2025-QQ-499_QQ_Requirements.pdf
PDF 162 KB Posted
- Attached to
- Piling Relocation - Blackburn Point Park
- Solicitation number
- 2025-QQ-499
- Issued by
- Sarasota County, Siesta Key CDP, Florida
About this file
This document is a Quick Quote Requirements for Services issued by Sarasota County for a piling relocation project at Blackburn Point Park Rowing Dock. The project involves installing two new concrete-filled eco-pilings, removing two existing terminal pilings, relocating D-ring attachment points, and replacing terminal deck boards and fascia to improve safety and maneuverability for rowers. The work must begin within 60 days of receiving a County Purchase Order and be completed within 180 days, with the County reserving the right to modify the schedule. Bidders must provide three references demonstrating similar project experience within the last 7 years, including at least one project involving dock modification with concrete-filled pilings.
Bidders are required to have a General Contractor and/or Building Contractor license and must submit all required documentation at the time of bid submittal. The payment method will be upon completion of each deliverable, and a contingency of up to 10% of the total bid price may be allowed for unforeseen circumstances, subject to County approval. The successful bidder will need to provide a Certificate of Insurance meeting the County's requirements and warranty all materials for one year from the date of County acceptance. All questions and clarifications must be submitted electronically through OpenGov Procurement, with no verbal requests for information being honored.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Piling_Relocation_-_Blackburn_Point_Park.pdf | ||
| Attachment_A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUICK QUOTE REQUIREMENTS (SERVICES)
Quick Quote Requirements – Services Revised 09/13/23 Page 1 of 3
1. BACKGROUND
A. The existing floating launch at the Blackburn Point Park Rowing Dock currently has two terminal pilings located at the outer corners. These pilings will be relocated 3 feet inward from each corner toward the center of the terminal end to improve safety and maneuverability for rowers accessing the launch.
2. SCOPE REQUIREMENTS
A. Installation of two new eco-pilings, filled with concrete, in accordance with the existing permit plans.
B. Removal of the two existing terminal pilings.
C. Relocation of D-ring attachment points to align with the new piling positions.
D. Replacement of the terminal deck board and fascia to match the existing design and materials.
E. Coordination and acquisition of an amendment to the existing environmental permits, to be handled by the County.
3. EXPERIENCE Not Applicable if checked
A. Bidder must provide a minimum of 3 references demonstrating experience providing services similar to those described in this Bid. All references must be provided using the reference form provided in OpenGov Procurement.
All project references must have been completed within the last 7 years and should be of similar construction type and scale to proposed scope, including at least one project involving modification and/or construction of a dock incorporating concrete-filled pilings.
B. Only references provided at time of submittal, using the reference form provided, will be used to verify required experience.
C. Failure to provide required references at time of submittal may result in Bidder being declared non-responsive.
D. Failure of references to verify required experience may result in Bidder being declared non-responsible.
4. LICENSES/CERTIFICATIONS Not Applicable if checked
Bidder must have the licenses and/or certifications listed below. All required licenses and certifications must be active at the time of bid submittal and must remain active throughout the course of work.
Required Licenses:General Contractor and/or Building Contractor
Quick Quote Requirements – Services Revised 09/13/23 Page 2 of 3
Required Certifications:
Failure to provide a copy of all required licenses and certifications at time of submittal may result in the Bidder being declared non-responsive.
Failure to provide a copy of all required licenses and certifications within business days after request, may result in the Bidder being declared non-responsive.
5. ALTERNATES Alternate Products not acceptable if checked
A. If Bidder wishes to provide an alternate product, the Bidder shall furnish to the County the name of the manufacturer, the model number, and other identifying data and information necessary to aid the County in evaluating the alternate product. Alternates shall be approved only if determined by the County to be equivalent to the prescribed specifications.
B. To be considered, alternates must be submitted to the Contact listed in OpenGov Procurement no later than at .
6. INSURANCE REQUIREMENTS Proof of Insurance not required if checked
Successful Bidder will be required to provide a Certificate of Insurance meeting the requirements contained in the attached Insurance Requirements.
7. PROJECT DURATION Not Applicable if checked
A. Work shall begin within 60 days after receipt of a County Purchase Order and shall be completed no more than 180 days after receipt of a County Purchase Order.
B. The County reserves the right to modify this schedule at their discretion.
Any modifications shall be communicated to the Contractor in writing.
8. BIDDER’S RESPONSIBILITIES Not Applicable if checked
A. Bidder will schedule deliveries so that there is minimal to no interruption to daily work at any location.
B. Bidder is responsible for any damage to County or third-party property caused by the Bidder or their employees. Restoration shall be made to the County’s satisfaction.
9. GENERAL TERMS AND CONDITIONS Not Applicable if checked
Successful Bidder will be required to comply with the General Terms and Conditions of Purchase Orders attached to this Quick Quote.
10. WARRANTY Not Applicable if checked
Unless otherwise noted in Section 1, all materials provided by the Bidder shall be fully warranted from the date of County’s acceptance for a period of one
Quick Quote Requirements – Services Revised 09/13/23 Page 3 of 3 year, or for the standard warranty period provided by the Bidder or product manufacturer, whichever is greater.
11. CONTINGENCY Not Applicable if checked
If during performance of repair work, an unforeseen circumstance occurs that triggers an additional expense, a contingency of up to 10% of the total bid price may be allowed. Any use of contingency funds is subject to the written approval of the County, and any unused contingency shall not be paid out as part of any final payment.
12. INVOICING AND PAYMENT (check applicable payment method)
A. Successful Bidder(s) shall be paid:
Upon completion of work
In equal monthly installments
Upon completion of each deliverable
Other:
B. Invoicing and payment shall be as described in the General Terms and Conditions of Purchase Orders.
13. RESERVED RIGHTS
The County reserves the right to request clarifications or additional information from any offeror.
14. QUESTIONS & ADDENDA
A. Any inquiries, suggestions, or requests concerning interpretation, clarification, or additional information pertaining to the Quick Quote shall be submitted electronically through OpenGov Procurement. All questions must be received no later than the deadline specified in the solicitation. No verbal requests for information will be honored.
B. The electronic response posted in OpenGov Procurement is the only official method whereby interpretation, clarification, or additional information will be provided. The County shall not be responsible for oral interpretations or representations made by County employees, representatives, or third parties.
File details come from the government source that posted it. Updated .