2025 Sidewalk Replacement Bid.pdf

PDF 599 KB Posted

Attached to
CONCRETE SIDEWALK REPLACEMENT
Solicitation number
COE 2025-12
Issued by
Racine County, Wisconsin

About this file

The City of Edgerton has issued a Request for Quotes (RFQ) for the 2025 Concrete Sidewalk Replacement project, seeking contractors to remove and install concrete sidewalks throughout designated areas within the city. The project involves approximately 700 square feet of sidewalk replacement, with quotes requested by 2:00 pm on October 6th, 2025. The city anticipates issuing a Notice of Award on October 7th, 2025, with all work to be substantially completed by November 21st, 2025. Contractors are required to provide a comprehensive quote including labor, materials, concrete disposal, and all associated costs.

The technical specifications require sidewalks to be 4-inches thick with 4 inches of granular base (6-inches at driveways), with concrete meeting WI DOT 415.3.12 specifications and having a minimum strength of 3000 PSI. The project includes specific requirements such as broom finish for slip resistance, topsoil and grass seed restoration, and a one-year warranty on all work. Contractors must handle barricades, signage, and traffic control, and comply with the city's noise ordinance. The bid form allows contractors to quote unit prices for both 4-inch and 6-inch sidewalk removal and installation, with contractors required to submit a certificate of insurance if awarded the work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .