About this file
This is a project manual for the Sadie Heath Cabaniss Hall Window Replacement Project at Virginia Commonwealth University (VCU), a prequalified contractor invitation for bid (IFB 2024-02804) in Virginia. The project involves the replacement of windows throughout Cabaniss Hall, a nursing facility, with deliverables including installation of new window systems meeting specified performance standards. The manual serves as the 100% design documentation and technical specifications guide for qualified bidders, establishing the scope of work, material requirements, and performance criteria necessary for project execution. The project encompasses multiple window replacement units across the building facade, with construction specifications detailed in the accompanying technical drawings and schedules that define the extent and nature of the work required.
The project manual provides comprehensive technical specifications, performance standards, and construction requirements but does not explicitly detail pricing terms, bid due dates, site visit requirements, or award timelines within the available documentation. The manual functions as the technical foundation for the bidding process, establishing quality standards, material specifications, and installation requirements that prequalified contractors must meet. Specific information regarding set-asides, funding sources, contract term, and renewal options is not contained within this project manual and would be referenced in the formal invitation for bid documents and associated procurement notices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025 07 24_VCU Nursing Window Replacement Project_100% Drawings_V2.pdf | ||
| Instruction to Bidders HECO-7A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SADIE HEATH CABANISS HALL
WINDOW REPLACEMENT PROJECT
100% Submission
Virginia Commonwealth University Richmond, Virginia
July 24, 2025
VCU PC: 2024-02804
MR #: 236-12708-00807
G&HA#: 24039.04
WDP#: 21136B
SADIE HEATH CABANISS HALL
WINDOW REPLACEMENT PROJECT
100% Submission
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
G&HA#: 24039.04
Prepared For:
Facilities Management 701 W. Broad Street, Suite 420 Box 842502 Richmond, Virginia 23284
Prepared By:
WDP & Associates Consulting Engineers, Inc.
335 Greenbrier Drive, Suite 205 Charlottesville, Virginia 22901
Glavé & Holmes Architecture 2101 East Main Street Richmond, Virginia 23223
Sadie Heath Cabaniss Hall Window Replacement Project
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
DESIGNER OF RECORD SEAL 00 01 00 - 1
SECTION 00 01 00
DESIGNER OF RECORD SEAL
Jodi Knorowski, P.E.
WDP & Associates Consulting Engineers, Inc.
335 Greenbrier Drive, Suite 205 Charlottesville, Virginia 22901
Seal Engineer of Record
7/24/25
Robert Parise Glave and Holmes Architecture 2101 East Main St Richmond, Va 23223
HECO-13
Public IFB (Rev. 10/2024) Page 1 of 1
NOTICE OF INVITATION FOR BIDS (IFB)
Sealed electronic bids are invited for the Sadie Heath Cabaniss Hall Window Replacement at 1100 East Leigh Street, Richmond, VA 23298
● VCU Project Code No.: 2024-02804
● DEB No.:
Architect/Engineer (A/E):
Glave’ and Holmes Architecture, Robert Parise WDP & Associates, Jodi Knorowski
This project is generally described as replacing windows, storefront doors, correcting flashing details and target facade repairs at Sadie Heath Cabaniss Hall.
Pre-bid Meeting
● 11/17/2026; 1:00 PM (1100 East Leigh Street). Meet in the front of the building at the main entrance.
● Attendance is mandatory for anyone submitting a bid.
● No one will be allowed into the meeting after 1:10 PM.
Subcontractor Site Visit
● Will be scheduled if requested.
The Invitation for Bids for the above project, including the drawings and the specifications containing the information necessary for bidding, may be obtained from the eBuilder Bid Portal. Registration is required for new users.
For technical assistance, please contact e-Builder support at (888) 288-5717 or support@e-builder.net.
VCU staff are unable to assist with technical issues within the bidding portal.
Bidding Process Submissions related to this bid including but not limited to RFI and questions, bid submissions, quantity worksheets, and bid bonds, must be submitted using the e-Builder Bid Portal.
Requests for Information (RFI) and questions
● Deadline for RFI and questions: 12/02/2026; 5:00PM
Any resulting addenda will be posted in eVA.
Bid Submission
● Deadline: January 6th, 2027, 10:00 AM
● See section 6 of the Instructions to Bidders for Bid Bond requirements.
● See the Invitation for Bids for additional qualification requirements.
● Prevailing wage, as outlined in Section 3(m) of the General Conditions of the Construction
Contract (HECO-7) will apply to this project if the Contract price exceeds $250,000. The prevailing wage determination is included in the bidding documents.
https://gateway.app.e-builder.net/app/bidders/landing?accountid=dd3338b7-2208-4a02-8a9e-2f531534d695&projectid=509ccf1a-a403-461e-a834-81fc2d58653e&bidpackageid=67856b33-9ea3-4281-96e5-4af1734b6219 mailto:support@e-builder.net https://gateway.app.e-builder.net/app/bidders/landing?accountid=dd3338b7-2208-4a02-8a9e-2f531534d695&projectid=509ccf1a-a403-461e-a834-81fc2d58653e&bidpackageid=67856b33-9ea3-4281-96e5-4af1734b6219 https://app.e-builder.net/public/publicLanding.aspx?QS=112820cea015459d8c71292fc2064279
Public IFB (Rev. 10/2024) Page 2 of 2
● Virginia Commonwealth University (VCU) is committed to supporting the growth and success of small, women-owned, and minority-owned businesses (SWaM), as certified by the Commonwealth of Virginia's Department of Small Business and Supplier Diversity (DSBSD).
VCU encourages the participation of these businesses in its procurement activities. In line with Virginia's Executive Order 35, VCU has set a goal for 50% SWaM participation in capital projects for fiscal year 2025. Contractors are encouraged to include SWaM businesses through partnerships, joint ventures, subcontracts, or other opportunities.
Bid Opening
● January 7th, 2026, 10:00 AM
The bid opening will take place via Zoom with access provided in advance.
Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 4, Item I, No. 3 of the Commonwealth of Virginia Purchasing Manual for Institutions for Higher Education and their Vendors (Procurement Manual). The Owner reserves the right to reject any or all bids.
Contract Award The awarded bidder must be registered in eVA and RealSource.
The contract shall be awarded on a lump sum basis as follows: the Total Base Bid Amount including any properly submitted and received bid modifications plus such successive Additive Bid Items as the Owner in its discretion decides to award in the manner set forth in Paragraph 12 of the Instructions to Bidders.
The "Notice of Award" will be posted on eVA and VCU’s Facilities Management website.
Contractor registration is required in accordance with § 54.1-1103 of the Code of Virginia. See the IFB for additional qualification requirements.
https://app.e-builder.net/public/publicLanding.aspx?QS=112820cea015459d8c71292fc2064279 https://vascupp.org/sites/vascupp/files/2020-09/hem.pdf https://vascupp.org/sites/vascupp/files/2020-09/hem.pdf https://eva.virginia.gov/register-now.html https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=VCU https://eva.virginia.gov/register-now.html https://fmd.vcu.edu
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
TABLE OF CONTENTS 00 10 00 - 1
SECTION 00 10 00
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00 DESIGNER OF RECORD SEAL
00 10 00 TABLE OF CONTENTS
00 20 00 SCHEDULE OF DRAWINGS
Notice of Invitation to Bid HECO-7a Instructions to Bidders
HECO-7b Pre-Bid Question Form (retired) Questions will be received electronically through the bidding portal Bid Form (retired) Bids will be received electronically through the bidding portal
HECO-10.2 Standard Bid Bond HECO-7 General Conditions of the Construction Contract HECO-9 Contract Between University and Contractor (for Reference Only) HECO-9a Virginia Workers Compensation Certificate of Coverage HECO-10 Standard Performance Bond HECO-10.1 Standard Labor and Material Payment Bond CO-11 Construction Contract Change Order GC-1 Change Order Estimate (General Contractor) SC-1 Change Order Estimate (Subcontractor) SS-1 Change Order Estimate (Sub-subcontractor) CO-12 Schedule of Values and Certificate for Payment HECO-13 Affidavit of Payment of Claims HECO-13.1 Certificate of Completion by AE or PM of Record HECO-13.1a Certificate of Substantial Completion by AE CO-13.1b Final Report of Structural & Special Inspection HECO-13.2 Certificate of Completion by Contractor HECO-13.2a Certificate of Partial or Substantial Completion by Contractor HECO-6a Statement of VUSBC Special Inspections Affiliate Identification Personnel Identification Requirements Account Security Contractor’s Account Security Requirements SWaM Reporting SWaM Reporting Requirements https://app.e-builder.net/public/publicLanding.aspx?QS=646db4ddc1bd4f119b4357b4e60f3fd7 https://app.e-builder.net/public/publicLanding.aspx?QS=c49770aa27114b6a897983fdb39f1ab6 https://app.e-builder.net/public/publicLanding.aspx?QS=d8e585cf5eab461795b5f0c56cfb3137 https://app.e-builder.net/public/publicLanding.aspx?QS=ec718483c26c4f2faeb25846e6456662 https://app.e-builder.net/public/publicLanding.aspx?QS=7b65cbbf32c946c6902b5c8869e15d12 https://app.e-builder.net/public/publicLanding.aspx?QS=bebc7081322148d08f6266b948a81225 https://app.e-builder.net/public/publicLanding.aspx?QS=c1b115b9212c45c48731d735ff2ccd35 https://app.e-builder.net/public/publicLanding.aspx?QS=0bf87bbb781948d6837afc9cc677a55b https://app.e-builder.net/public/publicLanding.aspx?QS=a45fc849323e455f952f3260fc3546e1 https://app.e-builder.net/public/publicLanding.aspx?QS=ba7a36840a3247c7bec1fd5262428f4d https://app.e-builder.net/public/publicLanding.aspx?QS=bcad7f8a5ecf421687b4ed1340b9e983 https://app.e-builder.net/public/publicLanding.aspx?QS=847ee4d5da9b49deb06d995101805af9 https://app.e-builder.net/public/publicLanding.aspx?QS=4600a00df79346648d05df1018446ed1 https://app.e-builder.net/public/publicLanding.aspx?QS=55abd007deac46f8aa229434d1dafbe1 https://app.e-builder.net/public/publicLanding.aspx?QS=55abd007deac46f8aa229434d1dafbe1 https://app.e-builder.net/public/publicLanding.aspx?QS=1295d29650714f1f8e5206b4f74cd9ac https://app.e-builder.net/public/publicLanding.aspx?QS=123dbe5c65f549e79298cabb882d3fd5 https://app.e-builder.net/public/publicLanding.aspx?QS=13e9d9615baa4d9ba69748c509e16bbc https://app.e-builder.net/public/publicLanding.aspx?QS=f637274d736d454a939c9a5fa279374f https://app.e-builder.net/public/publicLanding.aspx?QS=28eb715978974ad4802498630471550e https://app.e-builder.net/public/publicLanding.aspx?QS=868f43e45ff448a593c9d4dbefdde887 https://app.e-builder.net/public/publicLanding.aspx?QS=94ca9c3e5e4547d48b403282bcd807d2
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
TABLE OF CONTENTS 00 10 00 - 2
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 22 00 UNIT PRICES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 32 13 SCHEDULING OF WORK
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 43 00 QUALITY REQUIREMENTS
01 43 39 MOCKUPS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 56 00 TEMPORARY BARRIERS AND ENCLOSURES
01 74 00 CLEANING AND WASTE MANAGEMENT
01 77 00 CLOSEOUT PROCEDURES
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 00 00 EXTERIOR WALL FRAMING AND ACCESSORIES
07 27 26 FLUID-APPLIED AIR BARRIER MEMBRANE
07 53 23 ETHYLENE PROPYLENE DIENE MONOMER (EPDM) MEMBRANE
07 62 00 SHEET METAL FLASHING AND TRIM
07 92 00 JOINT SEALANTS
DIVISION 08 – WINDOWS AND OPENINGS
08 43 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS
08 80 00 GLAZING
DIVISION 09 – FINISHES
09 29 00 INTERIOR FINISHES
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SCHEDULE OF DRAWINGS 00 20 00 - 1
SECTION 00 20 00
SCHEDULE OF DRAWINGS
SHEET NO. SHEET TITLE
T1.0 TITLE SHEET
G1.1 GENERAL NOTES
G1.2 SITE PLAN
G1.3 SITE PROTECTION DETAILS
C1.1 TRAFFIC CONTROL PLAN
C1.2 TRAFFIC CONTROL PLAN
A1.1 FIRST FLOOR PLAN
A1.2 SECOND FLOOR PLAN
A1.3 THIRD FLOOR PLAN
A1.4 FOURTH FLOOR PLAN
A1.5 ROOF PLAN
A2.1 SOUTH AND EAST ELEVATIONS
A2.2 WEST AND NORTH ELEVATIONS
A2.3 PARTIAL ELEVATIONS
AD3.1 ENLARGED ELEVATIONS (DEMO) – COURTYARD AND PARAPET
AD3.2 ENALRGED ELEVATIONS (DEMO) – NORTH STAIR
AD5.1 TYPICAL MASONRY DEMOLITION DETAILS
AD5.2 TYPICAL WINDOW DEMOLITION DETAILS
A3.1 ENLARGED ELEVATIONS (REPAIR) – COURTYARD AND PARAPET
A3.2 ENLARGED ELEVATIONS (REPAIR) – NORTH STAIR
A5.1 REPAIR DETAILS – COURTYARD
A5.2 REPAIR DETAILS – NORTH STAIR
A5.3 REPAIR DETAILS – NORTH STAIR
A5.4 REPAIR DETAILS – NORTH STAIR
A5.5 REPAIR DETAILS – NORTH STAIR
A5.6 REPAIR DETAILS – EAST PARAPET
A6.1 REPAIR DETAILS – WINDOW AND DOOR TYPES
A6.2 REPAIR DETAILS – WINDOW AND DOOR SCHEDULE
A6.3 REPAIR DETAILS – WINDOW HEAD
A6.4 REPAIR DETAILS – WINDOW JAMB
A6.5 REPAIR DETAILS – WINDOW SILL
A6.6 REPAIR DETAILS – ENTRANCES
END OF SECTION 00 20 00
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 1
SECTION 01 10 00
SUMMARY OF WORK
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes:
1. Project information
2. Work covered by Contract Documents
3. Work performed by University
4. Contractor's use of site and premises
5. Work restrictions
6. Specification and Drawing conventions
1.03 RELATED SECTIONS
A. Section 01 26 00, “Contract Modification Procedures”
B. Section 01 31 00, “Project Management and Coordination”
C. Section 01 32 13, “Scheduling of Work”
D. Section 01 43 00, “Quality Requirements”
E. Section 01 50 00, “Temporary Facilities and Controls”
F. Section 01 56 00, “Temporary Barriers and Enclosures”
1.04 DEFINITIONS
A. Work Package: A group of specifications, drawings, and schedules prepared by the design team to describe a portion of the Project Work for pricing, permitting, and construction.
1.05 PROJECT INFORMATION
A. Project Identification: Sadie Heath Cabaniss Hall Window Replacement Project
1. Project Location: 1100 E. Leigh St., Richmond, VA 23298
2. University Project Code: 2024-02804
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 2
3. MR #: 236-12708-00807
4. G&HA #: 24039.04
5. WDP #: 21136B
B. Owner: Virginia Commonwealth University (VCU or “University”)
1. Owner's Representative: Katherine Mottley (kamottle@vcu.edu)
C. Architect: Glavé and Holmes Architecture
1. Architect's Representative: Robert Parise, AIA (rparise@glaveandholmes.com)
D. Architect's Consultants: Architect has retained the following design professionals, who have prepared designated portions of the Contract Documents:
1. Engineer: WDP & Associates Consulting Engineers, Inc. (WDP)
a. Engineer Representative: Jodi Knorowski, P.E.
(jknorowski@wdpa.com)
1.06 WORK COVERED BY CONTRACT DOCUMENTS
A. Background: Sadie Heath Cabaniss Hall was constructed in 2006 as part of the School of Nursing at Virginia Commonwealth University. Sadie Heath Cabaniss Hall is a four-story building generally constructed with metal stud framing, brick veneer, precast concrete banding elements, and punched windows.
1. Glavé & Holmes Architecture and WDP performed a condition assessment that included diagnostic water testing in isolated areas to evaluate moisture related issues through the building envelope. Based on the results of this assessment, the University has elected to conduct a window replacement project and isolated repairs at the upper north stair tower and base of wall at the north courtyard in order to limit water infiltration into the building.
2. This project is not intended and should not be expected to address all the deficiencies of the building, specifically with respect to the deficient through wall flashings beyond the limits of work, the lack of an effective air/water barrier and the unfavorable hygrothermal performance resulting from the insulation and vapor retarder placement.
3. The Documents were developed based on limited access and a necessarily limited field study.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 3
4. The building will remain occupied during the execution of the work. As such, consideration of the occupant impact will be required for the Project.
B. The Work of the Project is defined by the Contract Documents and includes, but is not limited to, the following:
1. Providing construction barriers, overhead protection, signage, and temporary weather protection, including at interior of all window openings, as required to maintain occupant access and egress during the Work as shown in the Drawings and as required by Code.
2. Storage of materials and equipment in designated areas to maintain access for building occupants and prevent impact to occupants or building activities.
3. All provisions to access the work areas necessary to complete the entire scope, including but not limited to aerial lift machinery and/or scaffolding.
4. Replacement of all windows and storefront entrances, to include incorporation of new perimeter flashing integrated with existing weather resistive barrier.
5. Replacement of base of wall flashing at the north courtyard, to include integrations with existing adjacent building components. Execution of repairs will require replacement of brick veneer at the base of the wall to include temporary shoring for the portions of remaining brick above.
6. Replacement of sealant joints in the precast of the south tower, south bay, and courtyard entry surrounds.
7. Providing new fluid-applied air barrier membrane and exterior cavity insulation at the upper floor of the north stair tower, to include new through wall flashing and parapet coping flashing. Execution of repairs will require:
a. Replacement of brick veneer and salvaging and reinstalling existing precast concrete elements.
b. Detaching and reinstalling various surface mounted building components such as conduit, outlets and other miscellaneous items.
c. Coordination with University for removal and reinstallation of signage and security measures, to be conducted by others.
d. Reinstallation and recertification of lightning protection within Work area.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 4
C. Type of Contract:
1. Project will be constructed under a single prime contract.
1.07 CONTRACTOR'S USE OF SITE AND PREMISES
A. Restricted Use of Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
B. Limits on Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Fire Lanes, Driveways, Loading Dock, Walkways, and Entrances: Keep fire lanes, driveways, loading dock, walkways, and side streets surrounding the project site clear and available for pedestrian and vehicular use, and available to the University, University's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.
a. Schedule deliveries to minimize use of loading dock and entrances by construction operations.
b. Schedule deliveries to minimize space and time requirements for on-site storage of materials and equipment.
C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations. This includes protecting all existing roofing systems from damage by construction traffic and material storage as well as moisture intrusion.
D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.
1.08 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: University will occupy the building during the entire construction period. Cooperate with the University during construction operations to minimize conflicts and facilitate University usage. Perform the Work so as not to interfere with University's day-to-day operations. Maintain existing exits unless otherwise indicated.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 5
B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.
1. The north courtyard will be closed to building occupants for the duration of the work to allow for construction activities. All exits to the north courtyard will be for emergency egress only. The Contractor shall maintain a clear path from exit doors to a point outside of the construction area as indicated in the Drawings.
2. Temporary closures of primary egress will be required to replace the storefront entrances. Work will need to be coordinated during off-hours or when the building is not occupied so as not to impact normal building operations.
C. Notify Owner not less than 72 hours in advance of activities that will affect University's operations.
1.09 WORK RESTRICTIONS
A. Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.
B. On-Site Work Hours: Limit work to between 7 a.m. to 6 p.m., Monday through Friday, unless otherwise indicated. Work hours may be modified to meet Project requirements if approved by University and authorities having jurisdiction.
1. Weekend Hours: Defined as between 6 p.m. Friday and 7 a.m. Monday.
2. Weekend work must be coordinated with the University and approved 72 hours in advance.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by University or others unless permitted under the following conditions and then only after arranging for temporary utility services according to requirements indicated:
1. Notify University not less than two (2) days in advance of proposed utility interruptions.
2. Obtain University's written permission before proceeding with utility interruptions.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 6
D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise, vibration, dust, odors, or other disruption to the University.
1. Notify University not less than two (2) days in advance of proposed disruptive operations.
2. Obtain University's written permission before proceeding with disruptive operations.
E. Smoking and Controlled Substance Restrictions: Use of tobacco products, alcoholic beverages, and other controlled substances within the existing building, on Project site, or on University's property is not permitted.
F. Employee Identification: Provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.
G. Employee Screening: Comply with University's requirements for drug and background screening of Contractor personnel working on Project site.
1. Maintain list of approved, screened personnel with University's representative.
1.10 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Text Color: Text used in the Specifications, including units of measure, manufacturer and product names, and other text may appear in multiple colors or underlined as part of a hyperlink; no emphasis is implied by text with these characteristics.
3. Hypertext: Text used in the Specifications may contain hyperlinks.
Hyperlinks may allow for access to linked information that is not residing in the Specifications. Unless otherwise indicated, linked information is not part of the Contract Documents.
4. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
SUMMARY OF WORK 01 10 00 - 7
B. Division 00 Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.
C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations scheduled on Drawings and published as part of the U.S. National CAD Standard.
3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 01 10 00
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
UNIT PRICES 01 22 00 - 1
SECTION 01 22 00
UNIT PRICES
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes administrative and procedural requirements for unit prices
1.03 RELATED SECTIONS
A. Section 01 26 00, “Contract Modification Procedures”
B. Section 04 20 00, “Unit Masonry”
1.04 DEFINITIONS
A. Unit price: The price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
1.05 PROCEDURES
A. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.
B. University reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at the University’s expense, by an independent surveyor acceptable to Contractor.
C. List of Unit Prices: A schedule of unit prices is included in Article 1.09.
Specification Sections referenced in the “Schedule of Unit Prices” Article contain requirements for materials described under each unit price.
