About this file
This set of engineering design documents is for the Oneal Vet Tech Boiler Replacement project at Fort Valley State University in Fort Valley, Georgia, prepared by NBP Engineers, Inc. of Macon, Georgia. The project involves a comprehensive replacement of the existing boiler system in the second-floor mechanical room 202, including demolition of existing equipment and installation of new heating infrastructure. The design set, dated 08.15.2025, is a bid set containing detailed mechanical, electrical, and plumbing plans for the boiler replacement, with specific focus on HVAC, power, and gas systems.
The project includes replacing the existing boiler (BLR-1) with a new condensing hot water boiler, installing new heating water pumps (HP-1 and HP-2) with variable frequency drives (VFDs), and modifying existing electrical and gas connections. The new boiler has an input of 1491 MBH with 95.7% efficiency, and will connect to the existing gas regulator. Electrical modifications involve updating power feeds, disconnects, and control systems, with careful preservation of existing infrastructure where possible. The design emphasizes system compatibility, energy efficiency, and minimal disruption to the existing mechanical room and university operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025_08_15_FVSU Vet Tech Boiler_Invitation to.pdf | ||
| 2025_08_15_FVSU Vet Tech Boiler_Project Manua.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
SHEET NO. TITLE
M001 ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC
M501 DETAILS - HVAC
E001
Fort Valley State University
FVSU Project No.: FVSUB 092025 Oneal Vet Tech Boiler Replacement
Oneal Vet Tech Boiler Replacement
Fort Valley, Georgia
LEGEND, SCHEDULE, RISER, & DETAILS - ELECTRICAL
E301
DEMOLITION & NEW WORK - SYSTEMS/HVAC POWER
LARGE SCALE - SECOND FLOOR PLAN - MECHANICAL ROOM 202 -
DEMOLITION & NEW WORK - HVAC
LARGE SCALE - SECOND FLOOR PLAN - MECHANICAL ROOM 202 -M301
M401 FLOW DIAGRAM - HVAC
P301
DEMOLITION & NEW WORK - PLUMBING
LARGE SCALE - SECOND FLOOR PLAN - MECHANICAL ROOM 202 -
08.15.2025 BID SET
P:\25077\25077m001.dgn
DATE PLOTTED
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077m001.dgn
AS SHOWN
WSH
LTF
WSH
25077
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
B
ID
S E
T
MARK SERVICE
TYPE
PUMP
GPM APPROX.
FT.H O
MAX. MIN.
EFF.%
REMARKS
2 B&G(EA.)
HEATING WATER VILHP-1
HP-2 VILHEATING WATER
HP
CHS CHR
HWS HWR
CR
D
SPF
HTWS HTWR
DTS DTR
CHILLED WATER SUPPLY CHILLED WATER RETURN
HEATING WATER SUPPLY HEATING WATER RETURN
CONDENSER WATER SUPPLY CONDENSER WATER RETURN
CONDENSATE DRAIN
FIRE PROTECTION MAIN STANDPIPE
HIGH TEMP. SUPPLY HIGH TEMP. RETURN
DUAL TEMP. SUPPLY DUAL TEMP. RETURN
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID
CONDENSATE DRAIN
CS
RS REFRIGERANT SUCTION
RG REFRIGERANT HOT GAS
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
(15 PSIG. MAX)
CR CONDENSATE RETURN (LP)
PUMPED CONDENSATE
50#
STEAM
(PRESSURE INDICATED)
SOLENOID VALVE RELIEF VALVE
GATE VALVE WITH
3/4" HOSE END
NEEDLE VALVE
OS&Y GATE VALVE .
GAS COCK
AUTOMATIC AIR VENTAAV
GAUGE WITH COCK
BOILER DRAIN PIPE TEST PLUG
FLEX. PIPE CONN. BACKFLOW PREVENTER
MANUAL AIR VENT
STRAINER
ELBOW UP ELBOW DOWN
BRANCH OUT BOTTOM BRANCH OUT TOP
TEE OUT BOTTOM TEE OUT TOP
SCREWED UNION FLANGED UNION
PIPE CAP BLIND FLANGE
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
2-WAY CONTROL VALVE
CONTROL VALVE
PLAN VIEW
ECCENTRIC REDUCER
GAUGE COCK
3-WAY MIXING
VALVE IN VALVE BOX
CONTROL VALVE
HPS
THERMOMETER IN WELL
SEPARABLE SOCKET WELL
LPS
PLUG VALVE
PCR
CONNECT TO EXISTING
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
93 F DB / 76 F WB 21 F DB
72 F DB75 F DB / 55% RH
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
MANUFACTURERS
M001
HVAC
LEGEND, & SCHEDULES -
ABBREVIATIONS,
PUMP SCHEDULE
PATTERSON TACO
MARK REMARKS
CONDENSING HOT WATER BOILER SCHEDULE
MBH
INPUT
BOILER
MBH
OUTPUT OPERATING
PRESSURE
GPM VOLT/PHASE
BLR-1
(PSI)
ofci owner furnished contractor installed
EFF. %
120/1 OFCI8045
2x2x9.52x2x9.52x2x9.5C565
RPM
17506080
2x2x9.52x2x9.52x2x9.5C56517506080
1500 1427 95.7
M301
AH-1
AH-2
38/36
36/24
32/32
36/28
BLR-1
28/28 H W
R C
H R
C H S
TU2-14
DN
PIPES
VFD-2
UH-1
H W
S
H W
R
H W
S
WH
H-1
HWR
HWS
34/20
FAN
CCAXHCAF
FAN
CC
AX
HC
AF
4"
2•"
4"
CV
CV
3"
2•"
CV
1 ‚"
4"
3"
1"
3"
2"
PIPES DN.
1‚"
F
B P
LINE LEGEND
POINT OF CONNECTION
NEW WORK
EXISTING TO REMAIN
DEMOLITION
CONCRETE PAD
EXISTING
PLENUM
SHEETMETAL
FULLSIZE
EXISTING
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
TO CAP ON ROOF
5"{ FLUE VENT UP
EXISTING
T
46/40 OA
AC VP
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
SECOND FLOOR MECHANICAL ROOM 202 - DEMOLITION - HVAC
LARGE SCALE -
SECOND FLOOR MECHANICAL ROOM 202 - NEW WORK - HVAC
LARGE SCALE -
FOR NEW FLUE
IN ROOF & ROOF CURB
EXISTING OPENING
ON ROOF; REUSE
BOILER FLUE & CAP
REMOVE EXISTING
REMAIN
HEATER FLUE TO
EXISTING WATER
CHEMICAL FEED TANK
REMOVE EXISTING
EXPANSIONTANK
REMOVE EXISTING
TO REMAIN
AIR LOUVER
COMBUSTION
48"X76"
EXISTING
AH-2 TO REMAIN
EXISTING AIR HANDLER
TO REMAIN
EXISTING AH-1 VFD
TO REMAIN
EXISTING ACP
HW PUMP STARTERS
REMOVE EXISTING
TO REMAIN
EXISTING HUMIDIFIERBOILER
EXISTING
REMOVE
WATER STATION
MAKE-UP
REMOVE EXISTING
PAD TO REMAIN
EXISTING HOUSEKEEPING
HP-2
HP-1
PUMPS HP-1 & 2
HEATING WATER
REMOVE EXISTING
ASSEMBLY TO REMAIN
DISPERSION TUBE
EXISTING HUMIDIFIER
AH-1 TO REMAIN
EXISTING AIR HANDLER
CP-1 TO REMAIN
EXISTING CHW PUMP
BLR-1
NEW
EXISTING
EXISTING
PAD
CONCRETE
EXISTING
3"
NEW MUW
3"
HP-2 VFD
HP-1 VFDNEW
NEW
CHEMICAL FEEDER
NEW BYPASS
NEW EXPANSIONTANK
3"
3"
FLUE CAP ON ROOF
EXISTING ROOF OPENING TO NEW
8"{ BOILER FLUE UP THRU
NEW
HP-2
NEW
HP-1
NEW WORK - HVAC
DEMOLITION &
MECHANICAL ROOM 202 -
SECOND FLOOR
LARGE SCALE -
SEPARATOR
NEW AIR
FOOTPRINT OF NEW BOILER
MODIFY EXISTING PAD TO ACCEPT
P:\25077\25077m301.dgn
DATE PLOTTED
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077m301.dgn
AS SHOWN
WSH
LTF
WSH
25077
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
T
AH-1
AH-2
38/36
36/24
32/32
36/28
28/28 H W
R C
H R
C H S
TU2-14
DN
PIPES
VFD-2
UH-1
H W
S
H W
R
H W
S
WH
HWR
HWS
34/20
FAN
CCAXHCAF
FAN
CC
AX
HC
AF
4"
2•"
4"
CV
3"
CV
1 ‚"
4"
1"
PIPES DN.
1‚"
F
B P
CONCRETE PAD
EXISTING
PLENUM
SHEETMETAL
FULLSIZE
EXISTING
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
TO CAP ON ROOF
5"{ FLUE VENT UP
EXISTING
T
46/40 OA
AC VP
REMAIN
HEATER FLUE TO
EXISTING WATER
TO REMAIN
AIR LOUVER
COMBUSTION
48"X76"
EXISTING
AH-2 TO REMAIN
EXISTING AIR HANDLER
TO REMAIN
EXISTING AH-1 VFD
TO REMAIN
EXISTING ACP
TO REMAIN
EXISTING HUMIDIFIER
ASSEMBLY TO REMAIN
DISPERSION TUBE
EXISTING HUMIDIFIER
AH-1 TO REMAIN
EXISTING AIR HANDLER
CP-1 TO REMAIN
EXISTING CHW PUMP
EXISTING
EXISTING
PAD
CONCRETE
EXISTING
P:\25077\25077m401.dgn
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077m401.dgn
AS SHOWN
WSH
LTF
WSH
25077
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
T
M401
FLOW DIAGRAM - HVAC1
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
F.M.
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BLR-1 BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
HEATING SYSTEM PUMP-VFD CONTROL
HEATING SYSTEM PUMP-VFD CONTROL
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
HP-1
HP-2
BOILER PLANT SYSTEM
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
M
G R
A P
H
IC
D
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
O P
A
K E
U P
S E
T P
O
IN
T
J
U S
T
D
C
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
L
IM
IT
R U
N
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
U
A R
T
S T
O P
D A
Y
N
IG
H
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
P
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
IN
G
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
F
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
FLOW DIAGRAM - HVAC
L
O
O
TEMPORARY BOILER
BLIND FLANGE FOR
3"
TEMPORARY BOILER
BLIND FLANGE FOR
HWS
HWR HWR
HWS
BLR-1
NEW
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
EXPANSION TANK, SET 25 PSIG
MIN. ACCEPTANCE VOLUME.
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
NEW HP-2
NEW HP-1
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
BYPASS VALVE
CV= 15.0
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
VLV-1
DP-1
3"
3"
3" 3" 3" 3"
3"
3"
3"
3"
3"
3"
3"
INITIAL FILL PRESSURE. 1 1 GAL.
30 GAL. MIN. TANK VOLUME
3"
3"
P:\25077\25077m501.dgn
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077m501.dgn
AS SHOWN
WSH
LTF
WSH
25077
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
T
M501
DETAILS - HVAC
A
BC
E
TO SYSTEM
B -ƒ" TO DISCHARGE OF PUMP.
C -ƒ" TO SUCTION OF PUMP.
F - RISER CLAMP. WELD TO 2X3/4 " FLAT
OFFSET BRACKET TO WALL.
A - CHEMICAL FEEDER TANK.
D -ƒ" TO FLOOR DRAIN.
D
4"MIN.
WELD
F
BALL VALVES
E -‚" BALL VALVE FOR VENT.
BY-PASS CHEMICAL FEEDER
NOT TO SCALE
BACKFLOW PREVENTER
1"1"
MAKE - UP WATER STATION
GAUGE COCK
ƒ"
PRESSURE REDUCING
VALVE. SET AT
1"
AIR GAP DRAIN
FITTING
1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR
TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE
CLAMPS SAME MATERIAL AS PIPE.
PSI.
GAUGE
BALL VALVE
BALL VALVE
NOT TO SCALE
TO FILL POINT
OF SYSTEM
BALL VALVE
QUICK FILL
CONNECTION
TO DOMESTIC COLD
WATER SUPPLY
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
NOT TO SCALE
SERVICE TEE
ECCENTRIC REDUCER
•" STREET ELL.
AUTOMATIC AIR VENT
MAINS
•"X2" NIPPLE
„"MPT X ‚" FLARE ELL.
‚" COPPER TO FLOOR
DRAIN OR OUTSIDE
AS SHOWN.
AUTOMATIC AIR VENT
NOT TO SCALE
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" BALL VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
NOT TO SCALE
ƒ" CHAMFER
ALL SIDES UNLESS OTHERWISE NOTED
EQUIPMENT
4" MINIMUM ALL SIDES
6" X 6", 10\10 WELDED WIRE
FABRIC AT MID-DEPTH OF
PAD (UNLESS OTHERWISE NOTED)
SLAB, FLOOR, OR SUPPORTING STRUCTURE.
ROUGH UP WHERE CONCRETE DOES NOT HAVE
BROOM FINISH OR ROUGHER.
6" THICK CONCRETE
(INERTIA PAD IDENTICAL)
HOUSEKEEPING PAD DETAIL
NOT TO SCALE
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE
TEST PLUG
STRAINER
CHECK VALVE
PIPES SUPPORT
PRESSURE GAUGE
GAUGE COCK
VERTICAL IN-LINE PUMP DETAIL
VERTICAL INLINE PUMP
NOT TO SCALE
ƒ" BALL VALVE W/
HOSE END ADAPTER (TYPICAL)
ƒ" BALL VALVE W/
HOSE END ADAPTER (TYPICAL)
BUTTERFLY VALVE BUTTERFLY VALVE
P:\25077\25077e001.dgn
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077e001.dgn
AS SHOWN
TWT
BCO
TWT
25077
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
T
E001
ELECTRICAL
RISER, & DETAILS -
LEGEND, SCHEDULE,
RECEPTACLES
CIRCUITS
DUPLEX - NORMAL
GFI DUPLEX - NORMAL
QUADRAPLEX - NORMAL
ELECTRICAL LEGEND
WP
H HORIZONTALLY MOUNTED
WEATHER PROOF OUTLET
RACEWAY EXPOSED
FLEXIBLE RACEWAY
CONDUIT UP
CONDUIT DOWN
HOMERUN- ONE ARROW PER CIRCUIT
ONE CROSSMARK PER WIRE
(3 WIRE UNLESS SHOWN)
RACEWAY CONCEALED IN CEILING OR WALL
RACEWAY IN GROUND, SLAB, OR UNDER FLOOR
CAP
CONNECTION TO EQUIPMENT
GENERAL EQUIPMENT
TRANSFORMER
F
PANELBOARD-250 VAC OR LESS
SURFACE MOUNTED
PANELBOARD-250 VAC OR LESS
RECESSED
PANELBOARD-OVER 250 VAC
RECESSED
PANELBOARD-OVER 250 VAC
SURFACE MOUNTED
T
M MANUAL STARTER AND MOTOR RATED SWITCH
EMERGENCY PUSHBUTTON
EXHAUST FAN
MOTOR
JJ J
COMMUNICATIONS
ENCLOSED CIRCUIT BREAKER
JUNCTION BOX - WALL/CEILING/FLOOR
DISCONNECT SWITCH: "F" IF FUSED
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
COMBINATION STARTER AND DISCONNECT
WITH A RJ45 CONNECTOR. STAINLESS STEEL COVER PLATE
DATA OUTLET WITH A SINGLE CAT 6 CABLE TERMINATED
T L C
MDP
EXISTING
SUPPRESSION
SURGE
SUPPRESSION
SURGE
CONTACTOR
LIGHTING
MDP 1
TO NEW
MDP 1
TO NEW
MDP 1
TO NEW
IN TRIAD CONFIGURATION
MINIMUM 10FT. APART
GROUND RODS SPACED
G
UTLITY TRANSFORMER
POLE MOUNTED
F
3•"C
1#3G, 4#500kcmil, 3•"C
1#3G, 4#500kcmil, R2
2•"C
1#6G, 4#3/0AWG,
1#1/0G, 4"C
4#500kcmil, 2 SETS:
NOT TO SCALE
225kVA
1#500KCMILG
400A/3P/1 SECTIONS 1 & 2
EXISTING R1
T1
TRANSFORMER
EXISTING
MDP 1 L1 M1
EXISTING POWER RISER DIAGRAM
HP-1
J
RP
AC VP
M1
BLR-1
TU2-14
AH-2
CP-1
HP-2
R1-47
R1-43
30/1/1
30/3/1
R1-26
M1-21
M1-27
R1-38 R1-78
M1-14,16,18
VAC. PUMP
R2-21
M1-8
M1-14
M1-20
E301
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
UH-1
VFD-2
TO REMAIN
EXISTING ACP
TO REMAIN
EXISTING AH-1 VFD
H-1
BOILER
EXISTING
REMOVE
M1-7
R1-77
R1-49
R1-51 R2-16
M1-1
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
SECOND FLOOR MECHANICAL ROOM 202 - NEW WORK - SYSTEMS/HVAC POWER
LARGE SCALE -
NOTES:(THIS SHEET ONLY)
AND EXISTING CONDUCTORS. CONDUIT CAN BE REUSED.
BOILER WILL BE 120 VOLTS. REMOVE EXISTING 30A/3P FUSED DISCONNECT
DEMO EXISTING 208 VOLT POWER FEEDING THE EXISTING GAS BOILER. NEW
BE LABELED AS SPARE AND TURNED OFF.
THE NEW BREAKERS SHALL SERVE THE NEW BOILER. THE OTHER SHOULD
THE NEW BREAKERS SHALL MATCH EXISTING PANEL AIC RATING. ONE OF
AND PROVIDE TWO 20A/1P CIRCUIT BREAKERS BACK IN THE SAME SPOT.
FINAL CONNECTIONS. REMOVE EXISTING 20A/2P BREAKER AT CIRCUIT R1-43
EXISTING CONDUIT TO SERVE NEW 120 VOLT FEED TO BOILER. MAKE ALL
POSITION. REUSE EXISTING HOMERUN CONDUIT. PROVIDE NEW 3#12 AWG IN
PROVIDE NEW 30A/2P FUSED DISCONNECT THAT IS LOCKABLE IN THE OPEN
M1 CAN BE REUSED TO SERVE THE NEW PUMPS.
REUSED IF PRACTICAL. THE EXISTING 20A/3P CIRCUIT BREAKERS IN PANEL
BACK TO SERVING PANEL. EXISTING CONDUIT BACK TO PANEL M1 CAN BE
HP-2 BEING REMOVED. REMOVE ALL EXISTING STARTERS AND CONDUCTORS
DEMO EXISTING 480 VOLT, 3 PHASE POWER TO EXISTING PUMPS HP-1 AND
CONNECT TO EXISTING 20A/3P CIRCUIT BREAKERS IN PANEL M1.
HOMERUN CONDUIT. EXTEND CONDUIT AS REQUIRED TO NEW PUMPS.
HP-2. PROVIDE NEW 4#10 AWG CONDUCTORS FOR EACH USING EXISTING
BY DIV 23) AND TO THE NEW PUMP MOTORS FOR NEW PUMPS HP-1 AND
NEW VFD. MAKE ALL FINAL CONNECTIONS THROUGH THE VFD (PROVIDED
PROVIDE NEW 30A/3P FUSED DISCONNECT ON THE LINE SIDE OF EACH
PROVIDE 480 VOLT, 3 PHASE POWER TO NEW HEATING WATER PUMP.
FAP
T
K V
A LC
MDP
L1
R1
T1
F
EXISTING MDP
DISCONNECT
R2
ON FIRST FLOOR
OF ELECTRICAL ROOM 134
APPROXIMATE LOCATION
ON FIRST FLOOR
OF ELECTRICAL ROOM 134
APPROXIMATE LOCATION
M1-14
M1-20
F
SECOND FLOOR MECHANICAL ROOM 202 - DEMOLITION - HVAC POWER
LARGE SCALE -
HVAC POWER
NEW WORK - SYSTEMS/
DEMOLITION &
MECHANICAL ROOM 202 -
SECOND FLOOR
LARGE SCALE -
P:\25077\25077e301.dgn
DATE PLOTTED
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077e301.dgn
AS SHOWN
TWT
BCO
TWT
25077
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
J
RP
AC VP
M1
TU2-14
CP-1
R1-47
30/1/1
R1-26
M1-21
M1-27
R1-38 R1-78
M1-14,16,18
VAC. PUMP
R2-21
M1-8
UH-1
VFD-2
TO REMAIN
EXISTING ACP
TO REMAIN
EXISTING AH-1 VFD
H-1
M1-7
R1-77
R1-49
R1-51 R2-16
M1-1
SHUT OFF SWITCH
BOILER EMERGENCY
EXISTING
FAP
T
K V
A LC
MDP
L1
R1
T1
F
EXISTING MDP
DISCONNECT
R2
BLR-1
NEW
HP-2 VFD
HP-1 VFDNEW
NEW
NEW
HP-2
NEW
HP-1
LARGE ANIMAL STALLELECTRICAL ROOM
LARGE ANIMAL STALLELECTRICAL ROOM
TU2-14
AH-1
SCALE:
= 1'-0
4 0 2 4 8
P301
B1
4"FD
4"FD
H1
4"
2"V-UP
4"CO
4"VTR
2"
W1 1•"
4"V-UP
4"W-DN
2"
4"FD
VACUUM PUMP
4"CO
4"
4"-BF
ƒ" MAKEUP
1" ƒ"
4"FD
ASSEMBLY
PRIMER VALVE
MULTIPLE TRAP
ƒ" HB @ 42" AFF.
A E
X
A E
X
SCALE:
= 1'-0
4 0 2 4 8
NOTE TO CONTRACTOR:
PROVIDE ACCESS TO THE CONCEALED UTILITY.
WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO
PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF
TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES
NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING
FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT
WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,
REGULATOR
NUMBER
MBH GAS
INPUT DEMAND PRESSURES
NOTES:
BR-1
B-1
W-1
EQUIPMENT
SERVED
MAXON CO., GENERAL CONTROL OR FISHER.
MANUFACTURER'S ARE: EQUIMETER., AMERICAN METER.
REGULATOR
LOCATION
BUILDING OUTSIDE
MEZZ.
MECH.
1491 MBH
MEZZ.
MECH.
300 MBH
2 PSI/ 11" WC
2 PSI/ 11" WC
HEATER
WATER
L-1 2 PSI/ 11" WC
OUTLETS
LAB
40 CFH
GRILLES, ETC.
PIPE RELIEF VENT FULL SIZE FROM INTAKE
INLET/OUTLET
METER /2 PSI
H-1 MEZZ.
MECH.
460 MBH 2 PSI/ 11" WC
2300 MBH
BOILER
ROOM 129
BOILER
LEGEND
SOIL , WASTE VENT
D CONDENSATE DRAIN COLD WATER
HOT WATER (140 ) HOT WATER RETURN
GATE VALVEBALL VALVE
CHECK VALVE
BALANCER (CIRCUIT SETTER)
FLOW INDICATOR
STRAINERPRESSURE REDUCING VALVE
GLOBE VALVE UNION
GAS COCK AQUASTAT
INCREASER FLOOR DRAIN (FD)
CLEANOUT (CO) CLEANOUT (CO)
HUB DRAIN BELOW FLOORBF
ABOVE CEILINGAC ABOVE FINISHED FLOORAFF
EXISTING VENT TO REMAIN
TO REMAIN
EXISTING SOIL, WASTE
WATER TO REMAIN
EXISTING COLD
BE REMOVED
EXISTING PIPING TO
WATER TO REMAIN
EXISTING HOT
RETURN TO REMAIN
EXISTING HOT WATER
LIMIT OF DEMOLITION
NEW TO EXISTING
POINT OF CONNECTION
GEXGAS REGULATOR GAS EXHAUST
G GAS (LOW PRESSURE) MED. PRESSURE GAS (2psi)MPG
H-1
TO REMAIN
EXISTING ACP
TO REMAIN
EXISTING AH-1 VFD
HW PUMP STARTERS
REMOVE EXISTINGHP-2
HP-1
PUMPS HP-1 & 2
HEATING WATER
REMOVE EXISTING
BLR-1
BOILER
EXISTING
REMOVE
WH
COMPRESSOR
AIR
SECOND FLOOR MECHANICAL ROOM 202 - DEMOLITION - PLUMBING
LARGE SCALE -
SECOND FLOOR MECHANICAL ROOM 202 - NEW WORK - PLUMBING
LARGE SCALE -
EXISTING GAS REGULATOR SCHEDULE
NOTES:(THIS SHEET ONLY)
2"
3 CONNECT NEW 2" GAS PIPING TO BOILER.
EXISTING GAS REGULATOR IS TO REMAIN TO SERVE NEW BOILER.
REMOVE EXISTING GAS PIPING SERVING BOILER. REMOVE PIPING BACK TO REGULATOR.
NEW BOILER CONNECTION.
CONNECT NEW 2" GAS PIPING TO EXISTING REGULATOR. ROUTE NEW 2" GAS PIPING TO
NEW WORK - PLUMBING
DEMOLITION &
MECHANICAL ROOM 202 -
SECOND FLOOR
LARGE SCALE -
P:\25077\25077p301.dgn
DATE PLOTTED
DGN FILE
15-AUG-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25077\25077p301.dgn
AS SHOWN
25077
WHD
WHD
WHD
COA Expiration: 6.30.2026
NBP Engineers, Inc.
COA#PEF000774
08.15.2025
F o rt V a ll e y
G e o rg ia
F V S
U P ro je c t
N o
F
V S
U B
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
F o rt V a ll e y S ta te U n iv e rs it y
O n e a l V e t T e c h B o il e r
R e p la c e m e n t
T
TU2-14
AH-2
AH-1
B1
4"FD
4"FD
H1
4"
2"V-UP
4"CO
4"VTR
2"
W1 1•"
4"V-UP
4"W-DN
2"
4"FD
VACUUM PUMP
4"CO
4"
4"-BF
ƒ" MAKEUP
1" ƒ"
4"FD
ASSEMBLY
PRIMER VALVE
MULTIPLE TRAP
ƒ" HB @ 42" AFF.
A E
X
A E
X
H-1
TO REMAIN
EXISTING ACP
TO REMAIN
EXISTING AH-1 VFD
WH
COMPRESSOR
AIR
BLR-1
NEW
HP-2 VFD
HP-1 VFDNEW
NEW
NEW
HP-2
NEW
| 25077aCov |
| 25077m001 |
| References |
| tb, 25077tb.dgn |
| 25077m301 |
| References |
| tb, 25077tb.dgn |
| afp1, 25077afp2.dgn |
| afp2, 25077afp2.dgn |
| existing, 25077m301.dgn |
| 25077m401 |
| References |
| tb, 25077tb.dgn |
| 25077m501 |
| References |
| tb, 25077tb.dgn |
| 25077e001 |
| References |
| tb, 25077tb.dgn |
| 25077e301 |
| References |
| tb, 25077tb.dgn |
| afp2-1, 25077afp2.dgn |
| afp2, 25077afp2.dgn |
| existing, 25077e301.dgn |
| hvac new, 25077m301.dgn |
| A1 Add 11, 25077afp1.dgn |
| A1 Add 1-1, 25077afp1.dgn |
| 25077p301 |
| References |
| tb, 25077tb.dgn |
| afp2-1, 25077afp2.dgn |
| afp2, 25077afp2.dgn |
| existing, 25077p301.dgn |
| hvac new, 25077m301.dgn |
File details come from the government source that posted it. Updated .