This is a construction document set for the Rock House Restoration project, a historic preservation initiative managed by McDuffie County in Thomson, Georgia. The project entails the comprehensive restoration of the circa 1799 Rock House, Georgia's oldest stone building and a property listed on both state and National Registers of Historic Places. The scope of work encompasses foundation drainage and waterproofing installation, construction of new porches at the south and north elevations, complete roof replacement using wood shingles, installation of new chimney caps, cleaning and maintenance of stone masonry walls, repair of exterior wood elements, installation of new window sashes and door restoration, interior structural reinforcement, restoration of limewashed wall surfaces, and removal of electrical systems. The project adheres strictly to the Secretary of the Interior's Standards for Restoration, with design intent to return the structure to its condition following a 1979-80 restoration while addressing significant deterioration from vandalism and weather exposure. The construction documents, dated January 5, 2026, represent 100 percent completion design review and include detailed architectural, structural, civil, mechanical, plumbing, and electrical plans prepared by a multidisciplinary team including Architectural Collaborative, Ethos Preservation, Sheats Structural Consulting, Ensembled Architecture and Engineering, and Koons Environmental Design.
The project includes two additive alternates addressing roofing material specifications: ALT-1 specifies installation of 16-ounce cold-rolled flat-seamed tin-zinc-coated copper roofing at porch roofs as a substitute for standing seam roofing, and ALT-2 substitutes cold-rolled uncoated copper for all roofing and flashings designated as tin-zinc-coated copper. Work requirements emphasize archaeological monitoring during ground disturbance activities, preservation of historic materials through repair rather than replacement, utilization of salvaged materials from the structure where feasible, and compliance with local building codes and environmental regulations. The contractor is responsible for field verification of all dimensions, provision of temporary environmental controls including erosion and sediment control, temporary utilities, sanitary facilities, and waste management. Construction specifications detail requirements for concrete work per ACI 318 standards, thermally-modified lumber for new exterior wood components, compatible lime-based mortar for masonry repointing, and careful graffiti removal and wood treatment protocols designed to minimize damage to historic finishes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 2026_04_002 Rock House Renovation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
NOTE: NOT ALL ABBREVIATIONS AND SYMBOLS ARE USED ON DRAWINGS CONTAINED IN THE SET. SYMBOLS AND
ABBREVIATIONS ON THIS SHEET APPLY ONLY TO ARCHITECTURAL DRAWINGS
ACOUSTIC
ADHESIVE
ADDENDUM
AREA DRAIN
ACRYLIC
ACST
A/C
APC
ADD
ADH
AD
ACR
ADJUSTABLE
ALTERNATE
ALUMINUM
ANODIZED
ASPHALT
ADJST
AFF
AHU
ALUM
AL
ANOD
ARCH
ASPH
APPROX
ADJ ADJACENT
AIR CONDITIONING
ACOUSTICAL CEILING TILE
AIR HANDLING UNIT
ABOVE FINISHED FLOOR
ARCHITECT(URAL)
APPROXIMATE (LY)
FLOOR DRAIN
FINISH(ED)
FIRE EXTINGUISHER
FEC
FD
FBO
FIN
FEX
FUTURE
FOOTING
FOUNDATION
FIRE RESISTIVE
FACE OF STUD
FOOT, FEET
GAUGE, GAGE
GALVANIZED
GYPSUM BOARD
GRAB BAR
FND
FOS
FR
FTG
FUT
FT
GA
GB
GALV
GBAR
FLR(G) FLOOR (ING)
FURNISHED BY OWNER
FIRE EXTINGUISHER CABINET
AUTOMATIC
BETWEEN
BOARD
BEAM
BLOCK (ING)
BUILDING
BOTTOM
BY OTHERS
AUTO
BTWN
BD
BLK(G)
BLDG
BOT
BO
BM
BRICK
BEARING
BASEMENT
BOTH SIDES
CABINET
CORNER GUARD
BS
BRK
BRG
BUR
BSMT
CFM
CAB
CG
BR BACKER ROD
CUBIC FEET/MINUTE
BUILT UP ROOFING
CEILING
CLOSET
CENTERLINE
CONTROL JOINT
CENTER
COLUMN
CLEANOUT
CLEAR (ANCE)
CJ
CIPC
CLG
CLO
CL
CMU
CTR
COL
COMP
CO
CLR
CONCRETE
CORRIDOR
COORDINATE
CORRUGATED
CONTRACT (OR)
CERAMIC TILE
CARPET (ED)
COLD WATER
CONC
CONT
CONTR
CORR
CT
CPT
CW
COORD
CORRUG
CSNK
CONST CONSTRUCTION
CONCRETE MASONRY UNIT
CAST-IN-PLACE CONCRETE
COMPRESS(ED, ION, IBLE, OR)
CONTINUOUS OR CONTINUE
COUNTERSINK/COUNTERSUNK
GRILLE
GLASS, GLAZING
GR
GL
GC GENERAL CONTRACT (OR)
DOUBLE
DISPOSAL
DIMENSION
DIAMETER
DEEP
DAMPPROOFING
DOWN
DF
DEMO
DBL
DIAM
DISP
DIM
DP
DPF
DN
DOWNSPOUT
DRAWING
DETAIL
EACH
DS
DWG
DTL
EA
EJ
DOOR DR
DRINKING FOUNTAIN
DEMOLISH, DEMOLITION
EXPANSION JOINT
ELEVATION
ELECTRIC (AL)
ENTRANCE
ENCLOSE (URE)
EQUIPMENT
EQUAL
EXHAUST
ELEV
ELEC
ENT
ENC
EQ
EQP
EWC
EXH
EXPOSED
EXISTING
EXTERIOR
EXPANSION EXPN
EXP
EXIST
EXT
ELECTRIC WATER COOLER
CONTENT INDEX
DISCIPLINE INDEX
SHEET NUMBERING
MATERIAL PATTERNS
TEXT SYMBOLS
GRAPHIC SYMBOLS
9'-0"
C
A
E
L
M
G
P
S
A-401
X
:OR/
X'
X"
ROOM IDENTIFICATION:
DETAIL IDENTIFICATION: DASHED
LINE INDICATES EXTENT OF
ENLARGED PLAN OR DETAIL
CEILING HEIGHT ABOVE FLOOR
TOILET ACCESSORY INDICATOR:
TA= TOILET ACCESSORY
NUMBER= ITEM NUMBER
WORK NOTE INDICATOR
WINDOW OR LOUVER TYPE INDICATOR:
WINDOWS HAVE A NUMBER DESIGNATION
LOUVERS HAVE A LETTER DESIGNATION
WALL TYPE INDICATOR: REFER
TO THE WALL TYPES SHEET FOR
WALL TYPE ASSEMBLY.
NORTH INDICATOR
INTERIOR ELEVATION SYMBOL: THE
DARKENED CORNERS INDICATE DRAWN
WALLS. ELEVATION DRAWINGS ARE
ARRANGED NUMERICALLY BY ROOM
NUMBER ON THE INTERIOR ELEVATION
SHEETS.
STRUCTURAL GRIDLINE IDENTIFIER
EXTERIOR ELEVATION SYMBOL:
UPPER=THE ELEVATION NUMBER
LOWER=THE SHEET WHERE DRAWN
MATCHLINE FLAG
ELECTRICAL DRAWINGS
ARCHITECTURAL DRAWINGS
CIVIL OR SURVEY DRAWINGS
LANDSCAPE DRAWINGS
MECHANICAL DRAWINGS
GENERAL INFORMATION
PLUMBING DRAWINGS
STRUCTURAL DRAWINGS
BUILDING SECTIONS
EXTERIOR ELEVATIONS
ROOF DRAWINGS
SCHEDULES
SUPPLEMENTAL DRAWINGS
SUPPLEMENTAL DWGS
DISCIPLINE ABBREVIATION
DETAILS
SHEET NUMBER
BATT INSULATION
BRICK
CONCRETE BLOCK
CAST-IN-PLACE CONCRETE
EARTH OR BACKFILL
PLANS INCLUDING SITE, FLOOR, CEILING AND
GENERAL INFORMATION AND STANDARDS
ENLARGED PLANS, SECTIONS AND ELEVATIONS
DRAWING CONTENT CATEGORY
STEEL
PLYWOOD
PRECAST CONCRETE
AND
AT
BY
RIGID INSULATION
PER
(X) FEET
POUND OR NUMBER
(X) INCHES
PLASTER & GYPSUM BOARD
NUMBER= ITEM NUMBER
EQUIPMENT TYPE INDICATOR:
LETTER= GROUP FUNCTION
A
A-410
WA.1
TA-2
WALL SECTION SYMBOL:
UPPER=THE SECTION NUMBER
LOWER=THE SHEET WHERE DRAWN
CABINET TYPE SYMBOL:
UPPER=CABINET STYLE
LOWER=CABINET SIZE IN INCHES
BUILDING SECTION SYMBOL:
UPPER=THE SECTION NUMBER
LOWER=THE SHEET WHERE DRAWN
A
DETAIL SYMBOL:
UPPER=THE SECTION NUMBER
LOWER=THE SHEET WHERE DRAWN
SYMBOLS LEGEND
Room name
N
E-1
IF INTERIOR FURNISHINGS
T TECHNOLOGY DRAWINGS
AV AUDIO VISUAL DRAWINGS
FP FIRE PROTECTION
VT VERTICAL TRANSPORTATION DRAWINGS
A1.1
A1.1
A1.1
A-410
PRESSURE TREATED
PAVEMENT
PLYWOOD
QUANTITY
POLYVINYL CHLORIDE
PSI
PSF
PT
PVMT
QTY
PWD
PVC
RADIUS
REMOVE
ROOF DRAIN
REFERENCE, REFER TO
REINFORCING
ROOM
REQUIRE (D)
RIGHT OF WAY
ROUGH OPENING
RD
RE
REINF
REM
RCP
RAD
RM
REQ
RO
ROW
R
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
RESISTANCE, THERMAL, RISER
REFLECTED CEILING PLAN
SCHEDULE
RESTROOM
SOLID CORE
SPLASH BLOCK
SECTION
SHEET
STORM DRAIN
RR
SC
SBLK
SCH
SD
SHT
SEC
SIMILAR
SLAB ON GRADE SOG
SIM
SHEATHING SHTH
LINEAL
LIBRARY
LOCKER
LIGHT
MAINTAIN (ENANCE)
MAXIMUM
MASONRY
LIB
LIN
LKR
LT
MAINT
MC
MAS
MAX
MECHANICAL CONTRACTOR
METAL
MINIMUM
MANHOLE
MECHANIC (AL)
MANUFACTURE (ER)
MISCELLANEOUS
MOUNT (ED), (ING)
MASONRY OPENING
MIRROR
MET
MECH
MIN
MH
MFR
MISC
MT
MR
MO
MIR
NOMINAL
NUMBER
NOISE REDUCTION COEFFICIENT
NOT IN CONTRACT
NOT TO SCALE
OVERALL
OBSCURE
ON CENTER (S)
NRC
NO
NOM
NIC
NTS
OA
OB
OC
MTL MATERIAL (S)
OPENING
OPPOSITE HAND
OUTSIDE DIAMETER
OPPOSITE
OVERHEAD
PERPENDICULAR
PARALLEL
OUNCE
OH
OD
OPG
OPP
OPH
ORD
PC
PERP
PAR
OZ
PAINT(ED)
PLUMBING
PLASTIC LAMINATE PLAM
PLBG
PNT
PLATE PL
MOISTURE RESISTANT
OVERFLOW ROOF DRAIN
PRECAST CONCRETE
NOT APPLICABLENA
NONE REQUIRED NR
RB RESILIENT BASE
PORCELAIN PRN
OWNER FURNISHED CONTRACTOR INSTALLED
OFCI
HOLLOW CORE
HOSE BIB HB
HC H
HOUR
HEIGHT
HARDWARE
HOLLOW METAL
HIGH POINT
HORIZONTAL
HEATER
HOT WATER
HM
HOR
HDW
HR
HT
HPT
HW
HTR
HVAC
HWH
HCAP HANDICAPPED
INCH(ES)
INFORMATION
INCANDESCENT
INSULATE (D), (ION)
INSIDE DIAMETER
INCLUDE (D), (ING)
INVERT
JOINT
LABORATORY
INTERIOR
IN
ID
INCAN
INS
INFO
INCL
INV
LAB
JT
INT
POUND(S)
LAVATORY LAV
LB
LAM LAMINATE (D)
HEATING/VENTILATION/AC
HOT WATER HEATER
SQUARE
SPECIAL
SPECIFICATION (S)
STAINLESS STEEL
SQ
SPEC
SPL
SST
STEEL
STORAGE
STANDARD
STRUCTURAL
TREAD
SUSPENDED
SYMMETRICAL
TOP AND BOTTOM
STRUC
STL
STO
STD
STC
T
T&B
SUS
SYM
TELEPHONE
THRESHOLD
TONGUE AND GROOVE
TEMPERATURE
THICK (NESS)
TOP OF
TOP OF BEAM
TOP OF PARAPET
TOP OF INSULATION
TOP OF CURB
THROUGH
TEMP
THK
THR
T&G
TEL
TO
TOB
TOI
TOP
TOC
THRU
SOUND TRANSMISSION CLASS
TRANSOM
TOP OF STEEL
TOILET PARTITION
TOP OF WALL
TYPICAL
TERRAZZO
TUBE STEEL
TELEVISION
TR
TOW
TPART
TOSTL
TPD
TV
TS
TZ
TYP
UNFINISHED
VAPOR BARRIER
VARIABLE (VARIES)
URINAL
UL
UNFIN
UON/UNO
VB
VCT
VAR
UR
TOILET PAPER DISPENSER
UNDERWRITERS LABORATORY
UNLESS OTHERWISE NOTED
VINYL COMPOSITION TILE
VESTIBULE
WITH
VERIFY IN FIELD
WIDE OR WIDTH
WOOD
WITHOUT
WATER CLOSET
WATERPROOF (ING)
VIF
W
VEST
W/
W/O
WP (G)
WD
WC
WATER RESISTANT
WELDED WIRE FABRIC WWF
WR
VERTICAL VERT
TOP OF SLAB TOS
TOP OF MASONRY TOM
SHEET TABLE OF CONTENTS PROJECT TEAMS
ARCHITECT
ARCHITECTURAL COLLABORATIVE (ARCOLLAB)
1328 PRINCE AVENUE, SECOND FLOOR
ATHENS, GA 30606
CONTACT: JOE SMITH, PRINCIPAL
OFFICE: 706.355.3010
EMAIL: JOE@ARCOLLAB.NET
PRESERVATION CONSULTANT
ETHOS PRESERVATION
303 MARTIN LUTHER KING JR. BLVD.
SAVANNAH, GA 31401
CONTACT: REBECCA FENWICK, PRINCIPAL
OFFICE: 912.329.9617
EMAIL: REBECCA@ETHOSPRESERVATION.COM
STRUCTURAL ENGINEER
SHEATS STRUCTURAL CONSULTING (SSCI)
P.O. BOX 1775
WINDER, GA 30680
CONTACT: REED SHEATS, PE, SE, PRESIDENT
OFFICE: 770.868.9000
EMAIL: RSHEATS@SHEATSCONSULTING.COM
MEP ENGINEER
ENSEMBLED ARCHITECTURE AND ENGINEERING, LLC
125 S. MILLEDGE AVENUE, SUITE A
ATHENS, GA 30605
CONTACT: VINCENT BRICKA, PE
OFFICE: 706.207.9751
EMAIL: VBRICKA@ENSEMBLEDAE.COM
CIVIL/LANDSCAPE
KOONS ENVIRONMENTAL DESIGN (KED)
675 PULASKI STREET, SUITE 2000
ATHENS, GA 30601
CONTACT: JOSH KOONS, RLA
OFFICE: 706.353.3838
EMAIL: JOSH@KOONSDESIGN.COM
ALTERNATES
SECRETARY OF THE INTERIOR'S STANDARDS FOR
REHABILITATIONPROJECT SCOPE
1. A PROPERTY SHALL BE USED FOR ITS HISTORIC PURPOSE OR BE PLACED IN A NEW USE THAT
REQUIRES MINIMAL CHANGE TO THE DEFINING CHARACTERISTICS OF THE BUILDING AND
ITS SITE AND ENVIRONMENT.
2. THE HISTORIC CHARACTER OF A PROPERTY SHALL BE RETAINED AND PRESERVED. THE
REMOVAL OF HISTORIC MATERIALS OR ALTERATION OF FEATURES AND SPACES THAT
CHARACTERIZE A PROPERTY SHALL BE AVOIDED.
3. EACH PROPERTY SHALL BE RECOGNIZED AS A PHYSICAL RECORD OF ITS TIME, PLACE, AND
USE. CHANGES THAT CREATE A FALSE SENSE OF HISTORICAL DEVELOPMENT, SUCH AS
ADDING CONJECTURAL FEATURES OR ARCHITECTURAL ELEMENTS FROM OTHER BUILDINGS,
SHALL NOT BE UNDERTAKEN.
4. MOST PROPERTIES CHANGE OVER TIME; THOSE CHANGES THAT HAVE ACQUIRED HISTORIC
SIGNIFICANCE IN THEIR OWN RIGHT SHALL BE RETAINED AND PRESERVED.
5. DISTINCTIVE FEATURES, FINISHES, AND CONSTRUCTION TECHNIQUES OR EXAMPLES OF
CRAFTSMANSHIP THAT CHARACTERIZE A HISTORIC PROPERTY SHALL BE PRESERVED.
6. DETERIORATED HISTORIC FEATURES SHALL BE REPAIRED RATHER THAN REPLACED. WHERE
THE SEVERITY OF DETERIORATION REQUIRES REPLACEMENT OF A DISTINCTIVE FEATURE, THE
NEW FEATURE SHALL MATCH THE OLD IN DESIGN, COLOR, TEXTURE, AND OTHER VISUAL
QUALITIES AND, WHERE POSSIBLE, MATERIALS. REPLACEMENT OF MISSING FEATURES SHALL
BE SUBSTANTIATED BY DOCUMENTARY, PHYSICAL, OR PICTORIAL EVIDENCE.
7. CHEMICAL OR PHYSICAL TREATMENTS, SUCH AS SANDBLASTING, THAT CAUSE DAMAGE
TO HISTORIC MATERIALS SHALL NOT BE USED. THE SURFACE CLEANING OF STRUCTURES, IF
APPROPRIATE, SHALL BE UNDERTAKEN USING THE GENTLEST MEANS POSSIBLE.
8. SIGNIFICANT ARCHEOLOGICAL RESOURCES AFFECTED BY A PROJECT SHALL BE PROTECTED
AND PRESERVED. IF SUCH RESOURCES MUST BE DISTURBED, MITIGATION MEASURES SHALL
BE UNDERTAKEN.
9. NEW ADDITIONS, EXTERIOR ALTERATIONS, OR RELATED NEW CONSTRUCTION SHALL NOT
DESTROY HISTORIC MATERIALS THAT CHARACTERIZE THE PROPERTY. THE NEW WORK SHALL
BE DIFFERENTIATED FROM THE OLD AND SHALL BE COMPATIBLE WITH THE MASSING, SIZE,
SCALE, AND ARCHITECTURAL FEATURES TO PROTECT THE HISTORIC INTEGRITY OF THE
PROPERTY AND ITS ENVIRONMENT.
10. NEW ADDITIONS AND ADJACENT OR RELATED NEW CONSTRUCTION SHALL BE
UNDERTAKEN IN SUCH A MANNER THAT IF REMOVED IN THE FUTURE, THE ESSENTIAL FORM
AND INTEGRITY OF THE HISTORIC PROPERTY AND ITS ENVIRONMENT WOULD BE
UNIMPAIRED.
P
RI
N C
E A
VE
N
U E, SE
C O
N D
F
LO
O R
A
TH
EN
S, G A
T:
.3
.3
P R O J E C T :
T I T L E :
I S S U E :
D A T E :
G-001
18 DECEMBER 2024
CONSTRUCTION
DOCUMENTS
GEORGIA B. WILLIAMS NURSING
HOME REHABILITATION
COVER SHEET
176 DYER STREET
CAMILLA, GEORGIA
G E O R G I A B. W I L L I A M S N U R S I N G H O M E R E H A B I L I T A T I O N
CAMILLA , GA
A-001 PARTITIONS & ASSEMBLY TYPES
A-002 DEMO PLANS
A-100 FOUNDATION PLAN
A-101 FIRST FLOOR PLAN
A-102 ROOF PLAN
A-110 GROUND LEVEL RCP
A-200 ELEVATIONS
A-201 ELEVATIONS
A-300 VERTICAL CIRCULATION
A-301 VERTICAL CIRCULATION
A-400 REHABILITATION NOTES
A-401 REHABILITATION NOTES
A-402 TYPICAL REHAB ELEVATIONS
A-403 INTERIOR REHAB ELEVATION DETAILS
A-404 INTERIOR REHAB ELEVATION DETAILS
A-405 INTERIOR ELEVATIONS
A-406 INTERIOR ELEVATIONS
A-407 INTERIOR DETAILS
A-500 EXTERIOR DETAILS
A-600 WINDOW AND DOOR SCHEDULES - RECONSTRUCTION
A-601 FINISH SCHEDULES AND PLANS
GENERAL
ARCHITECTURAL
G-001 COVER SHEET
G-002 CODE DIAGRAMS
CIVIL
STRUCTURAL
MECHANICAL
PLUMBING
ELECTRICAL
M-001 MECHANICAL NOTES
M-002 MECHANICAL NOTES & SCHEDULES
M-100 MECHANICAL PLAN - LEVEL 1
P-001 PLUMBING NOTES & SCHEDULES
P-100 PLUMBING PLAN - LEVEL 1
P-101 SANITARY PLAN - LEVEL 1
C0.00 COVER SHEET
C0.10 EXISTING CONDITIONS
C1.00 DEMOLITION PLAN
C2.00 SITE PLAN
C2.10 SITE PLAN DETAILS
C3.00 GRADING PLAN
C4.00 SESC PLAN
C4.10 SESC DETAILS
C5.00 UTILITY PLAN
C6.00 PLANTING PLAN
C6.01 PLANTING PLAN (CONT.)
C6.10 PLANTING PLAN DETAILS
S-001 GENERAL NOTES
S-002 SPECIAL INSPECTIONS
S-100 FOUNDATION PLAN
S-101 1ST FLOOR FRAMING PLAN
S-102 CEILING FRAMING PLAN
S-103 ROOF FRAMING PLAN
S-301 DETAILS
E-001 ELECTRICAL LEGEND AND NOTES
E-002 ELECTRICAL SCHEDULES
E-100 POWER PLAN - LEVEL 1
E-101 LIGHTING PLAN - LEVEL 1
ADDITIVE ALTERNATES
NONE
DEDUCTIVE ALTERNATES
NONE
GEORGIA B. WILLIAMS NURSING HOME, INC., STRIVES TO TRANSFORM THE FORMER GEORGIA B.
WILLIAMS NURSING HOME INTO A MUSEUM TO SHOWCASE THE WORK AND LIFE OF ITS
FOUNDER, GEORGIA B. WILLIAMS, AND ILLUSTRATE HOW THIS CENTER FITS INTO THE LARGER CONTEXT OF BLACK MIDWIFERY IN THE US. THESE DRAWINGS SERVE TO DETAIL THE FIRST PHASE
OF CONSTRUCTION IN THE REHABILITATION OF THE STRUCTURE.
AFTER A PREVIOUS CAMPAIGN OF DEMOLITION, REMAINING AREAS INCLUDE ALL ROOMS UNDER
THE MAIN GABLE ROOF, THE COMPLETE FRONT PORCH, AND A SMALL GABLE ROOF ON THE
WEST FACADE, CURRENTLY SHORED IN PLACE. IN THE FIRST PHASE, THE REMAINING STRUCTURE
WILL BE ENCLOSED AND WALL, FLOOR, AND FOUNDATION SYSTEMS WILL BE CONSTRUCTED
UNDERNEATH THE SMALL WEST GABLE. EXISTING HISTORIC WINDOWS AND DOORS WILL BE
RECONDITIONED AND REPAIRED TO COMPLETE THIS ENCLOSURE. EXTERIOR FACADES AND
INTERIOR SPACES WILL BE LARGELY RETURNED TO THEIR APPEARANCE AT THE END OF THE PERIOD
OF SIGNIFICANCE (1942 - 1971) AS DOCUMENTED THROUGH PHOTOS, FORENSIC EVIDENCE,
AND ORAL HISTORIES. TRANSFORMATION OF THE INTERIOR SPACES TO THEIR HISTORIC
APPEARANCE INCLUDES RETAINING AND REPAIRING AS MUCH INTERIOR FINISH AS POSSIBLE AS WELL AS REINSTALLING HISTORIC FIXTURES, SALVAGED FROM THE STRUCTURE BEFORE PREVIOUS
DEMOLITION.
A FUTURE PHASE IS DESIRED TO RECONSTRUCT THE PREVIOUSLY DEMOLISHED LOW-SLOPE
ADDITIONS WHICH WERE ADDED TO THE NORTH AND WEST ELEVATIONS BETWEEN 1942 AND
1971. THESE DRAWINGS DO NOT DETAIL THE CONSTRUCTION OF FUTURE PHASE ELEMENTS AS
THE FUTURE PHASE IS CURRENTLY UNFUNDED.
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
G-100
DATE:
ISSUE:
COVER SHEET
PROJECT NORTH
R O C K H O U S E R E S T O R A T I O N
1455 RO CK H O USE RO AD
THO MSO N VICINITY, McDUFFIE C O U NTY, GEORGIA
SYMBOLS LEGEND ABBREVIATIONS SHEET LIST PROJECT DESCRIPTION SECRETARY OF THE INTERIOR'S STANDARDS
G-100 COVER SHEET
A-100 REMOVALS PLAN: CELLAR AND FIRST FLOOR
A-101 REMOVALS PLAN: ATTIC AND ROOF
A-102 RESTORATION PLAN: CELLAR AND FIRST FLOOR
A-103 RESTORATION PLAN: ATTIC AND ROOF
A-200 EXISTING BUILDING ORTHOPHOTO ELEVATIONS
A-201 RESTORATION ELEVATIONS
A-400 CONSTRUCTION DETAILS
A-401 CONSTRUCTION DETAILS
A-402 CONSTRUCTION DETAILS
A-403 CONSTRUCTION DETAILS
A-600 WINDOW AND DOOR RESTORATION INFO
ALTERNATES
ALT-1 INSTALL 16 OZ COLD-ROLLED FLAT-SEAMED TIN-ZINC COATED
COPPER ROOFING AT PORCH ROOFS (SUB FOR STANDING SEAM)
ALT-2 SUBSTITUTE COLD-ROLLED UNCOATED COPPER FOR ALL ROOFING
AND FLASHINGS CALLED OUT AS TIN-ZINC COATED COPPER
THE PROJECT ENTAILS THE RESTORATION OF THE C. 1799 ROCK HOUSE
TO A CONDITION SIMILAR TO ITS STATE FOLLOWING THE RESTORATION
OF THE BUILDING COMPLETED IN 1979-80 UNDER THE GUIDANCE OF
NORMAN DAVENPORT ASKINS.
THE PURPOSE OF THIS RESTORATION IS TO RETURN THE ROCK HOUSE TO A
WEATHERTIGHT, MOSTLY STABLE STATE, ALLOWING ITS INTERIOR TO BE
SAFELY OPENED TO OCCASIONAL VISITORS. THE ROCK HOUSE'S LARGER
PURPOSE IS TO SERVE AS THE CENTERPIECE OF A NEW McDUFFIE COUNTY
PARK WITH THE HISTORIC INTERPRETIVE GOAL OF TELLING THE STORY OF THE
HOUSE, THE ANSLEY FAMILY, AND THE MILIEU OF THE WRIGHTSBORO
COMMUNITY IN THE LATE 18TH/EARLY 19TH CENTURY.
THE ASKINS RESTORATION DRAWINGS AND RESEARCH REPORT WERE
GRACIOUSLY SHARED WITH ARCOLLAB DIRECTLY BY MR. ASKINS. ALSO
REFERENCED FOR THIS RESTORATION DESIGN WERE THE 2022 ASSESSMENT
REPORT COMPLETED BY LANDMARK PRESERVATION, INC. AND THE 2022
ROCK HOUSE MASTER SITE PLAN COMPLETED BY ETHOS PRESERVATION, INC.
AT THE TIME ARCOLLAB COMMENCED DESIGN OF THIS RESTORATION, THE
ROCK HOUSE SUFFERED FROM THE CUMULATIVE EFFECTS OF DETERIORATION
AND VANDALISM. NO INTACT WINDOWS REMAINED, THE INTERIOR HAD
BEEN "TAGGED" IN MULTIPLE LOCATIONS WITH GRAFFITI AND SCRATCHITI,
AND THE WOOD SHINGLE ROOF HAD REACHED THE END OF ITS SERVICE LIFE
(THOUGH FORTUNATELY NOT LEAKING).
A STOOP, FORMERLY LOCATED ON THE SOUTH SIDE OF THE BUILDING, HAD
SO DETERIORATED IN THE 45 YEARS SINCE ITS CONSTRUCTION THAT IT WAS
REMOVED. TEMPORARY MEASURES UNDERTAKEN AFTER THIS REMOVAL
MITIGATED SOME WATER INTRUSION THROUGH THE CELLAR DOORWAY,
THOUGH GENERAL MOISTURE MIGRATION THROUGH THE MASONRY WALLS
REMAINED WIDESPREAD AND ACTIVE.
DUE TO THE EXTENSIVE REPLACEMENT OF HISTORIC MATERIALS DURING THE
1979-80 RESTORATION, ARCOLLAB WAS UNABLE TO CONFIDENTLY
ASCERTAIN WHETHER THE EXISTING INTERIOR STAIR LOCATION WAS, AS MR.
ASKINS ASSERTS IN HIS RESEARCH REPORT, TRUE TO THE HOUSE'S ORIGINAL
DESIGN, OR IF THE STAIR LOCATED IN THE SOUTHEAST CORNER OF THE
HOUSE PRIOR TO THE 1979-80 RESTORATION WAS THE ORIGINAL
CONFIGURATION AND LOCATION. THEREFORE, SO AS NOT TO FURTHER
CONFUSE THE QUESTION, ARCOLLAB HAS PROPOSED NO CHANGE TO
EITHER THE STAIR TO THE CELLAR OR TO THE ATTIC.
THE PROPOSED DESIGN OF THE NEW PORCHES IN THIS DRAWING SET IS
NOT INTENDED AS AN ASSERTION OF A "CORRECT" HISTORICAL DESIGN.
LIMITED PHYSICAL EVIDENCE REMAINS TO IDENTIFY A SIZE, LOCATION, OR
CONFIGURATION FOR HISTORIC PORCHES ON THE HOUSE. PRIOR TO THE
1979-80 RESTORATION, A FULL-WIDTH SHED-ROOFED PORCH WAS LOCATED
ON THE SOUTH SIDE OF THE HOUSE, WITH A NARROWER SHED-ROOFED
PORCH, LITTLE WIDER THAN THE DOOR AND WINDOW IT SHELTERED, ON THE
NORTH SIDE. THESE PORCHES DATE AT LEAST BACK TO 1933 WHEN THEY
WERE CAPTURED IN HABS PHOTOS OF THE HOUSE.
RATHER, THE PROPOSED PORCH DESIGN IS INTENDED TO PROVIDE A
HISTORICALLY-SYMPATHETIC APPEARANCE WHICH IS DISCERNABLE AS
NON-HISTORIC, WHILE ALSO PROVIDING WEATHER PROTECTION TO THE
BUILDING'S FRONT AND REAR ENTRANCES. THEIR LIMITED FOOTPRINTS ARE
INTENDED TO MINIMIZE IMPACT ON THE EXTANT HISTORIC RESOURCE AS
WELL AS ANY UNINVESTIGATED ARCHAEOLOGICAL RESOURCES.
ARCHAEOLOGICAL MONITORING IS HIGHLY RECOMMENDED DURING ANY
GROUND DISTURBANCE UNDERTAKEN AS PART OF THIS RESTORATION.
THE SCOPE OF THIS RESTORATION INCLUDES THE FOLLOWING:
--- INSTALLATION OF FOUNDATION DRAINAGE AND WATERPROOFING
--- CONSTRUCTION OF NEW PORCHES AT THE SOUTH AND NORTH SIDES
--- REPLACEMENT OF THE WOOD SHINGLE ROOF
--- INSTALLATION OF NEW CHIMNEY CAPS
--- CLEANING AND MAINTENANCE OF STONE MASONRY WALLS
--- CLEANING AND PRESERVATIVE TREATMENT OF UNPAINTED WOOD
EXTERIOR SURFACES
--- REPAIR OF DAMAGED AND DETERIORATED EXTERIOR WOOD ELEMENTS
--- INSTALLATION OF NEW WINDOW SASHES AND REPAIR OF DAMAGED OR
MISSING DOORS
--- INSTALLATION OF SUPPLEMENTAL INTERIOR STRUCTURE TO SUPPORT
INTERIOR SUMMER BEAMS AND JOIST-BEAM CONNECTIONS
--- RESTORATION OF INTERIOR LIMEWASHED WALL SURFACES
--- RESTORATION OF C.1979 PLANK PARTITIONS
--- REMOVAL OF ELECTRICAL DEVICES AND WIRING
RESTORATION AS A TREATMENT:
RESTORATION IS DEFINED AS THE ACT OR PROCESS OF ACCURATELY
DEPICTING THE FORM, FEATURES, AND CHARACTER OF A PROPERTY AS IT
APPEARED AT A PARTICULAR PERIOD OF TIME BY MEANS OF THE REMOVAL OF
FEATURES FROM OTHER PERIODS IN ITS HISTORY AND RECONSTRUCTION OF
MISSING FEATURES FROM THE RESTORATION PERIOD. THE LIMITED AND
SENSITIVE UPGRADING OF MECHANICAL, ELECTRICAL, AND PLUMBING
SYSTEMS AND OTHER CODE-REQUIRED WORK TO MAKE PROPERTIES
FUNCTIONAL IS APPROPRIATE WITHIN A RESTORATION PROJECT.
THE SECRETARY OF THE INTERIOR'S STANDARDS FOR RESTORATION:
1. A PROPERTY WILL BE USED AS IT WAS HISTORICALLY OR BE GIVEN A
NEW USE THAT INTERPRETS THE PROPERTY AND ITS RESTORATION
PERIOD.
2. MATERIALS AND FEATURES FROM THE RESTORATION PERIOD WILL BE
RETAINED AND PRESERVED. THE REMOVAL OF MATERIALS OR
ALTERATION OF FEATURES, SPACES AND SPATIAL RELATIONSHIPS THAT
CHARACTERIZE THE PERIOD WILL NOT BE UNDERTAKEN.
3. EACH PROPERTY WILL BE RECOGNIZED AS A PHYSICAL RECORD OF ITS
TIME, PLACE AND USE. WORK NEEDED TO STABILIZE, CONSOLIDATE
AND CONSERVE MATERIALS AND FEATURES FROM THE RESTORATION
PERIOD WILL BE PHYSICALLY AND VISUALLY COMPATIBLE, IDENTIFIABLE
UPON CLOSE INSPECTION AND PROPERLY DOCUMENTED FOR FUTURE
RESEARCH.
4. MATERIALS, FEATURES, SPACES AND FINISHES THAT CHARACTERIZE
OTHER HISTORICAL PERIODS WILL BE DOCUMENTED PRIOR TO THEIR
ALTERATION OR REMOVAL.
5. DISTINCTIVE MATERIALS, FEATURES, FINISHES AND CONSTRUCTION
TECHNIQUES OR EXAMPLES OF CRAFTSMANSHIP THAT CHARACTERIZE
THE RESTORATION PERIOD WILL BE PRESERVED.
6. DETERIORATED FEATURES FROM THE RESTORATION PERIOD WILL BE
REPAIRED RATHER THAN REPLACED. WHERE THE SEVERITY OF
DETERIORATION REQUIRES REPLACEMENT OF A DISTINCTIVE FEATURE,
THE NEW FEATURE WILL MATCH THE OLD IN DESIGN, COLOR, TEXTURE
AND, WHERE POSSIBLE, MATERIALS.
7. REPLACEMENT OF MISSING FEATURES FROM THE RESTORATION PERIOD
WILL BE SUBSTANTIATED BY DOCUMENTARY AND PHYSICAL EVIDENCE.
A FALSE SENSE OF HISTORY WILL NOT BE CREATED BY ADDING
CONJECTURAL FEATURES, FEATURES FROM OTHER PROPERTIES, OR BY
COMBINING FEATURES THAT NEVER EXISTED TOGETHER HISTORICALLY.
8. CHEMICAL OR PHYSICAL TREATMENTS, IF APPROPRIATE, WILL BE
UNDERTAKEN USING THE GENTLEST MEANS POSSIBLE. TREATMENTS
THAT CAUSE DAMAGE TO HISTORIC MATERIALS WILL NOT BE USED.
9. ARCHEOLOGICAL RESOURCES AFFECTED BY A PROJECT WILL BE
PROTECTED AND PRESERVED IN PLACE. IF SUCH RESOURCES MUST BE
DISTURBED, MITIGATION MEASURES WILL BE UNDERTAKEN.
10. DESIGNS THAT WERE NEVER EXECUTED HISTORICALLY WILL NOT BE
CONSTRUCTED.
A
EXTERIOR DOOR/WINDOW TAG
A
INTERIOR DOOR TAG
ROOM NAME ROOM IDENTIFICATION
A-000
DETAIL IDENTIFICATION:
DASHED LINE INDICATES EXTENT OF
ENLARGED PLAN OR DETAIL
UPPER NUMBER = DETAIL NUMBER
LOWER NUMBER = SHEET WHERE DRAWN
KEYED NOTE TAG
NORTH DIRECTIONAL INDICATOR
A-000
BUILDING SECTION SYMBOL:
UPPER NUMBER = SECTION NUMBER
LOWER NUMBER = SHEET WHERE DRAWN
STONE MASONRY
WOOD: CUSTOM OR NON-NOMINAL SIZE
WOOD: NOMINAL SIZE FRAMING/BLOCKING
EXG
EQUIP
DIA
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
GE
R 01.05.26
1. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS
SHOWN ON DRAWINGS AND SHALL NOTIFY THE ARCHITECT OF ANY
DISCREPANCIES, OMISSIONS AND/OR CONFLICTS BEFORE
PROCEEDING WITH THE WORK
2. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY IF
UNABLE TO COMPLY WITH ALL REQUIREMENTS SET FORTH HEREIN
3. DO NOT SCALE DRAWINGS: IN THE EVENT OF A CONFLICT BETWEEN
A DRAWING AND THE DIMENSIONAL NOTES, THE DIMENSIONAL
INFORMATION GOVERNS; LARGER SCALED DRAWINGS SHALL GOVERN
OVER SMALLER SCALE DRAWINGS
4. THE CONTRACTOR SHALL LAY OUT ITS OWN WORK, AND SHALL
PROVIDE ALL DIMENSIONS REQUIRED FOR EXECUTION OF THE WORK
ACCORDING TO THE DRAWINGS
5. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED BUT NECESSARY
FOR PROPER CONSTRUCTION OF ANY PART OF THE WORK SHALL BE
INCLUDED AS IF THEY WERE INDICATED IN THE PLANS
6. WHERE CLEAR DIMENSIONS ARE INDICATED IN THE PLAN, THE FINISH
DIMENSIONS INDICATED MUST BE MAINTAINED
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL
CONDITIONS AND MATERIALS WITHIN THE PROPOSED CONSTRUCTION
AREA. THE CONTRACTOR SHALL DESIGN AND INSTALL ADEQUATE
SHORING AND BRACING FOR ALL STRUCTURAL OR REMOVAL TASKS.
THE CONTRACTOR SHALL HAVE SOLE RESPONSIBILITY FOR ANY DAMAGE
OR INJURIES CAUSED BY OR DURING THE EXECUTION OF THE WORK
8. THE CONTRACTOR SHALL DO ALL CUTTING, PATCHING, REPAIRING AS
REQUIRED TO PERFORM ALL OF THE WORK INDICATED ON THE
DRAWINGS, AND ALL OTHER WORK THAT MAY BE REQUIRED TO
COMPLETE THE PROJECT
9. THE CONTRACTOR SHALL APPLY FOR ALL REQUIRED BUILDING DEPT.
INSPECTIONS AND SIGN-OFFS AS REQUIRED. THE CONTRACTOR SHALL
COORDINATE ALL WORK PROCEDURES WITH THE REQUIREMENTS OF
LOCAL AUTHORITIES AND THE OWNER
10. CONTRACTORS MUST COMPLY WITH THE RULES AND REGULATIONS
OF AUTHORITIES HAVING JURISDICTION.
11. THE CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET
OF CONSTRUCTION DOCUMENTS ON THE CONSTRUCTION SITE
DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL TRADES
12. THE CONTRACTOR'S USE OF PREMISES: DURING CONSTRUCTION,
THE CONTRACTOR SHALL HAVE FULL USE OF THE SITE AREA WITHIN
THE BOUNDARIES OF THE AREA OF WORK. THE CONTRACTOR'S
USE OF SAID AREA IS LIMITED ONLY BY OWNER'S RIGHT TO PERFORM
WORK OR EMPLOY OTHER CONTRACTOR(S) ON PORTIONS OF THE
PROJECT
1. PROVIDE TEMPORARY ENVIRONMENTAL CONTROLS AS REQUIRED BY
THE STATE OF GEORGIA AND LOCAL AUTHORITIES HAVING
JURISDICTION, BUT NOT LIMITED TO, EROSION AND SEDIMENT
CONTROL, DUST CONTROL, NOISE CONTROL, AND POLLUTION
CONTROL
2. PROVIDE CONSTRUCTION BARRIERS, AND OTHER MANDATED
PROTECTIVE BARRIERS AT PERIMETER OF WORK ZONE ON THE
PROPERTY AS REQUIRED
3. PROVIDE TEMPORARY UTILITY SERVICES AS NEEDED TO PROJECT SITE FOR
USE DURING CONSTRUCTION.
- ARRANGE FOR AND COORDINATE UTILITY SERVICES WITH LOCAL
UTILITY COMPANIES
- OWNER WILL PAY FOR USE CHARGES FOR TEMPORARY UTILITIES
4. PROVIDE TEMPORARY HEAT FOR CURING OR DRYING WORK, AND FOR
PROTECTION OF NEW CONSTRUCTION FROM ADVERSE EFFECTS OF
LOW TEMPERATURES
5. PROVIDE TEMPORARY SANITARY FACILITIES; COMPLY WITH
REGULATIONS AND HEALTH CODES
6. PROVIDE TEMPORARY ENCLOSURES FOR PROTECTION OF WORKERS
AND CONSTRUCTION, AND CONTAINMENT OF HEAT
7. COLLECT WASTE DAILY; WHEN CONTAINERS ARE FULL, LEGALLY DISPOSE
OF WASTE OFF-SITE. RECYCLE PER LOCAL AUTHORITIES HAVING
JURISDICTION
8. PROVIDE TEMPORARY BARRICADES, WARNING SIGNS, AND LIGHTS TO
PROTECT THE PUBLIC AND CONSTRUCTION PERSONNEL FROM
CONSTRUCTION HAZARDS
TEMPORARY FACILITIES AND CONTROLS
GENERAL CONSTRUCTION NOTES
UP
DN
DN
D03
APPLIES GENERALLY
TO FIRST FLOOR
CHAMBER
CHAMBER
CHAMBER
CHAMBER
D05
D05
D05
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-100
DATE:
ISSUE:
UP
UP
UP
NON-HISTORIC STONE MASONRY
FIREPLACE BREAST TO REMAIN
D02
D04
D01
D01
D03
CELLAR
APPLIES GENERALLY
TO CELLAR SPACE
PROJECT NORTH
REMOVAL PLANS:
CELLAR AND FIRST FLOOR
CELLAR REMOVALS PLAN
SCALE: 1/4" = 1'-0"
1FIRST FLOOR REMOVALS PLAN
SCALE: 1/4" = 1'-0"
D01 EXCAVATE HATCHED AREA TO REQUIRED DEPTH FOR INSTALLATION OF
NEW PORCH FOUNDATIONS AND FDN DRAINAGE SYSTEM.