1.06 GENERAL REQUIREMENTS
A. Perform work required by unit prices and lump sum prices in accordance with the Contract Documents.
B. Unit prices cover portions of Work added to or deducted from quantities indicated by Contract Documents.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
UNIT PRICES 01 22 00 - 2
C. Unit prices and lump sum prices are for work in place, except where indicated otherwise.
D. Acceptance or rejection of unit prices and lump sum prices, partially or completely, will be declared at time of Contract award.
E. Unit prices and lump sum prices for the work include:
1. Products.
2. Delivery to site.
3. Supervision, labor, and equipment.
4. Installation, including associated accessories and equipment.
5. Insurance.
6. Applicable taxes.
7. Overhead and profit.
8. Handling, including receiving, unloading, uncrating, storage, distribution, removal from job site and lawful disposal.
9. Protection from damage and from elements.
10. Submittal and processing of product data, shop drawings, samples, and other required submittals.
11. Permits.
12. Bonds.
13. Other expenses reasonably required to complete installation.
1.07 INVOICING INSTRUCTIONS
A. All Applications for Payment shall follow the procedural requirements of Section 01 29 00, “Payment Procedures.”
B. In order to apply for payment for Unit Price Work, full cost documentation shall be submitted with the Application for Payment.
C. For Unit price work items, Contractor shall maintain a log indicating where each quantity of repair item was conducted. Contractor shall allow access for Architect/Engineer to verify all quantities prior to application of payment.
D. Contractor shall notify the Architect/Engineer and University of all estimated quantities for unit price work within a work phase prior to execution of work within the given work phase.
E. Contractor shall not be reimbursed for repair quantities that increase due to negligence or carelessness resulting in additional work or increase in repair
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
UNIT PRICES 01 22 00 - 3
areas.
1.08 UNIT PRICE ITEMS
A. Work to be performed on a unit price basis shall be measured according to the methods described below and each applicable specification section.
Payment will be made for the work actually performed based on quantities recorded by the Contractor and reviewed and approved by the Architect/Engineer. Unless stated otherwise, records will consist of drawings showing the areas repaired with dimensions and a cumulative record of quantities repaired.
B. The Contractor shall notify the Architect/Engineer and University immediately in writing of any unit price work that deviates materially from the prescribed basis for bidding and for which an adjustment in unit price is desired. The Contractor shall measure and quantify any such deviations, subject to the Architect/Engineer’s verification, prior to performing any work which might make verification impossible. No adjustments in unit prices will be considered unless supporting field measurements and a supporting summary of changes in cost are submitted to the Architect/Engineer and University and approved by the Architect/Engineer and University in writing prior to the Contractor performing the work.
1.09 SCHEDULE OF UNIT PRICE WORK
A. CMU Repointing: Repointing of CMU backup wall at the top of the north stair tower where found to be deteriorated or as required for surface preparation prior to installation of new fluid-applied air/water barrier membrane in accordance with Section 04 20 00, “Unit Masonry.”
1. Contractor shall include a unit trade price item, expressed in terms of linear foot for the repointing of the CMU.
1.10 LUMP SUM ITEMS
A. Lump sum portions of the work shall include all items of the work as described in Section 01 10 00 “Summary of Work” and each specification section and/or as shown in the Plans (other than those items specifically identified as Unit Price Work Items) and all items reasonably incidental to furnishings and completing the Work described by the Specifications and/or Plans and generally described below.
1. Mobilization, Staging, Equipment, Protection, Inspection, Permits, Bonds, Management, Administration, Incidental Work, etc.: This item shall include payment for the items listed and any other item associated with the general requirements and conditions of the Project and incidental work which are not included in unit price items or other
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
UNIT PRICES 01 22 00 - 4
lump sum items. The purpose of this item is to permit the Contractor to be reimbursed for fixed costs associated with the items listed and to eliminate the Contractor’s risks associated with dividing these costs between the unit price items and lump sum bid items. Costs for the above referenced items shall not be included in unit prices for bid items but shall be completely included in this lump sum bid item.
B. The Contractor shall notify the Architect/Engineer and University immediately in writing of any lump sum work that deviates materially from the prescribed basis for bidding and for which an adjustment in lump sum price is desired.
The Contractor shall measure and quantify any such deviations, subject to the Architect/Engineer’s verification, prior to performing any work which might make verification impossible. No adjustments in lump sum prices will be considered unless supporting field measurements and a supporting summary of changes in cost are submitted to the Architect/Engineer and University and approved by the Architect/Engineer and University in writing prior to the Contractor performing the work. Items or materials, except for those indicated to be reused, reinstalled, or otherwise indicated to remain the University’s property, shall be removed from the site by the Contractor.
