These are construction plans for Mesa County's 35 8/10 Road Drainage Improvements project, prepared by Bohannan Huston engineering firm for Mesa County, Colorado. The project involves drainage infrastructure improvements along the 35 8/10 Road, with a total project area of approximately 6.66 acres. The project includes clearing and grubbing, removal of existing materials, excavation, storm drain installation, asphalt patching, and associated drainage system upgrades. Key components include installing 30-inch RCP storm drain pipes, constructing standard shallow manholes with flapgates, and modifying existing drainage structures. The project documents are dated October 2025 and are marked as 100% complete design plans for review.
The project scope involves detailed drainage management, including managing runoff across multiple sub-basins with varying impervious percentages. The existing site currently has a total impervious area of 24.80%, with runoff calculations provided for 2-year, 10-year, and 100-year storm events. The proposed drainage plan maintains similar hydrological characteristics, with design points and flow paths carefully mapped to ensure proper water management. Environmental considerations are prominent, with notes addressing utility coordination, dust control, erosion management, and potential archaeological or ecological sensitivities. The project will require careful coordination with local utilities, including the Ute Water Conservancy District, and adherence to Mesa County and Colorado Department of Transportation standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20250291.Final Drainage Report.pdf | ||
| IFB-25-35-8.10.pdf | ||
| 20250291 Unit Price Bid Proposal.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO
DESCRIPTION
COVER SHEET
GENERAL NOTES
SUMMARY OF QUANTITIES
SITE PLAN
GRADING AND STORM DRAIN PLAN
EXISTING DRAINAGE PLAN
PROPOSED DRAINAGE PLAN
DETAILS
1 G-01 2-3 G-02-G-03 4 G-04 5 G-05 6 G-06 7 G-07 8 G-08 9 D-01
DWG
NUMBER
SHEET
NUMBER
MESA COUNTY 35 8/10 RD DRAINAGE IMPROVEMENTS
FOR
PROJECT # 20250291
INDEX
MESA COUNTY, COLORADO
CONSTRUCTION PLANS
20250291 G-01 1 9
REVISION DATE
VICINITY MAP
1"=500'
THESE PLANS HAVE BEEN PREPARED BY ME OR UNDER MY DIRECT SUPERVISION/
[ENGINEER'S PRINTED NAME
COLORADO P.E. NO. [XXXXX]
PROJECT LOCATION
W Y O M I N G
N E W M E X I C O O K L A H O M A
U T
A H
K A N S A S
N E B R A S K A
DENVER
PALISADE
COLORADO
SPRINGS
FORT COLLINS
MONTROSE
CORTEZ
DURANGO
PAGOSA
SPRINGS
SILVERTON
ALAMOSA
WALSENBURG
TRINIDAD
LA JUNTA
PUEBLO
CHEYENNE
WELLS
BURLINGTON
BOULDER
DINOSAUR PROJECT LOCATION
/1
R D
GOVERNMENT HIGHLINE CANAL
PRICE DITCH RD
/1
R D
G 4/10 RD
G 4/10 RD
.1
R D
I-70
STUB DITCH RD
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
COVER SHEET
Water - UTE WATER DISTRICT
DAVE PRISKE...................................... 970-256-2876
Electric - XCEL ENERGY
TILLMON MCSCHOOLER................... 970-270-1953
Gas - XCEL ENERGY
TILLMON MCSCHOOLER................... 970-270-1953
Phone - CENTURY LINK/LUMEN
CHRIS JOHNSON................................ 970-730-2465
UTILITY CONTACTS
October 7, 2025
100% FOR
REVIEW
ONLY
ENGINEERS STAMP & SIGNATURE
Tue, 21-Oct-2025 - 2:19:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.COVER.SHEET.dwg
BHI PROJECT NO. SHEET OFDWG NO.
www.bhinc.com 800.877.5332Andrew T. Chambers 58679
G-02 2 9
GENERAL NOTES
September 15, 2025
100% FOR
REVIEW
ONLY
1. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, REGULATIONS, AND RULES WHICH APPLY.
2. THE TERM "THE ENGINEER" USED THROUGHOUT THESE PLANS REFERS TO THE ENGINEER OF RECORD AS INDICATED BY THE ENGINEER'S STAMP ON A GIVEN SHEET OF THE PLANS.
3. THE TERM "THE PROJECT MANAGER" USED THROUGHOUT THESE PLANS REFERS TO THE MESA COUNTY PROJECT MANAGER OR THEIR ASSIGNED DELEGATE.
4. LOCATIONS OF EXISTING UTILITIES SHOWN ON THESE PLANS AREA APPROXIMATE ONLY, THE CONTRACTOR IS TO CONTACT ANY AFFECTED UTILITY FOR SPECIFIC LOCATIONS BEFORE WORK
COMMENCES.
5. ALL UTILITY INSTALLATIONS ARE TO BE PERFORMED IN ACCORDANCE WITH STATE, COUNTY AND LOCAL REGULATIONS
6. CONTRACTOR SHALL NOTIFY THE ENGINEER DUE TO UNANTICIPATED CONDITIONS ENCOUNTERED ON-SITE DURING COMPLETION OF THE WORK WHICH WOULD CAUSE THE DESIGN PLANS TO BE
MODIFIED.
7. CONTRACTOR SHALL CONFINE THE CONSTRUCTION OF OPERATIONS TO THE LIMITS OF DISTURBANCE AND LIMITS OF GRADING SHOWN ON THESE PLANS. ANY DAMAGE TO FACILITIES OUTSIDE OF
THESE LIMITS OR LABELED AS TO REMAIN OR PROTECT IN PLACE SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
8. ALL CONSTRUCTION, RELATED WORK, MATERIALS, PERFORMANCE, AND QUALITY OF WORK PROVIDED SHALL CONFORM TO STATE, COUNTY AND LOCAL REGULATIONS
9. CAUTION: THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY WHICH SHALL REMAIN THE RESPONSIBILITY OF THE CONTRACTOR. ALL WORK ON THIS
PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, RULES AND REGULATIONS CONCERNING SAFETY AND HEALTH. ALL EXCAVATION, TRENCHING AND SHORING ACTIVITIES MUST BE CARRIED-OUT IN ACCORDANCE WITH OSHA 29 CFR 1926, SUBPART P-EXCAVATIONS.
10. ALL WORK ON THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, RULES AND REGULATIONS CONCERNING SAFETY AND HEALTH.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MISCELLANEOUS SITE PREPARATION AND CLEANUP WORK REQUIRED TO COMPLETE THE PROJECT.
12. THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER IN WRITING A MINIMUM OF FIVE (5) WORKING DAYS PRIOR TO THE START OF ANY WORK WITHIN ANY COUNTY RIGHT-OF-WAY.
13. CONTRACTOR SHALL PROVIDE AS-BUILT REDLINE DRAWINGS FOR ALL UTILITIES INSTALLED BY THE PROJECT, STAMPED WITH ELEVATION AND LOCATIONS. ALL WATER, SEWER, STORM AND
IRRIGATION LINES SHALL BE SURVEYED IN 3 DIMENSIONS AT EACH END AND AT ALL ANGLE POINTS OR CONNECTION POINTS.
14. CONTRACTOR SHALL NOTIFY ALL ADJACENT PROPERTY OWNERS AND COORDINATE WITH THE PALISADE IRRIGATION DISTRICT PRIOR TO THE START OF CONSTRUCTION.
GENERAL NOTES:
GOVERNING SPECIFICATIONS:
1. ALL WORK DETAILED ON THIS PLAN SET TO BE PERFORMED UNDER CONTRACT SHALL BE PERFORMED IN ACCORDANCE WITH MESA COUNTY STANDARD SPECIFICATIONS.
2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, REGULATIONS, AND RULES WHICH APPLY TO THIS PLAN SET.
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:19:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.GEN.NOTES.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
AS-BUILT:
SPECIAL NOTICES
DAMAGE/DISTURBANCE:
1. EXCEPT WHERE CALLED OUT TO BE REMOVED UNDER THE CONTRACT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY THE CONTRACTOR TO EXISTING WALLS, FENCING, SIGNING, SIDEWALKS, WHEELCHAIR RAMPS, DRIVEPADS, TRAIL SURFACES, IRRIGATION LINES, LANDSCAPING, VALVE BOXES, MANHOLES, CONDUITS, UTILITY LINES, CURB AND GUTTER, TRAFFIC SIGNS, PAVEMENT, PAVEMENT MARKINGS, SPEED HUMPS, ETC. DURING CONSTRUCTION AND SHALL REPAIR OR REPLACE SAME AT THE CONTRACTOR'S EXPENSE.
2. UPON COMPLETION OF CONSTRUCTION, ALL AREAS WITHIN PROJECT LIMITS WHICH ARE DISTURBED OR ARE TO BE RE-VEGETATED SHALL BE SEEDED IN ACCORDANCE WITH MESA COUNTY STANDARDS "SEEDING
(NATIVE) (HYDRAULIC)" OF THE CDOT STANDARD SPECIFICATIONS.
DISPOSAL:
1. DISPOSAL OF UNSUITABLE MATERIALS & DEBRIS: THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER IN WRITING OF THE DETAILS OF THE DISPOSAL OPERATIONS. BORROW, MATERIALS, ROCK WASTE, VEGETATION DEBRIS, ETC., SHALL NOT BE PLACED IN WETLAND AREAS OR AREAS WHICH MAY IMPACT ENDANGERED SPECIES OR ARCHAEOLOGICAL RESOURCES. AN ARCHAEOLOGICAL SURVEY AND ENVIRONMENTAL CLEARANCE SHALL BE OBTAINED BY THE CONTRACTOR BEFORE DISPOSAL SITES ARE ACCEPTED IN ACCORDANCE WITH SECTION 107.25 OF THE CDOT STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION. THE COST FOR PERFORMING THIS WORK IS INCIDENTAL TO THE CONTRACT AND NO SEPARATE PAYMENT SHALL BE MADE THEREFOR.
2. DISPOSAL SITE(S) FOR ALL EXCESS EXCAVATION MATERIAL, ASPHALT PAVING, DRIVEWAYS AND OTHER REMOVAL ITEMS SHALL BE LOCATED BY THE CONTRACTOR. ALL COSTS INCURRED IN OBTAINING A DISPOSAL SITE AND HAUL THERETO SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND NO DIRECT PAYMENT WILL BE THEREFOR. THE DISPOSAL SITE SHALL BE ENVIRONMENTALLY ACCEPTABLE AND APPROVED BY THE PROJECT MANAGER. ALSO, A PERMITTED FACILITY FOR DISPOSAL OF HAZARDOUS WASTE SHALL BE LOCATED AND APPROVED BY PROJECT MANAGER.
3. THE CONTRACTOR SHALL PROPERLY HANDLE AND DISPOSE OF ALL CLEAN ASPHALT PAVEMENT AND CONCRETE MATERIAL TO BE REMOVED ACCORDING TO THE PLANS. CLEAN ASPHALT IS CLASSIFIED AS FILL MATERIAL AND IS NOT SUBJECT TO THE SOLID WASTE MANAGEMENT REGULATIONS OF THE COLORADO ENVIRONMENTAL DEPARTMENT. CLEAN IS DEFINED AS "BEING FREE OF SOLID WASTE OR CONTAMINANTS WHICH HAVE THE POTENTIAL OF MIGRATING INTO SURFACE OR GROUND WATER". THE MATERIAL SHALL BE COVERED WITH TWO FEET OF CLEAN EARTH IMMEDIATELY AFTER DISPOSAL. THE MATERIAL CANNOT BE PLACED IN A WATERCOURSE, ARROYO, OR WITHIN 10 FEET OF GROUNDWATER. IF THE ASPHALT AND CONCRETE MATERIAL IS NOT CLEAN, IT IS SUBJECT TO THE SOLID WASTE ACT AND MUST BE PLACED IN AN APPROVED LANDFILL. ALL DISPOSAL SITES ARE SUBJECT TO THE APPROVAL OF THE RESPECTIVE LANDOWNER AND THE PROJECT MANAGER. THE COST FOR PERFORMING THIS WORK IS INCIDENTAL TO THE CONTRACT
AND NO SEPARATE PAYMENT SHALL BE MADE THEREFOR.
ENVIRONMENTAL NOTES:
1. THE CONTRACTOR SHALL ENSURE THAT DAMAGE TO OR REMOVAL OF VEGETATION WILL BE KEPT TO A MINIMUM AND THAT NO EXTRANEOUS CLEARING, GRUBBING, LAND DISTURBANCE OR EXCAVATION WILL TAKE PLACE. CONSISTENT WITH THE REQUIREMENTS OF THE CDOT'S STANDARD SPECIFICATIONS SECTION 107.12 PROTECTION & RESTORATION OF PUBLIC AND PRIVATE PROPERTY, AND SECTION 201-00001, CLEARING & GRUBBING. THE CONTRACTOR SHALL SEE TO IT THAT TREES AND SHRUBS WITHIN THE RIGHT-OF-WAY AND ALONG THE FENCE LINES ARE NOT OVERRUN OR DAMAGED BY CONSTRUCTION EQUIPMENT
UNNECESSARILY.
2. CONTRACTOR SHALL CONFORM TO ALL LOCAL AND FEDERAL DUST AND EROSION CONTROL REGULATIONS. THE CONTRACTOR SHALL PREPARE AND OBTAIN ANY DUST CONTROL OR EROSION CONTROL PERMITS FROM THE APPROPRIATE REGULATORY AGENCIES. WATERING, AS REQUIRED FOR CONSTRUCTION DUST CONTROL, SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND NO SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE. THE COST OF PERFORMING THIS WORK IS INCIDENTAL TO THE CONTRACT AND NO SEPARATE PAYMENT SHALL BE MADE THEREFOR.
3. CONSTRUCTION AREAS SHALL BE WATERED FOR DUST CONTROL IN COMPLIANCE WITH GOVERNMENT ORDINANCES. THE CONTRACTOR SHALL COORDINATE WITH THE UTE WATER CONSERVANCY DISTRICT FOR WATER AVAILABILITY AND USE. THE CONTRACTOR SHALL SUPPLY ALL EQUIPMENT AND MATERIALS NECESSARY FOR PROVIDING WATER. THE CONTRACTOR SHALL CONFINE HIS WORK WITHIN THE CONSTRUCTION EASEMENT LIMITS AND/OR RIGHT-OF-WAY OR PROVIDE COPIES OF AGREEMENTS WITH ADJACENT LANDOWNERS TO THE COUNTY. CONSTRUCTION MATERIAL AND WASTE PRODUCTS, INCLUDING MACHINERY LEAKAGE, MAINTENANCE MATERIAL AND SPILLS, WILL BE CONTAINED AND PROPERLY DISPOSED PRIOR TO PROJECT COMPLETION. SPILLS SHALL BE PROPERLY DISPOSED OF AS SOON AS POSSIBLE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING AND CLEANUP OF SPILLS ASSOCIATED WITH PROJECT CONSTRUCTION AND SHALL REPORT AND RESPOND TO SPILLS OF HAZARDOUS MATERIALS SUCH AS GASOLINE, DIESEL, MOTOR OILS, SOLVENTS, CHEMICALS, TOXIC AND CORROSIVE SUBSTANCES, ETC., WHICH MAY BE A THREAT TO PUBLIC HEALTH OR THE ENVIRONMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING DISCOVERIES OF PAST SPILLS AND OF CURRENT SPILLS NOT ASSOCIATED WITH CONSTRUCTION. REPORTS SHALL BE MADE IMMEDIATELY TO THE CO DEPARTMENT OF PUBLIC HEALTH & ENVIRONMENT AT 1-877-518-5608. THE COST FOR PERFORMING THIS WORK IS INCIDENTAL TO THE CONTRACT AND NO SEPARATE PAYMENT SHALL BE MADE THEREFOR.
5. IF ANY THREATENED OR ENDANGERED SPECIES OR THEIR HABITATS ARE DISCOVERED DURING CONSTRUCTION, WORK WILL CEASE IMMEDIATELY AND THE USFWS WILL BE NOTIFIED IN ORDER THAT APPROPRIATE
MEASURES CAN BE TAKEN IN ACCORDANCE WITH THE ENDANGERED SPECIES ACT.
6. IF HUMAN REMAINS ARE ENCOUNTERED DURING CONSTRUCTION, APPROPRIATE LAW ENFORCEMENT AUTHORITIES AND THE OFFICE OF THE MEDICAL EXAMINER WILL BE CONTACTED.
7. IF CULTURAL MATERIALS ARE DISCOVERED DURING CONSTRUCTION, WORK WILL CEASE IMMEDIATELY, AND EPA AND THE COLORADO STATE HISTORIC PRESERVATION OFFICER AT (303) 866-3392, WILL BE NOTIFIED OF THE DISCOVERY. EPA WILL PROCEED IN ACCORDANCE WITH THE REGULATIONS OF THE ADVISORY COUNCIL ON HISTORIC PRESERVATION PRIOR TO TAKING ANY ACTION WHICH WOULD AFFECT THE CULTURAL
RESOURCES.
1. THE CONTRACTOR SHALL MAINTAIN AN UP-TO-DATE SET OF AS-BUILT PLANS FOR THE PROJECT, PROMPTLY RECORDING DATA, INCLUDING HORIZONTAL AND VERTICAL LOCATIONS FOR ALL UTILITY LINES AND ACCESSORIES, EXISTING OR NEW, REQUIRED BY THE COUNTY FOR THE PREPARATION OF RECORD DRAWINGS BY THE ENGINEER. CONTRACTOR SHALL NOT COVER UTILITY LINES AND ACCESSORIES UNTIL ALL DATA HAS BEEN RECORDED. THE CONTRACTOR SHALL NOT BACKFILL OUTLET PIPES, SCOUR/RETAINING WALLS, ETC. UNTIL ALL DATA HAS BEEN RECORDED. THESE PLANS SHALL BE KEPT CURRENT AND AT THE PROJECT SITE AT ALL TIMES AND SHALL BE AVAILABLE TO THE PROJECT MANAGER AND ENGINEER AT ANY TIME DURING CONSTRUCTION AND WILL BE CHECKED BY THE ENGINEER FOR ACCURACY AND COMPLETENESS ONCE EVERY TWO WEEKS. THE FINAL AS-BUILT PLANS SHALL BE SUBMITTED TO THE PROJECT MANAGER PRIOR TO FINAL
PAYMENT.
1. HAND DELIVER SPECIAL NOTICES TO EACH RESIDENCE OR BUSINESS ADJACENT TO THE CONSTRUCTION AREA AND TO OTHERS WHICH MAY BE AFFECTED BY CONSTRUCTION ACTIVITIES. SPECIAL NOTICES ARE TO INFORM RESIDENTS AND BUSINESSES IN WRITING WHENEVER ACCESS, UTILITY SERVICES, OR OTHER SERVICES TO THEIR PROPERTIES MAY BE IMPAIRED. THIS WORK IS AT THE CONTRACTOR'S EXPENSE AND NO
SEPARATE PAYMENT SHALL BE MADE THEREFOR.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR: DELIVERY OF SPECIAL NOTICES NOT MORE THAN SEVEN (7) DAYS PRIOR TO PHYSICAL CONSTRUCTION THAT WILL AFFECT THE PROPERTY. CORRECTED NOTICES ARE TO BE DELIVERED IF CONSTRUCTION DOES NOT START WITHIN 48 HOURS OF DATE GIVEN IN NOTICE.
THE WRITTEN NOTICE IS TO STATE:
· CONTRACTOR'S NAME, ADDRESS, AND LOCAL TELEPHONE NUMBER.
· NATURE OF WORK TO BE DONE AND TIMING OF WORK.
· TIME AND LENGTH OF DISRUPTION TO EXPECT.
· EXPECTED DURATION OF CONSTRUCTION.
· CONTRACTOR'S LOCAL PHONE NUMBER TO WHICH EMERGENCY CONDITIONS CAN BE REPORTED DURING NORMAL WORK HOURS.
· CONTRACTOR'S LOCAL PHONE NUMBER TO WHICH EMERGENCY CONDITIONS CAN BE REPORTED DURING NON-WORKING PERIODS.
3. AT LEAST SEVEN (7) CALENDAR DAYS PRIOR TO THE INSTALLATION OF EACH SERVICE LINE, THE CONTRACTOR SHALL DISTRIBUTE A WRITTEN NOTICE TO EACH EXISTING RESIDENCE OF BUSINESS TO BE SERVICED BY THE LINE, ADVISING THEM OF THE PLANNED SERVICE LINE LOCATION AND PROVIDING A CONTACT NAME, ADDRESS AND PHONE NUMBER FOR ANY COMMENTS REGARDING THE PLAN. THE NOTICE WILL STATE IN
BOTH ENGLISH AND SPANISH:
• THE ADDRESS TO BE SERVED.
• SKETCH WITH VALVE PIT AND SERVICE LATERAL LOCATION.
• CONTRACTOR CONTACT INFORMATION
• ALL MARK-UP/RETURNED VALVE PIT SKETCHES SHALL BE FORWARDED TO ENGINEER/INSPECTOR FOR REVIEW PRIOR TO FINAL PLACEMENT OF VALVE PIT.
• IF RESIDENT DOES NOT RESPOND TO SKETCH, IT SHALL BE ASSUMED THAT THE VALVE PIT LOCATION AND/OR SERVICE LINE LATERAL LOCATION IS ACCEPTABLE AS SHOWN ON PLAN.
1. ALL TRAFFIC SIGNS AND CODING SHALL BE IN CONFORMANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LATEST EDITION.
2. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN (TCP) TO MESA COUNTY FOR CONSTRUCTION BARRICADING AND TRAFFIC CONTROL FOR ANY WORK ON MESA COUNTY RIGHT-OF-WAY.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL TRAFFIC CONTROL PROCEDURES AND FOR MAINTAINING A TRAFFIC CONTROL LOG IN ACCORDANCE WITH THE CONTRACT BID SPECIFICATIONS. EMERGENCY ACCESS MUST BE PROVIDED TO THE IMPACTED PROPERTIES AT ALL TIMES; AT NO POINT DURING CONSTRUCTION MAY ACCESS BE ELIMINATED. PHASING OF WORK
SHALL BE DETERMINED BY THE CONTRACTOR.
4. THE CONTRACTOR SHALL COORDINATE WITH MESA COUNTY VALLEY SCHOOL DISTRICT , MAIL SERVICES, AND WITH GRAND VALLEY TRANSIT TO ACCOMMODATE THE SCHEDULE FOR ALL DESIGNATED BUS ROUTES.