PERFORM ARCHAEOLOGICAL MONITORING OF GROUND DISTURBANCE
ACTIVITIES, INCLUDING (BUT NOT LIMITED TO) SIFTING REMOVED SOIL,
COLLECTING ARTIFACTS, AND CATALOGING FINDS. RETURN ALL ARTIFACTS
TO OWNER AFTER ANALYSIS
D02 REMOVE LOOSE WINDOW/DOOR FRAME, SHUTTERS, AND WOOD
PLANKING FROM CELLAR. EXAMINE CONDITION OF MATERIALS FOR
POTENTIAL SALVAGE USE IN THIS PROJECT. RETAIN AND STORE USABLE
MATLS ON SITE IN LOCATION PROTECTED FROM WEATHER AND INSECTS.
CONSULT W/ARCHITECT ON OPTIMAL REUSE OF MATERIALS
D03 REMOVE MISCELLANEOUS DIRT AND DEBRIS PRIOR TO COMMENCEMENT
OF RESTORATION WORK
D04 SHORE AND BRACE SUMMER BEAM PRIOR TO REMOVAL OF SCREW JACKS
AND PIPE SUPPORTS. REFER TO RESTORATION PLANS AND DETAILS FOR
NEW STRUCTURAL WORK
D05 REMOVE LOOSE WOOD PLANKING AND SALVAGE FOR REUSE. STORE
USABLE MATLS ON SITE IN LOCATION PROTECTED FROM WEATHER AND
INSECTS. CONSULT W/ARCHITECT ON OPTIMAL REUSE OF MATERIALS
KEYED NOTES
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
GE
R 01.05.26
D07
D06 D06
D08
D08
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-101
DATE:
ISSUE:
REMOVAL PLANS:
ATTIC AND ROOF
DN
D03
APPLIES GENERALLY
TO CELLAR SPACE
ATTIC
D03
PROJECT NORTH
KEYED NOTES
ATTIC REMOVALS PLAN
SCALE: 1/4" = 1'-0"
1ROOF REMOVALS PLAN
SCALE: 1/4" = 1'-0"
D03 REMOVE MISCELLANEOUS DIRT AND DEBRIS PRIOR TO COMMENCEMENT
OF RESTORATION WORK
D06 COPPER RIDGE CAP AND CHIMNEY COUNTERFLASHING TO REMAIN
(AS FEASIBLE) IN REROOFING
D07 REMOVE LOOSE PLYWOOD CHIMNEY CAP FROM ROOF
D08 REROOF BUILDING USING WOOD SHINGLES. REFER TO RESTORATION
ROOF PLAN AND DETAILS
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
R 01.05.26
107 INSTALL FOUNDATION DRAINAGE AROUND BUILDING, DISCHARGING TO
DAYLIGHT AT ROAD CUT. REFER TO CONSTR DETAIL ON SHEET A-403
108 WINDOW SHUTTER IN FULLY OPEN POSITION CONFLICTS WITH NEW PORCH
RAILING. FASTEN SHUTTER TO CAP RAIL IN PARTIALLY-OPEN POSITION OR
REMOVE SHUTTER AND STORE ON SITE
109 NEW CONC FOOTING AND STL POST LINE TO SUPPORT SUMMER BEAM.
CENTER NEW FOOTINGS/POSTS UNDER BEAM CENTERLINE, TYP.
110 INSTALL SUPPLEMENTAL STL HANGERS AT JOISTS WITH TENONS EXPOSED
MORE THAN 3/4" FROM FACE OF SUMMER BEAM. BASIS OF DESIGN:
SIMPSON OHU48-SD53. CONTRACTOR SHALL PROVIDE HANGER MOCK-UP
FOR ARCHITECT REVIEW. IF IT IS DETERMINED A CUSTOM HANGER MUST BE
USED, CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW
111 REMOVE PAINT AND SURFACE RUST AT EXPOSED STEEL TO BARE METAL .
RECOAT USING DTM PRIMER/COATING, COLOR: BLACK
112 REPLACE TERMITE-DAMAGED WOOD LINTEL ABOVE WINDOW OPG.
SHORE/BRACE STONE MASONRY ABOVE LINTEL DURING REPLACEMENT.
USE NON-HISTORIC THERMALLY-MODIFIED PINE FOR REPLACEMENT,
MARKED WITH DATE OF INSTALLATION IN DISCREET BUT VISIBLE LOCATION
UP
DN
DN
CHAMBER
B
A
B
C
D
D
C
B
A
B
C
CHAMBER
CHAMBER
CHAMBER
C
E103
F
A-401
A
A-400
FRAMING PLAN
DN
REFER TO WINDOW & DOOR SCHEDULE
FOR REPAIR NOTES PERTAINING TO
INDIVIDUAL WINDOWS AND DOORS,
INCLUDING MISSING SHUTTERS AND HDWE
REFER TO WOOD TREATMENT NOTES FOR
CLEANING AND SEALING INFORMATION
PERTAINING TO EXPOSED EXTERIOR WOOD
FRAMES AND SHUTTERS WHICH ARE
TO BE RETAINED IN PLACE
A-400
SIMILAR
APPLIES GENERALLY
TO FIRST FLOOR
APPLIES TO ALL
INTERIOR MASONRY
WALL SURFACES
114 114114
114 114
A-402
A
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-102
DATE:
ISSUE:
CELLAR RESTORATION PLAN
SCALE: 1/4" = 1'-0"
UP
EQ. 1'-6"EQ.1'-6" EQ.
A-403
C
F
G
CELLAR
E
D
B
A
A-400
A-401
A-402
EQ.
EXG SUMMER BEAM ABOVE
APPLIES TO ALL
INTERIOR MASONRY
WALL SURFACES
APPLIES TO MULTIPLE JOISTS
APPLIES GENERALLY
TO CELLAR SPACE
A-402
A-403
TYP FDN DRAIN DTL
FIRST FLOOR RESTORATION PLAN
SCALE: 1/4" = 1'-0"
PROJECT NORTH
RESTORATION PLANS:
CELLAR AND FIRST FLOOR
100 REMOVE GRAFFITI/SCRATCHITI ON INTERIOR WOOD FINISHES, TYP.
REFER TO GENERAL WOOD TREATMENT NOTES
101 REMOVE FRIABLE SOOT/DEBRIS AND REPOINT HEARTH/CHIMNEY/FIREBOX
W/COMPATIBLE MORTAR. REFER TO MASONRY TREATMENT NOTES
102 REINSTALL MISSING WOOD WINDOW STOOL. IF ORIGINAL STOOL MAT'L IS
NOT AVAILABLE, RECONSTRUCT STOOL USING NEW MATERIAL TO MATCH
TYP EXG. REFER TO GENERAL WOOD TREATMENT NOTES
103 REMOVE CEMENTITIOUS INTERIOR PARGE COAT ON STONE WALLS TO
EXPOSE HISTORIC LIMEWASH, TYP. RECOAT INTERIORS WITH COMPATIBLE
LIMEWASH FINISH. REFER TO INTERIOR FINISH NOTES
104 RECONSTRUCT WOOD PLANK WALL FINISH USING SALVAGED MAT'L
REMAINING ON SITE AND NEW MATERIAL TO MATCH EXG. REFER TO
GENERAL WOOD TREATMENT NOTES
105 REMOVE PORTLAND CEMENT-BASED MORTAR JOINT PATCHES WHERE
PRESENT AND REPOINT ALL INTERIOR MASONRY JOINTS USING COMPATIBLE
CLAY-LIME MORTAR MIX. REFER TO MASONRY TREATMENT NOTES
106 INSTALL NEW WOOD SILL AT ENTRY DOORS. REFER TO 1/A-401 AND
WOOD TREATMENT NOTES
KEYED NOTES
113 REMOVE MUD DAUBER WASP NESTS AND WIPE OR BRUSH MUD RESIDUE
FROM SURFACES
114 REMOVE ELECTRICAL WIRING AND DEVICES IN ALL LOCATIONS. PATCH
DEVICE HOLES WITH DUTCHMEN MATCHING ADJACENT WOOD. REFER TO
GENERAL WOOD TREATMENT NOTES
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
GE
R 01.05.26
INTERIOR WOOD REPAIR NOTES:
A. MATERIALS:
1. DUTCHMAN REPAIR: MATCH DUTCHMAN TO SURROUNDING
MATERIAL IN DIMENSION, SPECIES, GRAIN CHARACTERISTIC,
AND PROFILE. REPAIR MISSING ELEMENTS USING MATCHING
SALVAGED MATERIAL FROM THE SAME PROJECT WHERE
FEASIBLE. MARK DATE OF REPAIR ON PATCH IN AN
INCONSPICUOUS LOCATION
2. COMPONENT REPLACEMENT: WHERE THE SIZE OF
MISSING OR DETERIORATED MATERIAL MAKES PATCHING
INFEASIBLE, FULL COMPONENT REPLACEMENT MAY BE
REQUIRED. MATCH THE REPLACEMENT COMPONENT TO THE
ORIGINAL COMPONENT IN DIMENSION, SPECIES, GRAIN
CHARACTERISTIC, AND PROFILE. WHERE SALVAGED MATERIAL
FROM THE HOUSE IS NOT AVAILABLE, USE RECLAIMED
OLD-GROWTH HEART PINE LUMBER, MILLED TO SIZE, WHERE
REQUIRED. THE YEAR OF THE WORK SHOULD BE MARKED ON
EACH NEW PIECE IN AN INCONSPICUOUS LOCATION
3. IN ANY REPAIR, ENDEAVOR TO RETAIN AS MUCH ORIGINAL/
EXISTING MATERIAL AS POSSIBLE
B. GRAFFITI REMOVAL:
1. SCRATCHITI: REMOVAL OF SHALLOW SCRATCHITI SHOULD
REDUCE THE VISUAL CONTRAST AND SURFACE DISRUPTION
TO THE WOOD WHILE REMOVING AS LITTLE EXISTING
MATERIAL AS POSSIBLE. HIGHLY ABRASIVE APPROACHES
SHOULD BE AVOIDED
I. EVALUATION: CONFIRM THE DEPTH OF THE DAMAGE
AND WHETHER WOOD GRAIN IS COMPRESSED RATHER
THAN LOST. EVALUATE THE PATINA OF THE WOOD SO
AS TO AVOID WHOLESALE REMOVAL DURING REPAIR.
TEST REPAIR METHODS INCONSPICUOUSLY
II. FIBER RE-EXPANSION: LIGHTLY DAMPEN THE SCRATCH
WITH DISTILLED WATER USING A COTTON SWAB. APPLY
GENTLE HEAT (LOW-TEMP IRON OR HEATED SPATULA)
THROUGH A COTTON CLOTH. ALLOW TO FULLY DRY
BEFORE REASSESSING
III. MINIMAL ABRASION: USE A FINE GRAY NON-WOVEN
ABRASIVE PAD (600-1000 GRIT EQUIV) OR VERY FINE
SANDPAPER (800-1200 GRIT) TO WORK THE SCRATCHED
SURFACE BY HAND. WORK IN THE DIRECTION OF THE
GRAIN WHILE FEATHERING THE EDGES OF THE WORK
AREA. AVOID ANY MECHANICAL SANDING
IV. COLOR INTEGRATION: IF SCRATCHES PERSIST, CONSIDER
THE USE OF DYES OR PIGMENTS TO OPTICALLY BLEND
THE SCRATCHES INTO THE SURROUNDING AREA.
ALCOHOL OR WATER-BASED DYES, PIGMENTED WAXES,
AND ROSIN-BASED CONSERVATION TONERS ARE
ACCEPTABLE PRODUCTS FOR THIS USE
2. SPRAY-PAINTED GRAFFITI REMOVAL: REMOVING LIGHT
SPRAY-PAINT GRAFFITI REQUIRES A HIGHLY CONTROLLED,
LOWEST-IMPACT STRATEGY. AGGRESSIVE SOLVENTS OR
ABRASION CAN PERMANENTLY DARKEN, BLEACH, OR
SMEAR THE PAINT INTO THE WOOD GRAIN. THE GOAL IS
MAXIMUM REMOVAL WITH MINIMAL LOSS OF PATINA
I. EVALUATION: DETERMINE THE PAINT TYPE PRESENT
(ALKYD OR ACRYLIC) AND THE PENETRATION DEPTH.
EVALUATE THE PATINA OF THE WOOD SO AS TO AVOID
WHOLESALE REMOVAL DURING REPAIR. TEST REPAIR
METHODS INCONSPICUOUSLY
II. DRY MECHANICAL REDUCTION: USING SOFT NYLON
(NO METALLIC) BRUSHES OR LIGHT GRAY OR WHITE
NON-WOVEN PADS, WORK IN THE DIRECTION OF THE
WOOD GRAIN TO LIFT AND FLICK PAINT OFF THE
SURFACE, BEING CAREFUL NOT TO SCRUB PAINT INTO
THE OPEN PORES OF THE WOOD.
III. CONTROLLED SOLVENT REDUCTION: USING COTTON
SWABS SOAKED IN MINERAL SPIRITS, VM&P NAPHTHA,
ETHANOL, OR ISOPROPYL ALCOHOL (IN THAT ORDER OF
PREFERENCE), ROLL THE SWABS ACROSS THE SURFACE
OF THE PAINT, CHANGING SWABS CONSTANTLY TO
AVOID REDEPOSITING PAINT. AVOID ACETONE AND
LACQUER THINNERS AS THESE WILL DRIVE PIGMENT INTO
THE WOOD GRAIN
IV. ABSORPTIVE POULTICING (IF PIGMENT IS SET IN GRAIN):
CREATE A PASTE OF CELLULOSE POWDER OR WHITING
(CALCIUM CARBONATE POWDER) MIXED WITH MINERAL
SPIRITS OR ETHANOL. APPLY THIS POULTICE TO THE
STAINED AREA AND COVER LOOSELY DURING BRIEF
DWELL TIME (MINUTES NOT HOURS). LIFT THE POULTICE
AND REPEAT IF NECESSARY
V. MINIMAL ABRASION (IF FAINT GHOST REMAINS):USE A
FINE GRAY NON-WOVEN ABRASIVE PAD (600-1000 GRIT
EQUIV) OR VERY FINE SANDPAPER (800-1200 GRIT) TO
WORK THE SURFACE BY HAND. WORK IN THE DIRECTION
OF THE GRAIN WHILE FEATHERING THE EDGES OF THE
WORK AREA. AVOID ANY MECHANICAL SANDING
INTERIOR STONE MASONRY TREATMENT
NOTES:
A. INTERIOR PARGE COAT REMOVAL AND LIMEWASH RESTORATION:
I. EVALUATION: CONFIRM THE MATERIAL COMPOSITION AND
AVERAGE THICKNESS OF THE PARGE COAT AND LIMEWASH
(LIKELY LIME PUTTY OR LIMEWATER WITH MINERAL PIGMENT)
PERFORM REMOVAL TESTS IN SMALL, INCONSPICUOUS
AREAS USING MULTIPLE TECHNIQUES. SELECT THE METHOD
THAT ACHIEVES REMOVAL WITH THE LEAST DISTURBANCE TO
LIMEWASH AND STONE. NO FULL-SCALE WORK SHALL
PROCEED UNTIL MOCK-UPS ARE REVIEWED AND APPROVED BY
ARCHITECT
II. PROTECTION AND PREPARATION: PROTECT ADJACENT
FINISHES, ESPECIALLY UNFINISHED WOOD AT WALLS, CEILING,
AND FLOORS. MAINTAIN A STABLE INTERIOR TEMPERATURE
AND HUMIDITY. AVOID RAPID DRYING
III. PARGE COAT REMOVAL: REMOVE THE CEMENT PARGE COAT
BY HAND ONLY USING SMALL MASONRY CHISELS, CARBIDE
SCRAPERS, AND/OR WOOD OR PLASTIC WEDGES. KEEP TOOLS
NEARLY PARALLEL TO WALL WHILE WORKING TO AVOID
GOUGING. WORK INCREMENTALLY, REMOVING SMALL
SECTIONS AT A TIME
IV. CONTROLLED SOFTENING: WHERE CEMENT IS TIGHTLY
BONDED, LIGHTLY MIST THE SURFACE WITH DISTILLED WATER
TO REDUCE BRITTLENESS AND DUST. ALLOW WATER TO DWELL
BRIEFLY BEFORE HAND REMOVAL. DO NOT SATURATE THE WALL
OR ALLOW FREE WATER TO MIGRATE INTO MASONRY. ACIDIC
CLEANERS, CHEMICAL PAINT REMOVERS, OR CEMENT
DISSOLVERS ARE NOT PERMITTED
V. LIMEWASH TREATMENT:
I. CLEAN RESIDUES FROM SURFACES WITH A SOFT NATURAL
BRISTLE BRUSH
II. LIGHTLY DAMPEN MASONRY PRIOR TO LIMEWASH
APPLICATION TO PROMOTE CARBONATION
III. USE A HIGH-CALCIUM LIME PUTTY, AGED IF POSSIBLE,
DILUTED WITH CLEAN WATER TO A TRADITIONAL
LIMEWASH CONSISTENCY (AKIN TO SKIM MILK)
IV. IF PIGMENTS ARE USED, THEY SHALL BE ALKALI-STABLE
MINERAL PIGMENTS ONLY
V. APPLY LIMEWASH IN MULTIPLE THIN COATS (TYPICALLY
2 TO 4) ALLOWING EACH COAT TO BECOME SURFACE-DRY
BUT NOT FULLY CURED BEFORE THE NEXT APPLICATION.
APPLY WITH A SOFT MASONRY BRUSH USING A
CRISS-CROSS MOTION. MAINTAIN DAMP CONDITIONS
BETWEEN COATS IF NECESSARY TO PREVENT PREMATURE
DRYING
VI. ALLOW FINISHED LIMEWASH TO CURE (CARBONATE),
PROTECT FROM RAPID DRYING DRAFTS, OR TEMPERATURE
EXTREMES. LIGHT MISTING MAY BE USED DURING EARLY
CURING IF CONDITIONS ARE DRY. FULL CARBONATION
MAY TAKE SEVERAL WEEKS.
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-103
DATE:
ISSUE:
ATTIC
100 103103
APPLIES GENERALLY
TO ATTIC SPACE
DN
EXPOSED MASONRY
SURFACES
EXPOSED MASONRY
SURFACES
B
A
C
D
APPLIES TO HATCHED
AREA AT CLG
TR
A
C K
LIG
H
T
TR
A
C K
LIG
H
T
ATTIC RESTORATION PLAN
SCALE: 1/4" = 1'-0"
PROJECT NORTH
RESTORATION PLANS:
ATTIC AND ROOF
ROOF RESTORATION PLAN
SCALE: 1/4" = 1'-0"
KEYED NOTES
100 REMOVE GRAFFITI/SCRATCHITI ON INTERIOR WOOD FINISHES, TYP.
REFER TO GENERAL WOOD TREATMENT NOTES
103 REMOVE CEMENTITIOUS INTERIOR PARGE COAT ON STONE WALLS TO
EXPOSE HISTORIC LIMEWASH, TYP. RECOAT INTERIORS WITH COMPATIBLE
LIMEWASH FINISH. REFER TO INTERIOR FINISH NOTES
104 RECONSTRUCT WOOD PLANK WALL FINISH USING SALVAGED MAT'L
REMAINING ON SITE AND NEW MATERIAL TO MATCH EXG. REFER TO
GENERAL WOOD TREATMENT NOTES
113 REMOVE MUD DAUBER WASP NESTS AND WIPE OR BRUSH MUD RESIDUE
FROM SURFACES
114 REMOVE ELECTRICAL WIRING AND DEVICES IN ALL LOCATIONS. PATCH
DEVICE HOLES WITH DUTCHMEN MATCHING ADJACENT WOOD. REFER TO
GENERAL WOOD TREATMENT NOTES
115 NEW WOOD SHINGLE ROOFING ON EXG PLYWOOD ROOF SHEATHING.
REFER TO ROOFING DETAILS ON A-401 AND A-402
116 NEW TIN-ZINC-COATED COPPER ROOFING, GUTTER, AND DOWNSPOUT ON
NEW PORCH. REFER TO ROOFING DETAILS ON A-401 AND A-402
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
GE
R 01.05.26
117117
A-401
A-402
A-403
117 NEW BARREL-VAULT STONE CHIMNEY CAP ON SS FRAME.
REFER TO DETAILS ON A-403
120 120
120 120
NORTH ELEVATION
SCALE: 1/4" = 1'-0"
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-200
DATE:
ISSUE:
EXISTING CONDITIONS:
ORTHOPHOTO ELEVATIONS
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
1WEST ELEVATION
SCALE: 1/4" = 1'-0"
EAST ELEVATION
SCALE: 1/4" = 1'-0"
KEYED NOTES
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
GE
R 01.05.26
EXTERIOR STONE MASONRY
TREATMENT NOTES
A. SCOPE OF WORK:
1. CLEANING ACCUMULATED SOILING AND BIOGROWTH
FROM EXTERIOR MASONRY SURFACES
2. REMOVAL OF INCOMPATIBLE PORTLAND CEMENT MORTAR
USED IN PATCHING WORK
3. REPOINTING ERODED MORTAR JOINTS USING
HISTORICALLY- COMPATIBLE MORTAR
B. PERMISSIBLE CLEANING TECHNIQUES:
THE FOLLOWING TECHNIQUES MAY BE CONSIDERED FOR
USE IN CLEANING STONE MASONRY. PRIOR TO SELECTION,
EACH CONSIDERED TECHNIQUE MUST BE TESTED ON THE
BUILDING FOR EFFICACY AND EFFECT ON HISTORIC
SURFACES.
1. WATER BATH AND SURFACE SCRUBBING IN
COMBINATION WITH MILD DETERGENT
2. LATEX CLEANER
3. PROPRIETARY CLEANERS
4. MEDIA BLASTING: MEDIA MAY INCLUDE:
-- SODA
-- SPONGE
-- WALNUT SHELL
-- DRY ICE
5. LASER ABLATION
C. REQUIREMENTS FOR CLEANING MATERIALS:
1. PRODUCTS SHALL NOT DAMAGE MATERIALS TO BE
CLEANED OR ADJACENT MATERIALS AND SURFACES
INCLUDING VEGETATION
2. FINAL PRODUCT SELECTION MUST BE APPROVED BY
ARCHITECT PER TEST CLEANING
3. NEUTRALIZING AFTERWASH MUST NOT CONTAIN
HYDROFLUORIC ACID OR AMMONIUM BIFLUORIDE
D. MATERIALS AND METHODS:
1. DETERGENT SOLUTION, JOB MIXED: USE A SOLUTION
PREPARED BY MIXING 2 CUPS (0.5 L) OF TETRASODIUM
PYROPHOSPHATE (TSPP), 1/2 CUP (125 ML) OF
LAUNDRY DETERGENT, AND 20 QUARTS (20 L) OF
HOT WATER FOR EVERY 5 GAL. (20 L) OF SOLUTION
2. MOLD, MILDEW, AND ALGAE REMOVER, JOB MIXED:
SOLUTION PREPARED BY MIXING 2 CUPS (0.5 L) OF
TETRASODIUM PYROPHOSPHATE (TSPP), 5 QUARTS (5 L)
OF 5 PERCENT SODIUM HYPOCHLORITE (BLEACH), AND
15 QUARTS (15 L) OF HOT WATER FOR EVERY 5 GAL.
(20 L) OF SOLUTION REQUIRED
3. NON-ACIDIC GEL CLEANER: MFR'S STANDARD GEL
FORMULATION, WITH PH BETWEEN 6 AND 9, THAT
CONTAINS DETERGENTS WITH CHELATING AGENTS
AND IS SPECIFICALLY FORMULATED FOR CLEANING
MASONRY SURFACES
4. NON-ACIDIC LIQUID CLEANER: MFR'S STANDARD MILDLY-
ALKALINE LIQUID CLEANER FORMULATED FOR
REMOVING MOLD, MILDEW, AND OTHER ORGANIC
SOILING FROM ORDINARY BUILDING MATERIALS
5. PROPRIETARY CLEANERS: MFR'S STANDARD- STRENGTH
CLEANERS DESIGNED FOR REMOVING EXG SOILING
AND STAINS FROM STONE MASONRY, MORTAR, AND
GROUT SURFACES WITHOUT DISCOLORING OR
DAMAGING SURFACES
6. BRUSHES: NATURAL BRISTLE BRUSH
I. DO NOT USE WIRE BRUSHES OR BRUSHES THAT ARE
NOT RESISTANT TO CLEANER BEING USED
7. LOW-PRESSURE SPRAY: 100-400 PSI, 4-6 GPM
I. FAN SHAPED SPRAY THAT DISPERSES WATER AT 25
TO 50 DEG ANGLE
II. HOLD SPRAY NOZZLE AT LEAST 12” FROM
MASONRY SURFACE
E. STONE MASONRY CLEANING GUIDELINES:
1. A QUALIFIED HISTORIC MASONRY CLEANING SPECIALIST
SHOULD BE USED FOR ALL HISTORIC MASONRY CLEANING
2. COMPLETE TEST CLEANINGS WORKING FROM THE MOST
DELICATE CLEANER TO THE LEAST DELICATE CLEANER TO
DETERMINE THE LEAST DAMAGING CLEANER THAT
PRODUCES AN ACCEPTABLE RESULT.
3. CONTRACTOR TO PROVIDE TEST CLEANINGS FOR EACH
TYPE OF MASONRY AND SURFACE CONDITION FOR EACH
CLEANING METHOD AS DIRECTED BY ARCHITECT. TEST
CLEANINGS SHOULD BE AN AREA 36”X36”. DO NOT
PROCEED WITH CLEANING WORK PRIOR TO FIELD TESTING
AND ARCHITECT APPROVAL OF CLEANING PRODUCTS.
4. PROTECT WOOD SURFACES FROM EXPOSURE TO
MASONRY CLEANING PRODUCTS BEFORE BEGINNING
CLEANING.
5. PROCEED WITH CLEANING IN AN ORDERLY MANNER,
WORK FROM TOP TO BOTTOM AND FROM ONE
ELEVATION TO THE OTHER. ENSURE THAT DIRTY RESIDUE
AND RINSE WATER DO NOT WASH OVER DRY, CLEANED
SURFACES
6. PERFORM EACH CLEANING METHOD IN A MANNER THAT
RESULTS IN UNIFORM COVERAGE OF ALL SURFACES,
WITHOUT STREAKING OR DAMAGE
7. COMPLETELY REMOVE VISIBLE VEGETATION FROM
MASONRY SURFACES BY CUTTING AT ROOTS AND
ALLOWING REMAINING GROWTH TO DRY AS LONG AS
POSSIBLE BEFORE REMOVAL. REMOVE LOOSE SOIL AND
PLANT DEBRIS FROM OPEN MASONRY JOINTS TO
WHATEVER DEPTH THEY OCCUR
8. COMPLETELY REMOVE INSECTS AND BIRDS NESTS FROM
MASONRY SURFACES VIA SCRAPING OR RINSING WITH
LOW-PRESSURE SPRAY. DO NOT SCRATCH, CHIP, OR
DAMAGE MASONRY
9. REMOVE EXTRANEOUS SUBSTANCES SUCH AS PAINT,
CAULKING, ASPHALT, AND TAR THAT ARE RESISTANT TO
THE PLANNED CLEANING METHODS
118 CLEAN 100% OF EXTERIOR STONE MASONRY SURFACES, FOLLOWING THE
TREATMENT NOTES ON THIS SHEET
119 REMOVE PORTLAND CEMENT MORTAR FROM JOINTS IN HATCHED AREAS
AND OTHER LOCATIONS WHERE NOTED IN THE FIELD
120 REPOINT ERODED MORTAR JOINTS IN AREAS DESCRIBED BELOW.
ASSUME SCOPE OF REPOINTING WILL INCLUDE THE FOLLOWING AREAS:
-- 100% OF EAST/WEST GABLE END WALLS
-- ALL CHIMNEY SURFACES ABOVE THE ROOF
-- 75% OF THE NORTH WALL
-- 50% OF THE SOUTH WALL
EXTERIOR STONE MASONRY
TREATMENT NOTES (CONT.)
10. IF A DETERGENT TREATMENT IS SELECTED, WET SURFACE
WITH COLD OR HOT WATER APPLIED BY LOW- PRESSURE
RINSE OR SPRAY. USE ONLY LOW-PRESSURE SPRAY
EQUIPMENT (UNDER 400 PSI) THAT PROVIDES A
CONTROLLED APPLICATION. ADJUST PRESSURE AND
VOLUME TO ENSURE THAT CLEANING METHOD DOES NOT
DAMAGE MASONRY OR MORTAR OR FORCE WATER INTO
WALL INTERSTICES. UNLESS OTHERWISE NOTED, HOLD
SPRAY NOZZLE AT LEAST 12" FROM SURFACE OF MASONRY
11. SCRUB SURFACE WITH DETERGENT SOLUTION OR
CHEMICAL CLEANER APPROVED BY ARCHITECT. LET
CLEANER REMAIN ON SURFACE FOR PERIOD
RECOMMENDED BY MFR AND PROVEN IN TEST CLEANING
TO BE EFFECTIVE WITHOUT DAMAGING MASONRY. USE A
MEDIUM-SOFT NATURAL BRISTLE BRUSH UNTIL SOIL IS
THOROUGHLY DISLODGED AND CAN BE REMOVED BY
RINSING. USE SMALL BRUSHES TO REMOVE SOIL FROM
MORTAR JOINTS AND CREVICES. DIP BRUSH IN SOLUTION
OFTEN TO ENSURE THAT ADEQUATE FRESH DETERGENT IS
USED AND THAT SURFACE REMAINS WET
12. RINSE WITH COLD OR HOT WATER APPLIED WITH LOW-
PRESSURE SPRAY TO REMOVE DETERGENT SOLUTION AND
LOOSENED SOIL
13. COLLECT AND PROPERLY DISPOSE OF ALL RINSE WATER
IN ACCORDANCE WITH APPLICABLE REGULATIONS
F. STONE MASONRY REPOINTING GUIDELINES:
1. CONDUCT ALL REPOINTING OF HISTORIC MASONRY IN
ACCORDANCE WITH NPS PRESERVATION BRIEF #2,
“REPOINTING MORTAR JOINTS IN HISTORIC MASONRY
BUILDINGS,” IN COORDINATION WITH THESE GUIDELINES
2. PERFORM LAB ANALYSIS OF HISTORIC MORTARS FROM
DIFFERENT LOCATIONS IN THE TYPICAL WALL ASSEMBLY:
FACE, BEDDING, AND INTERIOR. USE THE LAB RESULTS TO
GUIDE THE MIXING OF HISTORICALLY-APPROPRIATE
MORTARS FOR USE IN REPOINTING THE BUILDING,
INCLUDING FINISHED MORTAR COLOR AND AGGREGATE
TYPE, COLOR, VARIETY AND AND SIZE
3. REMOVE PORTLAND CEMENT PATCH MORTAR WHERE
PRESENT USING HAND TOOLS (HAMMER AND COLD
CHISEL, ETC.). REFER TO ORTHOPHOTO ELEVATIONS ON
THIS SHEET.
4. REMOVE OTHER LOOSE AND/OR DEGRADED MORTAR IN
INDICATED AREAS ONLY USING HAND TOOLS (HAMMER
AND COLD CHISEL, ETC.). REMOVE MORTAR TO A DEPTH
ROUGHLY TWICE THE WIDTH OF THE MORTAR JOINT
5. DO NOT SPALL EDGES OF MASONRY UNITS OR WIDEN
JOINTS
6. NOTIFY ARCHITECT OF UNFORESEEN DETRIMENTAL
CONDITIONS
7. SWEEP PREPARED JOINT WITH NATURAL BRISTLE BRUSH TO
REMOVE LOOSE PARTICLES PRIOR TO REPOINTING
8. REPOINT SELECTED AREAS OF MORTAR USING THE
HISTORICALLY-COMPATIBLE MORTAR MIX DETERMINED BY
LAB ANALYSIS. MATCH JOINT TOOLING TO EXISTING AS
CLOSELY AS CAN BE ASCERTAINED
9. ALLOW MORTAR TO CURE COMPLETELY, AFTER WHICH,
BRUSH LOOSE MORTAR, DUST, AND OTHER PARTICULATES
FROM SURFACE OF BRICK
10. FOLLOWING REPOINTING, DO NOT USE ACID SOLUTION
OF ANY KIND TO REMOVE EXCESS MORTAR FROM
MASONRY SURFACES. MANUALLY REMOVE HARDENED
NUGGETS OF MORTAR WHERE POSSIBLE. FOR RESIDUES,
USE ONLY BIODEGRADABLE CONCRETE/MORTAR
DISSOLVER FOR THIS PURPOSE. THOROUGHLY WET
MASONRY BEFORE APPLICATION OF MORTAR DISSOLVER
PER MANUFACTURER INSTRUCTIONS. RINSE WALL SURFACE
THOROUGHLY WITH CLEAN WATER AFTER EACH
APPLICATION OF MORTAR DISSOLVER. REPEAT APPLICATION
AS NEEDED
100% CD RELEASE
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-201
DATE:
ISSUE:
BUILDING ELEVATIONS
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
1WEST ELEVATION
SCALE: 1/4" = 1'-0"
NORTH ELEVATION
SCALE: 1/4" = 1'-0"
3EAST ELEVATION
SCALE: 1/4" = 1'-0"
KEYED NOTES
JOSEPH P.
