This document is a Justification and Approval for Sole-Source Contract Number LCLGR22D0019 with Backporch Broadcast Consultants, Inc. The Library of Congress requires repair services for various analog video playback equipment, including Ampex and Sony units. The sole-source justification is based on the fact that the subcontractor, AheadTek, is the only provider capable of refurbishing the 2-inch quad videotape playback heads that are critical for preserving the Library's collection. Due to AheadTek's impending discontinuation of these services, the Library is sole-sourcing the repair work to Backporch Consultants through a modification to the existing IDIQ contract, increasing the ceiling to $425,000. The Library will continue to monitor for potential new sources that could provide the required services, but at this time, sole-sourcing is the only feasible option to obtain the critical repairs before AheadTek ceases operations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval Sole-Source Justification
Contract Number: LCLGR22D0019
Form Updated 4/14/2023
Justification & Approval Sole-Source Justification
As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in
Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.
This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.
This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.
Part 1 – Identification
1. Contracting Agency and Activity:
Library of Congress
NAVCC
Preservation Services Section (PSS)
Video Preservation Laboratory
2. Nature of Action Being Approved Contract (or modification)
LoC or Leg Branch Order (or modification)
GSA Schedule or GWAC: Identify Schedule/Contract
Other: Identify
Contract Number: LCLGR22D0019
Contractor: Backporch Broadcast Consultants, Inc.
Estimated Value (Base and all options): $425,000.00
Period of Performance: 01/01/2022 –01/31/2025
3. Description of Supplies or Services Required to Meet Library Needs
Describe the supplies or services that are required to meet the Library’s minimum needs and the delivery schedule required to meet those needs. Do not focus on a description of the program.
The Library requires the following supplies or services:
The Library requires repair services for the following pieces of equipment:
• Ampex AVR-1 2” quad VTR playback head refurbishment
• Ampex AVR-2 2” quad VTR playback head refurbishment
• Ampex VR-2000B 2” quad VTR playback head refurbishment
• Sony VO-9850 ¾” U-matic VTR repair
• Sony DVW-A500 Digital Betacam VTR repair
• SAMMA Solo JPEG2000 video encoder repair
For Other than Full and Open Competition
Plan ID Number:
Part 2 – Program Office Justification & Approval
4. Authority for Contracting Without Competition
Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:
There is only one responsible source and no other supplies or services will satisfy Library requirements.
41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.
Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).
Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-
1(b)(2).
Other exception identified in FAR 6.302-1: Identify the exception
There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.
41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.
Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: Identify the authority
Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302: Identify the exception
Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
IT Standard Data Sheet)
Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:
Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.
Product or service is reasonably available from only one source.
Source controls copyrights, patents or other exclusive licensing arrangements.
Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.
Source is expressly authorized or required by statute: Identify the authority
Library’s needs can only be satisfied by a brand-name product
The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:
An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.
FAR 8.405-6(a)(1)(i)(A).
Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).
In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).
Library’s needs can only be satisfied by a brand-name product
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:
The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).
The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR
16.505(b)(2)(i)(B).
A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).
To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).
Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).
The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41
U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
5. Rationale for Contracting Without Competition
In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs. The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement. Do not focus on the importance of the requirement; the issue is the rationale for not competing.
In supporting urgency, address the following What are the unexpected facts or the unpredictable events that led to this situation? When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.
In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the Library’s needs.
We are authorized to limit competition on the basis of the citation in section 4 because:
In late September 2024, the Library received a memo from Backporch Consultants’ subcontractor, AheadTek, which specializes in providing VTR playback head refurbishing servicing. The memo states that AheadTek will cease VTR playback head-refurbishing servicing at the end of the 2024 calendar year. Presently, AheadTek is the only business, worldwide, that is capable of refurbishing 2” quad VTR playback heads, which are critical for preserving 2” quad tapes. The Library currently has thousands of unpreserved 2” quad tapes in its collection. Without an inventory of refurbished heads, the NAVCC Video Lab will not be able to preserve these tapes. Given the short time remaining for AheadTek to service the
Library’s equipment, and the fact that the Library’s repair requirements would exceed the ceiling of the current repair IDIQ contract, the Library is sole-sourcing this work to AheadTek, Backporch’s subcontractor, through the existing contract. Alternatively, Video Lab would require a separate service contract. AheadTek will, however, cease providing its services well before the Library could award a separate contract to service this equipment. As a result, the Library’s only means to service the equipment is to sole-source this work to Backporch, who has a history of working with AheadTek and who will coordinate the repair work. To this end, the Library will increase the contract’s ceiling to accommodate these urgent repairs. These services are critical to the Library’s ability to preserve its collection of 2” quad tapes. Therefore, sole-sourcing this work through the
Library’s contract with Backporch Consultants is the only feasible means to obtain these critical services from AheadTek. The Library will sole-source the work through the existing contract, and increase the IDIQ ceiling, via a contract modification.
6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required
State what actions, if any, the program office can take to overcome barriers to competition before contracting for this requirement again, such as:
using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”
To increase competition, we will:
The Library has verified that, at this time, Backporch Broadcast Consultants, Inc. is the only contractor who can coordinate the repair work with its subcontractor, AheadTek, through the Library’s existing contract. The Library will continually check to see if new manufacturers of the product emerge. At this time, however, competing and awarding a new contract would prevent the Library from obtaining the subcontractor’s services. Sole-sourcing the work through the existing contract is the only means of obtaining the repair services.
7. Program Office Certification
I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.
Name
Title
Signature
Date
PART 3 – CONTRACTING OFFICER DETERMINATIONS & CERTIFICATION
8. Efforts to Solicit from As Many Potential Sources As Practicable Unless a justification is based on FAR 6.302-2, Unusual and compelling urgency, contracting officers shall post justifications for other than full and open competition, including brand name justifications, to the Contract Opportunities website on sam.gov (or eBuy for Brand Name Justifications under FAR Part 8) prior to requesting a proposal or otherwise entering into negotiations.
Advance notice will be published in sam.gov for 15 days before a contract is awarded. FAR 5.203(a).
Advance or concurrent notice will be published in sam.gov for a reasonable time for commercial items FAR 5.203(a) and 12.204(b).
Advance notice will not be published because the action meets the following FAR exception:
Notice would compromise national security. FAR 5.202(a)(1).
Unusual and compelling urgency; notice period would seriously injure Government. FAR 5.202(a)(2).
Expressly authorized or required to be made through another Government agency. FAR 5.202(a)(4).
Order will be placed against an IDIQ contract awarded under FAR 16.5. FAR 5.202(a)(6).
Order will be placed against GSA schedule or other competitively-awarded contract. FAR 5.202(a)(11).
Other:
Advance notice will not be published per 41 U.S.C. § 6101; see attached deviation from the FAR per LCR 7-210 § 3.A.
We made the following efforts to interest potential sources in this award: N/A
9. Listing of Sources That Expressed Interest in Writing
The following sources expressed interest in this award: N/A
10. Additional Information
The following additional information is relevant to this justification and approval: N/A
11. Contracting Officer Determination that Price Is Fair and Reasonable As explained in detail below, I have determined that the prices for this contracting action are fair and reasonable based on comparison of the prices to the following (see FAR 15.404-1(b)(2)):
Historical prices paid by the Government Published competitive price lists
Library’s Independent Government Estimate Prices obtained through market research
Other: Existing IDIQ prices Prices obtained through competitive proposals
The following analysis (based on attached pricing information) supports my determination:
12. Contracting Officer Determination of Responsibility Checked System for Award Management (or will check in the case of competitive proposals for a brand name product)
13. Contracting Officer Determination of Best Value I have determined that this action represents the best value to the Government because: a sole-source award to BackPorch Consultants represents the only means to obtain the required repair services. The IDIQ was competed and the prices were determined to be fair and reasonable at the time of award. The existing IDIQ prices will be used to price the repair services for these requirements.
14. Contracting Officer Certification I certify that, to the best of my knowledge and belief, this justification is accurate and complete. For those actions up to $750,000, I approve contracting without competition for this requirement.
Jennifer Zwahlen 10/25/2024
Name
Signature
Date