2025_300_Peachtree Court Sewer 01_10_2025.pdf

PDF 10 MB Posted

Attached to
Peachtree Court Sanitary Sewer
Solicitation number
PE-33879-NONST-2025-000000004
Issued by
Dodge County, Georgia

About this file

This document is an Erosion, Sedimentation, and Pollution Control (ES&PC) Plan for the Peachtree Court Sanitary Sewer project located in Peachtree City, Fayette County, Georgia, prepared by Rochester & Associates, LLC. The project involves the installation of a sanitary sewer line along Peachtree Court, with detailed engineering plans and specifications for erosion control, site stabilization, and environmental protection. The plan is dated January 10, 2025, and includes comprehensive documentation for land-disturbing activities, including site grading, vegetation establishment, and sediment control measures.

The ES&PC Plan provides extensive technical specifications for dust control, permanent vegetation establishment, concrete washout procedures, and construction site management. The document includes detailed checklist requirements from the Georgia Soil and Water Conservation Commission, covering items such as GPS locations, drainage basin delineation, soil series identification, and specific erosion control practices. The plan emphasizes environmental protection through measures like maintaining 25-foot undisturbed stream buffers, implementing sediment storage requirements, and ensuring proper vegetative stabilization with specific grass and plant species recommended for the region. The technical specifications include precise guidelines for soil preparation, seeding, fertilization, mulching, and long-term site maintenance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.Georgia811.com rochester-assoc.com

770.716.8123 p | 770.716.8124 f 286 Hwy 314, Ste A, Fayetteville, GA 30214

Sheet List Table

0.

8.

p w w w .ro ch es te r-as so c.

co m

O ak S t N W

, G ai ne sv ill e, G A

R oc he st er

A ss oc ia te s, L

LC

GENERAL SITE NOTES: NO MATERIAL IS TO BE BURNED ON SITE. ALL WASTE MATERIAL SHALL

BE DISPOSED OF AT A PERMITTED OFFSITE LANDFILL

THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE

PLACE PRIOR TO OR CONCURRENT WITH LAND DISTURBING ACTIVITIES

ALL IMPROVEMENTS TO CONFORM WITH THE PEACHTREE CITY

CONSTRUCTION STANDARDS

NOTIFY PEACHTREE CITY 24 HOURS BEFORE STARTING EACH PHASE OF

CONSTRUCTION

ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSPECTED

DAILY AND ANY DEFICENCIES NOTED WILL BE CORRECTED BY THE END

OF EACH DAY. ADDITIONAL EROSION CONTROL MEASURES WILL BE

INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTOR.

MAXIMUM CUT OR FILL SLOPES ON SITE ARE 2 HORIZONTAL TO 1 VERTICAL

REVISION LOG SUBMISSION LOG

SURVEY CONTROL NOTE:

EROSION CONTROL NOTES: SANITARY SEWER SPECIFICATIONS:CONSTRUCTION NOTES:

P/T

P/T

P/T

P/T

P/T

P/T

TT

T

T

T

T

T

T

T

CITY OF PEACHTREE CITY

UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE

UE

UE

UE

UE

UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE

UE

UE

UE

WWWWWWWWWWWWWWWWWWWWWWW

W

W

W

W

W

W

W

UE

UCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUC

UC

UCUCUCUCUC

UCUCUCUCUCUCUC

UCUCUCUCUCUCUCUC

UC

UCUCUCUCUCUCUCUCUCUCUCUCUCUCUC

UC

UC

UCUCUCUCUCUCUC UC

UC

UC

GGGG

FAYETTE COUNTY

SS

0.

8.

p w w w .ro ch es te r-as so c.

co m

O ak S t N W

, G ai ne sv ill e, G A

R oc he st er

A ss oc ia te s, L

LC

P/T

P/T

P/T

P/T

P/T

TT

T

T

T

T

T

T

T

UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE

UE

UE

UE

UE

UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE

UE

UE

UE

WWWWWWWWWWWWWWWWWWWWWWW

W

W

W

W

W

W

W

UE

UCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUC

UC

UCUCUCUCUC

UCUCUCUCUCUCUC

UCUCUCUCUCUCUCUC

UC

UCUCUCUCUCUCUCUCUCUCUCUCUCUCUC

UC

UC

UCUCUCUCUCUCUC UC

UC

UC

GGGGSS

HORIZ. SCALE: 1"=50'

VERT. SCALE: 1"=10'

0.

8.

p w w w .ro ch es te r-as so c.

co m

O ak S t N W

, G ai ne sv ill e, G A

R oc he st er

A ss oc ia te s, L

LC

0.