TRAFFIC:
1. WHEN ABUTTING EXISTING AREAS, ALL NEW STREET PAVING, AND DRIVEWAYS SHALL MATCH THE ELEVATION OF THOSE AREAS.
2. WHERE A PROFILE GRADE IS NOT PROVIDED IN THE PLANS, STREET CENTERLINE GRADES SHALL BE RESTORED BY THE CONTRACTOR TO THE EXISTING CENTERLINE GRADES. CROSS SECTION THE EXISTING ROAD PRIOR TO CONSTRUCTION AT 50' MINIMUM SPACING. MINOR ADJUSTMENTS TO THE STREET GRADES MAY BE NECESSARY AND WILL BE DIRECTED BY THE PROJECT MANAGER. MINOR ADJUSTMENTS TO STREET GRADES WILL BE AT THE CONTRACTOR'S EXPENSE AND NO ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE. SMOOTH TRANSITIONS SHALL BE MADE BETWEEN EXISTING PAVEMENT WHICH REMAINS IN PLACE AND PAVEMENT WHICH IS BEING REPLACED. TRAFFIC CONTROL DEVICES, INCLUDING PAVEMENT MARKINGS MUST BE RESTORED TO THE SAME OR BETTER CONDITIONS AS BEFORE CONSTRUCTION.
3. THE FINAL SURFACE OF THE REPLACED PAVEMENT SHALL CONFORM TO A GRADE LINE SET BY THE CONTRACTOR SUCH THAT THE PAVEMENT WILL READILY DRAIN AND DOES NOT VARY SIGNIFICANTLY FROM
ADJACENT EXISTING GRADES.
4. PAVEMENT SAFETY EDGE POLICY: IF A PAVEMENT DROP-OFF IS CREATED DURING CONSTRUCTION, THE CONTRACTOR SHALL INITIATE PROTECTIVE ACTION IN ACCORDANCE WITH THE CDOT CURRENT SAFETY EDGE POLICY. THIS WORK SHALL BE AT THE CONTRACTOR'S EXPENSE AND NO SEPARATE PAYMENT OR MEASUREMENT WILL BE MADE.
5. CONTRACTOR WILL NOT PAVE OVER ANY SURFACE FEATURE, I.E., GAS VALVE, MANHOLE COVER, WATER VALVE, ETC. WITHOUT PRIOR APPROVAL FROM THE PROJECT MANAGER.
PAVEMENT:
G-03 3 9
GENERAL NOTES
September 15, 2025
100% FOR
REVIEW
ONLY
www.bhinc.com 800.877.5332
Thu, 23-Oct-2025 - 1:47:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.GEN.NOTES.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
1. ALL UTILITIES, UTILITY SERVICE LINES, AND STORM DRAIN LINES SHALL BE INSTALLED PRIOR TO PAVING.
2. TWO (2) WORKING DAYS PRIOR TO ANY EXCAVATION, CONTRACTOR MUST CONTACT COLORADO ONE CALL SYSTEM, 800-922-1987, FOR LOCATION OF EXISTING UTILITIES.
3. CONTRACTOR SHALL COORDINATE WITH THE UTE WATER CONSERVANCY DISTRICT SEVEN (7) WORKING DAYS IN ADVANCE OF PERFORMING WORK THAT WILL AFFECT THE PUBLIC WATER INFRASTRUCTURE. WORK REQUIRING SHUTOFF OF FACILITIES MUST BE COORDINATED WITH THE UTE WATER CONSERVANCY DISTRICT FOURTEEN (14) DAYS IN ADVANCE OF PERFORMING SUCH WORK. ONLY THE UTE WATER CONSERVANCY DISTRICT CREWS ARE AUTHORIZED TO OPERATE PUBLIC VALVES. CONTRACTOR SHALL COORDINATE SEQUENCING OF ALL PLANNED VALVE CLOSURES. CONTRACTOR SHALL SUBMIT A WATER SHUT OFF PLAN FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES IN APPLICABLE AREAS.
4. CONTRACTOR SHALL COORDINATE WITH PERTINENT UTILITY COMPANIES OF ALL EXISTING UTILITY LINES AND APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY WORK CREWS. THE CONTRACTOR SHALL RESCHEDULE HIS ACTIVITIES AS NECESSARY TO ALLOW UTILITY WORK CREWS TO
PERFORM THE REQUIRED WORK.
5. CONTRACTOR SHALL COORDINATE ANY REQUIRED UTILITY INTERRUPTIONS WITH THE AFFECTED UTILITY COMPANY A MINIMUM OF THREE WORKING DAYS BEFORE THE INTERRUPTION.
6. IF ANY UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES ARE SHOWN ON THESE DRAWINGS, THEY ARE SHOWN IN AN APPROXIMATE MANNER ONLY, AND SUCH LINES MAY EXIST WHERE NONE ARE SHOWN. IF ANY SUCH EXISTING LINES ARE SHOWN, THE LOCATION IS BASED UPON INFORMATION PROVIDED BY THE OWNER OF SAID UTILITY, AND THE INFORMATION MAY BE INCOMPLETE, OR MAY BE OBSOLETE BY THE TIME CONSTRUCTION COMMENCES. THE ENGINEER HAS CONDUCTED ONLY PRELIMINARY INVESTIGATION OF THE LOCATION, DEPTH, SIZE, OR TYPE OF THE EXISTING UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES. THIS INVESTIGATION IS NOT CONCLUSIVE, AND MAY NOT BE COMPLETE; THEREFORE, THE ENGINEER MAKES NO REPRESENTATION PERTAINING THERETO, AND ASSUMES NO RESPONSIBILITY OR LIABILITY THEREFOR. THE CONTRACTOR SHALL INFORM ITSELF OF THE LOCATION OF ANY UTILITY LINE, PIPELINE, OR UNDERGROUND UTILITY LINE IN OR NEAR THE AREA OF WORK IN ADVANCE OF AND DURING EXCAVATION WORK. SHALL THE CONTRACTOR PERFORM POTHOLE INVESTIGATION OF EXISTING UTILITY LINES, PIPELINES, OR UNDERGROUND UTILITY LINES TO VERIFY LOCATION, DEPTH, OR TYPE, INCLUDING THOSE NOT SHOWN ON THESE DRAWINGS, SUCH WORK SHALL BE PERFORMED PRIOR TO EXCAVATION. ALL COSTS ASSOCIATED WITH POTHOLE INVESTIGATION SHALL BE INCIDENTAL TO THE WORK AND SHALL NOT BE PAID FOR SEPARATELY. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE CAUSED BY ITS FAILURE TO LOCATE, IDENTIFY AND PRESERVE ANY AND ALL EXISTING UTILITIES, PIPELINES, AND UNDERGROUND UTILITY LINES. IN PLANNING AND CONDUCTING EXCAVATION, THE CONTRACTOR SHALL COMPLY WITH STATE STATUTES, MUNICIPAL AND LOCAL ORDINANCES, RULES AND
REGULATIONS, IF ANY, PERTAINING TO THE LOCATION OF THESE LINES AND FACILITIES.
7. ALL UTILITY LINES SHALL BE MAINTAINED IN SERVICE. SHORING, SHEETING, AND OTHER MEANS OF SUPPORT SHALL BE EMPLOYED BY THE CONTRACTOR TO PREVENT DAMAGE OR LOSS OF THESE EXISTING UTILITIES AT CONTRACTOR'S EXPENSE. BEAM AND CABLE OR OTHER ADEQUATE SUPPORTS SHALL BE USED FOR TEMPORARY SUPPORT OF ALL UTILITY LINES. ANY DAMAGE TO EXISTING UTILITIES SHALL BE PROMPTLY REPAIRED AT THE CONTRACTOR'S EXPENSE. THE ENGINEER MUST BE IMMEDIATELY NOTIFIED OF ANY SIGNIFICANT DEVIATION OF EXPOSED UTILITIES FROM THE LOCATIONS SHOWN ON THE PLANS SO THAT
CONFLICTS CAN BE RESOLVED IN A TIMELY MANNER.
