2025-192_Price_Schedule.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
DNR RFB Big Stone WMA Wetland Enhancement
Solicitation number
2000016202
Issued by
Big Stone County, Minnesota

About this file

This document is a Price Schedule for the Big Stone WMA Wetland Restoration project, Solicitation #2025-192, issued by the state. The Price Schedule lists 26 line items for various materials and services required for the project, including site preparation, earthwork, drainage infrastructure, erosion control, and stormwater permitting. The quantities, units, and estimated amounts are provided for each line item. Vendors must bid on all line items and upload the completed Price Schedule as part of their response. The project requires delivering and installing specific quantities of materials such as compacted clay fill, rock riprap, and perforated drainage pipe. Vendors must provide scale tickets for material deliveries. The project also includes removal and disposal of an existing culvert. The bid notes provide additional details on the scope of work for each line item.

The Price Schedule indicates this is a lump sum contract. Vendors must provide pricing for all line items, and the total bid amount is provided at the bottom of the form. The bid notes provide guidance on the contractor's responsibilities for various bid items, including site preparation, de-watering, and connections between pipe materials. There is no information provided on incumbent contractors, funding sources, or set-aside requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Event Price Schedule
Failure to respond to all line items may result in bid rejection
PROJECT:Big Stone WMA Wetland Restoration
SOLICITATION #:2025-192
The completed Price Schedule should be uploaded in either a Microsoft Excel 97-2003 Worksheet (.xls) or Microsoft

Excel 2010 Worksheet (.xlsx). The Price Schedule document may also be downloaded, completed and uploaded in a .pdf format. Other Excel file extensions that MAY be compatible are: .xlsm , .xlt, .xltm , and .xlw .

The State reserves the right to reject Price Schedules submitted in any other format.

Name(VENDOR: PLEASE INSERT YOUR BUSINESS NAME)
Item
NoBid NotesDescriptionPay
UnitEst.
QtyUnit
PriceAmount

Bid

Wetland ID# 01
1ASite Prep - Strip 12 inch depthLump Sum1$ - 0$ - 0
2BCompacted clay fill (HAULED IN)CY387$ - 0$ - 0
3CEmergency spillway excavationEach1$ - 0$ - 0
4DMnDOT Class 1 Rock RiprapTon51$ - 0$ - 0
5EA2 filter material 3/4"-1 1/2" clear rockTon51$ - 0$ - 0
6FA1 filter materail 2"-4" round rockTon51$ - 0$ - 0
7GMnDOT Type IV geotextile fabricSq FT1100$ - 0$ - 0
8HClass II rip rapTon17$ - 0$ - 0
9ISand bedding (only needed if not knifing HPDE tile in)Ton51$ - 0$ - 0
10J4 inch single-walled HPDE perforated tileLF1800$ - 0$ - 0
11K4 inch SCH-40 bell end PVC pipeLF332$ - 0$ - 0
12L6 inch corrugated metal pipeLF10$ - 0$ - 0
13M6 inch stainless steal rodent guardEach1$ - 0$ - 0
14N24 inch corrugated metal pipeLF10$ - 0$ - 0
15O4" Agri-Drain Valterra Gate ValveEach1$ - 0$ - 0
16PLocking lid for 24 inch CMP pipeEach1$ - 0$ - 0
17QPre-cast cement 27" catch basin baseEach1$ - 0$ - 0
19RCulvert removal and disposal (10"x20' CMP)Each1$ - 0$ - 0
20Straw WattlesLF300$ - 0$ - 0
21Erosion control blanket with natural nettingSQ Yds800$ - 0$ - 0
22Fernco "THE HULK 4" couplersEach2$ - 0$ - 0
24SStorm water permit for constructionLump Sum1$ - 0$ - 0
Mobilization
25TMobilizationEach1$ - 0$ - 0
$ - 0
26Total$ - 0
Responders MUST bid on all lines and Upload this attachment back into this Event.

Call the Helpline with questions (651-201-8100 Option 1)

Bid Notes
ABID ITEM FOR SITE PREPARATION IS TO STRIP 12 INCH DEPTH OF TOPSOIL OVER EMBANKMENT FOOTPRINT, STOCKPILE, AND UPON COMPLETION OF COMPACTED FILL PLACE MINIMUM 6 INCH DEPTH TOPSOIL OVER TOP AND SIDE SLOPES.
BBID ITEM FOR COMMON EXCAVATION- INCLUDES EXCAVATION OF BORROW PIT AND CLAY FILL NEEDED FOR THE DITCH PLUG AS IDENTIFIED IN THE PLANS. ALL TOP SOIL MUST BE STRIPPED OFF BORROW PIT AND STOCKPILLED TO BE PLACED BACK OVER THE BORROW AREA WHEN DONE, ADDITIONALLY SOME OF THE TOP SOIL WILL BE PLACED OVER THE DITCH PLUG. DO NOT MIX TOP SOIL WITH MINERAL SOIL. PAYMENT IS BASED ON CUBIC YARD PLAN, THERE WILL BE NO ADJUSTMENT MADE FOR INCREASE OR DECREASE TO QUANTITY. FINISHED SURFACES SHALL BE SMOOTH FIRM SEED BED, FREE OF ROCK AND DEBRIS SUITABLE FOR NATIVE SEED PLANTING.
CBID ITEM FOR COMMON EXCAVATION OF THE TWO EMERGENCY SPILLWAYS AS SHOWN IN THE PLANS.
DBID ITEM FOR COARSE AGGREGATE MnDOT CLASS 1 ROCK RIPRAP IS FOR THE SPILLWAY ARMORING. THE CONTRACTOR WILL ONLY BE PAID FOR THE EXACT QUANTITY DELIVERED AND INSTALLED ONSITE. QUANTITIES ARE BASED ON TONS, CONTRACTOR SHALL PROVIDE SCALE TICKETS WITH WEIGHTS INCLUDING TARE WEIGHTS, GROSS WEIGHTS, AND NET WEIGHTS OF MATERIALS DELIVERED.
EBID ITEM FOR COARSE AGGREGATE 3/4"- 1 1/2" CLEAR ROCK IS FOR THE A2 FILTER MATERIAL IN THE FRENCH DRAINS. THE CONTRACTOR WILL ONLY BE PAID FOR THE EXACT QUANTITY DELIVERED AND INSTALLED ONSITE. QUANTITIES ARE BASED ON TONS, CONTRACTOR SHALL PROVIDE SCALE TICKETS WITH WEIGHTS INCLUDING TARE WEIGHTS, GROSS WEIGHTS, AND NET WEIGHTS OF MATERIALS DELIVERED.
FBID ITEM FOR AGGREGATE 2"- 4" CLEAR ROUND ROCK IS FOR THE A1 FILTER MATERIAL IN THE FRENCH DRAINS. THE CONTRACTOR WILL ONLY BE PAID FOR THE EXACT QUANTITY DELIVERED AND INSTALLED ONSITE. QUANTITIES ARE BASED ON TONS, CONTRACTOR SHALL PROVIDE SCALE TICKETS WITH WEIGHTS INCLUDING TARE WEIGHTS, GROSS WEIGHTS, AND NET WEIGHTS OF MATERIALS DELIVERED.
GBID ITEM IS FOR THE MATERIAL AND INSTALLATION INCLUDING EXCAVATION AND STAPLES TO ANCHOR THE FABRIC.
HBID ITEM FOR MnDOT CLASS II ROCK RIPRAP SHALL. EXCAVATION REQUIRED FOR ROCK RIPRAP SHALL BE INCLUDED IN THIS LINE ITEM. THE CONTRACTOR WILL ONLY BE PAD FOR THE EXACT QUANTITY DELIVERED AND INSTALLED ONSITE. QUANTITIES ARE BASED ON TONS, CONTRACTOR SHALL PROVIDE SCALE TICKETS WITH WEIGHTS INCLUDING TARE WEIGHTS, GROSS WEIGHTS, AND NET WEIGHTS OF MATERIALS DELIVERED. RIPRAP SUPPLY SOURCE SHALL BE IDENTIFIED FOR INSPECTION BY DNR REPRESENTATIVE FOR INVASIVE SPECIES PRIOR TO TRANSPORTING ONSITE.