END OF SECTION 01 22 00
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
CONTRACT MODIFICATION PROCEDURES 01 26 00 - 1
SECTION 01 26 00
CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes administrative and procedural requirements for handling and processing Contract modifications.
1.03 RELATED SECTIONS
A. Section 01 10 00, “Summary of Work”
B. Section 01 29 00, “Payment Procedures”
C. Section 01 31 00, “Project Management and Coordination”
1.04 MINOR CHANGES IN THE WORK
A. Architect/Engineer will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.
1.05 PROPOSAL REQUESTS
A. University-Initiated Proposal Requests: Architect/Engineer will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
1. Work Change Proposal Requests issued by Architect/Engineer are not instructions either to stop work in progress or to execute the proposed change.
a. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
b. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
CONTRACT MODIFICATION PROCEDURES 01 26 00 - 2
c. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
d. Include costs of labor and supervision directly attributable to the change.
e. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
f. Quotation Form: Use standard state forms supplied by the Virginia Department of General Services found on the Department of General Services website.
B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect/Engineer.
1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
6. Proposal Request Form: Use standard state forms supplied by the Virginia Department of General Services found on the Department of General Services website.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
CONTRACT MODIFICATION PROCEDURES 01 26 00 - 3
1.06 CHANGE ORDER PROCEDURES
A. On University’s approval of a Work Change Proposal Request, Architect/Engineer will issue a Change Order for signatures of University and Contractor.
1.07 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: Architect/Engineer may issue a Construction Change Directive, which instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
END OF SECTION 01 26 00
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 1
SECTION 01 29 00
PAYMENT PROCEDURES
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.
1.03 RELATED SECTIONS
A. Section 01 22 00, “Unit Prices”
B. Section 01 26 00, “Contract Modification Procedures”
C. Section 01 31 00, “Project Management and Coordination”
D. Section 01 32 00, “Construction Progress Documentation”
E. Section 01 33 00, “Submittal Procedures”
F. Section 01 77 00, “Closeout Procedures”
1.04 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.
1.05 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.
1. Coordinate line items in the schedule of values with items required to be indicated as separate activities in Contractor's construction schedule.
2. Submit the schedule of values to Architect/Engineer and University at earliest possible date but no later than seven (7) days before the date scheduled for submittal of initial Applications for Payment.
B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 2
1. Arrange schedule of values in DGS Form CO-12.
2. Identification: Include the following Project identification on the schedule of values:
a. Project name and location
b. University's name
c. University's Project Number
d. University’s Purchase Order Number
e. Name of Architect/Engineer
f. Architect/Engineer's Project number
g. Contractor's name and address
h. Date of submittal
3. Arrange the schedule of values in tabular form, with separate columns to indicate the following for each item listed:
a. Related Specification Section or division
b. Description of the Work
c. Name of subcontractor
d. Name of manufacturer or fabricator
e. Name of supplier
f. Change Orders (numbers) that affect value
g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent. Round dollar amounts to whole dollars, with total equal to Contract Sum.
i. Labor
ii. Materials
iii. Equipment
4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Provide multiple line items for principal subcontract amounts in excess of five (5) percent of the Contract Sum.
5. Provide a separate line item in the schedule of values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored but not yet installed.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 3
a. Differentiate between items stored on site and items stored off site.
6. Purchase Contracts: Provide a separate line item in the schedule of values for each Purchase contract. Show line-item value of Purchase contract. Indicate University payments or deposits, if any, and balance to be paid by Contractor.
7. Overhead Costs, Proportional Distribution: Include total cost and proportionate share of general overhead and profit for each line item.
8. Overhead Costs, Separate Line Items: Show cost of temporary facilities and other major cost items that are not direct cost of actual work-in-place as separate line items.
9. Temporary Facilities: Show cost of temporary facilities and other major cost items that are not direct cost of actual work-in-place as separate line items.
10. Closeout Costs: Include separate line items under Contractor and principal subcontracts for Project closeout requirements in an amount totaling five (5) percent of the Contract Sum and subcontract amount.
11. Schedule of Values Revisions: Revise the schedule of values when Change Orders or Construction Change Directives result in a change in the Contract Sum. Include at least one separate line item for each Change Order and Construction Change Directive.
1.06 APPLICATIONS FOR PAYMENT
A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments, as certified by Architect/Engineer and paid for by University.
B. Payment Application Times: The date for each progress payment is indicated in the University-Contractor Agreement. The period of construction work covered by each Application for Payment is the period indicated in the Agreement.
1. Draft Pay Applications to be submitted by the 25th of each month or as directed by the University.
2. Draft Pay Application to be reviewed as part of the Monthly Pay Meetings as required in Section 01 31 00, “Project Management and Coordination.”
3. Architect/Engineer will provide comments or approval within five (5) days of the Monthly Pay Meeting.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 4
C. Application for Payment Forms: Use DGS Form CO-12 or as indicated by the University for Applications for Payment.
D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor.
Architect/Engineer will return incomplete applications without action.
1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.
2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.
3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.
4. Indicate separate amounts for work being carried out under University-requested project acceleration.
E. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored but not yet installed. Differentiate between items stored on site and items stored off site.
1. Provide certificate of insurance, evidence of transfer of title to University, and consent of surety to payment for stored materials.
2. Provide supporting documentation that verifies amount requested, such as paid invoices. Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.
3. Provide summary documentation for stored materials indicating the following:
a. Value of materials previously stored and remaining stored as of date of previous Applications for Payment.
b. Value of previously stored materials put in place after date of previous Application for Payment and on or before date of current Application for Payment.
c. Value of materials stored since date of previous Application for Payment and remaining stored as of date of current Application for Payment.
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 5
F. Transmittal: After Application for Payment is reviewed and Approved by the Architect/Engineer and University, submit Application for Payment electronically through Trimble Unity Construct (formerly known as “e- Builder”).
1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.
G. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application.
1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage.
2. When an application shows completion of an item, submit conditional final or full waivers.
3. University reserves the right to designate which entities involved in the Work must submit waivers.
4. Submit final Application for Payment with or preceded by conditional final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.
5. Waiver Forms: Submit executed waivers of lien on forms acceptable to University.
H. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
1. List of subcontractors
2. Schedule of values
3. Contractor's construction schedule (preliminary if not final)
4. Combined Contractor's construction schedule (preliminary if not final) incorporating Work of multiple contracts, with indication of acceptance of schedule by each Contractor
5. Products list (preliminary if not final)
6. Schedule of unit prices
7. Submittal schedule (preliminary if not final)
8. List of Contractor's staff assignments
9. List of Contractor's principal consultants
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 6
10. Copies of building permits
11. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work
12. Initial progress report
13. Report of preconstruction conference
14. Certificates of insurance and insurance policies
15. Performance and payment bonds
16. Data needed to acquire University's insurance
I. Application for Payment at Substantial Completion: After Architect/Engineer issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.
a. Complete administrative actions, submittals, and Work preceding this application, as described in Section 01 77 00, ”Closeout Procedures.”
2. This application shall reflect Certificate(s) of Substantial Completion issued previously for University occupancy of designated portions of the Work.
J. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:
1. Evidence of completion of Project closeout requirements
2. Certification of completion of final punch list items
3. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid
4. Updated final statement, accounting for final changes to the Contract Sum
5. Evidence that claims have been settled
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PAYMENT PROCEDURES 01 29 00 - 7
6. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when University took possession of and assumed responsibility for corresponding elements of the Work
7. Final liquidated damages settlement statement
8. Proof that taxes, fees, and similar obligations are paid
9. Waivers and releases
END OF SECTION 01 29 00
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1
SECTION 01 31 00
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. This section includes the following:
1. Coordination
2. Existing Conditions
3. Meetings
a. Preconstruction Conference
b. Preinstallation Conferences
c. Progress Meetings
d. Monthly Pay Meeting
4. Project Web Site
5. Architect/Engineer’s Construction Administration Site Visit Reports
6. Daily Construction Reports
7. Job Bulletins
8. Request for Information (RFI)
1.03 RELATED SECTIONS
A. Section 01 10 00, “Summary of Work”
B. Section 01 26 00, “Contract Modification Procedures”
C. Section 01 29 00, “Payment Procedures”
D. Section 01 32 13, “Scheduling of Work”
E. Section 01 33 00, “Submittal Procedures”
F. Section 01 43 00, “Quality Requirements”
G. Section 01 43 39, “Mockups”
1.04 DEFINITIONS
Richmond, Virginia
VCU PC: 2024-02804
MR #: 236-12708-00807
PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2
A. Request for Information (RFI): Request from Contractor seeking information required by or clarifications of the Contract Documents.
1.05 INFORMATIONAL SUBMITTALS
A. Key Personnel Contact Information: Submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses, cellular telephone numbers, and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.
1. Post copies of list in a prominent location on the Project site. Keep list current at all times.
B. Subcontractor List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.
2. Number and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .