This document is a Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction for the procurement of DetectaChem SEEKERe-EDK Explosive Detection Equipment. The Air Force Life Cycle Management Center (AFLCMC) at Hanscom AFB is seeking to purchase two units of this specific brand-name equipment for the New Boston Space Force Station (NBSFS), with an estimated cost of $35,000. The justification emphasizes the need to match existing infrastructure, prevent additional training costs, and maintain continuity with the current explosive detection system already in use at the facility.

The document provides detailed rationale for selecting this specific brand, highlighting that the existing system at NBSFS uses DetectaChem SEEKERe-EDK equipment, and procuring the same brand and model will eliminate the need for system modifications, component replacements, or additional staff training. The Contracting Officer has determined the anticipated cost to be fair and reasonable based on market research and pricing available through GSA. The procurement is classified as an individual determination, with signatures from a Physical Security Specialist and Contracting Officer dated April 2025, indicating the document's recent preparation for an upcoming acquisition.

View the file

Other files

File Type Posted
Combined Synopsis Solicitation Final.pdf PDF
Bid Schedule.pdf PDF
SOW - Explosive Detection Equipment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction

CONTROLLED UNCLASSIFIED INFORMATION

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 416 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4

Is this a brand-name justification? Yes No Please provide the product title and description. [ FAR16.505(a)(4)(i) ]

Brand-Name Product Title: DetectaChem SEEKERe-EDK

Brand-Name Product Description: Explosive Detection Equipment and accessories

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Contracting Activity: Contracting AFLCMC/PZIB

Purchase Request / Local ID Number:

Program Name (and Program Element, if applicable): NBSFS Explosive Detection Equipment

Estimated Cost/Price of the Order (including options): $35000

Type Program (see AFFARS 5302.101 for definitions): PEO Program Operational Enterprise

Type of D etermination: Individual Class Expires: [ click and select ]

Click here for instructions to complete the boxes below.

(1) Contracting Activity:

The Air Force Life Cycle Management Center (AFLCMC) (PZIB) is the the contracting office at Hanscom AFB, Massachusetts responsible for this proposed procurement. New Boston Space Force Station (NBSFS) 23 SOPS is the customer for the use of a Brand-Name Restriction.

(2) Nature and/or description of the action being approved:

Approve brand name purchase of DetectaChem SEEKERe-EDK Explosive Detection Equipment and accessories IAW SOW.

(3) Description of the supplies/services required to meet the agency's needs:

Justification for brand-name purchase of DetectaChem SEEKERe-EDK Explosive Detection Equipment and accessories requires purchase of this specific brand and parts in order match current equipment of the same brand and model number and to conform with the existing explosive Detection Equipment and accessories at NBSFS. No installation services necessary.

(4) Justification for restricting consideration to a brand-name item:

This specific brand and part number is the current existing Explosive Detection Equipment and accessories in use at NBSFS. The existing system is being expanded to include coverage at a variety of locations on the installation. This same specific brand and part number will match existing configuration without the need for system modification or replacement of system components.

The ability to immediately implement this equipment in the existing system at NBSFS will maintain continuity and prevent the extra unnecessary cost of replacing supporting components or infrastructure. Technicians at NBSFS are familiar with this equipment and installation. Restricting to this specific brand name will eliminate the extra cost and time associated with additional training or maintenance. Existing inventory of parts and supplies will result in future cost savings.

(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:

The Contracting Officer has determined that the anticipated cost for this order will be fair and reasonable based on market research and a thorough review of pricing available through GSA. This data will be used to support the Government's evaluation of the proposed cost from the vendor. The PZIB office will accomplish a price analysis prior to award.

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 416 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4

(6) Other facts supporting the justification:

This specific brand and model is already in use at NBSFS and we are procuring the exact brand and model to match existing infrastructure and so that no additional training or equipment is necessary.

(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:

Continual market research will be conducted to decrease the use of brand-name items before acquisition and award of this type of supplies or services.

(8) Program Manager's certification that supporting data is accurate and complete:

As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.

(9) Contracting Officer's certification that the justification is accurate and complete:

As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.

(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:

As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.

REMOVING ROWS: CAUTION (click here first) NOTE: The text in the signature blocks below is editable, including the title.

Date

01 Apr 2025

Physical Security Specialist David Dinwoodie

NBSFS

Signature

X

Date 07 Apr 2025

Contracting Officer Eva K . Leavitt

Signature X

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 416 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4

Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)

(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).

(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts.

(Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).

(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.

FAR 16.505(b)(2)(i)(A): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.

FAR 16.505(b)(2)(i)(B): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information.

Supporting documentation may be attached to the back of the document. General statements are not acceptable.

FAR 16.505(b)(2)(i)(C): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information.

General statements are not acceptable.

FAR 16.505(b)(2)(i)(D): “It is necessary to place an order to satisfy a minimum guarantee.”

FAR 16.505(b)(2)(i)(E): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”

Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 416 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4

If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.

(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.

(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.

(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-front.jpg https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-back.jpg Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction 16 Jun 2022 Page of Is this a brand-name justification?

Please provide the product title and description. [ FAR16.505(a)(4)(i) ] Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Type Program (see AFFARS 5302.101 for definitions):

Type of D etermination:

Fair Opportunity Exception: FAR 16.505(B)(2)(i) (Check the applicable subparagraph below.)

(1) Contracting Activity:

(2) Nature and/or description of the action being approved:

(3) Description of the supplies/services required to meet the agency's needs:

(4) Justification for restricting consideration to a brand-name item:

(4) Identification of the exception to fair opportunity and the supporting rationale:

(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:

(6) Other facts supporting the justification:

(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:

(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:

(8) Program Manager's certification that supporting data is accurate and complete:

As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.

(9) Contracting Officer's certification that the justification is accurate and complete:

As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.

(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:

As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.

(10) Approving Official's determination that one of the circumstances in FAR 16.505(b)(2)(i) applies to the order.

As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.

NOTE: The text in the signature blocks below is editable, including the title.

Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)

(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).

(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts. (Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).

(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.

FAR 16.505(b)(2)(i)(A): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.

FAR 16.505(b)(2)(i)(B): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information. Supporting documentation may be attached to the back of the document. General statements are not acceptable.

FAR 16.505(b)(2)(i)(C): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information. General statements are not acceptable.

FAR 16.505(b)(2)(i)(D): “It is necessary to place an order to satisfy a minimum guarantee.”

FAR 16.505(b)(2)(i)(E): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”

Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.

If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.

(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.

(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.

(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

9.0.0.2.20120627.2.874785

security_markings: CONTROLLED UNCLASSIFIED INFORMATION
CurrentPage:
PageCount:
Yes:
No:
Brand-Name-Title_hidden: DetectaChem SEEKERe-EDK
Brand-Name-Description_hidden: Explosive Detection Equipment and accessories
Contacting-Activity: Contracting AFLCMC/PZIB
Purchase-Request:
Program-Name: NBSFS Explosive Detection Equipment
Cost-Price: $35000
PEO-Program: 0
Operational: 1
Enterprise: 0
Individual:
Class:
Expiration_Date: [ click and select ]
subparagraph-A: 0
subparagraph-B: 0
subparagraph-C: 0
subparagraph-D: 0
subparagraph-E: 0
subparagraph-F: 0
subparagraph-G: 0
Drop-Down_for_Exceptions: Select the applicable FAR 6.302 exception from the drop-down list below.
Instructions_Button:
A:
CAUTION:
Date: 01 Apr 2025
Date: 07 Apr 2025
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-SCO-Coord:
Hide-Approval-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
anchor:

File details come from the government source that posted it. Updated .