IBID ITEM FOR SAND BEDDING AND BACKFILL IS FOR THE 4"Ø HPDE PIPELINE ALONG WITH BACKFILLING INSIDE THE 24"Ø CMP RISER. THE CONTRACTOR WILL ONLY BE PAID FOR THE EXACT QUANTITY DELIVERED AND INSTALLED ONSITE. QUANTITIES ARE BASED ON TONS, CONTRACTOR SHALL PROVIDE SCALE TICKETS WITH WEIGHTS INCLUDING TARE WEIGHTS, GROSS WEIGHTS, AND NET WEIGHTS OF MATERIALS DELIVERED.
JBID ITEM FOR 4"Ø SINGLE-WALLED HPDE PIPE SHALL INCLUDE MATERIALS AND INSTALLATION. ALSO INCLUDED IN THIS LINE ITEM WILL BE DE-WATERING OR CONTROL OF WATER AND ANY OTHER ITEMS NEEDED TO SUCCESSFULLY INSTALL THE PIPELINE AS OUTLINED IN THESE PLANS OR DESCRIBED BY THE DNR FIELD REPRESENTATIVE. COUPLERS, TILE CAPS, TILE TAPE, AND ALL OTHER CONNECTIONS SHALL BE CONSIDERED INCIDENTAL TO THE PIPE.
KBID ITEM FOR 4"Ø SCH-40 PVC PIPE SHALL INCLUDE MATERIALS AND INSTALLATION. SHALL INCLUDE CONCRETE COLLAR AND NON-WOVEN FILTER FABRIC AROUND JOINT CONNECTION WITH HPDE PIPE. ALSO INCLUDED IN THIS LINE ITEM WILL BE DE-WATERING OR CONTROL OF WATER AND ANY OTHER ITEMS NEEDED TO SUCCESSFULLY INSTALL THE PIPELINE AS OUTLINED IN THESE PLANS OR DESCRIBED BY THE DNR FIELD REPRESENTATIVE. COUPLERS, TILE CAPS, TILE TAPE, AND ALL OTHER CONNECTIONS SHALL BE CONSIDERED INCIDENTAL TO THE PIPE.
LBID ITEM FOR 6"Ø GALVANIZED CMP'S SHALL INCLUDE CONCRETE COLLAR AND NON-WOVEN FILTER FABRIC AROUND JOINT CONNECTION. COUPLERS, TILE CAPS, TILE TAPE, AND ALL OTHER CONNECTIONS SHALL BE CONSIDERED INCIDENTAL TO THE PIPE.
MBID ITEM FOR STAINLESS STEEL RAT GUARD SHALL INCLUDE MATERIALS AND INSTALLATION (4").
NBID ITEM FOR 24"Ø CMP PIPE SHALL INCLUDE MATERIALS AND INSTALLATION ALONG WITH SAND FILL FOR INSIDE THE CMP.
OBID ITEM FOR 4" AGRI-DRAIN VALTERRA GATE VALVE AND HANDLE EXTENSIONS SHALL INCLUDE MATERIALS AND INSTALLATION.
PBID ITEM INCLUDES THE MATERIAL AND INSTALLATION OF THE LOCKING LID.
QBID ITEM INCLUDES THE MATERIAL AND INSTALLATION OF A PRE-CAST CEMENT 24"Ø CATCH BASIN BASE.
RBID ITEM INCLUDES THE REMOVAL AND DISPOSAL OFFSITE OF AN OLD CMP CULVERT THAT IS LOCATED WHERE THE NEW DITCH PLUG WILL BE CONSTRUCTED.
SBID ITEM FOR STORM WATER PERMIT FOR CONSTRUCTION SHALL INCLUDE THE CONTRACTOR OBTAINING THE STORM WATER PERMIT FOR CONSTRUCTION ACTIVITIES PRIOR TO THE START OF CONSTRUCTION.
TBID ITEM FOR MOBILIZATION SHALL INCLUDE THE SUPPLY OF ALL LABOR, MATERIAL, AND EQUIPMENT TO TRANSPORT ALL NEEDED LABOR, MATERIAL, FIELD REPRESENTATIVE.

File details come from the government source that posted it. Updated .