Summary
This is a Request for Qualifications (RFQu) issued by the Baltimore County Department of Public Works and Transportation, Bureau of Engineering & Construction, for on-call collection, pumping, and transmission system modeling services (Project No. 2026-04). The County seeks consulting services to assist the Sewer Design Section with hydraulic modeling efforts for the wastewater collection system serving approximately 141,000 acres across 380 miles of public sewer interceptors, 1,600 miles of collection system, and 120 pumping stations. Services include review of GIS databases, construction and refinement of dynamic models using Autodesk InfoWorks ICM software, field surveys, model calibration and verification, training provision, and reporting on system capacity and improvements. The RFQu is due electronically by January 8, 2027, at 2:00 PM EST to dpwtpsec@baltimorecountymd.gov. References must be submitted by January 22, 2027. The selection process is projected to conclude by February 2027, with contract council approval and award expected in May 2027 and notice to proceed in June 2027. One consultant will be selected through an on-call form of agreement with tasks assigned on an as-required or emergency basis.
Submissions must include Standard Form 255 with qualifications organized in designated sections with specific page limitations (Sections 1-5 limited to one page combined; Section 6 limited to one page; Section 7 limited to one page per resume; Section 8 limited to two pages per project; Section 9 limited to two pages; Section 10 limited to five pages). The previous contract included one award with an approximate total spend of $2,000,000. Evaluation criteria include references (10 points), individual qualifications and experience of key personnel (30 points), project examples demonstrating completion of similar work using InfoWorks ICM software (100 points), and project approach including ability to carry out work (40 points), for a maximum of 180 points. The contract includes a 20% Minority Business Enterprise/Women Business Enterprise (MBE/WBE) participation requirement. A Professional Engineer holding a current Maryland PE license must be designated and maintained on staff throughout the contract term. All required MWBE forms, procurement affidavits, proof of PE licensure, taxpayer identification certification, and references submission forms must accompany the submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF ENGINEERING & CONSTRUCTION
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
111 WEST CHESAPEAKE AVENUE, ROOM 205
TOWSON MD 21204
REQUEST for QUALIFICATIONS (RFQu)
Project No. 2026-04 On-Call Collection, Pumping and Transmission System Modeling
Services
Due Date: January 8, 2027
Due Time: 2:00 PM EST
Electronic Submission:
dpwtpsec@baltimorecountymd.gov
Amendments to solicitations often occur prior to bid opening and sometimes within as little as 48 hours prior to RFQu due date. It is the potential firm’s responsibility to frequently visit the Design Architecture and Engineering Projects website: https://baltimorecountymd.gov/departments/public-works/engineering/pssc/projects to obtain amendments once they have downloaded a solicitation.
Request for Qualifications Checklist:
_____ Have you filled out all the required forms?
_____ SF255 (Signed)
_____ Minority forms (As per the MBE/WBE participation summary)
_____ Procurement Affidavit
_____ PRIME CONTRACTOR Minority and Women Participation Affidavit (Consultant)
_____ Taxpayer Identification Number (Tin and Certification)
_____ Proof of Professional Engineer License
_____ Do all applicable forms have original/electronic signatures?
_____ Have you verified the time the Request for Qualifications are due?
_____ Have you submitted the “References Submission Form”?
_____ Have you signed any Addendum Acknowledgements (if applicable)?
mailto:dpwtpsec@baltimorecountymd.gov https://baltimorecountymd.gov/departments/public-works/engineering/pssc/projects https://baltimorecountymd.gov/departments/public-works/engineering/pssc/projects
NOTICE OF INTEREST TO ASSIGN PROJECT
NOTE: for email notification of new Baltimore County professional service projects go to:
https://www.baltimorecountymd.gov/departments/public-works/engineering/pssc/projects
In the near future, the Professional Services Evaluation Committee (PSEC) for Baltimore County will recommend a consulting assignment for the following Project:
On-Call Collection, Pumping and Transmission System Modeling Services
Consultant services are needed for performing various types of modeling services tasks including, but not limited to, as required to assist the Sewer Design Section with hydraulic modeling efforts. Services may include efforts related to the County’s Consent Order between the U.S. Department of Justice, the U.S. Environmental Protection Agency, the Maryland Department of the Environment and Baltimore County, Maryland.
Background:
Baltimore County’s wastewater collection, pumping and transmission system serves approximately 141,000 acres of land comprised of residential, industrial, and commercial areas and includes over 380 miles of public sewer interceptors, about 1,600 miles of collection system, and 120 wastewater pumping stations.
Scope:
On-Call assignments may include but are not limited to the following:
• Review of the County GIS databases for sanitary sewer, manhole and other relevant background information;
• Construction, development, expansion and refinement of a dynamic model using Infoworks ICM software; output produced must be consistent and compatible with the County’s Infoworks ICM models and comply with all Baltimore County technical standards;
Provide data in a format fully compatible with ESRI products (including
ArcGIS Pro), AutoCAD and the County’s Infoworks ICM software
• Provide educational/training services and materials on the processes and procedures for the hydraulic model, including the Infoworks ICM software. The training shall be in the form of on-site courses, as well as hands on computer training.
• Evaluate the ability of the County’s wastewater collection system to convey existing and future flows.
Including population/employment projections on a Sewer Service Area level and connections of existing onsite disposal systems to public sewer Including compilation of any requested reports documenting findings
• Conduct fieldwork including field surveys of modeled manholes, and gather necessary data for pump stations;
• Maintain and update the existing dynamic model(s) that would simulate collection system response to both existing and future flows, including design storm simulations to include:
https://www.baltimorecountymd.gov/departments/public-works/engineering/pssc/projects
All gravity lines 8” in diameter or larger All existing siphons All force mains that convey wastewater from one service area to another service area
• Calibration and verification of the model with County and consultant supplied flow monitoring and rainfall data;
Calibrations should take into account water use data on Tax Parcel level, County provided boundary conditions, and operational procedures and temporary changes to the collection system operations, including adjustment of pumping station operations and any operational incidents that could significantly affect flows in the collection system;
Verification of model connectivity as needed and model review to determine any questionable sewer system attribute data and connectivity data gaps;
• Preparation of reports summarizing model methodology, calibration, capacity assessment, assumptions, results, recommended improvements and costs;
• Incorporate completed/planned collection system rehabilitation projects, completed/planned pipeline capacity improvement project, and completed/planned pumping station capacity improvements into the model;
• Project management, quality assurance, and quality control for all work performed by the prime consultant. The firm shall be capable of meeting schedules and quality control objectives and properly manage subconsultants.
Project examples should be recent (within the last 10 years) and must show successful completion of projects involving work described in the Scope by the Prime Consultant using Autodesk InfoWorks ICM software. If a Consultant submits ongoing projects, it must be clear what has been completed, versus what was included in the scope of services but not yet completed.
Tasks will be assigned on an “as-required” or emergency basis through the utilization of an On-Call form of agreement. One consultant will be selected for this project. The value of services authorized under the resulting contract(s) will be determined based on the County’s needs and available funding. The previous contract included one award with an approximate total spend of $2,000,000.00
Technical Requirements For Software And Data:
Autodesk InfoWorks ICM software must be used to construct and develop the models. The modeled network data will be derived from the County’s GIS as the primary data source.
Updates are made to the County’s GIS on a regular basis and these updated files must be used.
Spatial data (x-y grid coordinates, invert elevations, etc.) will be used to refine the model input files. An electronic file of all corrections to the County GIS must be provided to the County.
SELECTION CRITERIA
The following criteria will be considered in determining which firms are recommended.
1) References. (10 points)
The firm shall provide three (3) references as part of this submission. References should complete the “References Submission Form” provided within the RFP and submit directly to Heather Panowicz, dpwtpsec@baltimorecountymd.gov . Include contact information of the reference as additional outreach to the reference may be completed by the County.
Only the reference form provided will be accepted. Other forms, letters of recommendation, or similar documents will not be considered. Please ensure that your references are aware of this requirement.
References may not be from current Baltimore County Department of Public Works and Transportation Bureau of Engineering and Construction employees.
Reference forms will be due no more than two weeks (14 calendar days) after the RFQ due date. References are due January 22, 2027 by 2:00 pm EST.
2) Individual Qualifications and related experience. (30 points)
Key personnel must have at least five years’ experience in appropriate disciplines and must demonstrate those capabilities. The firm must provide technical and managerial qualifications and experience for all key personnel. The firm must have knowledge of the Consent Decree requirements and their application to the County’s sanitary sewer hydraulic model. A brief explanation describing the project responsibility of each team member must be provided. Key personnel shall be the individuals in which the Consultant intends to have perform the work on this Contract and must demonstrate they have the necessary training and/or experience to carry out assigned tasks. If key personnel are replaced at any time during the Contract, the Consultant will be required to submit qualifications of the proposed replacements prior to the replacement of the key personnel occurring.
Key Personnel for this Contract:
• Contract Manager
• Senior Project Manager
• Hydraulic Modeler
• GIS Specialist
3) Examples of projects completed (5 projects). (100 points)
Project examples shall be recent (within the last 10 years) and must show successful completion of projects involving work described in the Scope by the submitting offeror.
Preference will be given to firms using Autodesk InfoWorks ICM software. If a Consultant submits ongoing projects, it must be clear what has been completed, versus what was included in the scope of services but not yet completed.
An assessment of past experience of the firm in general will be made. The qualities and indicators that will receive consideration include the number and types of projects the firm has completed; a demonstration of the firm's ability to undertake this project;
the firm's ability to realize timetables and quality control objectives; and the ability to manage subconsultants.
4) Project Approach including the ability of the firm to Carry Out and Complete the
Work. (40 points)
A detailed description of the overall project approach with a summary of the methodology, objectives and results is important and should be clearly identified. The firm shall demonstrate their ability to assess Infoworks ICM Models, including the County’s current versions. The Firm must demonstrate experience in the sequences and processes involved in model development, use, maintenance, and risk management of Infoworks ICM models. The Firm must be able to provide data output from the model in a particular format for interested internal and external stakeholders or the public use, and for a potential future use of the modeling tools developed. The overall strengths and duties of the proposed project team shall be clearly identified.
The firm’s technical approach for all items in the scope of work will be considered.
Scoring Rubric
PROJECTED SCHEDULE (subject to change)
• Issue expression of interest to potential bidders – November 2026
• Proposals due from potential bidders – January 2027
• Complete Selection Process – February 2027
• Negotiate Scope/Contract – March 2027
• Council Approval of Contract – May 2027
• Award of Contract – May 2027
Criteria Total Possible Points
1) References -
a) References 10
2) Individual Qualifications and related experience -
a) Key Personnel Technical Knowledge 10
b) Key Personnel Managerial Knowledge 5
c) Key Personnel Knowledge of Baltimore County and their
Consent Decree 15
3) Project Examples -
a) Project Management including schedule and subconsultant management 15
b) Experience with InfoWorks ICM 15
c) Experience Evaluating Future Flows 15
d) Experience Maintaining and Updating a Dynamic Model 15
e) Model Calibration and Verification 15
f) Reporting and Documentation Experience 10
g) Field Survey Experience 5
h) Training Experience 5
i) Experience with GIS 5
4) Project Approach -
a) Model Assessment 10
b) Model Development, Use, and Maintenance 10
c) Risk Management 10
d) Schedule and Subconsultant Management 10
Maximum Possible 180
• Sign and Process Contract – June 2027
• Notice to Proceed – June 2027
QUESTIONS
Any questions pertaining to this RFQu should be submitted in writing to:
dpwtpsec@baltimorecountymd.gov by (December 14, 2026) by 2:00 p.m. EST Answers may be posted as an addendum
COUNTY’S USE OF SELECTED FIRMS
No firm is guaranteed any amount of work. The County reserves the right, in its sole discretion, to award individual jobs on a sound rotation basis, based on demonstrated areas of experience and expertise, or based on job location. The County reserves the right to interview consultants to determine the best firm to complete a designated task.
PREQUALIFICATION
Prequalification’s are no longer required. Standard Form 254 is not required for prime or subconsultants.
PROFESSIONAL ENGINEER LICENSE
The Offeror shall designate a Professional Engineer (PE) who holds a current and valid Professional Engineer license in the State of Maryland and who is authorized to execute contractual agreements. Proof of Maryland licensure shall be included with the submitted qualifications. The Offeror shall maintain the designated Professional Engineer on its staff for the duration of any resulting contract. If the designated Professional Engineer is no longer employed by or otherwise available to the Offeror during the contract term, the Offeror shall promptly notify the County and provide a replacement Professional Engineer with equivalent qualifications and a current, valid Maryland PE license, subject to the County's review and approval. Firms that do not demonstrate compliance with these requirements will be deemed non-responsive and will not be considered for award.
SAMPLE CONTRACT
A sample contract can be found online at the link below.
http://www.baltimorecountymd.gov/Agencies/publicworks/engineering/pssc/projectstobeassigne d.html
SUBMITTALS
Firms to be considered for award must submit one Standard Form (SF) 255 in response to the RFQu by the RFQu deadline. No other forms, including the Standard Form 330, will be accepted.
SF 255 Sections 1, 2, 3, 4 & 5: All Sections combined are limited to one (1) page in length.
SF 255 Section 6: All subconsultants must be clearly indicated on the form. The entire Section is limited to one (1) page in length.
SF 255 Section 7: Limited to a maximum of one (1) page in length for each resume.
SF 255 Section 8: Limited to a maximum of two (2) pages in length for each project.
http://www.baltimorecountymd.gov/Agencies/publicworks/engineering/pssc/projectstobeassigned.html http://www.baltimorecountymd.gov/Agencies/publicworks/engineering/pssc/projectstobeassigned.html
SF 255 Section 9: Limited to a maximum of two (2) pages in length. Can include active projects and partnership projects with other Baltimore County agencies.
SF 255 Section 10: Limited to a maximum of five (5) pages in length and should demonstrate the Firm’s understanding of the project scope and ability to perform the work, and include information related to the project approach, support staff, the Firm’s proximity to the project and other information at the discretion of the Firm.
A prime cannot subcontract to another prime in this project.
All pages must be 8.5” x 11”. There are no specific font size or style requirements; however, respondents should keep the applicable page limitations in mind. Any information that is not legible when printed, including information presented in an unreasonably small font size or an unreadable font style, will not be scored.
MINORITY BUSINESS ENTERPRISE AND WOMEN BUSINESS ENTERPRISE
REQUIREMENTS (MBE/WBE): The resulting minority and women business participation requirement for this contract is 20%.
1. Each Prime Contractor must comply with all Minority Business Enterprise and Women
Business Enterprises (MBE/WBE) participation requirements. Included with this solicitation package are copies of the County’s MBE/WBE policy and provisions and MBE/WBE participation schedule forms. All MBE/WBE participation forms must be completed, executed, and returned with the bid, proposal or qualifications if a goal has been assigned. MBE/WBE participation forms are available online at www.baltimorecountymd.gov/go/mwbe or you may contact the buyer on the solicitation.
2. The Prime Contractor shall comply with the required participation levels on a cumulative basis for the full term of the contract. The Prime Contractor shall estimate the participation level (for the full term of the contract) for each subcontractor and/or supplier listed on the participation schedule.
3. If no minimum participation level has been assigned, the Prime Contractor shall nevertheless make a genuine good faith effort to comply with the County’s MBE/WBE minimum participation goal even if the Prime Contractor has the capability to complete the work with its own workforce. The Prime Contractor shall make a good faith effort to obtain MBE/WBE subcontractor participation. The selected MBE/WBE subcontractor(s) must perform a commercially useful function when it is responsible for execution of the work of the contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved.
Certified Minority-owned or Certified Women-owned Prime Contractors may count their participation for up to 50% of the solicitation goal. Certified firms must make a good faith effort to obtain MBE/WBE subcontractor participation for the remaining portion of the goal.
Example: 20% MBE/WBE participation goal. Certified Minority-owned or Certified Women-owned firm bidding as the prime may count for 10% of the goal provided, they are self-performing the work. The remaining 10% must be subcontracted to an MDOT and/or City of Baltimore certified firm.
If the materials or supplies are purchased from an MBE/WBE supplier, 60% of the cost of the materials or supplies from the certified MBE/WBE supplier will be counted toward the MBE/WBE goal.
http://www.baltimorecountymd.gov/go/mwbe
The failure of a Bidder/Offeror to properly complete and submit the appropriate MBE/WBE plan forms and, if applicable, required Good Faith Effort (GFE) documentation shall result in the bid/proposal being deemed as nonresponsive and not susceptible of being selected for award.
x.x Within 10 working days of receiving notification that the Bidder/Offeror is the apparent awardee, the Bidder/Offeror shall provide the following documentation to the Buyer:
a. BCG FORM C-Subcontractor MBE-WBE SUBCONTRACTOR PARTICIPATION
NOTICE OF INTENT TO AWARD accompanied by a fully executed copy of the subcontract for each subcontractor.
b. Any other documentation required by the Buyer to ascertain Bidder’s/Offeror’s susceptibility of being selected for award in connection with the certified MBE/WBE participation goal.
NOTE: If the apparent awardee fails to return each completed document within the required time, THE PROCUREMENT OFFICER MAY DETERMINE THAT THE
APPARENT AWARDEE IS NOT RESPONSIBLE AND THEREFORE NOT
SUSPECTIBLE FOR CONTRACT AWARD.
x.x Prospective Bidders/Offerors are advised to carefully review the Minority and
Disadvantage Business Enterprise Package regarding MBE/WBE or DBE participation.
x.x All MBE/WBE subcontractors must be MDOT or Baltimore City certified at the time of bid/proposals submission to count towards the MBE/WBE solicitation subcontract goal.
x.x If the Bidder/Offeror is a certified Minority or Women Business Enterprise, it should be so indicated with the certification number in the Bid or Technical Proposal.
4. Under circumstances where mobilization payments are issued to the Prime Contractor, the subcontractor shall be paid an amount equal to their participation percentage no later than five (5) business days before they are required to mobilize to perform the contracted work.
The Prime Contractor shall submit proof of mobilization payment to subcontractors when the subcontractor performs their initial item of work in the MBE/WBE Compliance portal.
5. Prompt Payment
The Prime Contractor agrees to pay each subcontractor under this contract for satisfactory performance of its responsibilities under the applicable subcontract within 30 days of the subcontractor’s satisfactory completion of the work as accepted by Baltimore County, Maryland. The Prime Contractor agrees further to return retainage payments to each subcontractor within 30 days after the subcontractor’s satisfactory completion of work. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of Baltimore County, Maryland. This clause applies to both MBE/WBE and non-MBE/WBE subcontracts.
• The Prime Contractor shall report the subcontractor’s mobilization cost as the initial payment in the PRiSM Compliance Portal found under Compliance Reporting for Prime and Sub-Contractors at www.baltimorecountymd.gov/go/MBE/WBE.
• The Prime Contractor must include in its subcontract’s language providing that the Prime Contractor and the subcontractors will use appropriate alternative dispute resolution mechanisms to resolve payment disputes.
• The Prime Contractor will not be reimbursed for work performed by subcontractors unless and until the Prime Contractor ensures that the subcontractors are promptly paid for the work they have performed.
• Prime Contractors may be subject to liquidated damages pursuant to Maryland and/or Baltimore County law, to ensure that MBE/WBEs and other contractors are fully and promptly paid.
6. All Prime Contractors and MBE/WBE and/or DBE subcontractors are required to report monthly to the County through the online Compliance Portal (PRISM). The portal can be found under Compliance Reporting for Prime and Sub-Contractors at www.baltimorecountymd.gov/go/MBE/WBE. Prime Contractors must provide a contact person and contact information for the MBE/WBE compliance reporting. If the Prime Contractor cannot submit its report on time, it must notify the County MBE/WBE Office and request additional time to submit the report. Failure to report in a timely manner may result in a finding of noncompliance, and may result in a finding of default under the terms of the contract. The County, in its sole discretion, may require additional reports regarding MBE/WBE. Questions regarding the use of this system can be directed to the MBE/WBE Office at mwbe@baltimorecountymd.gov or call 410-887-3407.
UTILIZATION OF BALTIMORE COUNTY’S DEPARTMENT OF ECONOMIC AND
WORKFORCE DEVELOPMENT
Baltimore County’s First Source Hiring Agreement requires that developers, contractors, and employers utilize good faith efforts toward employing economically disadvantaged Baltimore County residents in newly created positions on applicable projects. These efforts are supported by Baltimore County’s workforce development system, a partnered network of business and economic development professionals, education and training providers, and human service agencies working together systematically to provide a ready supply of qualified workers to employers with hiring needs.
The Contractor may use Baltimore County’s Department of Economic and Workforce Development as a “First Source” for training and recruitment of employees. To utilize “First Source” the [Contractor/vendor] may notify the Department of Economic and Workforce Development of employment opportunities to present qualified candidates to the [Contractor/vendor] for consideration. The [Contractor/vendor] may use reasonable efforts to consider qualified Baltimore County residents who are either unemployed or under-employed for all available positions. For additional information call 410-887-8000 or visit:
http://www.baltimorecountymd.gov/Agencies/economicdev/business/workforce/recruiting-retention.html http://www.baltimorecountymd.gov/go/mwbe http://www.baltimorecountymd.gov/Agencies/economicdev/business/workforce/recruiting-retention.html http://www.baltimorecountymd.gov/Agencies/economicdev/business/workforce/recruiting-retention.html
CONFIDENTIALITY
Offerors must specifically identify any portions of their proposals deemed to contain confidential information, proprietary information or trade secrets. Those portions must be readily separable from the balance of the proposal. Such designations will not be conclusive, and offerors may be required to justify why such material should not, upon written request, be disclosed by the County under the Public Information Act, State Government Article, Title 10, Sub-Title 6, of the Annotated Code of Maryland, as amended. The County may disclose such information if required by law, court order or subpoena.
SUBMITTAL DUE DATE
All required forms must be received electronically on or before, but not later than 2:00 p.m. E.S.T.
on January 8, 2027. Late or incomplete submittals will not be considered. Material submitted will not be returned. Do not bind or fax submittals.
To be considered, submissions shall be received by the submittal due date and time to the following email address: dpwtpsec@baltimorecountymd.gov. Submissions may not be submitted by any other means. Submissions that are mailed or otherwise delivered to the Department of Public Works and Transportation (including emails which indicate links to locations where the bid may be downloaded) and/or emails sent to any other Baltimore County email address will not be accepted.
Late submissions will not be accepted. Firms are strongly encouraged not to wait until the last minute to submit bids. Submissions received after the deadline will not be accepted. Firms are advised that the County cannot receive email attachments greater in size than twenty-five (25) megabytes and this size limitation may be further reduced by requirements of the Firms email provider which are beyond the control of the County. Firms should consider separating any large bid attachments into multiple parts and emailing each part separately. In such case, Firms will note that each email is 1 of 2, 2 of 2, etc. Multiple part submissions will not be considered unless all parts are received by the submittal due date and time.
Lauren T. Buckler, PE, Director Department of Public Works and Transportation
Architecture and Engineering Firm Reference Submission Form
On-Call Collection, Pumping and Transmission System Modeling Services
Project No. 2026-04
Architect/Engineering Firm Information:
• Name of Firm:
Reference Information:
• Contact Person:
• Name of Organization:
• Position:
• Contact Information:
Instructions for Reference: Thank you for agreeing to provide a reference for the architecture and engineering firm named above. Your feedback will be instrumental in helping us evaluate their capabilities and reputation. Please provide an honest assessment based on your experience working with them. Please email the completed assessment form to Baltimore County Department of Public of Public Works and Transportation’s (DPW&T’s) procurement officer, Heather Panowicz, dpwtpsec@baltimorecountymd.gov.
Rating Scale:
• 1 = Poor
• 2 = Below Average
• 3 = Average
• 4 = Above Average
• 5 = Excellent
Evaluation Criteria:
1) Project Quality: Evaluate the overall quality of projects completed by the firm.
a) Score:
2) Technical Expertise: Assess the firm's technical proficiency in engineering and architecture.
a) Score:
3) Communication: Evaluate the firm's communication effectiveness and responsiveness.
4) Project Management: Assess the firm's ability to manage projects efficiently and meet budgets and deadlines.
a) Score:
5) Client Satisfaction: Rate the level of satisfaction as a client who has worked with the firm.
Comments: Please provide specific examples to support your ratings and any additional comments you believe are relevant.
Overall Recommendation: Based on your assessment, would you recommend this architecture and/or engineering firm for future projects?
BALTIMORE COUNTY, MARYLAND
USE OF MINORITY BUSINESS ENTERPRISES AND WOMEN’S BUSINESS ENTERPRISES
IN
COUNTY CONTRACTS
MWBE Plan Package
Division of Diversity, Equity and Inclusion The Jefferson Building
105 West Chesapeake Avenue Towson, Maryland 21204
410-887-3407 www.baltimorecountymd.gov/go/mwbe
MWBE Plan Packet Page| 2
PROSPECTIVE BIDDERS/OFFERORS
Baltimore County Executive Order 2022-005 Use of Minority Business Enterprises and Women’s Business Enterprises states:
SECTION 6. BID REQUIREMENTS.
(A)(l) All bidders shall submit a list of all subcontractors contacted in preparation of their bid package or proposal.
(2) The list shall include the service to be performed, bid amount, and the race/ethnicity/gender of the business owner(s).
(B)(l) All bidders shall submit a list of all subcontractors to be used on a county contract in the bid package.
(2) This list shall include all subcontractors (both MWBE and non-MWBE) used, the service to be performed, the total amount to be paid, and the race/ethnicity/gender of the owner.
If the solicitation includes a MWBE subcontracting goal, you MUST demonstrate “Good Faith” effort either by:
1. Complete and sign FORM A, FORM B (to include FORM B-Prime if MWBE Prime wishes to count towards the goal) and FORM C listing all subcontractors with the initial bid submission.
a. All Forms must be completed and signed. However, FORM C MUST be completed and signed by both the prime and the MWBE subcontractor.
OR
2. If you are unable to meet any portion of the goal, you MUST do one of the following:
a. If you are requesting a partial waiver, complete and sign FORM A with initial bid submission. FORM B (to include FORM B-Prime if MWBE Prime wishes to count towards the goal) and FORM C (listing all subcontractors). In addition, complete, sign and submit FORM D and FORM E accompanied with all supporting documentation for the portion of the goal that will not be achieved as specified on
FORM A.
b. If you are requesting a full waiver, complete and sign FORM A indicating your intent to request a full waiver accompanied with a completed and signed FORM C listing all subcontractors, FORM D and FORM E accompanied with all supporting documentation. This MUST be submitted with the initial bid as specified on FORM A.
c. All Forms must be completed and signed. FORM C and FORM D MUST be completed and properly signed by both the Prime AND the MWBE subcontractor(s).
NOTE: The MWBE subcontracting goal applies to ALL prime/general contractors including certified and non-certified minority and women owned firms. However, a Minority-owned or a Women-owned prime may self-perform up to 50% of MWBE subcontracting goal set in the solicitation. The MWBE primes that wish to count towards the goal must list themselves on all appropriate forms.
12/2023
MWBE Plan Packet Page| 3
MWBE PARTICIPATION SUMMARY
Executive Order: Minority Business Enterprises and Women Business Enterprises (MWBE) shall have the maximum opportunity to participate in the performance of contracts financed in whole, or in certain circumstances, in part with County funds. Accordingly, on December 6, 2022, the County Executive adopted the EXECUTIVE ORDER No. 2022- 005 addressing MWBE participation in County contracts. The December 6, 2022 Executive Order may be found on the Baltimore County website at www.baltimorecountymd.gov/go/mwbe.
