This presentation is a comprehensive overview of the U.S. Army Corps of Engineers Rock Island District's Small Business Industry Day, scheduled for April 9, 2025. The document provides detailed insights into the district's business lines, including navigation, flood risk management, environmental stewardship, recreation, and emergency management, covering approximately 78,000 square miles across five states and five river basins. The district's fiscal year 2024 appropriations total $334.3 million, with significant funding allocated to construction ($178.5M), operations & maintenance ($154.8M), and investigations ($1M).
The presentation highlights upcoming projects and solicitations, such as the Brandon Road Interbasin Project, Cedar Rapids Flood Risk Management Project, and various Navigation & Ecosystem Sustainability Program (NESP) initiatives. The small business program aims to achieve specific goals for different business categories, with FY24 actual obligations showing over 56% for small businesses and varying percentages for disadvantaged, woman-owned, HUBZone, and service-disabled veteran-owned businesses. The document also outlines acquisition strategies, contract types, and funding timelines for major projects, and provides contact information for key district personnel. Interested businesses are encouraged to attend industry days, use provided websites for opportunities, and engage in individualized meetings to explore potential partnerships.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ARMY CORPS OF ENGINEERS
ROCK ISLAND DISTRICT
SMALL BUSINESS INDUSTRY DAY
April 9, 2025
Area of Responsibility
Roughly 78,000 sq. miles in portions of:
Iowa Illinois Wisconsin Minnesota Missouri
Portions of 5 river basins:
Mississippi River Illinois River Des Moines River Iowa-Cedar River Rock River
Rock Island District Business Lines Navigation
Flood Risk Management
Environmental Stewardship
Recreation
Emergency Management
• 9-foot channel maintenance
• 314 miles of the Mississippi River
12 lock and dam sites
• 268 miles of the Illinois Waterway
6 lock and dam sites
• More than 900 miles of levee 146 levee and drainage systems
• 5 Reservoirs
3 in Iowa (wet) 2 in Illinois (dry)
• Regional Environmental Stewardship for the Upper Mississippi River System Upper Mississippi River Restoration Navigation & Ecosystem Sustainability Program Brandon Road Interbasin Project
• USACE is the largest provider of water-based outdoor recreation in the nation
• USACE Rock Island District 97 recreation sites across 5 states
16.8 million visitors annually
• Disaster response and recovery for the District, Division and Nation Levee Safety/Rehabilitation Flood Area Engineer Teams National Flood Fight Materiel Center
Small Business Program
SB Programs/Goals FY24 Goals FY24 Actual Obligations FY24 Actual % FY25 Goals Small Business 30% $123,762,313 56.58% 30%
Small Disadvantaged Business 12% $66,039,142 30.19% 14% Woman Owned SB 5% $24,096,117 11.02% 5%
HUBZone 7% $28,272,551 12.93% 5% Service-Disabled Veteran SB 3% $10,692,458 4.89% 3%
Provides outreach and information to ensure small businesses have the maximum practicable opportunity to participate in Rock Island District acquisitions through contracts or subcontracts.
Examples of Outreach and Informational Events include:
SAME Small Business Conferences
Roundtable Discussions SAME Industry Days District Industry Days
National Industry Meetings
Program website: https://www.mvr.usace.army.mil/Business-With-Us/Small-Business/
Total FY24 Contracting Obligations = $218,726,166 Forecasted FY25 Contracting Obligations = $250M https://www.mvr.usace.army.mil/Business-With-Us/Small-Business/
FY24 FUNDING
Rock Island District FY24 Appropriations - $334.3M
INVESTIGATIONS - $1M
UMR Flow Frequency Study - $1M (Earmark)
CONSTRUCTION - $178.5M
UMRR - $55M
NESP - $120M (Earmark) Hannibal, MO Environmental Infrastructure - $3.5M (Earmark)
OPERATIONS & MAINTENANCE - $154.8M
Mississippi River - $76.7M Illinois Waterway - $51.3M Saylorville Lake - $6.5M Lake Red Rock - $5.4M Coralville Lake - $5.0M Farm Creek - $0.6M Seven Small Boat Harbor Dredging Projects - $9.3M
Project Location Anticipated Advertisement Estimated Range
Dubuque Forced Sewer Main CAP Sec 14 Dubuque, IA 4th Qtr FY25 $1M-$10M
Flood Risk Management
Navigation & Structural
Advertisement Estimated Range
Marseilles Electrical System Marseilles, IL 4th Qtr FY25 $10M-$25M
FRP Dam Tainter Gate Fabrication TBD 4th Qtr FY25 TBD IWW Peoria and LaGrange
End of Dam Wicket Bulkhead Peoria, IL 3rd Qtr FY25 $1M-$5M
Lock 19 Nose Pier Replacement and Bulkhead Recess Keokuk, IA 4th Qtr FY25 $10M-$25M
Upper Mississippi River Restoration (UMRR)
Program website:
https://www.mvr.usace.army.mil/Missions/Environmental-Stewardship/Upper-Mississippi-River-Restoration/ https://www.mvr.usace.army.mil/Missions/Environmental-Stewardship/Upper-Mississippi-River-Restoration/
UMRR Steamboat Island Stage 3 HREP Clinton, IA 1st Qtr FY26 $5M-$10M
Civil, Channel & Ecosystem Restoration
88th Readiness Division FY25 Project Locations
88th RD - Harlan ARC - Construct Storage Caging, Repair Electrical & Fire Alarm Systems Evansville, IN 3rd Qtr FY25 $1M-$5M
88th RD - Twinsburg ARC – Repair Building Settling and Interior Cracking Twinsburg, OH 3rd Qtr FY25 $1M-$5M
88th RD - Silver Spring Drive, Building 319 – Repair HVAC & Electrical Systems Milwaukee, WI 2nd Qtr FY25 $1M-$5M
88th RD - Keeble AFRC – Repair MEP Lot Sioux Falls, SD 3rd Qtr FY25 $500K-$1M
88th RD - O’Donnell ARC – Repair VMS Building and Expand MEP Lot Springfield, IL 3rd Qtr FY25 $1M-$5M
First Floor North Annex EOC Rock Island, IL 2nd Qtr FY25 $1M-$10M
Building Renovations – 88th RD & Others
Brandon Road Interbasin Project
Project website: www.mvr.usace.army.mil/BRIP/
INCREMENT I-A
• Automated Barge Clearing Deterrent
• Leading Edge Bubble Deterrent
• Leading Edge Acoustic Deterrent Array
• Leading Edge Support Facilities
• Upstream Boat Launch
INCREMENT I-B
• Site Prep
• Channel Rock Excavation
INCREMENT II
• Electric Deterrent
• Large Acoustic Deterrent Array
• Support Facilities
• Engineered Channel floor & walls for the electric & large acoustic deterrents
• Flushing Lock
• Downstream Boat Launch
INCREMENT III
• Finish Engineered Channel
• Connect RDB Wall to
Lower Guidewall
Project Anticipated Contract Type Anticipated Advertisement Estimated Range
Increment I-A Construction Construction 3rd Qtr FY25 $100M-$200M Increment II & III AE Design AE Services 3rd Qtr FY25 $25M-$50M
Increment II RDB Wall Construction Construction 1st Qtr FY27 $100M-$200M Increment II Flushing Lock Construction Construction 1st Qtr FY29 $100M-$200M
Increment II Construction Construction 3rd Qtr FY29 $200M-$300M Increment III Construction Construction 2nd Qtr FY32 $25M-$50M http://www.mvr.usace.army.mil/BRIP/
I-B
BEDROCK
REMOVAL
I-A
LEADING-
EDGE
DETERRENTS
I-A
BOAT
RAMP
I-A / I-B
SITE PREP
ELECTRICAL
SUBSTATION
Brandon Road Interbasin Project
Project Anticipated Contract Type Anticipated Advertisement Estimated Range
Increment I-A Construction Construction 3rd Qtr FY25 $100M-$200M
Increment I-A and I-B Site Features
Navigation & Ecosystem Sustainability Program The Navigation and Ecosystem Sustainability Program (NESP) is a long-term, dual-purpose program that integrates navigation improvements and ecosystem restoration together to provide Upper Mississippi River System once in a generation-type positive impacts.
The primary goals of the program are to increase the capacity and improve the reliability of the inland navigation system while restoring, protecting, and enhancing the environment.
NESP Upcoming Solicitations
Project FY25 Contract Action Approximate Solicitation Timeframe
NESP Navigation - Lock 7 mooring cell (St Paul District) Construction Contract FY25
NESP Navigation - Lock 10 mooring cell (St Paul District) Construction contract FY25
NESP Ecosystem – Wacouta Bay Ecosystem Restoration (St Paul District)
Construction contract FY25 (pending appropriations)
NESP Ecosystem – Sny Magill Effigy Mounds Ecosystem Restoration (St Paul District)
Construction contract FY25 (pending appropriations)
NESP Ecosystem – MMR Stone Dike Ecosystem Restoration (St Louis District)
Construction contract FY25 (pending appropriations)
New 1200-ft Lock at LaGrange
• New 1,200-foot lock will be constructed in a cofferdam landward of the existing lock
• Existing lock remains operational during construction
LaGrange 1200-ft Lock Features
NORTH DISPOSAL
PILE
UPSTREAM APPROACH
EXCAVATION
1200’ LOCK
EXISTING
LOCK
COFFERDAM
DISPOSAL PILE MAINTENANCE
BLDG
ADMIN
BLDG
UPSTREAM
CONTROL
STATION
DOWNSTREAM
CONTROL STATION
DOWNSTREAM GUIDE WALL
DOWNSTREAM
APPROACH
EXCAVATION
SOUTH DISPOSAL
PILE
EXISTING
BLDGS
UPSTREAM
GUIDE WALL
DOWNSTREAM HPU
BLDGUPSTREAM HPU BLDG
BUBBLER
Cofferdam
Lock and Guide Walls
• Concrete gravity walls
• H-Piles driven 30’ to bedrock
• Sheet pile cutoff driven to bedrock
Acquisition
FFP-Firm Fixed Price IFB- Invitation for Bid BV- Best Value (With Trade Offs or Least Price Technically Acceptable)
What are your questions?
Thomas E. Mack P.E.
Technical Lead, Inland Navigation Design Center
Phone: 309-794-5664 Cell: 309-912-1987 Thomas.E.Mack@usace.army.mi l
Cedar Rapids Flood Risk Management Project
Cedar Rapids Flood Risk Management Project
Project Project Location Anticipated Advertisement
Estimated Range
Cedar Lake South Railyard Floodwall (USACE) Cedar Lake Summer 2025 $10M-$25M Downstream River Floodwall, Pump Station, Culverts and Closures (USACE) South Industrial Summer 2025 $50M-$100M
Downtown East Removable & Permanent Floodwall (USACE) Downtown Fall 2025 $25M-$50M Cedar Lake Railyard Roller Gate Closure Structures (USACE) Cedar Lake Fall 2025 / TBD $10M-$25M
McLoud Run Lower Reach Culverts (USACE) McLoud Run Channel Winter 2025/2026 $5M-$10M Cedar Lake South Shore Levee (CITY) Cedar Lake Spring 2026 $5M-$10M
8th Ave SE Floodwalls (USACE) Downtown Spring 2026 $1M-$5M Cedar Lake Pump Station (CITY) Cedar Lake TBD $10M-$25M
Southwest Coastal Louisiana Nonstructural Project Overview
Contract Status
• DB First Priority Group
Awarded June 2024
• Screening Awarded January 2025
• DB MATOC
Draft solicitation targeted for May 2025.
Solicitation targeted for July 2025.
Upcoming Events
15-17 April 2025 SAME SMPS/St. Louis Industry Day
17 April 2025 St. Louis District Small Business Industry Day
28-30 May 2025 Omaha Industry Day
10-12 June 2025 GKC SAME Post Industry Day
Websites for Industry Partners:
www.mvr.usace.army.mil/Business-With-Us/Small-Business/ www.mvr.usace.army.mil/Business-With-Us/Contracting/
• Upcoming training for industry or outreach events
• Contract Forecast Lists
• How-To’s for Finding Opportunities
• Subcontracting Opportunities
Individualized Meetings Available to Discuss:
• Projects/programs and doing business with the District
• Potential connection with other District personnel and/or other resource partners
• Inclusion on District email list for ongoing communication
Doing Business With Us http://www.mvr.usace.army.mil/Business-With-Us/Small-Business/ https://www.mvr.usace.army.mil/Business-With-Us/Contracting/
On Social Media www.instagram.com/usacerockisland/
On the Web www.mvr.usace.army.mil
Stay Connected www.linkedin.com/company/us-army-corps-of-engineers-rock-island-district https://twitter.com/USACERockIsland www.facebook.com/RockIslandDistrictUSACE www.youtube.com/c/USACERockIslandDistrict http://www.instagram.com/usacerockisland/ http://www.mvr.usace.army.mil/ http://www.linkedin.com/company/us-army-corps-of-engineers-rock-island-district http://www.linkedin.com/company/us-army-corps-of-engineers-rock-island-district https://twitter.com/USACERockIsland http://www.facebook.com/RockIslandDistrictUSACE http://www.youtube.com/c/USACERockIslandDistrict
Rock Island District Commander Col. Aaron Williams
(309) 794-5224
Engineering & Construction Roger Perk
(309) 794-5227
Programs & Project Management
Brad Houzenga
(309) 794-5260
Operations Division Tom Heinold
(309) 794-5401
Construction Branch Richard Busch
(309) 794-5480
Contracting Division Scott Harris
(309) 794-5628
Small Business Programs Troy Robbins
(309) 794-5205
Regulatory Branch Matt Zehr
(309) 794-5372
Emergency Management Sarah Jones
(309) 794-5206
Inland Navigation Design Center Lenna Hawkins
(412) 862-7536
Points of Contact
QUESTIONS?
| U.S. Army corps of engineers �rock island district�Small Business Industry Day �� |
| Area of Responsibility |
| Rock Island District Business Lines |
| Small Business Program |
| FY24 FUNDING |
| Flood Risk Management |
| Navigation & Structural |
| Upper Mississippi River Restoration (UMRR) |
| Civil, Channel & Ecosystem Restoration |
| 88th Readiness Division�FY25 Project Locations |
| Building Renovations – 88th RD & Others |
| Brandon Road Interbasin Project |
| Brandon Road Interbasin Project |
| Navigation & Ecosystem Sustainability Program |
| NESP Upcoming Solicitations |
| New 1200-ft Lock at LaGrange |
| LaGrange 1200-ft Lock Features |
| Cofferdam |
| Lock and Guide Walls |
| Acquisition |
| What are your questions?� |
| Cedar Rapids Flood Risk Management Project |
| Cedar Rapids Flood Risk Management Project |
| Southwest Coastal Louisiana�Nonstructural Project Overview� |
| Upcoming Events |
| Doing Business With Us |
| Stay Connected |
| Points of Contact |
| Slide Number 29 |
File details come from the government source that posted it. Updated .