The document is a bid schedule for the 2025 Corinthian Tank Water Main Project located in Colorado, prepared for a town park infrastructure improvement initiative. The project involves the installation of approximately 260 linear feet of 12" Ductile Iron Waterline, including mechanically restrained pipe, tees, elbows, and valves. The comprehensive bid schedule details 32 line items covering general conditions, removals and earthwork, water system improvements, and proposed site improvements, with quantities specified for tasks such as erosion control (315 linear feet), concrete removal (34 square yards), and asphalt removal (100 square yards).

The bid schedule presents a detailed breakdown of project components with zero dollar amounts currently populated, indicating this is likely a preliminary or template document awaiting specific contractor pricing. The project scope includes site preparation, utility modifications, road and shoulder reconstruction, and landscaping elements such as topsoil placement and site cleanup. Key technical components include installing water main infrastructure, valve adjustments, aggregate base course preparation, concrete shouldering, and hot mixed asphalt pavement installation. The document notes that the contractor is responsible for verifying spreadsheet formulas and making necessary modifications, suggesting a requirement for careful bid preparation and cost calculation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2020 Town Park Phase 1

BID SCHEDULE: 2025 Corinthian Tank Water Main ProjectJune 25, 2025
Item No.Bid ItemQUANTITYUnitUnit
CostTotal
GENERAL
1Mobilization & Bonds1LS$ - 0
2Maintain Town furnished Traffic Control Devices at Site1LS$ - 0
3Furnish/Install/Maintain Erosion Control: STRAW WADDLES315LF$ - 0
4Furnish/Install/Maintain Heavy Duty Orange Construction Fence315LF$ - 0
5Vehicle Tracking Control1EA$ - 0
6Potholing (Shallow) (0'-3')16HR$ - 0
Removals & Earthwork
7Clear & Grub Area & Haul Offsite (6" DEEP)256CY$ - 0
8REMOVE Aspen Trees1LS$ - 0
9Sawcut concrete and asphalt full depth (4"-6" Thick)88LF$ - 0
10Remove 6" Concrete Pans & Concrete Curb and Gutter34SY$ - 0
11Remove 4" Asphalt roadways/Paths100SY$ - 0
12Excavate to subgrade and Export Excess Materials (120 CY)1LS$ - 0
13Rebuild South Side Berm on Oro Grande Ditch1LS$ - 0
Water System Improvements0
14REMOVE TEE & Replace with Solid Pipe and Solid Sleeves1LS$ - 0
158" DIP water Main (COMPLETE-IN-PLACE)10LF$ - 0
1612" DIP water Main (COMPLETE-IN-PLACE)266LF$ - 0
178" Gate Valve with Valve Box & Stem Riser (COMPLETE-IN-PLACE)2EA$ - 0
188"x8" TEE (With Thrust Block)1EA$ - 0
1912" 11.25 Elbow3EA$ - 0
2012" 22.5 Elbow (With Thrust Block)2EA$ - 0
2112"x8" Reducer1EA$ - 0
228" Solid Sleeve Coupler3EA$ - 0
2312" Solid Sleeve Coupler1EA$ - 0
24Flowfill at SEWER /WATER crossing10CY$ - 0
25Adjust Valves to Final Grade4EA$ - 0
Proposed Improvements0
26Subgrade Preparation140SY$ - 0
27Class 5 Aggregate Base Course63TONS$ - 0
286" Concrete Shoulder (3' Wide)120SF$ - 0
296" Concrete Valley Pan (3' Wide)180SF$ - 0
30Hot Mixed Asphalt (HMA) Pavement (4" Thick)(Roadway & Shoulders)23TONS$ - 0
313" Topsoil (High Quality)128CY$ - 0
32Site Cleanup & Debris Removal1LS$ - 0
BID TOTAL$ - 0