2025-509_Butterwort_Cliffs_Equipment_Specifications.pdf

PDF 83 KB Posted

Attached to
DNR Butterwort Cliffs Brush Removal REBID
Solicitation number
2000016538
Issued by
Clay County, Minnesota

About this file

This is an Equipment Specifications Form for solicitation #2025-509 from Cook County for Butterwort Cliffs Brust Removal near Grand Marais. The form outlines requirements for tracked equipment to be used on site, specifically calling for tracked skid steer or tracked crawler machinery. The contractor must operate only during dry or frozen conditions to avoid rutting and compaction, and equipment can only remain on site during the project without impeding public access or site management. The form requires detailed specifications for up to three pieces of equipment, including make/model, HP rating, hydraulic flow capacity, and cutting/mulching attachment specifications.

The form mandates that equipment operators must have a minimum of 150 hours of operating experience with the specified equipment type. Contractors must provide details for up to three operators, including their names and estimated hours of operating experience. The form concludes with fields for the contractor's signature, title, and date. No specific pricing terms, set-asides, or funding requirements are mentioned in this equipment specification document.

View the file

Other files

File Type Posted
DNR_Butterwort_Cliffs_Brush_Removal_REBID.pdf PDF
2025-509_Butterwort_Cliffs_Brush_Removal_REBID.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment Specifications Form 2025-509 Butterwort Cliffs Brust Removal

Cook County, Near Grand Marais Solicitation # 2025-509

CONTRACTOR NAME:

EQUIPMENT SPECIFICATIONS REQUIRED

The equipment used on site must be tracked, such as tracked skid steer or tracked crawler. The contractor must take every precaution to avoid rutting and compaction in the site. Do not operate in the site during wet conditions. Dry or frozen conditions are preferred. Equipment may only be left on site during the project and must not impede public use or access or other management at the site.

SPECIFY EQUIPMENT TO BE USED ON THIS PROJECT BELOW:

#1

MAKE/MODEL:

HP RATING:

HYDRAULIC FLOW CAPCITY:

CUTTING/MULCHING ATTACHMENT MAKE/MODEL(S) :

#2

MAKE/MODEL:

HP RATING:

HYDRAULIC FLOW CAPCITY:

CUTTING/MULCHING ATTACHMENT MAKE/MODEL(S) :

#3

MAKE/MODEL:

HP RATING:

HYDRAULIC FLOW CAPCITY:

CUTTING/MULCHING ATTACHMENT MAKE/MODEL(S) :

OPERATOR EXPERIENCE:

The operator(s) must have a minimum of 150 hours of experience in operating the type of equipment to be used on the project.

NAME OF OPERATOR #1: Estimated hours operating experience:

NAME OF OPERATOR #2: Estimated hours operating experience:

NAME OF OPERATOR #3: Estimated hours operating experience:

Signature of Contractor Title Date

File details come from the government source that posted it. Updated .