Each Contract: The County shall establish a minimum MWBE participation amount for each contract, as applicable.
Bidder/Offeror Responsibility: The bidder/offeror shall ensure that MWBE participation occurs in accordance with the contract requirements and the County Executive’s Executive Order. All bidder/offerors shall ensure that MWBE have the maximum opportunity to compete for and perform County contracts, as applicable. Baltimore County, Maryland, and/or its bidder/offerors and contractors shall not discriminate on the basis of race, color, national origin, disability or sex in the award and performance of any County contract.
Mobilization Payments: For subcontractors, project start-up costs can also be significant. A subcontractor that has limited resources and access to credit may find that start-up expenses inhibit its ability to bid County contracts. Under circumstances where mobilization payments are approved for the prime contractor, the subcontractor should be paid an amount equal to their participation percentage no later than five (5) business days before they are required to mobilize to perform the contracted work.
Mobilization costs represent pre-contract costs incurred by a contractor to prepare a job site before the actual commencement of the contract. These costs can include movement of personnel and equipment to the project site and for the establishment of the Contractor’s offices, buildings, and other facilities necessary to begin work.
APPROVED MWBE LISTINGS
Published compilations of approved and certified MWBE, contractors, subcontractors, material suppliers, etc. include:
DIRECTORY OF MINORITY BUSINESS ENTERPRISE (MDOT):
https://marylandmdbe.mdbecert.com
MINORITY BUSINESS DIRECTORY OF THE CITY OF BALTIMORE:
https://baltimorecity.diversitycompliance.com
BIDDER/OFFEROR’S ACTIONS
Seeking Firms:
The bidder/offeror will seek commitments by subcontract or otherwise from MWBE firms for supplies and/or services, any combined value of which equals or exceeds the required percentage of MWBE participation goal for the County contract. However a MWBE Prime that affirms its MWBE status on the Minority and/or Women Prime Participation Affidavit may count up to 50% of the goal.
Expenditures for Materials and Supplies:
A bidder/offeror may count toward its MWBE contract requirements all expenditures for materials and supplies obtained from MWBE suppliers and manufacturers, provided that the MWBE firm is furnishing and installing the materials and is certified to perform these services. If the MWBE firm is only being used as a supplier, wholesaler and/or regular dealer or is not certified to install the supplies/materials, for purposes of achieving the MWBE participation goal, you may only count sixty percent (60%) of the value of the subcontract for these supplies/products (60% Rule). To apply the 60% Rule, first divide the amount of the subcontract for these supplies/products only (not installation) by the total Contract value. Then, multiply the result by sixty percent (60%) and insert the percentage in the Percent of Total Contract field of Form B Subcontractor Participation Schedule.
MWBE Plan Packet Page| 4
MWBE PARTICIPATION SUMMARY
Information to be supplied: All bidder/offerors shall submit the following information to the County at the time of bid submission:
1. The name of an employee designated as the bidder/offeror’s liaison to the County’s Minority Business Enterprise Office.
2. The following forms shall be completed and submitted:
• Certified MWBE Utilization and Fair Solicitation Affidavit (Form A); from among those names appearing in the
Approved MWBE Listings (excepting Federal Highway Administration projects, which exclusively require DBE approved and certified by the Maryland Department of Transportation MBE Advisory Committee);
• A Subcontractor Participation Schedule (Form B) completed by the prime contractor for each MWBE listed on the Form.
• A MWBE Prime Participation Schedule (Form B-Prime) completed by a MWBE prime contractor if the firm wishes to self-perform up to 50% of the MBE/WBE goal.
• A MWBE Disclosure and Participation Statement (Form C) completed and signed by the prime contractor and MWBE firm for each MWBE listed on the Form. Form C must match what is stated on Form B.
• If applicable, MWBE Subcontractor Unavailable Certificate (Form D) completed and signed by the prime contractor and MWBE for each MWBE listed on the Form.
3. If applicable, MWBE Outreach Efforts - Compliance Statement (Form E) completed and signed by the Bidder/Offeror. The prime shall submit a list of all subcontractors.
4. For DPW contracts, if the bidder/offeror intends to fulfill the MWBE requirements by use of a joint venture, he/she must submit a Joint Venture Disclosure Affidavit (Form D-EEO-006-A and B showing the extent of MWBE participation. If a bidder/offeror intends to use a MWBE joint venture as a subcontractor to meet its MWBE requirements, the affidavit must be submitted through the bidder/offeror by the proposed subcontractors and signed by all parties.
5. If the bidder/offeror’s proposed MWBE participation does not meet the MWBE contract requirements, information sufficient to demonstrate that the bidder/offeror has made every effort to meet the requirements must be submitted. (See DETERMINATION OF BID RESPONSIVENESS hereafter)
RECORDS AND REPORTS
Returning Records: The bidder/offeror must keep such records as are necessary to determine compliance with its MWBE utilization requirements:
1. The MWBE and non-minority contractors, type of work being performed, actual values of work and services.
2. Documentation of all correspondence, contacts, telephone calls, etc., to obtain MWBE services for the contract.
3. All prime contractors and MWBE sub-contractors are required to report monthly, by the 10th of each month, to the County through an online system called PRISM. If the contractor cannot submit his/her report on time, he/she will notify the County MWBE office and request additional time to submit the report. Failure of the contractor to report in a timely manner may result in a finding of noncompliance. The County in its sole discretion and/or upon written request may require additional reports regarding MWBE. In the event you are not able to enter your payments in PRiSM, a spreadsheet is attached for your use. Please be sure to list the PO for each invoice/ payment reported and include in your submission any corresponding documentation (e.g. copies of invoices or cancelled checks).
Retaining Records: All MWBE records must be retained for 3 years following the expiration or any earlier termination of the contract and shall be available for inspection and photocopying by the County.
Investigation and Notification: Whenever the County believes the bidder/offeror, contractor, or any subcontractor may not be operating in compliance with the MWBE requirements, the County may, in its sole discretion, conduct an investigation. If the County finds the bidder/offeror, contractor, or any subcontractor is not in compliance with the MWBE requirements, the County may exercise any and all rights and remedies available to the County, under the contract, at law or equity, as deemed applicable and appropriate by the County in its sole discretion.
MWBE Plan Packet Page| 5
MWBE PARTICIPATION SUMMARY
DETERMINATION OF BID RESPONSIVENESS
Request for Deviation: If the bidder/offeror is unable to procure from MWBE firms (by subcontract or otherwise), supplies and services, any combined value of which equals the required percentage of the total value of the contract, the bidder/ offeror may request, in writing, a deviation or waiver of the contract requirements. To obtain such a waiver, the bidder/ offeror must submit the following information at the time bids are due:
1. The request for waiver request shall include (1) a signed unavailability statement (Form D) executed by all MBEs and WBEs that the bidder/offeror solicited for participation and (2) Outreach Efforts/Compliance Statement (Form E) that demonstrates the bidder/offeror’s good faith efforts to comply with the contract requirements, including copies of solicitation documentation to all potential subcontractors:
2. Emails, letters, facsimile transmittals and confirmations containing plans, specifications, and anticipated time schedule for portions of the work to be performed and meeting notes and agendas clearly identifying the certified MBE or WBE classification and dates that the bidder/offeror contacted each MWBE; and
3. Telephone logs containing names, addresses, dates, telephone numbers, work to be performed, anticipated time schedule and classification of certified MBEs and WBEs contacted.
Bid Rejection: The failure of any bidder/offeror (including the apparent low bidder/offeror) to provide a responsive MWBE Plan as required by the solicitation may result in the bidder/offeror being deemed non-responsive and the County’s rejection of the bid.
Liquidated Damages If the County issues a notice of intent to awards contract to the apparent low bidder/offeror who provided a responsive MWBE Plan, but, if after said notice and before execution of Contract Documents, it is determined by the County that the apparent low bidder/offeror has failed to comply with the MWBE Plan, such failure may result in the recommendation by the appropriate Procurement Official to annul the award and forfeit the bidder/offeror’s Proposal Guaranty to the County, not as a penalty, but as liquidated damages, it being acknowledged that actual damages will be difficult if not impossible to accurately measure. In addition, the County may proceed as it determines to be in its best interest, including but not limited to, the Notice of Award may be made to the next lowest responsive and responsible bidder/offeror or the work may be re-advertised.
Contract Breach: If, after execution of a County contract, the contractor becomes aware it may or will fail to fulfill the applicable MWBE requirements and/or may or will deviate from the contractor’s bid response/contract terms, the contractor shall promptly advise the County of this in writing. Thereafter, the County will determine what action or remedy is appropriate on a case-by-case basis, in the County’s sole discretion.
Approval Required for Changes: Any and all changes to the MWBE subcontractors or the type or amount of work to be performed by such subcontractors during the contract term must be mutually agreeable to the County and the contractor and shall be documented via a contract amendment, executed by legally authorized representatives of the County and the contractor.
Cooperation in Reviews: The bidder/offeror will cooperate with the County in any reviews of the contractor’s procedures and practices with respect to MBE or WBE firms, which the County may from time to time conduct in its sole discretion.
Other: If the documents used to determine the contractor’s efforts, achievement of, and/or the status of an MWBE requirement or fulfillment thereof contain false, misleading or misrepresented information, the contractor may be declared in breach of the contract and the County may take any and all actions and/or remedies available to the County under the contract, at law, or in equity. If an MWBE is disqualified by any public entity, including but not limited to, Baltimore City, the State or MDOT, at any time after award or during the term of the contract, the County may, in its sole discretion, require the prime contractor to promptly submit for County approval, the contractor’s plans for fulfilling the required MWBE participation under the contract, and/or request such detail and additional information as the County, in its discretion deems appropriate.
MWBE Plan Packet Page| 6
PRIME CONTRACTOR MINORITY AND WOMEN PARTICIPATION AFFIDAVIT
A. AUTHORIZED REPRESENTATIVE
I HEREBY AFFIRM THAT:
I am the [title] and the duly authorized representative of [business]
(the “Business”) and that I possess the legal authority to make this Affidavit on behalf of myself and the Business for which I am acting.
B. AFFIRMATION REGARDING MINORITY AND WOMEN PARTICIPATION
I FURTHER AFFIRM THAT:
I am aware that, pursuant to the December 6, 2022 Executive Order of Baltimore County, Maryland, the following words have the meanings indicated.
(A) “Minority Business Enterprise” or “MBE” means a business enterprise that is owned, operated and controlled by one or more minority group members (African American, Hispanic American, Asian American, or Native American) who have at least 51% ownership and in which the minority group members have operational and managerial control, interest in capital and earnings commensurate with their percentage of ownership.
(B) “Women’s Business Enterprise” or “WBE” means a business enterprise that is owned, operated and controlled by one or more women who have at least 51% ownership and in which the women have operational and managerial control, interest in capital and earnings commensurate with their percentage of ownership.
The Prime is a MBE or WBE
Maryland State Department of Transportation (MDOT) #
City of Baltimore #
Name Other Jurisdiction: #
The ownership of the Noncertified MWBE business consists of ___% minorities and % women (for a total of %), each of which has operational and managerial control, interest in capital and earnings commensurate with their percent ownership.
% African American % Hispanic American % Women % Asian American % Native American % Disadvantaged (DBE)
The MWBE prime anticipates meeting up to 50% of the stated participation goal with its own workforce.
MWBE primes percentage must be stated on the MWBE PRIME PARTICIPATION SCHEDULE (FORM B- PRIME) to count towards the goal.
The prime anticipates does not anticipate utilizing subcontractors for % of the work of the contract requirements, of which it anticipates % will be MBEs and % will be WBEs.
I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT THE CONTENTS OF THIS AFFIDAVIT ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION, AND
BELIEF.
Date: By:
(Authorized Representative and Affiant’s Name and Title) PB040 Revised 12/2024
MWBE Plan Packet Page| 7
*This document must be completed and submitted with Bid/Proposal to Baltimore County.
NOTE: If you do not complete and submit this form with your bid or offer to the County, the County may, in its sole discretion, deem your bid or offer NON-RESPONSIVE and accordingly the COUNTY WILL NOT CONSIDER YOU
FOR CONTRACT AWARD.
I acknowledge the goal for solicitation # _____ is a minimum of %. This goal must be met by any combination of the MWBE subcontractors. However, for instances where the Prime is counting up to 50% of the goal, the remaining goal balance must be met by any combination of the MWBE subcontractors.
• The goal breakdown is as follows:
o % Minority/Women Prime o % for certified MBE-owned businesses and/or o % for certified WBE-owned businesses.
I have made a good-faith effort to achieve this MWBE solicitation requirement. If awarded the contract, I will comply with this MWBE contract requirement and will continue to use my best efforts to increase MWBE participation during the contract term.
PLEASE CHECK ONE BOX (EITHER 1, 2, OR 3)
1 Prime has met the MWBE contract requirements for this solicitation and contract. I submit the Subcontractor Participation Form B and Form C, along with this Affidavit, which details how the Prime will achieve the contract requirements. Submit a complete list of all additional subcontractors
Or 2 After having made a good-faith effort to achieve the MWBE requirements, the Prime can only achieve partial success. I submit the Subcontractor Participation Form B, Form C, Form D and Form E along with this Affidavit, which details how the Prime will partially achieve the contract requirements. Submit a complete list of all additional subcontractors
I request a partial waiver and will meet the following MWBE participation goals:
• Partial waiver of MWBE subcontract participation:
o % Minority/Women Prime o % for certified MBE-owned businesses and/or o % for certified WBE-owned businesses.
Or 3 After having made a good faith effort to achieve the MWBE requirements for this contract, the Prime is unable to achieve the requirements and/or sub requirements for this contract. I submit the MWBE Participation Form D and Form E, along with this Affidavit, which details the steps the Prime has taken in an attempt to achieve the contract requirements. Therefore, I request a full waiver.
IF YOU HAVE CHECKED BOX 2 OR 3, THE FOLLOWING IS APPLICABLE:
1) If a bidder is unable to comply with the goals established in a bid for a project, the bidder may submit a request for a waiver at the time of bid submission. However, occasions for granting waivers will be limited.
BALTIMORE COUNTY, MARYLAND
Certified MWBE Utilization and Fair Solicitation Affidavit
(FORM A)
MWBE Plan Packet Page| 8
2) The request for waiver shall include documentation that demonstrates the bidder’s good faith efforts to comply with the goals, including:
a. Signed unavailability statements from all MBEs and WBEs that the bidder solicited for participation; and
b. Copies of solicitation documentation to include the scope of services to be performed by the subcontractors accompanied with the following:
i. Emails, letters, facsimile transmittals and confirmations containing plans, specifications, and anticipated time schedule for portions of the work to be performed and meeting notes and agendas clearly identifying the certified MBE or WBE classification and dates that the bidder contacted each; and
ii. Telephone logs containing names, addresses, dates, telephone numbers, work to be performed, anticipated time schedule and classification of certified MBEs and WBEs contacted.
iii. Responses from MWBE firms contacted to fulfill the goal.
As I have checked Box 2 or 3 of this Affidavit, I understand I must submit the following supporting documentation with the bid:
• Subcontractor Participation Schedule (Form B)
• MWBE Subcontractor Disclosure and Participation Statement (Form C)
• MWBE Subcontractors Unavailable Certificate (Form D) (if applicable)
• MWBE Outreach Efforts – Compliance Statement (Form E) (if applicable)
I acknowledge that the MWBE subcontractors/suppliers listed on the Subcontractor Participation Schedule (Form B) will be used to accomplish the percentage of MWBE participation that the Prime shall achieve. A fully executed Form C must match Form B.
In the solicitation of subcontract quotations or offers, MWBE subcontractors were provided the same information and amount of time to respond, as were non-MWBE subcontractors.
The solicitation process was conducted in such a manner so as to not place MWBE subcontractors at a competitive disadvantage to non-MWBE subcontractors.
I solemnly affirm under the penalties of perjury that this Affidavit is true to the best of my knowledge, information, and belief.
Bidder/Offeror Name Phone Number
Address Affiant Signature
Address (continued) Printed Name & Title
E-mail address Date
BALTIMORE COUNTY, MARYLAND
Certified MWBE Utilization and Fair Solicitation Affidavit
(FORM A)
MWBE Plan Packet Page| 9
Rev 12/2024
MBE or WBE Prime…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .