2026-08-03__EIB_NTC_-_Terrazzo.pdf

PDF 121 KB Posted

Attached to
Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Terrazzo
Solicitation number
0000039984
Issued by
Kern County, Kernville CDP, California

About this file

Summary

This is an Invitation for Prequalification issued by Swinerton Builders on behalf of CSU Bakersfield for qualified subcontractors and suppliers for the Energy and Innovation Building project located at 9001 Stockdale Highway, Bakersfield, California. The project encompasses the design and construction of a new multi-story science building approximately 56,500 gross square feet, including offices, research laboratories, teaching labs, a capstone design laboratory, and flexible event space, along with dynamic outdoor spaces for engagement. This collaborative design-build project falls under Public Works and Prevailing Wage regulations. The prequalification deadline for subcontractors is August 28, 2026, with anticipated trade bid packages to be posted on August 7, 2026. Construction is estimated to commence on January 1, 2026, and be completed by June 16, 2027. The specific trade being solicited is Terrazzo work.

The project has a 6% Disabled Veteran Business Enterprise (DVBE) requirement set-aside. Interested subcontractors and suppliers must submit the Swinerton Builders Prequalification form and execute the Swinerton Master Service Agreement (MSA). All required documents and submission instructions are available at https://swinerton.com/subcontractor-prequalification/. Questions and prequalification inquiries should be directed to the Swinerton Prequalification Team at subcontractorprequal@swinerton.com.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR PREQUALIFICATION

Qualified Subcontractors & Suppliers Requested

Collaborative Design-Build Agreement for the Energy and Innovation Building CSU Bakersfield Campus 9001 Stockdale Hwy, Bakersfield CA 93311

DUE DATE FOR PREQUALIFIACTIONS:

Requesting completed prequalification forms from subcontractors by August 28, 2026

OUTREACH GOALS: 6% DVBE Requirement

PROJECT INFORMATION AND DESCRIPTION:

The project consists of the design and construction of a new multi-story Science Building of approximately 56,500 GSF. The new Energy Innovation Building will include a combination of offices, research laboratories, teaching labs, a capstone design laboratory, and a versatile flex-design event space. Additionally, the scope encompasses the creation of flexible outdoor spaces that provide dynamic areas for engagement and interaction. This project is a collaborative design-build and falls under Public Works and Prevailing Wage regulations.

Deadline for Pre-Qualification packages: 8/28/26 Anticipated Trade Bid Packages Posted date: 8/7/26 Estimated Construction Start Date: 01/01/26 Estimated Construction Completion Date: 06/16/27

DOCUMENTS:

https://swinerton.com/subcontractor-prequalification/

TRADES:

Terrazzo

REQUIRED SUBMITALS:

Swinerton Builders Prequalification Swinerton Master Service Agreement (MSA)

Interested in prequalifying, please contact the Swinerton Prequalification Team at:

subcontractorprequal@swinerton.com https://swinerton.com/subcontractor-prequalification/ mailto:subcontractorprequal@swinerton.com

File details come from the government source that posted it. Updated .