2025_08_15_FVSU_VetTech_BoilerNBP.pdf

PDF 2 MB Posted

Attached to
FVSU-Vet Tech Boiler Replacement
Solicitation number
PE-53300-RFP-2026-000000050
Issued by
Paulding County, Georgia

About this file

This set of engineering design documents is for the Oneal Vet Tech Boiler Replacement project at Fort Valley State University in Fort Valley, Georgia, prepared by NBP Engineers, Inc. of Macon, Georgia. The project involves a comprehensive replacement of the existing boiler system in the second-floor mechanical room 202, including demolition of existing equipment and installation of new heating infrastructure. The design set, dated 08.15.2025, is a bid set containing detailed mechanical, electrical, and plumbing plans for the boiler replacement, with specific focus on HVAC, power, and gas systems.

The project includes replacing the existing boiler (BLR-1) with a new condensing hot water boiler, installing new heating water pumps (HP-1 and HP-2) with variable frequency drives (VFDs), and modifying existing electrical and gas connections. The new boiler has an input of 1491 MBH with 95.7% efficiency, and will connect to the existing gas regulator. Electrical modifications involve updating power feeds, disconnects, and control systems, with careful preservation of existing infrastructure where possible. The design emphasizes system compatibility, energy efficiency, and minimal disruption to the existing mechanical room and university operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

PROJECT CONSULTANTS

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

SHEET NO. TITLE

M001 ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC

M501 DETAILS - HVAC

E001

Fort Valley State University

FVSU Project No.: FVSUB 092025 Oneal Vet Tech Boiler Replacement

Oneal Vet Tech Boiler Replacement

Fort Valley, Georgia

LEGEND, SCHEDULE, RISER, & DETAILS - ELECTRICAL

E301

DEMOLITION & NEW WORK - SYSTEMS/HVAC POWER

LARGE SCALE - SECOND FLOOR PLAN - MECHANICAL ROOM 202 -

DEMOLITION & NEW WORK - HVAC

LARGE SCALE - SECOND FLOOR PLAN - MECHANICAL ROOM 202 -M301

M401 FLOW DIAGRAM - HVAC

P301

DEMOLITION & NEW WORK - PLUMBING

LARGE SCALE - SECOND FLOOR PLAN - MECHANICAL ROOM 202 -

08.15.2025 BID SET

P:\25077\25077m001.dgn

DATE PLOTTED

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077m001.dgn

AS SHOWN

WSH

LTF

WSH

25077

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

B

ID

S E

T

MARK SERVICE

TYPE

PUMP

GPM APPROX.

FT.H O

MAX. MIN.

EFF.%

REMARKS

2 B&G(EA.)

HEATING WATER VILHP-1

HP-2 VILHEATING WATER

HP

CHS CHR

HWS HWR

CR

D

SPF

HTWS HTWR

DTS DTR

CHILLED WATER SUPPLY CHILLED WATER RETURN

HEATING WATER SUPPLY HEATING WATER RETURN

CONDENSER WATER SUPPLY CONDENSER WATER RETURN

CONDENSATE DRAIN

FIRE PROTECTION MAIN STANDPIPE

HIGH TEMP. SUPPLY HIGH TEMP. RETURN

DUAL TEMP. SUPPLY DUAL TEMP. RETURN

R REFRIGERANT PIPING

RL REFRIGERANT LIQUID

CONDENSATE DRAIN

CS

RS REFRIGERANT SUCTION

RG REFRIGERANT HOT GAS

HIGH PRESSURE STEAM

LOW PRESSURE STEAM

(15 PSIG. MAX)

CR CONDENSATE RETURN (LP)

PUMPED CONDENSATE

50#

STEAM

(PRESSURE INDICATED)

SOLENOID VALVE RELIEF VALVE

GATE VALVE WITH

3/4" HOSE END

NEEDLE VALVE

OS&Y GATE VALVE .

