2026-036 SCHOOL - GHS Locker Room Project Bid Drawings.pdf
PDF 18 MB Posted
- Attached to
- 2026-036 GHS Locker Room Renovation
- Solicitation number
- BD-26-1441-COG01-COG01-127754
- Issued by
- Massachusetts
About this file
This is a bid drawings document prepared by Tighe & Bond for the City of Gardner, Massachusetts School Department for the GHS Locker Room Project (Project No. G-0384-103). The project consists of renovation of the existing boys' and girls' locker rooms at Gardner High School, including the fit-out of new team rooms, renovated locker rooms, training room, conditioning spaces, and ancillary athletic facilities. The scope of work encompasses demolition of existing systems, installation of new partitions, finishes, plumbing fixtures, HVAC equipment including two rooftop air handling units (DOAS-1 and DOAS-2) with supplementary steel and roof patch and flashing, electrical systems, fire alarm devices, lighting, and data/communication infrastructure. The complete construction document set comprises 54 sheets and was issued for bidding on April 8, 2026. The drawings include detailed architectural, structural, mechanical, electrical, and plumbing plans; demolition schedules; finish plans; door and frame specifications; shower and toilet layouts; reflected ceiling plans; HVAC ductwork and piping plans; plumbing first floor and underground plans; electrical lighting, power, technology, and fire alarm plans; and comprehensive detail sheets.
The project involves renovation of approximately 7,600 square feet of locker room and associated athletic spaces within the gymnasium wing, with work areas including boys locker room (G-30), girls locker room (G-15), multiple team rooms, showers, storage, training, conditioning, and equipment spaces. New partition types are specified with fire ratings and acoustic properties; plumbing demolition and new installation includes multiple floor drains, shower valves, water supply and return lines, and sanitary waste piping; HVAC work includes supply and return ductwork distribution to multiple spaces with VAV terminal units; electrical work includes new lighting fixtures, emergency battery units, occupancy sensors, power receptacles for washers and dryers, fire alarm devices including duct smoke detectors and horn/strobe combinations, and technology infrastructure including wireless access ports and data cabling. The design basis includes Massachusetts State Building Code 10th Edition, 2021 Massachusetts Stretch Code, and 2021 International Energy Conservation Code compliance, with specific ASHRAE outdoor air design criteria and indoor conditioning requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-036 SCHOOL - GHS Locker Room Renovation Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .