2025-LGR-0151 - JA - 03-24-2025_Redacted.pdf

PDF 337 KB Posted

Attached to
Library of Congress - ERAL - Audio Converters
Solicitation number
030ADV25Q0111
Issued by

About this file

This is a Justification and Approval (J&A) document for a non-competitive procurement by the Library of Congress to acquire 15 Merging Technologies Hapi MKIII audio converters for the NAVCC Audio Lab. The Library is seeking to replace 20+ year old audio converters with specific brand-name equipment that supports AES 67 standards for Audio over IP, high-resolution PCM encoding up to 384 kHz, and DSD encoding, which are critical for digitizing archival audio recordings at ultra-high sampling rates.

The procurement is valued under $250,000, with a performance period from 6/30/2025 to 6/29/2027. The solicitation (030ADV25Q0111) requires offeror questions by 03/31/2025 at 12:00 PM EST, with responses due by 04/09/2025 at 12:00 PM EST. The Library justifies the sole-source procurement by emphasizing the unique capabilities of Merging Technologies converters, which are fully integrated with the Audio Lab's existing Merging Technologies hardware and software ecosystem and provide unmatched technical specifications for audio preservation work.

View the file

Other files

File Type Posted
Attachment J-1 QA - Audio Converters 030ADV25Q0111 - 4-8-2025.pdf PDF
030ADV25Q0111 0001.pdf PDF
030ADV25Q0111.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval For Other than Full and Open Competition

Plan ID Number: 2025-LGR-0150

Form Updated 4/14/2023

Part 2 – Program Office Justification & Approval

4. Authority for Contracting Without Competition Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:

There is only one responsible source and no other supplies or services will satisfy Library requirements.

41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.

Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).

Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-

1(b)(2).

Other exception identified in FAR 6.302-1: Identify the exception

There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.

41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.

Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: Identify the authority

Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302: Identify the exception

Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

IT Standard Data Sheet)

Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:

Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.

Product or service is reasonably available from only one source.

Source controls copyrights, patents or other exclusive licensing arrangements.

Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.

Source is expressly authorized or required by statute: Identify the authority

Library’s needs can only be satisfied by a brand-name product The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

IT Standard Data Sheet)

GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:

An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.

FAR 8.405-6(a)(1)(i)(A).

Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).

In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).

Library’s needs can only be satisfied by a brand-name product The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:

The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).

The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR

16.505(b)(2)(i)(B).

A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).

To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).

Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).

The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41

U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

5. Rationale for Contracting Without Competition

In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs. The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement. Do not focus on the importance of the requirement; the issue is the rationale for not competing.

In supporting urgency, address the following: What are the unexpected facts or the unpredictable events that led to this situation? When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.

In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the Library’s needs.

We are authorized to limit competition on the basis of the citation in section 4 because:

Merging Technology Hapi converters support AES 67 standards for Audio over IP over the Ravenna network, which seamlessly allows routing and sharing of audio signals with the other current Merging Technologies equipment in the lab such as the Pyramix digital audio workstations and the other Merging Technologies HORUS converters over simple IT networks and cabling. This has been the backbone of the digital audio workstation (DAW) routing infrastructure. The Hapi converters will expand the capability of the system we have now and comply with planned future enhancements.

Additionally, the converters support high resolution PCM encoding, up to 384 kHz, and DSD (direct stream digital) encoding. This flexibility is critical to the operations of the Audio Lab, where certain recordings such as studio masters are digitized at both 192 kHz PCM .wav files as well as .dsd files at DSD256 fs. This is 256 times the sampling rate of the compact disc and Merging Technologies audio converters are the only converters on the market that support this ultra-high sample rate. Without this specific product the audio lab will not be capable of digitizing recordings to the highest standard. The Audio Lab has an embedded system of Merging Technologies hardware and software.

6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required

State what actions, if any, the program office can take to overcome barriers to competition before a contracting for this requirement again, such as:

using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”

To increase competition, we will:

The Audio Lab supervisor and myself will continue to monitor the industry for further developments and availability of archival grade turntables that meet our specifications. Particular attention will be paid to form factor and the ability to play non-standard disc sizes. If other suitable options become available future contracts will be full and open bidding with no brand name justification.

7. Program Office Certification

I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.

Audio Preservation Specialist 1/27/25

Name

Title

Signature

Date

0BPART 3 – CONTRACTING OFFICER DETERMINATIONS & CERTIFICATION

8. Efforts to Solicit from As Many Potential Sources As Practicable Unless a justification is based on FAR 6.302-2, Unusual and compelling urgency, contracting officers shall post justifications for other than full and open competition, including brand name justifications, to the Contract Opportunities website on sam.gov (or eBuy for Brand Name Justifications under FAR Part 8) prior to requesting a proposal or otherwise entering into negotiations.

Advance notice will be published in sam.gov for 15 days before a contract is awarded. FAR 5.203(a).

Advance or concurrent notice will be published in sam.gov for a reasonable time for commercial items FAR 5.203(a) and 12.204(b).

Advance notice will not be published because the action meets the following FAR exception:

Notice would compromise national security. FAR 5.202(a)(1).

Unusual and compelling urgency; notice period would seriously injure Government. FAR 5.202(a)(2).

Expressly authorized or required to be made through another Government agency. FAR 5.202(a)(4).

Order will be placed against an IDIQ contract awarded under FAR 16.5. FAR 5.202(a)(6).

Order will be placed against GSA schedule or other competitively-awarded contract. FAR 5.202(a)(11).

Other:

Advance notice will not be published per 41 U.S.C. § 6101; see attached deviation from the FAR per LCR 7-210 § 3.A.

We made the following efforts to interest potential sources in this award:

9. Listing of Sources That Expressed Interest in Writing

The following sources expressed interest in this award:

10. Additional Information

The following additional information is relevant to this justification and approval:

11. Contracting Officer Determination that Price Is Fair and Reasonable As explained in detail below, I have determined that the prices for this contracting action are fair and reasonable based on comparison of the prices to the following (see FAR 15.404-1(b)(2)):

Historical prices paid by the Government Published competitive price lists Library’s Independent Government Estimate Prices obtained through market research Other: Prices obtained through competitive proposals

The following analysis (based on attached pricing information) supports my determination:

12. Contracting Officer Determination of Responsibility Checked System for Award Management (or will check in the case of competitive proposals for a brand name product)

13. Contracting Officer Determination of Best Value I have determined that this action represents the best value to the Government because: A best value determination shall be determined before an award is made.

14. Contracting Officer Certification I certify that, to the best of my knowledge and belief, this justification is accurate and complete. For those actions up to $750,000, I approve contracting without competition for this requirement.

Name

Signature

__ 03/21/2025_____

Part 4 – Competition Advocate Approval (Required for actions valued at greater than $750,000)

Approved. Based on the information, determinations, and certifications provided by the program office and the contracting officer, and in accordance with the instructions below, I approve contracting without competition for this requirement.

Option periods: No Yes, Number through Date

Not Approved. As explained below, I do not approve contracting without competition for this requirement.

Comments or instructions:

________________________ Assist/Assoc General Counsel __________________________________ ________________ Name Title

Signature

Part 5 – Senior Procurement Executive (Required for actions valued at greater than $12,500,000)

17. Head of the Procurement Activity Approval

Approved. Based on the information, determinations, and certifications provided by the program office and the contracting officer, and in accordance with the instructions below, I approve contracting without competition for this requirement.

Not Approved. As explained below, I do not approve contracting without competition for this requirement.

Comments or instructions:

Name

Director, Contracts and Grants

Signature

File details come from the government source that posted it. Updated .