8.

p w w w .ro ch es te r-as so c.

co m

O ak S t N W

, G ai ne sv ill e, G A

R oc he st er

A ss oc ia te s, L

LC

MAINTENANCE STATEMENT:

ALL EROSION AND SEDIMENT CONTROL MEASURES

WILL BE CHECKED DAILY AND ANY DEFICIENCIES

NOTED WILL BE CORRECTED BY THE END OF EACH

DAY. ADDITIONAL EROSION AND SEDIMENT CONTROL

MEASURES WILL BE INSTALLED IF DEEMED

NECESSARY AFTER ON-SITE INSPECTION BY THE

ISSUING AUTHORITY.

INSTALLATION STATEMENT:

THE INSTALLATION OF EROSION CONTROL

MEASURES AND PRACTICES SHALL TAKE PLACE

PRIOR TO OR CONCURRENT WITH LAND DISTURBING

ACTIVITIES.

ALL CUT AND FILL SLOPES MUST BE SURFACE

ROUGHENED AND VEGETATED WITHIN (3) DAYS OF

THEIR COMPLETION.

ALL FILL SLOPES WILL HAVE SILT FENCE AT TOE OF

SLOPE. - CLEARING LIMITS SHALL BE CLEARLY

DELINEATED WITH EITHER TREE SAVE FENCE OR

OTHER SUITABLE MEANS.

0.

8.

p w w w .ro ch es te r-as so c.

co m

H ig hw ay

, S ui te

A , F ay et te vi lle , G

A

24 HOUR EMERGENCY CONTACT

ENGINEERING CONTACT

SURVEYING CONTACT

OWNER/DEVELOPER CONTACT

Georgia Soil and Water Conservation Commission

CERTIFICATION NUMBER________________

ISSUED: __________ EXPIRES: __________

CONSTRUCTION SCHEDULE Month 1 Month 2 Month 3

EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN CHECKLIST

INFRASTRUCTURE PROJECTS

SWCD: PEACHTREE CITY

PROJECT NAME: PEACHTREE COURT SANITARY SEWER

ADDRESS: PEACHTREE CT, ----

City/County: CITY OF PEACHTREE CITY, FAYETTE COUNTY, GEORGIA Date on Plans: 01/10/2025

Name & email of person filling out checklist: JEFF COLLINS, PE, jncollins@rochester-assoc.com Plan Included

TO BE SHOWN ON ES&PC PLAN

Page # Y/N

6 Y 1 The applicable Erosion, Sedimentation and Pollution Control Plan Checklist established by the Commission as of January 1 of the year in which the land-disturbing activity was permitted. (The completed Checklist must be submitted with the ES&PC Plan or the Plan will not be reviewed)

6-10 Y 2 Level II certification number issued by the Commission, signature and seal of the certified design professional. (Signature, seal and Level II number must be on each sheet pertaining to ES&PC plan or the Plan will not be reviewed)

6 Y 3 The name and phone number of the 24-hour contact responsible for erosion, sedimentation and pollution controls.

6 Y 4 Provide the name, address, email address, and phone number of primary permittee.

6 Y 5 Note total and disturbed acreage of the project or phase under construction.

7 Y 6 Provide the GPS Locations of the beginning and end of the infrastructure project. Give the Latitude and Longitude in decimal degrees.

ALL Y 7 Initial date of the Plan and the dates of any revisions made to the Plan including the entity who requested the revisions.

6 Y 8 Descriptions of the nature of construction activity and existing site conditions.

1 Y 9 Provide vicinity map showing site’s relation to surrounding areas. Include designation of specific phase, if necessary.

6 Y 10 Identify the project receiving waters and describe all sensitive adjacent areas including streams, lakes, residential areas, wetlands, marshlands, etc. which may be affected.

6 Y 11 Design professional's certification statement and signature that the site was visited prior to development of the ES&PC Plan as stated on Part IV page 21 of the permit.

N/A N 12 Design professional's certification statement and signature that the permittee’s ES&PC Plan provides for an appropriate and comprehensive system of BMPs and sampling to meet permit requirements as stated on Part IV page 20 of the permit.*

N/A N 13 Design professional's certification statement and signature that the permittee’s ES&PC Plan provides for representative sampling as stated on Part IV.D.6.c.(3) page 37 of the permit as applicable.*

N/A N 14 Clearly note the statement that "The design professional who prepared the ES&PC Plan is to inspect the installation of the initial sediment storage requirements, perimeter control BMPs, and sediment basins within 7 days after installation." in accordance with Part IV.A.5 page 26 of the permit.*

6 Y 15 Clearly note the statement that "Non-exempt activities shall not be conducted within the 25 or 50-foot undisturbed stream buffers as measured from the Jurisdictional Determination Line without first acquiring the necessary variances and permits."

6 N 16 Provide a description of any buffer encroachments and indicate whether a buffer variance is required.

N/A N 17 Clearly note the statement that "Amendments/revisions to the ES&PC Plan which have a significant effect on BMPs with a hydraulic component must be certified by the design professional." *

N/A N 18 Clearly note the statement that "Waste materials shall not be discharged to waters of the State, except as authorized by a Section 404 permit." *

6 Y 19 Clearly note statement that "The escape of sediment from the site shall be prevented by the installation of erosion and sediment control measures and practices prior to land disturbing activities."

6 Y 20 Clearly note statement that "Erosion control measures will be maintained at all times. If full implementation of the approved Plan does not provide for effective erosion control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."

6 Y 21 Clearly note the statement "Any disturbed area left exposed for a period greater than 14 days shall be stabilized with mulch or temporary seeding."

N/A N 22 Any construction activity which discharges storm water into an Impaired Stream Segment, or within 1 linear mile upstream of and within the same watershed as, any portion of an Biota Impaired Stream Segment must comply with Part III. C. of the permit. Include the completed Appendix 1 listing all the BMPs that will be used for those areas of the site which discharge to the Impaired Stream Segment. *

N/A N 23 If a TMDL Implementation Plan for sediment has been finalized for the Impaired Stream Segment (identified in Item 22 above) at least six months prior to submittal of NOI, the ES&PC Plan must address any site-specific conditions or requirements included in the TMDL Implementation Plan. *

N/A N 24 BMPs for concrete washdown of tools, concrete mixer chutes, hoppers and the rear of the vehicles. Washout of the drum at the construction site is prohibited. *

6 Y 25 Provide BMPs for the remediation of all petroleum spills and leaks.

N/A N 26 Description of the measures that will be installed during the construction process to control pollutants in storm water that will occur after construction operations have been completed. *

N/A N 27 Description of practices to provide cover for building materials and building products on site. * N/A N 28 Description of the practices that will be used to reduce the pollutants in storm water discharges. *

6 Y 29 Description and chart or timeline of the intended sequence of major activities which disturb soils for the major portions of the site (i.e., initial perimeter and sediment storage BMPs, clearing and grubbing activities, excavation activities, utility activities, temporary and final stabilization).

N/A N 30 Provide complete requirements of inspections and record keeping by the primary permittee. * N/A N 31 Provide complete requirements of sampling frequency and reporting of sampling results. * N/A N 32 Provide complete details for retention of records as per Part IV.F. of the permit. * N/A N 33 Description of analytical methods to be used to collect and analyze the samples from each location. * N/A N 34 Appendix B rationale for NTU values at all outfall sampling points where applicable. *

N/A N 35 Delineate all sampling locations, perennial and intermittent streams and other water bodies into which storm water is discharged also provide a summary chart of the justification and analysis for the representative sampling as applicable. *

N/A N 36

A description of appropriate controls and measures that will be implemented at the construction site including:(1) initial sediment storage requirements and perimeter control BMPs, (2) intermediate grading and drainage BMPs, and (3) final BMPs. For construction sites where there will be no mass grading and the initial perimeter control BMPs, intermediate grading and drainage BMPs, and final BMPs are the same, the Plan may combine all of the BMPs into a single phase. *

7 Y 37 Graphic scale and North arrow.

7 Y 38

Existing and proposed contour lines with contour lines drawn at an interval in accordance with the following:

Existing Contours USGS 1":2000' Topographical Sheets Proposed Contours 1":400' Centerline Profile

6 N 39 Use of alternative BMPs whose performance has been documented to be equivalent to or superior to conventional BMPs as certified by a Design Professional (unless disapproved by GAEPD or the Georgia Soil and Water Conservation Commission). Please refer to the Alternative BMP Guidance Document found at www.gaswcc.georgia.gov.

N/A N 40 Use of alternative BMP for application to the Equivalent BMP List. Please refer to Appendix A-2 of the Manual for Erosion & Sediment Control in Georgia 2016 Edition. *

6 N 41 Delineation of the applicable 25-foot or 50-foot undisturbed buffers adjacent to state waters and any additional buffers required by the Local Issuing Authority. Clearly note and delineate all areas of impact.

6 N 42 Delineation of on-site wetlands and all state waters located on and within 200 feet of the project site.

7 Y 43 Delineation and acreage of contributing drainage basins on the project site.

7 Y 44 Delineate on-site drainage and off-site watersheds using USGS 1":2000' topographical sheets.

6 Y 45 An estimate of the runoff coefficient or peak discharge flow of the site prior to and after construction activities are completed.

7 Y 46 Storm-drain pipe and weir velocities with appropriate outlet protection to accommodate discharges without erosion. Identify/Delineate all storm water discharge points.

7 Y 47 Soil series for the project site and their delineation.

7 Y 48 The limits of disturbance for each phase of construction.

6 Y 49

Provide a minimum of 67 cubic yards of sediment storage per acre drained using a temporary sediment basin, retrofitted detention pond, and/or excavated inlet sediment traps for each common drainage location. Sediment storage volume must be in place prior to and during all land disturbance activities until final stabilization of the site has been achieved. A written justification explaining the decision to use equivalent controls when a sediment basin is not attainable must be included in the Plan for each common drainage location in which a sediment basin is not provided. A written justification as to why 67 cubic yards of storage is not attainable must also be given. Worksheets from the Manual included for structural BMPs and all calculations used by the design professional to obtain the required sediment when using equivalent controls.

