMOVED, UNLESS INDICATED
TO REMAIN OR NECESSARY TO MAINTAIN SERVICE TO EXISTING ITEMS TO REMAIN. WHERE CONDUIT RISES FROM FLOOR TO FEED
REMOVED ITEMS, CUT CONDUIT FLUSH WITH FLOOR AND FILL IT WITH GROUT. FINISH TO MATCH FLOOR SURFACE. ALL ACCESSIBLE
UNUSED CONDUIT SHALL BE REMOVED; ALL INACCESSIBLE UNUSED CONDUIT SHALL BE ABANDONED. ALL CONDUIT TO NEW DEVICES
AND EQUIPMENT SHALL BE NEW, UNLESS NOTED OTHERWISE.
6. MAINTAIN CIRCUIT CONTINUITY AS NECESSARY IN ALL DEMOLITION WORK.
7. THE CONTRACTOR SHALL INFORM THE OWNER'S REPRESENTATIVE OF ELECTRICAL EQUIPMENT REMOVED FROM THE BUILDING. IF
THE OWNER DESIRES TO RETAIN EQUIPMENT, HE WILL REMOVE IT FROM THE SITE. ALL EQUIPMENT NOT RETAINED BY THE OWNER
SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. DISPOSAL OF ALL EQUIPMENT
CONTAINING HAZARDOUS MATERIALS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AND THE COST OF DISPOSAL SHALL BE
INCLUDED.
8. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING RED AND SHALL VERIFY ALL DEMOLITION REQUIRED. ADDITIONAL
COMPENSATION WILL NOT BE ALLOWED FOR DEMOLITION DUE TO CONTRACTOR NOT VISITING SITE AND DETERMINING FULL SCOPE
OF DEMOLITION REQUIRED.
9. SEE THE DEMOLITION FLOOR PLANS FOR ADDITIONAL DEMOLITION REQUIREMENTS. ON THE DEMOLITION FLOOR PLANS AND RISERS, ALL DASHED ITEMS SHALL BE REMOVED AND ALL SOLID ITEMS SHALL REMAIN, UNLESS NOTED OTHERWISE. SOME DEMOLITION ITEMS
ARE AFFECTED BY ADDITIVE BID ITEM, AS INDICATED IN THE FLOOR PLANS. NEW WORK FLOOR PLANS MAY CONTAIN ADDITIONAL
DEMOLITION INFORMATION IN SOME LOCATIONS.
MTG. HGT. SYMBOL DESCRIPTION
ELECTRICAL LEGEND
PLAN NOTE DESIGNATION.1
2 DEMOLITION PLAN NOTE DESIGNATION.
SCCR SHORT CIRCUIT CURRENT RATING
1. ALL ABBREVIATIONS LISTED MAY NOT APPLY TO THIS PROJECT. REFER TO OTHER ABBREVIATION LISTS
NOTE (ELECTRICAL ABBREVIATIONS):
ELSEWHERE IN THESE DOCUMENTS FOR ABBREVIATIONS NOT LISTED HERE.
GF OR GFI
HPF
HZ
HP
HID
HOA
GND
GEN
HIGH INTENSITY DISCHARGE
HORSEPOWER OR HEAT PUMP
HIGH POWER FACTOR
HAND-OFF-AUTOMATIC
HERTZ
GROUND
GENERATOR
GROUND FAULT INTERRUPTER
TRANSFORMER
TRANSFER
XFMR
XFER
VOLT-AMPERE
UNDERGROUND
UNLESS NOTED OTHERWISE
VOLTV
VA
TYPICAL
UG
UNO
TYP
SYMMETRICAL
SWITCHBOARD
SOLID NEUTRAL
SWITCHGEAR
SYM
SN
SWGR
SWBD
SECONDARYSEC
COMB
E OR EMER
ENG
ER
EQUIP
ENCL
EMT
EML
EM
EMN
ELEC
EL
CTRL
DC
DISC
CU
COND
CONT
CONN
CND
CNTR
EXIST RELOCATED TO THIS LOCATION
EXIST REMOVED
EXIST REMOVED AND NEW INSTALLED
ELECTRICAL METALLIC TUBING
EXIST TO REMAIN
EQUIPMENT
ENCLOSURE
ENGINE
EMERGENCY
ELEC…
This is the start of the file's text. The full file is on GovTribe.