SMITH III
ROEGFOETATS
GIA
NO . R A0 11 6
ETACI
FI
T
R E
C
A R CH I T
EC
T
DERETSI
GE
R 01.05.26
D
D
A 200
B
A
B
C
D 000
E
F
A-402
A
A-402
117117
A-401
C
B
A
B
A
C
B
A
C 200
D
C
B
G
A-400
117117
EXTERIOR WOOD REPAIR NOTES:
A. MATERIALS:
1. DUTCHMAN REPAIR: MATCH DUTCHMAN TO SURROUNDING
MATERIAL IN DIMENSION, SPECIES, GRAIN CHARACTERISTIC,
AND PROFILE. REPAIR MISSING ELEMENTS USING MATCHING
SALVAGED MATERIAL FROM THE SAME PROJECT WHERE
FEASIBLE. MARK DATE OF REPAIR ON PATCH IN HIDDEN LOC
2. COMPONENT REPLACEMENT: WHERE THE SIZE OF
DETERIORATED MATERIAL MAKES PATCHING INFEASIBLE,
FULL COMPONENT REPLACEMENT MAY BE REQUIRED.
MATCH THE REPLACEMENT COMPONENT TO THE ORIGINAL
COMPONENT IN DIMENSION, SPECIES, GRAIN
CHARACTERISTIC, AND PROFILE. USE THERMALLY-MODIFIED
LUMBER, MILLED TO SIZE, WHERE WHOLLY-NEW MATERIAL IS
REQUIRED.
3. IN ANY REPAIR, ENDEAVOR TO RETAIN AS MUCH ORIGINAL/
EXISTING MATERIAL AS POSSIBLE
115 NEW WOOD SHINGLE ROOFING ON EXG PLYWOOD ROOF SHEATHING.
REFER TO ROOFING DETAILS ON A-401 AND A-402
117 NEW BARREL-VAULT STONE CHIMNEY CAP ON SS FRAME.
REFER TO DETAILS ON A-403
121 CLEAN AND SEAL EXPOSED EXTERIOR WOOD SURFACES, FOLLOWING
WOOD TREATMENT NOTES ON THIS SHEET
EXTERIOR WOOD CLEANING NOTES:
A. MATERIALS
1. DETERGENT SOLUTION: SOLUTION PREPARED BY MIXING
2 CUPS OF TETRASODIUM PYROPHOSPHATE (TSPP),
1/2 CUP OF LAUNDRY DETERGENT CONTAINING NO
AMMONIA, 5 QUARTS OF 5 PERCENT SODIUM
HYPOCHLORITE BLEACH, AND 15 QUARTS OF WARM
WATER FOR EACH 5 GAL. OF SOLUTION REQUIRED
3. MILDEWCIDE: COMMERCIAL, PROPRIETARY MILDEWCIDE
OR A SOLUTION PREPARED BY MIXING 1/3 CUP OF
HOUSEHOLD DETERGENT CONTAINING NO AMMONIA,
1 QUART OF 5 PERCENT SODIUM HYPOCHLORITE BLEACH,
AND 3 QUARTS OF WARM WATER
B. CLEANING AND PREPARATION:
1. CLEAN WOOD OF MILDEW, ALGAE, MOSS, PLANT
MATERIAL, LOOSE PAINT, GREASE, DIRT, AND OTHER
DEBRIS BY SCRUBBING WITH NATURAL BRISTLE BRUSH OR
SPONGE AND DETERGENT SOLUTION
2. SCRUB MILDEWED AREAS WITH MILDEWCIDE. AFTER
CLEANING, RINSE THOROUGHLY WITH FRESH WATER.
ALLOW TO DRY BEFORE REPAIRING
3. CONDITION REPLACEMENT WOOD MEMBERS AND
REPLACEMENT UNITS TO PREVAILING CONDITIONS AT
INSTALLATION AREAS BEFORE INSTALLING
EXTERIOR WOOD FINISHING NOTES:
A. MATERIALS
1. BORATE PRESERVATIVE TREATMENT: INORGANIC, BORATE-
BASED SOLUTION, WITH DISODIUM OCTABORATE
TETRAHYDRATE AS THE PRIMARY INGREDIENT,
MANUFACTURED FOR PRESERVING WEATHERED AND
DECAYED WOOD FROM FURTHER DAMAGE BY DECAY
FUNGI AND WOOD-BORING INSECTS. COMPLIES WITH
AWPA P5 AND CONTAINS NO BORIC ACID
2. SEMI-TRANSPARENT STAIN (NEW MATERIAL ONLY):
WATER-BASED SEMI-TRANSPARENT STAIN (COLOR TBD)
TO BLEND NEW WOOD WITH EXISTING WOOD PATINA
3. PENETRATING SEALER WITH UV PROTECTION:
NON FILM-FORMING, BREATHABLE, PENETRATING SEALER,
WITH OR WITHOUT TRANSOXIDE PIGMENTS,
MANUFACTURED TO PROVIDE UV AND WATER
RESISTANCE TO UNPAINTED WOOD
B. APPLICATION:
APPLY THE FOLLOWING TREATMENTS TO ALL WOOD
EXPOSED TO EXTERIOR WEATHERING, INCLUDING BOTH
NEW AND HISTORIC WOOD.
1. WOOD SHOULD BE DRY BEFORE COMMENCING WORK
2. LIGHTLY SAND SURFACES TO MAXIMIZE PENETRATION OF
TREATMENTS. REMOVE WOOD DUST PRIOR TO
APPLICATION
3. APPLY BORATE TREATMENT PER MFR INSTRUCTIONS,
ALLOWING FULL CURE/DRY TIME
4. APPLY SEMI-TRANSPARENT STAIN PER MFR INSTRUCTIONS,
ALLOWING FULL CURE/DRY TIME
5. APPLY PENETRATING UV-PROTECTIVE FINISH AND ALLOW
FULL CURE/DRY TIME. APPLY ADDITIONAL COATS PER
MFR'S RECOMMENDATION
L-SHAPED MORTARED FIELDSTONE PIER,
LOCALLY-SOURCED STONE OR EQUIV
MOST CLOSELY MATCHED TO HOUSE, TYP
LINE OF REINF CONC FTG BELOW
±1'-6"
THERMALLY-MODIFIED
5/4X6 SYP PINE SLATS
FASTENED TO 2X BLOCKING
±3 '-4
±1'-6"
STONE PIERSTONE PIER
±1
A
VG
C
LR
, V
IF
±6 '-2
EXCAVATE AREAWAY BELOW PORCH
TO BOTTOM OF FOOTING;
BACKFILL W/#57 STONE TO
MATCH CELLAR INTERIOR FLOOR LEVEL
PAIRED WOOD PLANK
ACCESS DOORS
±1 '-0
±1'-0" ±3'-6" ±1'-0"
5' -2
PLAN NORTH
A-401
B
MORTARED FIELDSTONE PIER,
LOCALLY-SOURCED STONE OR EQUIV
MOST CLOSELY MATCHED TO HOUSE, TYP
PORCH POST ABOVE ANCHORED
INTO STONE PIER. REFER TO
FRAMING PLAN FOR POST LOCS
THERMALLY-MODIFIED
5/4X6 SYP PINE SLATS
FASTENED TO 2X BLOCKING
REBAR AND ANCHOR BOLTS
FOR PORCH POSTS AND FRAMING
MORTARED INTO PIER CORE
REBAR AND ANCHOR BOLTS
FOR PORCH POSTS AND FRAMING
MORTARED INTO PIER CORE
±1'-0"
±1 '-0
±1'-0"
±1 '-0
L M.O. AT FIRST FLOOR
SOUTH SIDE
C
±3'-6"
FIELDSTONE FDN WALL
±3'-0"
LINE OF PORCH SKIRT ABOVE
NEWEL ABOVE ANCHORED
INTO STONE PIER. REFER TO
FRAMING PLAN FOR NEWEL LOCS
EXG STONE THRESHOLD
LINE OF FDN DRAIN PIPE
±3'-0"
±9'-0"
3" 3"
±2 '-1
0"
ST
O
N E
PI
ER
±1 '-4
±1
'-6
ST
O
N E
PI
ER
C O
N C
S
TA
IR
FT
G12" X 12" X 4'-3"
REINF CONC FTG
4'-3"
1' -0
4'
-5
±2'-4 1/2"±2'-4 1/2"
01.05.26
100% CD REVIEW
ROCK HOUSE RESTORATION
1455 ROCK HOUSE RD
THOMSON, GEORGIA 30824
P
RI
N
CE
A
VE
N
UE
SE
CO
N D
FL
O
O R
AT
HE
N S, G A
T:
.3
.3
PROJECT:
TITLE:
A-400
DATE:
ISSUE:
CONSTRUCTION DETAILS:
SOUTH PORCH
SOUTH PORCH DTL FOUNDATION PLAN
SCALE 1" = 1'-0"
1SOUTH PORCH DTL FRAMING PLAN
SCALE 1" = 1'-0"
CLEAR 4X4 THERMALLY-MODIFIED SOUTHERN PINE
NEWEL ON SIMPSON ABA44Z STANDOFF BASE
ANCHORED W/THREADED ROD INTO STONE PIER
BELOW PER MFR RECOMMENDED INSTALLATION
REFER TO ELEVATIONS FOR NEWEL TAPER DESIGN
PLAN NORTH
A-401
SY
P
2X
6" O
.C
TY
P
5' -6
/4
8'-2 1/2"2 3/4" 2 3/4"
8'-8"
1'-3" 1'-3" 1'-3"
1/
4" L
N
EW
EL
C
L NEWELC
1/
4"
L N
EW
EL
C
L NEWELC4'-3" 2'-2 1/2"
12" X 12" X 4'-3"
REINF CONC FTG
PT KDAT 2X12 NOTCHED STRINGER, TYP.
SISTER UN-NOTCHED PT KDAT 2X4 TO BOTH SIDES
OF INTERIOR STRINGERS. SISTER PT KDAT 2X6
TO INTERIOR FACE OF OUTER STRINGERS,
W/2" EXTENDING BELOW BOTTOM OF STRINGER
TO PROVIDE BLOCKING FOR FASTENING SLATS
LINE OF FINISH STAIR TREADS ABOVE
3 1/4"
2'-2 1/2"
8'-8"
L POSTC
L
PO
ST
C
L N
EW
EL
C L N
EW
EL
L
PO
ST
C
L POSTC
L NEWELC
C
L NEWELC
A
A
NEWEL THROUGH-BOLTED TO BLOCKING
AND RIM BOARD W/ (2) 9" X 1/2" GALV CARRIAGE BOLTS
AT 2" AND 7" BELOW BOTTOM OF DECKING.
PROVIDE SIMPSON DTT2Z TENSION TIE AT TOP BOLT ONLY)
PROVIDE…