When discharging from sediment basins and impoundments, permittees are required to utilize outlet structures that withdraw water from the surface, unless infeasible. If outlet structures that withdraw water from the surface are not feasible, a written justification explaining this decision must be included in the Plan.

7 Y 50 Location of Best Management Practices that are consistent with and no less stringent than the Manual for Erosion and Sediment Control in Georgia. Use uniform coding symbols from the Manual, Chapter 6, with legend.

10-## Y 51 Provide detailed drawings for all structural practices. Specifications must, at a minimum, meet the guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.

8-## Y 52 Provide vegetative plan, noting all temporary and permanent vegetative practices. Include species, planting dates and seeding, fertilizer, lime and mulching rates. Vegetative plan shall be site specific for appropriate time of year that seeding will take place and for the appropriate geographic region of Georgia.

*If using this checklist for a project that is less than 1 acre and not part of a common development but within 200 ft of a perennial stream the * checklist items would be N/A.

S means separate from Plan Set

Effective January 1, 2023

P/T

P/T

P/T

P/T

P/T

TT

T

T

T

T

T

T

T

UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE

UE

UE

UE

UE

UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE

UE

UE

UE

WWWWWWWWWWWWWWWWWWWWWWW

W

W

W

W

W

W

W

UE

UCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUCUC

UC

UCUCUCUCUC

UCUCUCUCUCUCUC

UCUCUCUCUCUCUCUC

UC

UCUCUCUCUCUCUCUCUCUCUCUCUCUCUC

UC

UC

UCUCUCUCUCUCUC UC

UC

UC

GGGGSS

Co Sd2-P

Sd2-P

SOIL TYPE

CeC

SOIL TYPE

CeB

SOIL TYPE

CfC2

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeB

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CeC

SOIL TYPE

CfC2

SOIL TYPE

CeB

G

EO

RG

IA

H W

Y

PEACHTREE COURT

0.

8.

p w w w .ro ch es te r-as so c.

co m

O ak S t N W

, G ai ne sv ill e, G A

R oc he st er

A ss oc ia te s, L

LC

Co

STRUCTURAL PRACTICES STRUCTURAL PRACTICES

VEGETATIVE PRACTICES

CODE PRACTICE DETAIL DESCRIPTIONMAP

SYMBOL CODE PRACTICE DETAIL DESCRIPTIONMAP

SYMBOL

CODE PRACTICE DETAIL DESCRIPTIONMAP

SYMBOL

Bf Bf

Cs Cs

Ds1 Ds1

Ds2 Ds2

Ds3 Ds3

Ds4 Ds4

Du Du

Fl-Co Fl-Co

Sb Sb

Ss Ss

Tac Tac

Cd

Ch

Co Co

Cr Cr

Dc

Di

Dn1 Dn1

Dn2 Dn2

Fr

Ga

Gr Gr

Lv

Rd

Re Re

Rt Rt

Sd1

Sd2

Sd3 Sd3

Sd4

Sk Sk

Spb

Spb

Sr Sr

St St

Su Su

Tc Tc

Tp Tp

Tr

Wt

TREATMENT SPECIFICATIONS

DEFINITION

Controlling surface and air movement of dust on construction sites, roads, and demolition sites.

PURPOSE

•To prevent surface and air movement of dust from exposed soil surfaces.

•To reduce the presence of airborne substances which may be harmful or injurious to human health, welfare, or safety, or to animals or plant life.

CONDITIONS

This practice is applicable to areas subject to surface and air movement of dust where on and off-site damage may occur without treatment.

METHOD AND MATERIALS

A. Temporary Methods Mulches. See standard Ds1 - Disturbed Area Stabilization (With Mulching Only). Synthetic resins may be used instead of asphalt to bind mulch material. Refer to specification Tac - Tackifiers.

Resins such as Curasol or Terratack should be used according to manufacturer’s recommendations.

Vegetative Cover. See specification Ds2 - Disturbed Area Stabilization (With Temporary Seeding).

Spray-on Adhesives. These are used on mineral soils (not effective on muck soils). Keep traffic off these areas. Refer to specification Tac - Tackifiers.

Tillage. This practice is designed to roughen and bring clods to the surface. It is an emergency measure which should be used before wind erosion starts. Begin plowing on windward side of site. Chisel-type plows spaced about 12 inches apart, spring-toothed harrows, and similar plows are examples of equipment which may produce the desired effect.

Irrigation. This is generally done as an emergency treatment. Site is sprinkled with water until the surface is wet. Repeat as needed.

Barriers. Solid board fences, snowfences, burlap fences, crate walls, bales of hay and similar material can be used to control air currents and soil blowing. Barriers placed at right angles to prevailing currents at intervals of about 15 times their height are effective in controlling wind erosion.

Calcium Chloride. Apply at rate that will keep surface moist. May need retreatment.

B. Permanent Methods

Permanent Vegetation. See specification Ds3 -Disturbed Area Stabilization (With Permanent Vegetation). Existing trees and large shrubs may afford valuable protection if left in place.

Topsoiling. This entails covering the surface with less erosive soil material. See specification Tp - Topsoiling.

Stone. Cover surface with crushed stone or coarse gravel. See specification Cr-Construction Road Stabilization.

Du DUST CONTROL ON

DISTURBED AREA

0.

8.

p w w w .ro ch es te r-as so c.

co m

H ig hw ay

, S ui te

A , F ay et te vi lle , G

A

DISTURBED AREA STABILIZATION

(WITH PERMANENT VEGETATION)

DEFINITION

The planting of perennial vegetation such as trees, shrubs, vines, grasses, or legumes on exposed areas for final permanent stabilization. Permanent perennial vegetation shall be used to achieve final stabilization.

PURPOSE

-To protect the soil surface from erosion -To reduce damage from sediment and runoff to down-stream areas -To improve wildlife habitat and visual resources -To improve aesthetics

REQUIREMENT FOR REGULATORY COMPLIANCE

This practice shall be applied immediately to rough graded areas that will be undisturbed for longer than six months. This practice or sodding shall be applied immediately to all areas at final grade. Final Stabilization means that all soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by the GA EPD for waste disposal, 100% of the soil surface is uniformly covered in permanent vegetation with a density of 70% or greater, or landscaped ac- cording to the Plan (uniformly covered with landscaping materials in planned landscaped areas), or equivalent permanent stabilization measures.

Permanent vegetation shall consist of, planted trees, shrubs, perennial vines; or a crop of perennial vegetation appropriate for the region, such that within the growing season a 70% coverage by perennial vegetation shall be achieved. Final stabilization applies to each phase of construction. For linear construction projects on land used for agricultural or silvicultural purposes, final stabilization may be accomplished by stabilizing the disturbed land for its agricultural or silvicultural use. Until this standard is satisfied and permanent control measures and facilities are operational, interim stabilization measures and temporary erosion and sedimentation control measures shall not be removed.

CONDITIONS

Permanent perennial vegetation is used to provide a protective cover for exposed areas including cuts, fills, dams, and other denuded areas.

PLANNING CONSIDERATIONS

-Use conventional planting methods where possible.

-When mixed plantings are done during marginal planting periods, companion crops shall be used.

-No-till planting is effective when planting is done following a summer or winter annual cover crop. Sericea lespedeza planted no-till into stands of rye is an excellent procedure.

-Block sod provides immediate cover. It is especially effective in controlling erosion adjacent to concrete flumes and other structures. Refer to Specification Ds4-Disturbed Area Stabilization (With Sodding).

-Irrigation should be used when the soil is dry or when summer plantings are done.

-Low maintenance plants, as well as natives, should be used to ensure long-lasting erosion control.

-Mowing should not be performed during the quail nesting season (May to September).

-Wildlife plantings should be included in critical area plantings.

Wildlife Plantings Commercially available plants beneficial to wildlife species include the following:

Mast Bearing Trees

Beech, Black Cherry, Blackgum, Chestnut, Chinkapin, Hackberry, Hickory, Honey Locust, Native Oak, Persimmon, Sawtooth Oak and Sweetgum.

All trees that produce nuts or fruits are favored by many game species. Hickory provides nuts used mainly by squirrels and bear.

Shrubs and Small Trees

Bayberry, Bicolor Lespedeza, Crabapple, Dog- wood, Huckleberry or Native Blueberry, Mountain Laurel, Native Holly, Red Cedar, Red Mulberry, Sumac, Wax Myrtle, Wild Plum and Blackberry.

Plant in patches without tall trees to develop stable shrub communities. All produce fruits used by many kinds of wildlife, except for lespedeza which produces seeds used by quail and songbirds.

Grasses, Legumes, Vines and Temporary Cover

Bahiagrass, Bermudagrass, Grass-Legume mixtures, Partridge Pea, Annual Lespedeza, Orchardgrass (for mountains), Browntop Millet (for temporary cover), and Native grapes.

Provides herbaceous cover in clearings for a game bird brood-rearing habitat. Appropriate legumes such as vetches, clovers, and lespedezas may be mixed with grass, but they may die out after a few years.

CONSTRUCTION SPECIFICATIONS

Grading and Shaping Grading and shaping may not be required where hydraulic seeding and fertilizing equipment is to be used. Vertical banks shall be sloped to enable plant establishment.

When conventional seeding and fertilizing are to be done, grade and shape where feasible and practical, so that equipment can be used safely and efficiently during seedbed preparation, seeding, mulching and maintenance of the vegetation.

Concentrations of water that will cause excessive soil erosion shall be diverted to a safe outlet.

Diversions and other treatment practices shall conform with the appropriate standards and specifications.

Lime and Fertilizer Rates and Analysis Agricultural lime is required at the rate of one to two tons per acre unless soil tests indicate otherwise. Graded areas require lime application. If lime is applied within six months of planting permanent perennial vegetation, additional lime is not required. Agricultural lime shall be within the specifications of the Georgia Department of Agriculture.

Lime spread by conventional equipment shall be “ground limestone.” Ground limestone is calcitic or dolomitic limestone ground so that 90 percent of the material will pass through a 10-mesh sieve, not less than 50 percent will pass through a 50-mesh sieve and not less than 25 percent will pass through a 100-mesh sieve.

Fast-acting lime spread by hydraulic seeding equipment should be “finely ground limestone” spanning from the 180 micron size to the 5 micron size. Finely ground limestone is calcitic or dolomitic limestone ground so that 95 percent of the material will pass through a 100-mesh sieve.

It is desirable to use dolomitic limestone in the Sand Hills, Southern Coastal Plain and Atlantic Coast Flatwoods MLRAs. (See Figure 6-4.1)

Agricultural lime is generally not required where only trees are planted.

Initial fertilization, nitrogen, topdressing, and maintenance fertilizer requirements for each species or combination of species are listed in Table 6-5.1.

Lime and Fertilizer Application When hydraulic seeding equipment is used, the initial fertilizer shall be mixed with seed, innoculant (if needed), and wood cellulose or wood pulp fiber mulch and applied in a slurry. The innoculant, if needed, shall be mixed with the seed prior to being placed into the hydraulic seeder. The slurry mixture will be agitated during application to keep the ingredients thoroughly mixed. The mixture will be spread uniformly over the area within one hour after being placed in the hydroseeder.

Finely ground limestone can be applied in the mulch slurry or in combination with the top dressing.

When conventional planting is to be done, lime and fertilizer shall be applied uniformly in one of the following ways:

-Apply before land preparation so that it will be mixed with the soil during seedbed preparation.

-Mix with the soil used to fill the holes, distribute in furrows.

-Broadcast after steep surfaces are scarified, pitted or trenched.

-A fertilizer pellet shall be placed at root depth in the closing hole beside each pine tree seedling.

Plant Selection Refer to Tables 6-4.1, 6-5.2, 6-5.3 and 6-5.4 for approved species. Species not listed shall be approved by the State Resource Conservationist of the Natural Resources Conservation Service before they are used.

Plants shall be selected on the basis of species characteristics, site and soil conditions, planned use and maintenance of the area; time of year of planting, method of planting; and the needs and desires of the land user.

Some perennial species are easily established and can be planted alone. Examples of these are Common Bermuda, Tall Fescue, and Weeping Lovegrass.

Other perennials, such as Bahia Grass and Seri- cea Lespedeza, are slow to become established and should be planted with another perennial spe- cies. The additional species will provide quick cover and ample soil protection until the target perennial species become established. For example, Common seeding combinations are 1) Weeping Lovegrass with Sericea Lespedeza (scarified) and 2) Tall Fescue with Sericea Lespedeza (unscarified).

Plant selection may also include annual companion crops. Annual companion crops should be used only when the perennial species are not planted during their optimum planting period. A common mixture is Brown Top Millet with Common Bermuda in mid-summer. Care should be taken in selecting companion crop species and seeding rates because annual crops will compete with perennial species for water, nutrients, and growing space. A high seeding rate of the companion crop may prevent the establishment of perennial species.

Ds3 CONTINUED Ryegrass shall not be used in any seeding mixtures containing perennial species due to its ability to out-compete desired species chosen for permanent perennial cover.

Seed Quality The term “pure live seed” is used to express the quality of seed and is not shown on the label.

Pure live seed, PLS, is expressed as a percent- age of the seeds that are pure and will germinate. Information on percent germination and purity can be found on seed tags. PLS is deter- mined by multiplying the percent of pure seed with the percent of germination; i.e., (PLS = % germination x % purity)

EXAMPLE:

Common Bermuda seed 70% germination, 80% purity -PLS = 70% germination x 80% purity PLS = 56% The percent of PLS helps you determine the amount of seed you need. If the seeding rate is 10 pounds PLS and the bulk seed is 56 % PLS, the bulk seeding rate is:

-10 lbs. PLS/acre = 17.9 lbs/acre

56% PLS

-You would need to plant 17.9 lbs/acre to provide 10 lbs/acre of pure live seed.

Seedbed Preparation Seedbed preparation may not be required where hydraulic seeding and fertilizing equipment is to be used (but is strongly recommended for any seeding process, when possible). When conventional seeding is to be used, seedbed preparation will be done as follows:

Broadcast plantings

-Tillage, at a minimum, shall adequately loosen the soil to a depth of 4 to 6 inches; alleviate compaction; incorporate lime and fertilizer; smooth and firm the soil; allow for the proper placement of seed, sprigs, or plants; and allow for the anchoring of straw or hay mulch if a disk is to be used.

-Tillage may be done with any suitable equipment.

-Tillage should be done on the contour where feasible.

-On slopes too steep for the safe operation of tillage equipment, the soil surface shall be pitted or trenched across the slope with appropriate hand tools to provide two places 6 to 8 inches apart in which seed may lodge and germinate. Hydraulic seeding may also be used.

Individual Plants

-Where individual plants are to be set, the soil shall be prepared by excavating holes, opening furrows, or dibble planting.

-For nursery stock plants, holes shall be large enough to accommodate roots without crowding.

-Where pine seedlings are to be planted, subsoil under the row 36 inches deep on the contour four to six months prior to planting. Subsoiling should be done when the soil is dry, preferably in August or September.

Innoculants All legume seed shall be inoculated with appropriate nitrogenfixing bacteria. The innoculant shall be a pure culture prepared specifically for the seed species and used within the dates on the container.

A mixing medium recommended by the manufacturer shall be used to bond the innoculant to the seed. For conventional seeding, use twice the amount of innoculant recommended by the manufacturer. For hydraulic seeding, four times the amount of innoculant recommended by the manufacturer shall be used.

All inoculated seed shall be protected from the sun and high temperatures and shall be planted the same day inoculated. No inoculated seed shall remain in the hydroseeder longer than one hour.

Planting Hydraulic Seeding Mix the seed (innoculated if needed), fertilizer, and wood cellulose or wood pulp fiber mulch with water and apply in a slurry uniformly over the area to be treated. Apply within one hour after the mixture is made.

Conventional Seeding Seeding will be done on a freshly prepared and fi rmed seedbed. For broadcast planting, use a culti-packer-seeder, drill, rotary seeder, other mechanical seeder, or hand seeding to distribute the seed uniformly over the area to be treated. Cover the seed lightly with 1/8 to 1/4 inch of soil for small seed and 1/2 to 1 inch for large seed when using a cultipacker or other suitable equipment.

No-Till Seeding No-till seeding is permissible into annual cov- er crops when planting is done following maturity of the cover crop or if the temporary cover stand is sparse enough to allow adequate growth of the permanent (perennial) species. No-till seed- ing shall be done with appropriate no-till seeding equipment. The seed must be uniformly distrib- uted and planted at the proper depth.

Individual Plants Shrubs, vines and sprigs may be planted with appropriate planters or hand tools. Pine trees shall be planted manually in the subsoil furrow. Each plant shall be set in a manner that will avoid crowding the roots.

Nursery stock plants shall be planted at the same depth or slightly deeper than they grew at the nursery. The tips of vines and sprigs must be at or slightly above the ground surface.

Where individual holes are dug, fertilizer shall be placed in the bottom of the hole, two inches of soil shall be added and the plant shall be set in the hole.

Mulching Mulch is required for all permanent vegetation applications. Mulch applied to seeded areas shall achieve 75% to 100% soil cover. When selecting a mulch, design professionals should consider the mulch's functional longevity, vegetation establishment enhancement, and erosion control effectiveness. Select the mulching material from the following and apply as indicated:

-Dry straw or dry hay of good quality and free of weed seeds can be used. Dry straw shall be applied at the rate of 2 tons per acre. Dry hay shall be applied at a rate of 2 1/2 tons per acre.

-Wood cellulose mulch or wood pulp fiber shall be used with hydraulic seeding. It shall be applied at the rate of 500 pounds per acre. Dry straw or dry hay shall be applied (at the rate indicated above) after hydraulic seeding.

-One thousand pounds of wood cellulose or wood pulp fiber, which includes a tackifier, shall be used with hydraulic seeding on slopes 3/4:1 or steeper.

-Sericea Lespedeza hay containing mature seed shall be applied at a rate of three tons per acre.

-Pine straw or pine bark shall be applied at a thickness of 3 inches for bedding purposes. Other suitable materials in sufficient quantity may be used where ornamentals or other ground covers are planted. This is not appropriate for seeded areas.

-When using temporary erosion control blan-kets or block sod, mulch is not required.

-Bituminous treated roving may be applied on planted areas, slopes, in ditches or dry water-ways to prevent erosion. Bituminous treated roving shall be applied within 24 hours after an area has been planted. Application rates and materials must meet Georgia Depart- ment of Transportation specifications.

Wood cellulose and wood pulp fibers shall not contain germination or growth inhibiting factors.

They shall be evenly dispersed when agitated in water. The fibers shall contain a dye to allow visual metering and aid in uniform application during seeding.

Applying Mulch Straw or hay mulch will be spread uniformly within 24 hours after seeding and/or planting. The mulch may be spread by blower-type spreading equipment, other spreading equipment or by hand. Mulch shall be applied to cover 75% of the soil surface.

Wood cellulose or wood fiber mulch shall be applied uniformly with hydraulic seeding equipment.

Anchoring Mulch Anchor straw or hay mulch immediately after application by one of the following methods:

-Hay and straw mulch shall be pressed into the soil immediately after the mulch is spread. A special “packer disk”' or disk harrow with the disks set straight may be used. The disks may be smooth or serrated and should be 20 inches or more in diameter and 8 to 12 inches apart. The edges of the disks shall be dull enough to press the mulch into the ground without cutting it, leaving much of it in an erect position. Mulch shall not be plowed into the soil.

-Synthetic tackifiers, binders or hydraulic mulch specifi cally designed to tack straw, shall be applied in conjunction with or im- mediately after the mulch is spread. Syn- thetic tackifi ers shall be mixed and applied according to manufacturer's specifications. All tackifi ers, binders or hydraulic mulch specifi cally designed to tack straw should be verifi ed nontoxic through EPA

2021.0 testing. Refer to Tackifi ers-Tac -Rye or wheat can be included with Fall and Winter plantings to stabilize the mulch. They shall be applied at a rate of one-quarter to one-half bushel per acre.

-Plastic mesh or netting with mesh no larger than one inch by one inch may be needed to anchor straw or hay mulch on unstable soils and concentrated flow areas. These materials shall be installed and anchored according to manufacturer's specifications.

Bedding Material Mulch is used as a bedding material to con- serve moisture and control weeds in nurseries, ornamental beds, around shrubs, and on bare areas on lawns.

Material Depth Grain straw 4” to 6” Grass Hay 4” to 6” Pine needles 3” to 5” Wood waste 4” to 6”

Irrigation Irrigation will be applied at a rate that will not cause runoff.

Topdressing Topdressing will be applied on all temporary and permanent (perennial) species planted alone or in mixtures with other species. Recommended rates of application are listed in Table 6-5.1.

Second Year and Maintenance Fertilization Second year fertilizer rates and maintenance fertilizer rates are listed in Table 6-5.1.

Lime Maintenance Application Apply one ton of agricultural lime every 4 to 6 years or as indicated by soil tests. Soil tests can be conducted to determine more accurate requirements. if desired.

Use and Management -Mow Sericea Lespedeza only after frost to ensure that the seeds are mature. Mow between November and March.

-Bermudagrass, Bahiagrass and Tall Fescue may be mowed as desired. Maintain at least 6 inches of top growth under any use and management. Moderate use of top growth is beneficial after establishment.

-Exclude traffic until the plants are well established. Because of the quail nesting season, mowing should not take place between May and September.

Ds3 TABLE 6-5.2 - PERMANENT COVER CROPS

PLANT, PLANTING RATE, AND PLANTING DATE FOR PERMANENT COVER

Ds3

0.

8.

p w w w .ro ch es te r-as so c.

co m

H ig hw ay

, S ui te

A , F ay et te vi lle , G

A

CONCRETE WASHOUT BASIN

CONCRETE

WASHOUT

A A

CRUSHED STONE CONSTRUCTION EXIT

CROSS SECTION

Co

HARD SURFACE PUBLIC ROAD

SEDIMENT TRAP (SEE NOTE 8)

CULVERT UNDER

ENTRANCE

(IF NEEDED)

DIVERSION RIDGE

(SEE NOTE 6)

COARSE AGGREGATE

(N.S.A. R-2 (1.5"-3.5") )

GEOTEXTILE UNDERLINER

TIRE WASH RACK AREA /

TIRE WASHERS

SUPPLY WATER TO WASH

WHEELS IF NECESSARY

GEOTEXTILE UNDERLINER

COARSE AGGREGATE (N.S.A. R-2)

ORIGINAL GRADE

SECTION B-B

4"

CURB INLET FILTER "PIGS IN BLANKET"

4"

PLAN

Sd2-P

0.

8.

p w w w .ro ch es te r-as so c.

co m

H ig hw ay

, S ui te

A , F ay et te vi lle , G

A

Sheets and Views
1 COVER
2 GENERAL NOTES
3 SANITARY SEWER LINE D PLAN
4 SANITARY SEWER LINE D PLAN & PROFILE
5 CONSTRUCTION DETAILS
6 ESPC NOTES
7 ESPC PLAN
8 ESPC VEGETATIVE BMP DETAILS
9 ESPC VEGETATIVE BMP DETAILS
10 ESPC STRUCTURAL BMP DETAILS