2025 Currier Watermain Replacement Project-Site Plans.pdf

PDF 8 MB Posted

Attached to
2025 CURRIER STREET WATER MAIN REPLACEMENT PROJECT
Solicitation number
20250331BE
Issued by
Wayne County, West Branch City, Michigan

About this file

The document is a detailed site plan set for the 2025 Currier Street Water Main Replacement Project for the City of Wayne, Michigan Engineering Department. The project involves replacing approximately 800 linear feet of 8-inch ductile iron pipe water main on Currier Street, with associated infrastructure improvements including 2,345 square yards of road and repair, 790 square feet of drive approach/sidewalk replacement, 3,170 square feet of sidewalk replacement, and 2,345 square yards of 6-inch thick aggregate base course. The project scope includes installing 3 each 8-inch gate valves and wells, 2 each 6-inch fire hydrants, and performing necessary roadway and utility infrastructure modifications.

The site plans provide comprehensive technical details including existing and proposed cross-sections, road profiles, water main profiles, sanitary profiles, and standard construction details for elements like concrete pavement joints, sidewalks, ramps, water service connections, and utility crossings. The documents are prepared by the City of Wayne Engineering Department, located at 3200 S. Wayne Road, Wayne, Michigan 48184, with contact information provided. The technical specifications and detailed drawings suggest a comprehensive municipal infrastructure renewal project focused on improving water distribution infrastructure and associated roadway elements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .