20252052_E1_Response_Log_and_Abstract.pdf

PDF 77 KB Posted

Attached to
Owners Rep - Detroit Marinas Excavation and Resiliency Project
Solicitation number
S-C25102-00013693
Issued by
Marion County, Oregon

About this file

This is a Response Log and Abstract document for Solicitation #20252052, the Library Rotunda Remodel project, submitted to an unspecified state or local jurisdiction. The solicitation closed on May 22, 2025, at 2:00 PM. Three contractors submitted bids: Ordell Construction, Ryan Thomas Construction, and Bridgeway Contracting. All three bidders submitted their responses on May 22, 2025, and each provided signed bid forms, acknowledged Addendum 1 and 2, included bid security equal to 10% of their base bid amounts, and disclosed full-time superintendent and afterhours first-tier subcontractor information as required. Jennifer Lunsford, the designated buyer, and Jenni Rogers, the witness, were present at the bid opening.

The three bids submitted for the Library Rotunda Remodel project reflected the following base bid amounts: Ordell Construction bid $477,230.00 with an Alternate 1 (Install Terrazzo Floor) amount of $26,025.00; Ryan Thomas Construction bid $439,890.00 with an Alternate 1 amount of $25,465.00; and Bridgeway Contracting bid $363,102.00 with no alternate pricing submitted. Bid security amounts ranged from $25,465.00 to $26,025.00 based on each contractor's base bid percentage. The document does not specify contract award decisions, funding sources, contract term, or renewal options.

View the file

Other files

File Type Posted
Addendum 1~5.pdf PDF
Notice of Intent to Award Letter~36.pdf PDF
OregonBuys Posting Page~57.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Title: Library Rotunda Remodel

Solicitation #: 20252052

Closing Date: May 22, 2025 @ 2:00pm

Response Log & Abstract

Date Received

CCB #

and

Signed Bid Form

Acknowledgement Addendum 1 -2

Full Time Superintendent Bid Security 10% Base Bid

Amount

Alternate 1 - Install Terrazzo Floor Afterhours

First Tier Subcontractor Disclosure**

Bidder Name

May 22, 2025 x x x x $477,230.00 $26,025.00

May 22, 2025 x x x x $439,890.00 $25,465.00 X

May 22, 2025 x x x x $363,102.00 X

Buyer present at Opening: Jennifer Lunsford Witness present at Opening: Jenni Rogers

Ordell Construction

Ryan Thomas Construction

Bridgeway Contracting

ResponseLogAbstract

File details come from the government source that posted it. Updated .