2025 Loader Statement of Objectived (SOO).pdf

PDF 229 KB Posted

Attached to
2025 Buckley Front End Loader
Solicitation number
FA254325Q0046
Issued by

About this file

This Statement of Objectives (SOO) from the US Space Force details a six-month lease requirement for a front-end loader to support snow removal operations at Buckley Space Force Base, effective May 16, 2025. The government seeks a John Deere 644 or equivalent 4-yard front-end loader with specific technical requirements, including 4-wheel drive, closed cab with climate control, manufactured in 2018 or newer, and potentially equipped with an ACS Industries #70 Pro-series front coupler attachment. The loader is needed to enhance base safety by efficiently clearing snow and ice from roadways, walkways, and critical areas during winter months.

The procurement includes one front-end loader for a 6-month lease period and associated transportation costs, with delivery specified for October 1st, 2025. The loader must be transported to Buckley Space Force Base using a lowboy delivery vehicle due to limited access and no off-loading ramp. The contractor must provide repair service response within 48 hours of a service call, and the delivered equipment will be inspected and accepted by government officials upon arrival.

View the file

Other files

File Type Posted
Combo Solicitation - FA254325Q0046.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

US Space Force

Front-End Loader Six-Month Lease for Snow Removal Current as of 16 May 2025

1. SCOPE: The government requires a 4-yard front end loader to enhance the safety of base personnel and equipment during winter months. Accumulated snow and ice pose significant hazards to movement and operations on Buckley SFB. A front-end loader is a critical asset for promptly and safely clearing snow from roadways, walkways and other critical areas

2. REQUIREMENT:

Product Quantity John Deere 644 or equivalent front-end Loader 4.0-4.9 Cubic yard 6 Months

4 Cubic Yard Front End Loader Transportation Cost 1 Each

3. SPECIFICATIONS:

•Loader Shall have a 4-4.9 Cubic yard bucket.

•Loader Shall be 4-wheel drive.

•Loader Shall be closed cab with heat and air conditioning.

•Loader Shall be a John Deere 644 or equivalent.

•Loader, if possible, ACS industries, Inc #70 Pro-series front coupler attachment.

•Loader shall be manufactured in the year 2018 or newer.

•Upon repair service calls, contractor shall respond within 48 hrs.

4. DELIVERY:

Must be delivered to Buckley Space force Base. A lowboy delivery vehicle will be required, as there is limited access and no off-loading ramp available. The contractor shall deliver the above requirements on October 1st 2025.

Items, when delivered, will be accepted and inspected by the government officials responsible for receiving the products and performing any required inspections.

File details come from the government source that posted it. Updated .