8. CONTRACTOR SHALL PROVIDE A UTILITY SUPPORT DESIGN FOR ALL LARGE AND/OR CRITICAL SERVICES (E.G. COMMUNICATIONS AND ELECTRIC DUCT BANKS, EXPOSED GRAVITY LINE JOINTS, PRESSURIZED WATERLINES, SEWER FORCE MAINS, ETC.). SUPPORT FOR THESE CRITICAL SERVICES SHALL BE DESIGNED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER AND SUBMITTED TO THE PROJECT MANAGER FOR APPROVAL. THE DESIGN AND INSTALLATION OF BOTH CRITICAL AND NON-CRITICAL SUPPORTS SHALL BE PERFORMED AT THE CONTRACTOR'S EXPENSE.
1. ALL EXCAVATION, TRENCHING AND SHORING ACTIVITIES SHALL BE CARRIED OUT IN ACCORDANCE WITH OSHA 29 CFR 1926.
2. THE EARTHWORK QUANTITIES WILL BE BASED ON THE METHOD OF MEASUREMENT STATED IN SPECIFICATIONS 203 AND 206.
3. UNLESS OTHERWISE STATED WITHIN THIS PLAN SET, ALL SIDE SLOPES SHALL BE 3:1 (HORIZONTAL TO VERTICAL) MAXIMUM, KEEPING SLOPES FLATTER WHEREVER POSSIBLE. SLOPES SHALL TRANSITION SMOOTHLY
TO EXISTING GRADES IN ALL CASES.
4. THE CONTRACTOR SHALL WARP SLOPES WHERE NECESSARY TO STAY WITHIN THE RIGHT-OF-WAY, CONSTRUCTION EASEMENT, OR GRADING LIMITS.
5. THE DESIGN "R" VALUE FOR THIS PROJECT IS 50. MATERIAL WITH AN "R" VALUE OF LESS THAN 50 SHALL NOT BE PLACED IN, NOR ALLOWED TO REMAIN WITHIN THE TOP TWO FEET OF FINISHED GRADE.
6. SPOIL PILES WILL BE ALLOWED ONLY AS APPROVED BY THE PROJECT MANAGER.
7. NO MATERIAL PITS HAVE BEEN IDENTIFIED FOR THIS PROJECT. THE CONTRACTOR MAY OBTAIN SUITABLE MATERIAL FROM ANY ACCEPTABLE SOURCE, PROVIDED THAT IT MEETS PROJECT SPECIFICATIONS. ALL MATERIAL PIT ACTIONS SHALL BE IN COMPLIANCE WITH SECTION 203 SPECIFICATIONS. NO ADDITIONAL PAYMENT SHALL BE MADE FOR HAULING OF SUCH MATERIAL.
8. CONTRACTOR IS RESPONSIBLE FOR EXAMINATION OF THE SITE AND DETERMINATION OF THE CHARACTER AND QUANTITY OF MATERIALS TO BE ENCOUNTERED.
9. EXCESS SUITABLE SOIL MATERIAL, SHALL BE USED ON-SITE AS NEEDED FOR AESTHETIC FILL AREAS. ON-SITE MATERIAL SHALL BE USED IN LIEU OF IMPORTING OFF-SITE MATERIAL. NO ADDITIONAL PAYMENT WILL BE MADE TO CONTRACTOR UNLESS DIRECTED BY PROJECT MANAGER FOR IMPORT OF OFF-SITE MATERIAL IN LIEU OF USING ON-SITE SOIL MATERIAL NOR WILL ANY ADDITIONAL PAYMENT BE MADE FOR ON-SITE MATERIAL THAT WILL BE USED AS AESTHETIC FILL. VERIFY WITH PROJECT MANAGER PRIOR TO REMOVAL OF ANY EXCESS SOIL MATERIAL FROM JOB SITE.
10. CONTRACTOR SHALL SUPPORT ALL POWER POLES AND FENCES ALONG THE RIGHT-OF-WAY IF NECESSARY DURING CONSTRUCTION OF PROJECT INFRASTRUCTURE. THIS WORK AND ANY COORDINATION EFFORTS REQUIRED AS A RESULT IS AT THE CONTRACTOR'S EXPENSE AND NO SEPARATE PAYMENT SHALL BE MADE THEREFOR.
11. DESIGN AND CONSTRUCTION OF ALL FORMS, SHORING, AND TEMPORARY BRACING SHALL COMPLY WITH 29 CFR 1926 AND THESE COSTS SHALL BE CONSIDERED INCIDENTAL TO THE EARTHWORK COSTS.
GENERAL UTILITY:
1. CONTRACTOR SHALL MAKE ALL WATER VALVES AND VAULT LIDS ACCESSIBLE TO THE OWNER AT ALL TIMES.
2. IF A WATER SERVICE LINE IS DAMAGED, CONTRACTOR SHALL REPLACE FROM MAIN TO METER BOX WITHOUT SPLICING AT NO ADDITIONAL COST TO THE OWNER.
WATER SYSTEMS:
EARTHWORK:
CONSTRUCTION LIMITS AND STORAGE LIMITS:
1. THE CONTRACTOR SHALL BE REQUIRED TO CONFINE THEIR WORK WITHIN THE CONSTRUCTION LIMITS, DESIGNATED CONSTRUCTION EASEMENTS ON THE PLAN SET, AND/OR RIGHT-OF-WAY LIMITS.
2. THE CONTRACTOR SHALL NOT STORE ANY EQUIPMENT OR MATERIAL WITHIN THE PUBLIC RIGHT-OF-WAY DURING NON-WORKING HOURS.
3. THE CONTRACTOR SHALL PARK EQUIPMENT AND VEHICLES SO AS TO NOT INTERFERE WITH NORMAL ACTIVITIES OF RESIDENTS OR OTHER CONTRACTORS ON SITE.
4. THE CONTRACTOR SHALL NOT STORE EQUIPMENT OR MATERIAL WITHIN 20 FEET OF THE EDGE OF THE DRIVING LANE DURING WORK HOURS UNLESS THE EQUIPMENT OR MATERIAL IS PROPERLY SHIELDED UTILIZING CURRENT SAFETY DESIGN AND INSTALLATION METHODS. THE SAFETY DESIGN FOR SHIELDING SHALL BE PROVIDED BY THE CONTRACTOR AND MUST BE APPROVED BY THE ENGINEER BEFORE IMPLEMENTING. THIS WORK, INCLUDING DESIGN, INSTALLATION, AND REMOVAL OF THE SHIELDING, SHALL BE AT THE CONTRACTOR'S EXPENSE AND NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE.
SURVEYING
1. THE CONTRACTOR SHALL NOTIFY THE COUNTY SURVEYOR NOT LESS THAN SEVEN (7) DAYS PRIOR TO STARTING WORK IN ORDER THAT THE COUNTY SURVEYOR MAY TAKE NECESSARY MEASURES TO INSURE THE PRESERVATION OF SURVEY MONUMENTS. CONTRACTOR SHALL NOT DISTURB PERMANENT SURVEY MONUMENTS WITHOUT THE CONSENT OF THE COUNTY SURVEYOR AND SHALL NOTIFY THE COUNTY SURVEYOR AND BEAR THE EXPENSE OF REPLACING ANY THAT MAY BE DISTURBED WITHOUT PERMISSION. REPLACEMENT SHALL BE DONE ONLY BY THE COUNTY SURVEYOR. WHEN A CHANGE IS MADE IN THE FINISHED ELEVATION OF THE PAVEMENT OF ANY ROADWAY IN WHICH A PERMANENT SURVEY MONUMENT IS LOCATED, CONTRACTOR SHALL, AT HIS OWN EXPENSE, ADJUST THE MONUMENT COVER TO THE NEW GRADE
UNLESS OTHERWISE SPECIFIED. REFER TO SECTION 629 OF THE SPECIFICATIONS.
2. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTAINING ALL EXISTING SURVEY MONUMENTATION CONTROLS. SURVEY MONUMENTS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED BY A LICENSED COLORADO SURVEYOR AT THE CONTRACTOR'S EXPENSE. NOTIFY MONUMENT OWNER 48 HOURS PRIOR TO ANY WORK AROUND EXISTING MONUMENTS.
3. CONSTRUCTION SURVEYING SHALL INCLUDE ALL SURVEYING AND CONTROL STAKING NECESSARY TO ESTABLISH THE PROJECT CONSTRUCTION BASELINE, TOE OF SLOPE CATCH POINTS, AND ALL OTHER INFRASTRUCTURE DESIGNATED IN THE CONSTRUCTION PLANS SET AS REQUIRED FOR CONSTRUCTION OF THE PROJECT. SUCH INFRASTRUCTURE SHALL INCLUDE BUT NOT BE LIMITED TO ALL SURFACING, DRAINAGE
PONDS, STORM DRAIN LINES, SEWER LINES, WATER LINES AND SERVICE LINES.
4. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REESTABLISH ANY MISSING REFERENCE POINTS REQUIRED FOR CONSTRUCTION OF THE PROJECT INFRASTRUCTURE. ALL COSTS INCURRED IN PROVIDING SUCH CONSTRUCTION STAKING AND SURVEYING WORK SHALL BE PAID AS SHOWN IN THE BID PROPOSAL.
5. ANY DISCREPANCIES BETWEEN THE DESIGN AND SITE CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IMMEDIATELY.
6. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL EXCAVATE AND VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL OBSTRUCTIONS. SHOULD A CONFLICT EXIST BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL PROMPTLY NOTIFY THE ENGINEER IN WRITING SO THAT THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY FOR ALL PARTIES.
7. PROJECT SURVEY CONTROL WAS ESTABLISHED AND CHECKED AS DESCRIBED ON SHEETS 8 AND 9.
G-04 4 9
SUMMARY OF QUANTITIES
September 15, 2025
100% FOR
REVIEW
ONLY
www.bhinc.com 800.877.5332
Thu, 23-Oct-2025 - 10:27:am, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.GEN.NOTES.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
MESA COUNTY
35 8/10 DRAINAGE IMPROVEMENTS
BID SPECIFICATION ITEM
ITEM CDOT ITEM DESCRIPTION UNIT ESTIMATED FINAL
NO. NUMBER TYPE QUANTITY QUANTITY
1 201-00000 Clearing & Grubbing LS 1 _____
2 202-00035 Removal of Pipe LF 32 _____
3 202-00220 Removal of Asphalt Mat SY 15 _____
4 203-00000 Unclassified Excavation CY 150 _____
5 212-00006 Seeding (Native) AC 0.02 _____
6 403-00721 Asphalt Patching SY 15 _____
7 603-01185 18" RCP Storm Pipe LF 100 _____
8 603-01305 30" RCP Storm Pipe LF 214 _____
9 603-05012 12" End Section EA 1 _____
10 603-30018 18" End Section EA 1 _____
11 603-50012 12" HDPE Storm Pipe LF 29 _____
12 604-13005 Inlet Type 13 (5-Foot) EA 2 _____
13 604-30010 60" Shallow Standard Manhole EA 2 _____
14 625-00000 Construction Surveying LS 1 _____
15 626-00000 Mobilization LS 1 _____
16 630-10005 Traffic Control LS 1 _____
17 N/A Connect to Existing Irrigation Structure EA 1 _____
18 N/A Gravel SY 29 _____
19 N/A Flap gate EA 1 _____
20 700-70010 Minor Contract Revisions LS 1 _____
50' PALISADE IRRIGATION
DISTRICT EASEMENT739 35 810 RD.
ROW (TYP)
20.0' 30.0'
20.0' DRAINAGE
EASEMENT
.0
PR
ES
CR
IP
TIV
E
RO
W30
.0'
DE
DI
CA
TE
D
RO
W
.0'
DE
ED
ED
RO
W 20.0'
IRRIGATION
AND
UTILITY
EASEMENT
30.0' IRRIGATION
AND UTILITY
EASEMENT
GRAVEL TO MATCH EXISTING AFTER
GRADING/STORM DRAIN INSTALL
PR TYPE 13 AREA INLET
SEE GRADING AND UTILITY PLAN
PR MANHOLE
SEE GRADING AND UTILITY PLAN
PR MANHOLE WITH FLAPGATE
SEE GRADING AND UTILITY PLAN
PR FES
SEE GRADING AND UTILITY PLAN
EX IRRIGATION STRUCTURE
TO REMAIN
EX PROPERTY BOUNDARY
(TYP)
.0'
TO
TA
L R
OW
EDGE OF ROADWAY
SEEDING
PR FES
SEE GRADING AND UTILITY PLAN
PR TYPE 13 AREA INLET
SEE GRADING AND UTILITY PLAN
GRAVEL TO MATCH EXISTING AFTER
GRADING/STORM DRAIN INSTALL
ASPHALT PATCHING
HATCH LEGEND:
SEEDING
GRAVEL
ASPHALT PATCHING
G-05 5 9
1"=20'
20 10 0 20
SITE PLAN
September 15, 2025
100% FOR
REVIEW
ONLY
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.SITE.PLAN.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
738b 35 810 RD.
35 810 RD.
738a 35 810 RD.
PR
IC
E
DI
TC
H
RD
18" RCP SD
" R
CP
S
D
S(2)
PR TYPE 13 AREA INLET
(SEE SHEET D-01)
STA 0+59.82
N=1478823.1669 E=2180682.0634
43 47
42 47
43 47
434744 47
1+04
-0+
0+
1+00
EX DRIVEWAY
(APPROX.)
STA 0+05.90
OFF 0.00'
EX DRIVEWAY
(APPROX.)
STA 0+24.20
OFF 0.00'
S(1)
18" RCP END SECTION
STA 0+00.00
OFF 0.000
S(4)
12" RCP END SECTION
STA 0+00.00
OFF 0.000
S(3)
PR TYPE 13 AREA INLET
(SEE SHEET D-01)
STA 0+93.94
N=1478821.8916 E=2180647.9685
2+
-0+
0+
1+
2+
738A STORM DRAIN
12" HDPE SD
30" RCP SD
S(5)
60" DIA. SD STANDARD SHALLOW MH
SEE MESA COUNTY STANDARDS SD-05
STA. 1+28.29
30" RCP SD
EX PROPERTY BOUNDARY
(TYP)
30" RCP SD
S(6)
60" DIA. SD STANDARD SHALLOW MH WITH FLAPGATE
SEE MESA COUNTY STANDARDS SD-05
FLAPGATE DETAIL SEE SHEET D-01
STA. 2+31.63
N=1478620.7974 E=2180617.8456
EX 12" CMP
(ENDS TO BE FLOWFILLED)
NATURAL GAS CROSSING
STA 0+89.86'
WATER MAIN CROSSING
STA 0+90.46'
START ALIGNMENT
738A STORM DRAIN
STA -0+40.00
N=1478922.95 E=2180684.77
END ALIGNMENT
738A STORM DRAIN
STA 1+03.94
N=1478821.53 E=2180637.98
START ALIGNMENT
739 STORM DRAIN
STA -0+20.00
N=1478870.18 E=2180648.39
END ALIGNMENT
739 STORM DRAIN
STA 2+51.63
N=1478601.10 E=2180621.31
47424743
4744 4743
474347
54746
EX 12" PLASTIC PIPE
(TO BE FLOWFILLED)
EX UTILITY EASEMENT
EX ROW (TYP)
STA 0+93.94, 0.01' LT, 738A STORM DRAIN=
STA 0+28.29, 0.00' , 739 STORM DRAIN
NATURAL GAS CROSSING
STA 1+60.43'
WATER SERVICE CROSSING
STA 1+48.15'
UNDERGROUND ELECTRIC CROSSING
STA 2+13.15'
TIE INTO EXISTING STRUCTURE
(SEE STRUCTURE PENETRATION
DETAIL THIS SHEET)
STA 2+41.74
EX STRUCTURE AND
EX 60" RCP SD
(TO REMAIN)
EX CULVERT
TO BE REMOVED
(APPROX.)
STA 0+03.49
OFF 0.00'
EX 8" CMP
(TO BE FLOWFILLED)
TELECOM LINE CROSSING
STA 0+69.36'
7.7 5'
2.5 8'
20.0'
DRAINAGE EASMENT
20.0' 30.0'
50' PALISADE IRRIGATION
DISTRICT EASEMENT
PR
ES
CR
IP
TIV
E
RO
W
.0'
TO
TA
L R
OW
.0'
DE
ED
ED
R
OW
.0'
DE
DI
CA
TE
D
RO
W
30.0' IRRIGATION
AND UTILITY
EASEMENT
-0+40 0+00 1+00 1+10
EX
.0
PG EX
.4
PG
.59
EX
.6
PG
.79
EX PG
18" RCP SD59.82' @ S=2.27%
18" RCP SD
34.12' @ S=0.49%
EXISTING GRADE
S( 2)
PR
TY
PE
A
RE
A
IN
LE
T
ST
A
0+
.82
RI
M=
.00
IN
V
IN
=4
0.5 7'
(N
IN
V
OU
T=
.57 ' (W
S( 3)
PR
TY
PE
A
RE
A
IN
LE
T
ST
A
0+
.29
RI
M=
.06
IN
V
IN
=4
0.4 0'
(E
IN
V
IN
=4
0.9
0' (N
IN
V
OU
T=
.40
' (S
24in PR FES
INV = 4741.92
FINISHED GRADE
100YR HGL
S=8.97%
EX NATURAL GAS MAIN CROSSING
(LOCATION APPROXIMATE)
STA = 0+89.86
T.O.P. = 4743.082'
EX TELECOM LINE CROSSING
TO BE FIELD ADJUSTED
STA = 0+69.36
T.O.P. = 4742.13
EX WATER MAIN CROSSING
TO BE LOWERED PER DETAIL F
STA = 0+90.46
T.O.P. = 4739.84
0.3 5'
-0+20 0+00 1+00 2+00 2+75
EXISTING GRADE
12in PR FES
INV = 4744.49
12" HDPE SD
28.29' @ S=12.68%
30" RCP SD
100.00' @ S=0.50% 30" RCP SD
103.34' @ S=0.50% 30" RCP SD
10.00' @ S=3.03%
S( 3)
PR
TY
PE
A
RE
A
IN
LE
T
ST
A
0+
.29
RI
M=
.06
IN
V
IN
=4
0.4 0'
(E
IN
V
IN
=4
0.9
0' (N
IN
V
OU
T=
.40
' (S
S( 5)
" D
IA
. S
D
ST
AN
DA
RD
S
HA
LL
OW
M
H
SE
E
ME
SA
C
OU
NT
Y
ST
AN
DA
RD
S
SD
-05
ST
A
1+
.29
RI
M=
.85
IN
V
IN
=4
8.9 0'
(N
IN
V
OU
T=
.90 ' (S
S( 6)
" D
IA
. S
D
ST
AN
DA
RD
S
HA
LL
OW
M
H W
ITH
FL
AP
GA
TE
SE
E
ME
SA
C
OU
NT
Y
ST
AN
DA
RD
S
SD
-05
FL
AP
GA
TE
D
ET
AI
L S
EE
S
HE
ET
D -02
ST
A
2+
.63
RI
M=
.74
IN
V
IN
=4
8.3 8'
(N
IN
V
OU
T=
.38 ' (S
EX IRRIGATION STRUCTURE
EX
.8
PG EX
.5
PG
.58
EX
.0
PG EX
.1
PG EX PG
FINISHED GRADE
EX 60" RCP
WATER SURFACE ELEVATION
(ELEVATION APPROX.)
ELEV = 4741.23
EX WATER SERVICE CROSSING
(LOCATION APPROX.)
STA = 1+48.15
EX NATURAL GAS CROOSING
(LOCATION APPROX.)
STA = 1+60.43
UNDERGROUND ELECTRIC CROSSING
(LOCATION APPROX.)
STA = 2+13.15
100YR HGL
NOTES:
1. THE EXISTING GAS MAIN SHOWN IN 35 & 8/10THS ROAD WAS
NOT FOUND DURING POTHOLE ACTIVITIES PERFORMED BY
BONAFIDE SURVEYING AND BADGER INC. ON 09/09/25.
SURVEY INFORMATION OBTAINED FROM THE COUNTY
INDICATES THAT A GAS MAIN IS PRESENT WITHIN THE
ROADWAY, AS SHOWN ON THIS PLANSET. ALL VERTICAL
DATA IS APPROXIMATE. THE CONTRACTOR SHALL USE
CAUTION WHEN PERFORMING EXCAVATION AND SHALL
FIELD VERIFY THE LOCATION AND DEPTH OF THE GAS MAIN
DURING CONSTRUCTION. THE CONTRACTOR SHALL
COORDINATE WITH THE UTILITY OWNER AS NECESSARY.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER
IMMEDIATELY IF A CONFLICT WITH THE PROPOSED STORM
DRAIN IS FOUND.
2. BACKFILL AROUND MANHOLES, INLET BOXES, AND OTHER
STRUCTURES SHALL BE PLACED IN 8" LIFTS AND
COMPACTED TO 95% AASHTO T-180
3. ALL PORTLAND CEMENT CONCRETE SHALL BE COLORADO
DEPARTMENT OF TRANSPORTATION CLASS "B". (SECTION
601.2)
4. ALL NON-SHRINK GROUT SHALL BE COLORADO
DEPARTMENT OF TRANSPORTATION APPROVED. (SECTION
412.22).
5. ANY EXISTING PAVEMENT NOT DESIGNATED FOR REMOVAL
WHICH IS DAMAGED BY CONSTRUCTION SHALL BE
REPLACED IN-KIND AT THE CONTRACTOR'S EXPENSE.
6. ALL CONCRETE WORK WITHIN PUBLIC RIGHT-OF-WAY
SHALL BE PERFORMED BY A LICENSED COUNTY
CONTRACTOR.
7. MANHOLE RING AND COVER AND INLET GRATE AND FRAME
SHALL BE ADJUSTED TO FINISHED GRADE USING
NON-SHRINK GROUT AND PRE-CAST CONCRETE GRADE
RINGS OR WITH THE "WHIRLY GIG" METHOD. GROUT
THICKNESS SHALL NOT EXCEED 2 INCHES.
8. ALL WORK SHALL BE IN ACCORDANCE WITH APPROVED
PLANS, STANDARD STORM DRAIN DETAILS AND THE MESA
COUNTY STANDARD SPECIFICATIONS FOR CONSTRUCTION.
9. STORM DRAIN INLET BOXES MAY BE MADE FROM
STACKABLE PRECAST BOX SECTIONS WITH TONGUE AND
GROOVE JOINTS AND FLEXIBLE SEALANT BETWEEN
SECTIONS. THE TOP SECTION OF THE INLET BOX SHALL
HAVE A GROOVE-LESS FLAT SURFACE TO SUPPORT THE
INLET FRAME AND GRATE.
G-06 6 9
1"=20'
20 10 0 20
GRADING AND STORM DRAIN PLAN
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.GRADING&UTILITY.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
October 21, 2025
100% FOR
REVIEW
ONLY
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.GRADING&UTILITY.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
739 35 810 RD.
738b 35 810 RD.
35 810 RD.
738a 35 810 RD.
PRICE DITCH RD.
738A STORM DRAIN PROFILE 739 STORM DRAIN PROFILE
LEGEND
EX NATURAL GAS
EX WATER LINE
EX UNDERGROUND ELECTRIC
EX OVERHEAD ELECTRIC
EX STORM DRAIN
PR STORM DRAIN
EX PROPERTY BOUNDARY/ROW
EX EASEMENT
60" RCP
(TO REMAIN)
60" RCP
(TO REMAIN)
#5 HOOP
3" CLEAR FROM
RCP O.D.
2" DEEP SAW CUT
6" FROM RCP O.D.
CUT EXISTING REINF.
2" CLEAR FROM RCP O.D.
MANUALLY REMOVE CONC. WALL
WITHIN SAW CUT AREA
PRESERVE EXISTING REINF.
12" MIN. THICK GROUT (NON-SHRINK
CDOT APPROVED SECTION 412.22)
COLLAR AROUND PIPE PENETRATION VOID
STRUCTURE PENETRATION DETAIL
N.T.S.
10.33'
0.5'
(TYP.)
7.75'
FLOW
EX IRRIGATION
STRUCTURE
2.58'
EX IRRIGATION
475047
474247 434744
474647
54475547
604761
G-07
1"=20'
20 10 0 20
EXISTING DRAINAGE PLAN
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.EX.DRAINAGE.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
October 21, 2025
100% FOR
REVIEW
ONLY
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.EX.DRAINAGE.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
7 9
LEGEND
0.58 0.68
0.81
BASIN NAME
AREA IN ACRES
10 YEAR RUNOFF
COEFFICIENT
100 YEAR RUNOFF
COEFFICIENT
A DESIGN POINT
FLOW PATH
EXISTING CONTOUR
PROPOSED CONTOUR
SUB-BASIN BOUNDARY
OS-2
3.00 0.20
0.52
0.19 0.48
0.68
OS-1
0.61 0.18
0.51
1.31 0.46
0.67
OS-3
0.75 0.52
0.701
0.49 0.32
0.59
0.25 0.46
0.66
2 5
0.06 0.52
0.70
Existing Basin Summary Table
Sub-Basin Area (ac) % Impervious Q2 (cfs) Q10 (cfs) Q100 (cfs
1 0.49 26.16% 0.10 0.32 1.05 2 0.25 44.15% 0.13 0.31 0.81 3 1.31 44.89% 0.43 1.05 2.72 4 0.06 53.20% 0.04 0.09 0.21 5 0.19 46.70% 0.10 0.25 0.64
OS-1 0.61 7.00% 0.02 0.17 0.86
OS-2 3.00 8.80% 0.12 0.77 3.63
OS-3 0.75 53.20% 0.31 0.71 1.70
Total Site 6.66 24.80% 1.25 3.67 11.62
Existing Design Points Summary Table EX Design Pts Tributary Design Point Q2 (cfs) Q10 (cfs) Q100 (cfs)
1 1 0.10 0.32 1.05 2 1,2,3,4 0.70 1.77 4.79 3 3 0.43 1.05 2.72 4 3,4 0.47 1.14 2.93 5 1,2,3,4,5 0.80 2.02 5.43
EX IRRIGATION
G-08
1"=20'
20 10 0 20
PROPOSED DRAINAGE PLAN
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.PR.DRAINAGE.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
October 21, 2025
100% FOR
REVIEW
ONLY
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:20:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.PR.DRAINAGE.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
8 9
LEGEND
0.58 0.68
0.81
BASIN NAME
AREA IN ACRES
10 YEAR RUNOFF
COEFFICIENT
100 YEAR RUNOFF
COEFFICIENT
A DESIGN POINT
FLOW PATH
EXISTING CONTOUR
PROPOSED CONTOUR
SUB-BASIN BOUNDARY
OS-2
3.00 0.20
0.52
0.19 0.48
0.68
OS-1
0.61 0.18
0.51
1.31 0.46
0.67
OS-3
0.75 0.52
0.70
0.49 0.32 0.59
2a
0.06 0.52
0.70
2a
0.22 0.46
0.66
2b
0.03 .46
.66
2b
Proposed Basin Summary Table
Sub-Basin Area (ac) % Impervious Q2 (cfs) Q10 (cfs) Q100 (cfs
1 0.49 26.16% 0.10 0.32 1.05 2a 0.22 44.15% 0.11 0.27 0.71 2b 0.03 44.15% 0.02 0.04 0.10 3 1.31 44.89% 0.43 1.05 2.72 4 0.06 53.20% 0.04 0.09 0.21 5 0.19 46.70% 0.10 0.25 0.64
OS-1 0.61 7.00% 0.02 0.17 0.86
OS-2 3.00 8.80% 0.12 0.77 3.63
OS-3 0.75 53.20% 0.31 0.71 1.70
Total Site 6.66 24.80% 1.25 3.67 11.62
Proposed Design Points Summary Table EX Design Pts Tributary Design Point Q2 (cfs) Q10 (cfs) Q100 (cfs)
1 1 0.10 0.32 1.05 2a 1,2a 0.21 0.59 1.76 2b 1,2a,2b,3,4 0.70 1.77 4.79 3 3 0.43 1.05 2.72 4 3,4 0.47 1.14 2.93 5 1,2a,2b,3,4,5 0.80 2.02 5.43
October 21, 2025
100% FOR
REVIEW
ONLY
D-01 9 9
DETAILS
www.bhinc.com 800.877.5332
Tue, 21-Oct-2025 - 2:21:pm, Plotted by: JENCISO P:\20250291\ENGDEN\Plans\20250291.Details.dwg
NO
DA
TE
BY
A
S- B
U
IL
T
IN
FO
R
M A
TI
O
N
ENGINEER'S SEAL
DR
AW
IN
GS
CO
RR
EC
TE
D
BY
FIE
LD
VE
RI
FIC
AT
IO
N
BY
IN
SP
EC
TO
R' S
AC
CE
PT
AN
CE
B
Y
W
OR
K
ST
AK
ED
B Y
CO
NT
RA
CT
OR
DA
TE
DA
TE
DA
TE
DA
TE
DA
TE
R
EV
IS
IO
N S
BHI PROJECT NO. SHEET OFDWG NO.
CH
EC
KE
D
BY
DR
AW
N
BY
DE
SI
GN
ED
B Y
D
ES
IG
N
MESA COUNTY 35 8/10th ROAD
DRAINAGE IMPROVEMENTS
20250291
A C
C
H JE
O C
TO
B
ER
- F
IN
A L
D
ES
IG
N
A
S A
D
VE
R
TI
SE
D
30" RCP
60" STANDARD SHALLOW
MANHOLE WALL
FLAPGATE
REFER TO TABLE
FOR BOLT SPACING FLAPGATE CONNECTION
NTS
NOTES:
1. FLAP GATE SHALL BE PAID FOR AS SUCH AND MEASURED AS EACH
2. THE CONTRACTOR SHALL INSTALL THE FLAP GATE PER THE MANUFACTURER'S
RECOMMENDATIONS
3. FRESNO 30 INCH VALVE OR APPROVED EQUAL SHALL BE USED, CONTRACTOR SHALL PROVIDE
THE COUNTY A MATERIAL SUBMITTAL FOR FLAP GATE APPROVAL PRIOR TO INSTALLATION
4. ITEMS AND EFFORTS ANCILLARY TO INSTALLATION OF FLAP GATE INCLUDING BUT NOT LIMITED
TO LABOR AND MATERIALS NEEDED FOR INSTALLATION SHALL BE INCIDENTAL TO THE FLAP
GATE AND WILL NOT BE MEASURED AND PAID FOR SEPARATELY