2025-RFP-045_Animal_Shelter_Plans-_Revision_1_-_Copy.pdf
PDF 3 MB Posted
- Attached to
- GREENVILLE OUTDOOR KENNELS
- Solicitation number
- 2025-RFP-045
- Issued by
- Hockley County, Texas
About this file
These construction plans are for the City of Greenville Animal Control Outdoor Kennel project located in Greenville, Texas, prepared by MTG Stovall Engineers & Surveyors in December 2023. The project involves constructing a metal building animal kennel facility with specific design requirements, including a 101'x50' inside clear dimension building with a 50' clear span, 12' eave height, 2/12 roof pitch, and no interior columns. The pre-engineered metal building will be a standalone structure with all sides open and free from obstructions, designed to house animal control kennels.
The foundation will utilize 30" diameter drilled piers for structural support, with specific geotechnical considerations based on a report by Geotex Engineering dated August 30, 2023. The design is based on an allowable net soil bearing capacity of 6,000 PSF, and the project is designed to meet 2018 International Building Code standards. The building is classified as Risk Category II, with design parameters including a ground snow load of 5 PSF and an ultimate design wind speed of 115 MPH. The project includes provisions for lighting, fans, and a gutter system, with detailed specifications for concrete placement, reinforcing steel, and foundation construction methods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
PROJECT LOCATION
METAL BUILDING FOUDNATION
30" Ø DRILLED PIERS
EACH COLUMN, SEE DETAIL
EXTENTS OF CONCRETE SLAB BY OTHERS, SEE CIVIL
20'-83 8" 20'-83
8" 20'-83 8" 20'-83
8" 20'-83 8"
'-6
101'
COLUMN, BASE
PLATE AND BOLT Ø
BY OTHERS
1'
30" Ø
(8) #6 VERTICAL BARS
#3 HOOPS @ 12" OC
#3 HOOPS @ 12" OC
#6 VERTICAL BARS
3"
30"Ø DRILLED PIER
30"Ø
3" M
IN
NOTE:
1. ANCHOR BOLT NUTS SHALL CONFORM TO ASTM
A563, HEAVY HEX, GRADE A.
2. ALL WASHERS SHALL CONFORM TO ASTM F436,
TYPE 1.
(1) HEAVY HEX NUT
& (1) FLAT WASHER
ASTM A307 BOLT
REF METAL BLDG MFR FOR
PROJECTION AND DIAMETER
ANCHOR BOLT DETAIL
1' -9
" E M
BE
D
3" P
R O
JE
C
TI
O
N
FOUNDATION PLAN
FINAL FOR CONSTRUCTIONS1.01
M
C D
O N
A L
D L
N
T ex ar k an a, A rk an sa s
T .8
.7
ENGINEERS SEAL
SHEET
SHEET TITLE
NO. DATE DESCRIPTION
REVISIONS
FOUNDATION
PLAN
T X
F
IR
M N
O
23-144
TR
RE JOB NO.
DESIGN:
12/1/2023DATE:
C
IT
Y O
F G
R
EE
N
VI
LL
E
AN
IM
AL
C
O N
TR
O
L
DRILLED PIER DETAIL
DESIGN NOTES:
1. THE FOLLOWING GEO-TECHNICAL REPORT WAS USED FOR THE DESIGN OF THIS
FOUNDATION.
REPORT BY: GEOTEX ENGINEERING
PROJECT NO.: G23-2180
DATE: AUGUST 30, 2023
ALLOWABLE NET SOIL BEARING CAPACITY: 6,000 PSF
2. SIZES AND REINFORCING STEEL SHOWN ARE MINIMUM REQUIREMENTS NEEDED TO ALLOW
THIS STRUCTURAL SYSTEM TO ADEQUATELY PERFORM IN CONJUNCTION WITH SOIL
PARAMETERS DESCRIBED IN SOIL REPORT.
3. ALL REINFORCING BARS SHALL BE GRADE 60 AND SHALL CONFORM TO ASTM A615-60.
4. REINFORCING SHALL BE CLEAN AND SECURELY HELD IN PLACE BEFORE PLACING CONCRETE.
BARS SHALL BE CLEAN AND SUPPORTED BY HEAVY DUTY SPACERS AS DESCRIBED IN SOIL
REPORT AND TIED AT ALL INTERSECTIONS TO PREVENT VERTICAL AND HORIZONTAL
MOVEMENT DURING CONCRETE PLACEMENT.
5. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH, f'c, of 3,000 PSI AT 28
DAYS. SLUMP SHALL BE 7-9". ALL CONCRETE SHALL BE PLACED IN ACCORDANCE WITH
APPLICABLE ACI STANDARDS. CONCRETE SHALL BE PLACED WITHIN 90 MINUTES OF BATCH
TIME - ALL CONCRETE OVER 90 MINUTES OLD SHALL NOT BE PLACED IN FOUNDATION.
CONTRACTOR SHALL SUBMIT A MIX DESIGN FOR APPROVAL TO THIS OFFICE.
6. FOUNDATION UNITS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH ACI 336.2 "STANDARD
SPECIFICATION FOR THE CONSTRUCTION OF DRILLED PIERS".
7. REMARKS: SEE SOIL REPORT FOR ADDITIONAL INFORMATION.
8. THE OWNER WILL EMPLOY A TESTING LABORATORY TO PERFORM TESTS AND TO SUBMIT
TEST REPORTS. THE CONTRACTOR WILL COORDINATE COMMUNICATIONS WITH THE TESTING
LAB AND INSURE THAT THEY ARE AT THE SITE TO PERFORM THE TESTS REQUIRED.
SAMPLING OF FRESH CONCRETE SHALL BE COMPLETED PER ASTM C 172. TESTING SHALL
CONSIST OF THE FOLLOWING:
SLUMP: ASTM C 143; ONE TEST AT POINT OF DISCHARGE FOR EACH DAY'S POUR OF EACH
TYPE OF CONCRETE; ADDITIONAL TESTS WHEN CONCRETE CONSISTENCY SEEMS TO
HAVE CHANGED.
AIR CONTENT: ASTM C 173; VOLUMETRIC METHOD FOR LIGHTWEIGHT OR NORMAL WEIGHT
CONCRETE; ASTM C 231 PRESSURE METHOD FOR NORMAL WEIGHT CONCRETE; ONE FOR
EACH DAY'S POUR OF EACH TYPE OF AIR-ENTRAINED CONCRETE.
COMPRESSION TEST SPECIMEN: ASTM C 31; ONE SET OF 4 STANDARD CYLINDERS FOR
EACH COMPRESSIVE STRENGTH TEST, UNLESS OTHERWISE DIRECTED. MOLD AND STORE
CYLINDERS FOR LABORATORY-CURES TEST SPECIMENS EXCEPT WHEN FIELD-CURE TEST
SPECIMENS ARE REQUIRED.
COMPRESSIVE STRENGTH TESTS: ASTM C 39; ONE SET FOR EACH DAY'S POUR
EXCEEDING 5 CU. YDS. OF EACH CONRETE CLASS PLACED IN ANY ONE DAY; ONE
SPECIMEN TESTED AT 7 DAYS; TWO SPECIMENS TESTED AT 28 DAYS, AND ONE SPECIMEN
RETAINED IN RESERVE FOR LATER TESTING IF REQUIRED.
GENERAL NOTES:
1. THE CONTRACTOR SHALL COORDINATE THE FOUNDATION PLAN WITH ARCHITECTURAL
DRAWINGS FOR OPENINGS, DROPS,INSERTS, AND RELATED ITEMS. CONTRACTOR SHALL
ALSO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD BEFORE CONCRETE IS
PLACED.
2. THE CONTRACTOR SHALL VERIFY, PRIOR TO CONSTRUCTION, THAT THE NEW
CONSTRUCTION WILL NOT CONFLICT WITH ANY EXISTING UTILITIES. IF CONFLICT ARISE, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER AND SHALL STOP UNTIL AN APPROPRIATE
SOLUTION IS FOUND.
3. TYPICAL DETAILS AND NOTES SHALL APPLY UNLESS SPECIFICALLY SHOWN OR NOTED
OTHERWISE. CONSTRUCTION DETAILS NOT FULLY SHOWN OR NOTED SHALL BE SIMILAR TO
DETAILS SHOWN FOR SIMILAR CONDITIONS.
4. DUE TO INTRICACIES OF CONSTRUCTION, IT IS IMPRACTICAL TO SPECIFY OR SHOW EVERY
DETAIL. IF A CONDITION IS NOT SHOWN, A SIMILAR DETAIL OR THE CURRENT RULES OF
GOOD CONSTRUCTION PRACTICES SHALL BE FOLLOWED.
5. SITE GRADINGS AND DRAINAGE AROUND THE FOUNDATION SHALL BE MAINTAINED AT ALL
TIMES IN SUCH A MANNER THAT SURFACE OR GROUND WATER WILL NOT COLLECT UNDER
OR ADJACENT TO THE FOUNDATION. MOISTURE CONTENT SHOULD BE KEPT CONSISTENT
AND PROPER DRAINAGE AWAY FROM THE SLAB IS REQUIRED.
6. CONTRACTOR IS RESPONSIBLE TO ADVISE OWNER OF PROPER FOUNDATION MAINTENANCE,
WHICH INCLUDES WATERING OF THE AREAS WITHIN 4 FEET OF THE FOUNDATION DURING
THE DRY SEASON. HEAVY VEGETATION, SUCH AS TREES WITHIN 10-15 FEET OF THE
PERIMETER OF THE FOUNDATION MAY CAUSE EXCESSIVE WATER REMOVAL FROM THE SOIL
NEAR OR UNDER THE FOUNDATION. SUCH UNANTICIPATED PARAMETERS ARE NOT
CONSIDERED UNLESS REPORTED BY THE CONTRACTOR TO THE ENGINEER, IN WRITING,
PRIOR TO DESIGN.
7. VERIFY ALL DIMENSIONS WITH ARCHITECT/CIVIL ENGINEERS.
8. ANY REQUIRED UNDERCUT AND SOIL REPLACEMENT WITHIN THE BUILDING AREA SHALL BE
COMPLETED PRIOR TO DRILLING OF PIERS. COMPACTION SHALL BE ACHIEVED UTILIZING
REQUIREMENTS SET FORTH BY CIVIL ENGINEER.
METAL BUILDING REQUIREMENTS:
1. PRE-ENGINEERED METAL BUILDING
2. USAGE: STAND ALONE ANIMAL KENNELS
3. 101'x50' INSIDE CLEAR DIMENSIONS, SEE CIVIL PLANS FOR DETAILS
4. 50' CLEAR SPAN, NO INTERIOR COLUMNS
5. ALL SIDES OPEN AND FREE FROM OBSTRUCTIONS (INCLUDING LATERAL BRACING)
6. GABLE ROOF
7. 12' EAVE HEIGHT
8. 2/12 ROOF PITCH
9. ANCHOR BOLT SIZE AND QUANTITY TO BE DESIGNED BY PRE-ENGINEERED METAL BUILDING
MFR.
10. GUTTER SYSTEM REQUIRED
11. LIGHTING AND FANS SHOWN ON SHEET C10 OF THE CIVIL PLANS
12. REGULATING BUILDING CODE: 2018 IBC
13. BUILDING RISK CATEGORY: II
14. GROUND SNOW LOAD: 5 PSF
15. ULTIMATE DESIGN WIND SPEED: 115 MPH
16. COLLATERAL LOADS: LIGHTING AND FANS
17. PRE-ENGINEERED METAL BUILDING PLANS SHALL BE PROVIDED TO FOUNDATION ENGINEER
FOR APPROVAL PRIOR TO FOUNDATION CONSTRUCTION.
| TS |
| C1 |
| C2 |
| C3 |
| C4 |
| C5 |
| C6 |
| C7 |
| C8 |
| C9 |
| C10 |
File details come from the government source that posted it. Updated .