2025 Washer Dryer SOW-Revised - 8 Aug 2025.pdf

PDF 232 KB Posted

Attached to
Sources Sought - UniMac Washing Machines & Dryers - Travis AFB, CA
Solicitation number
FA442725QZ060
Issued by

About this file

These technical specifications outline a contract for the U.S. Air Force's 60th Force Support Squadron (60 FSS/FSVS) at Travis Air Force Base to purchase and install new commercial laundry equipment for the fitness center. The project requires replacing two existing washer and dryer units with new UniMac or equivalent 30-lb commercial units, specifically the UYT030VN0HXUB0C0BA washer-extractor and UTS30EFN0RGG6W0000 single tumble dryer.

The detailed specifications include precise equipment dimensions, electrical requirements (208V/60HZ/1-Phase for washer, 208V/60HZ/3-Phase for dryer), and key features such as multiple cycle settings, water level controls, and automatic chemical dispensing. Work site conditions mandate performance between Monday and Friday from 07:30 to 18:30 hours, with contractor responsibilities including utility conservation, debris removal, maintaining site cleanliness, and obtaining necessary permits. The contractor must provide warranty documentation and return all disturbed areas to their original condition before final government acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Specifications DATE: August 2025

60 FSS/FSVS

Tanya McCormick

DATE: 8 August 2025

U.S. AIR FORCE

60 AMW

TRAVIS AFB, CA 94535

TECHNICAL SPECIFICATIONS FOR

PURCHASE NEW COMMERCIAL

WASHER & DRYER FOR FITNESS CENTER

TRAVIS AFB, CALIFORNIA

1. SCOPE OF WORK:

PURCHASE AND INSTALL PROJECT: The Contractor shall provide all management, tools, supplies, equipment, transportation and qualified personnel necessary to install two new 30 lb commercial washers and two new 30 lbs commercial dryers. The work will include removal and disposal of existing washer/dryer units and installation of new replacement units.

Contractor shall comply with regulations and law in force. Contractor shall store their materials in designated areas as specified by Project Inspector or Representative. Period of performance shall be 30 calendar to allow material procurement, work completion and clean up.

Replace two existing washer units:

Replace two existing dryer units:

Request to purchase UniMac or equivalent 30lb softmount washer units:

Specifications for the UniMac UYT030VN0HXUB0C0BA 30lb hardmount washer-extractor:

• Capacity: 30 lbs (13.6 kg).

• Controls: M9 (9 cycle settings).

• G-force: 200 G-Force available.

• Dimensions:

• Width: 29 inches (737 mm).

• Depth: 35.3 inches (897 mm).

• Height: 45 inches (1143 mm).

• Cylinder:

• Diameter: 24 inches (610 mm).

• Depth: 16 inches (406 mm).

• Volume: 4.2 cu. ft. (119 liters).

• Motor Size: 1 HP (0.75 kW).

• Speeds: 9 cylinder speeds available.

• Water Inlet Connection: 2 @ 0.75 inches (19 mm).

• Drain: 1 @ 3 inches (76 mm) diameter.

• Electrical: Voltage/Hz/Phase Circuit options available. Chosen option shall be 208V/60Hz/1-Phase.

• Features:

• 3 water level settings.

• Up to 5 supply signals for automatic laundry chemical dispensing.

• Self-diagnostic and cycle counter tools.

• Computer-optimized frame designed to handle unbalanced loads efficiently.

Unimac 30 lb single tumble dryer model number UTS30EFN0RGG6W0000, here are the specifications for the Unimac dryer or equivalent:

• Capacity: 30 lb

• Heat Input Power:

• Electric: 21 kW

• Dimensions:

• Width: 31 in (800 mm)

• Depth: 39.6 in (1006 mm)

• Height: 63.4 in (1610 mm)

• Cylinder Dimensions:

• Diameter: 30 in (762 mm)

• Depth: 26 in (660 mm)

• Volume: 10.6 cu ft (301 liters)

• Features:

• Reversing Cylinder: Standard

• Door Opening Size: 22.7 in (577 mm)

• Electrical Specifications:

• Gas & Steam Electric

• Voltage options:

• 100-120V/50/60/1

• 200-240V/50/60/1-3. Chosen option shall be 208V/60HZ/3-Phase.

• 440-480V/50-60/3

• Cord Included: No

• Airflow: 500 ft³/min

• Motor Size:

• Fan: 0.5 HP

• Cylinder: 0.5 HP

• Energy Star Certified: No

2. WORK SITE CONDITIONS

The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.

Interruption of utilities. Utilities shall not be interrupted until approval is received from the Contracting Officer. Any such need shall be requested in writing by the Contractor at least 10 days in advance of the needed interruption. Requests for utility interruption shall indicate the type of utility to be interrupted, the type of operation requiring the interruption, the date and duration. To the maximum extent possible interruption shall be scheduled on weekends or U.S.

holidays in order to minimize impact to base activities.

Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 07.30 to 18.30 hours. Work during week ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities. A proposal work schedule will be submitted by the Contractor for C.O. approval.

Toilet facilities in the vicinity of the work site shall be available for Contractor use. The Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.

If welding is to be performed the Contractor shall ensure a welding permit is obtained from the Travis AFB Base Fire Department prior to performing welding operations.

The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.

The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety.

At least 5 days prior to the pre-final inspection, the Contractor shall furnish to the Contracting Officer all installed equipment operation and maintenance documentation, certificates concerning installed systems as required by host country laws, test reports and results and as built drawings where required by host nation laws.

3. GENERAL NOTES

At the end of the work, the Contractor shall provide the Government with three copies of the following documents: for warranty call purpose, 3 copies of letter identifying project number, item, company address, phone number, point of contact, item warranty expiration date, etc.

The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the Government.

Housekeeping and Site Clean-up: At the end of each working day, the Contractor shall be responsible for cleaning of the area. Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times.

Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow away to another area.

File details come from the government source that posted it. Updated .