GAS COCK

AUTOMATIC AIR VENTAAV

GAUGE WITH COCK

BOILER DRAIN PIPE TEST PLUG

FLEX. PIPE CONN. BACKFLOW PREVENTER

MANUAL AIR VENT

STRAINER

ELBOW UP ELBOW DOWN

BRANCH OUT BOTTOM BRANCH OUT TOP

TEE OUT BOTTOM TEE OUT TOP

SCREWED UNION FLANGED UNION

PIPE CAP BLIND FLANGE

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

BALANCE VALVE

SCREWED & FLANGED

SCREWED & FLANGED

SCREWED & FLANGED

SCREWED & FLANGED

SCREWED & FLANGED

GLOBE VALVE

CHECK VALVE

2-WAY CONTROL VALVE

CONTROL VALVE

PLAN VIEW

ECCENTRIC REDUCER

GAUGE COCK

3-WAY MIXING

VALVE IN VALVE BOX

CONTROL VALVE

HPS

THERMOMETER IN WELL

SEPARABLE SOCKET WELL

LPS

PLUG VALVE

PCR

CONNECT TO EXISTING

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

INSIDE

93 F DB / 76 F WB 21 F DB

72 F DB75 F DB / 55% RH

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

MANUFACTURERS

M001

HVAC

LEGEND, & SCHEDULES -

ABBREVIATIONS,

PUMP SCHEDULE

PATTERSON TACO

MARK REMARKS

CONDENSING HOT WATER BOILER SCHEDULE

MBH

INPUT

BOILER

MBH

OUTPUT OPERATING

PRESSURE

GPM VOLT/PHASE

BLR-1

(PSI)

ofci owner furnished contractor installed

EFF. %

120/1 OFCI8045

2x2x9.52x2x9.52x2x9.5C565

RPM

17506080

2x2x9.52x2x9.52x2x9.5C56517506080

1500 1427 95.7

M301

AH-1

AH-2

38/36

36/24

32/32

36/28

BLR-1

28/28 H W

R C

H R

C H S

TU2-14

DN

PIPES

VFD-2

UH-1

H W

S

H W

R

H W

S

WH

H-1

HWR

HWS

34/20

FAN

CCAXHCAF

FAN

CC

AX

HC

AF

4"

2•"

4"

CV

CV

3"

2•"

CV

1 ‚"

4"

3"

1"

3"

2"

PIPES DN.

1‚"

F

B P

LINE LEGEND

POINT OF CONNECTION

NEW WORK

EXISTING TO REMAIN

DEMOLITION

CONCRETE PAD

EXISTING

PLENUM

SHEETMETAL

FULLSIZE

EXISTING

SHUT OFF SWITCH

BOILER EMERGENCY

EXISTING

TO CAP ON ROOF

5"{ FLUE VENT UP

EXISTING

T

46/40 OA

AC VP

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

SECOND FLOOR MECHANICAL ROOM 202 - DEMOLITION - HVAC

LARGE SCALE -

SECOND FLOOR MECHANICAL ROOM 202 - NEW WORK - HVAC

LARGE SCALE -

FOR NEW FLUE

IN ROOF & ROOF CURB

EXISTING OPENING

ON ROOF; REUSE

BOILER FLUE & CAP

REMOVE EXISTING

REMAIN

HEATER FLUE TO

EXISTING WATER

CHEMICAL FEED TANK

REMOVE EXISTING

EXPANSIONTANK

REMOVE EXISTING

TO REMAIN

AIR LOUVER

COMBUSTION

48"X76"

EXISTING

AH-2 TO REMAIN

EXISTING AIR HANDLER

TO REMAIN

EXISTING AH-1 VFD

TO REMAIN

EXISTING ACP

HW PUMP STARTERS

REMOVE EXISTING

TO REMAIN

EXISTING HUMIDIFIERBOILER

EXISTING

REMOVE

WATER STATION

MAKE-UP

REMOVE EXISTING

PAD TO REMAIN

EXISTING HOUSEKEEPING

HP-2

HP-1

PUMPS HP-1 & 2

HEATING WATER

REMOVE EXISTING

ASSEMBLY TO REMAIN

DISPERSION TUBE

EXISTING HUMIDIFIER

AH-1 TO REMAIN

EXISTING AIR HANDLER

CP-1 TO REMAIN

EXISTING CHW PUMP

BLR-1

NEW

EXISTING

EXISTING

PAD

CONCRETE

EXISTING

3"

NEW MUW

3"

HP-2 VFD

HP-1 VFDNEW

NEW

CHEMICAL FEEDER

NEW BYPASS

NEW EXPANSIONTANK

3"

3"

FLUE CAP ON ROOF

EXISTING ROOF OPENING TO NEW

8"{ BOILER FLUE UP THRU

NEW

HP-2

NEW

HP-1

NEW WORK - HVAC

DEMOLITION &

MECHANICAL ROOM 202 -

SECOND FLOOR

LARGE SCALE -

SEPARATOR

NEW AIR

FOOTPRINT OF NEW BOILER

MODIFY EXISTING PAD TO ACCEPT

P:\25077\25077m301.dgn

DATE PLOTTED

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077m301.dgn

AS SHOWN

WSH

LTF

WSH

25077

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

T

AH-1

AH-2

38/36

36/24

32/32

36/28

28/28 H W

R C

H R

C H S

TU2-14

DN

PIPES

VFD-2

UH-1

H W

S

H W

R

H W

S

WH

HWR

HWS

34/20

FAN

CCAXHCAF

FAN

CC

AX

HC

AF

4"

2•"

4"

CV

3"

CV

1 ‚"

4"

1"

PIPES DN.

1‚"

F

B P

CONCRETE PAD

EXISTING

PLENUM

SHEETMETAL

FULLSIZE

EXISTING

SHUT OFF SWITCH

BOILER EMERGENCY

EXISTING

TO CAP ON ROOF

5"{ FLUE VENT UP

EXISTING

T

46/40 OA

AC VP

REMAIN

HEATER FLUE TO

EXISTING WATER

TO REMAIN

AIR LOUVER

COMBUSTION

48"X76"

EXISTING

AH-2 TO REMAIN

EXISTING AIR HANDLER

TO REMAIN

EXISTING AH-1 VFD

TO REMAIN

EXISTING ACP

TO REMAIN

EXISTING HUMIDIFIER

ASSEMBLY TO REMAIN

DISPERSION TUBE

EXISTING HUMIDIFIER

AH-1 TO REMAIN

EXISTING AIR HANDLER

CP-1 TO REMAIN

EXISTING CHW PUMP

EXISTING

EXISTING

PAD

CONCRETE

EXISTING

P:\25077\25077m401.dgn

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077m401.dgn

AS SHOWN

WSH

LTF

WSH

25077

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

T

M401

FLOW DIAGRAM - HVAC1

NOT TO SCALE

VFD

VSD

VFD

VSD

TT

TT

F.M.

TT

DP

AI

AI

AI

AI

FM

AI

AI DI AO DO

AI DI AO DO

VLV

AI AO

SOFTWAREINPUTSOUTPUTS

ACP

DDC PANEL

INPUT/OUTPUT

SUMMARIES

NOTES:

1. FAILURE MODES:

2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF

ELECTRIC POWER TO THE DDC PANEL.

L - LAST COMMAND

O - OPEN OR ON

C - CLOSE OR OFF

TAG

LOW WATER LEVEL

POINT DESCRIPTION

BLR-1 BOILER

TT-1

TT-2

HWR - (SYSTEM)

HWS - (SYSTEM)

HEATING SYSTEM PUMP-VFD CONTROL

HEATING SYSTEM PUMP-VFD CONTROL

DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP

FM-1 HEATING WATER FLOW METER

BYPASS VALVE

HP-1

HP-2

BOILER PLANT SYSTEM

DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS

S Y

S T

M

G R

A P

H

IC

D

IS

P L

A Y

S T

A R

T

S T

O P

E N

A B

L E

D

IS

A B

L E

O P

E N

C L

O S

E

S T

A R

T

S T

O P

A

K E

U P

S E

T P

O

IN

T

J

U S

T

D

C

N T

R O

L

D

IF

F E

R E

N T

IA

L

P

R E S

S U

R E

P R

E S

S U

R E

S

W

IT

C H

A U

X

IL

IA

Y

N T

A C

T

A L

A

N T

A C

T

T E

M P

E R

A T

U R

E

H

IG

H

L

W

L

IM

IT

R U

N

T A

L

IZ

A T

IO

N

P R

O P

O R

T

IO

N A

L

P R

O P

IN

T E

G R

A L

T

IM

E

S

C H

E D

U L

E

S

S

O P

T

IM

U

A R

T

S T

O P

D A

Y

N

IG

H

T B

A C

K

D E

M A

IT

C Y

C L

E

R E S

P

T

IM

IZ

A T

IO

N

E C

O N

O M

IZ

E R

N O

T E S

C U

R R

E

L A

Y

S P

E E

D

IN

D

IC

A T

IO

N

S P

E

N T

R O

L

P O

S

IT

IO

N

IN

D

IC

A T

IO

N

O P

E R

A T

IN

G

A T

U S

D

IF

F

P

R E S

S U

R E

K W

P R

E S

S U

R E

W A

T

F

O W

S T

E

O W

S T

A T

U S

D R

IV

E

S

T A

T U

S

T R

E

G

F A

IL

U

D E (S

T E S

A

N D

FLOW DIAGRAM - HVAC

L

O

O

TEMPORARY BOILER

BLIND FLANGE FOR

3"

TEMPORARY BOILER

BLIND FLANGE FOR

HWS

HWR HWR

HWS

BLR-1

NEW

BOILER

CONTROL

DRAIN w/HOSE END

CONNECTION (TYP) CONCRETE PAD

GAUGE

PRESSURE

AIR RELEASE TANK

ROUTE TO

FLOOR DRAIN

EXPANSION TANK, SET 25 PSIG

MIN. ACCEPTANCE VOLUME.

BLADDER

PURGE

VALVE

CHEMICAL FEED TANK

NEW HP-2

NEW HP-1

1"

1"

PUMP GAUGE (TYP)

1" TO DOMESTIC

WATER

MAKE-UP WATER STATION

ROUTE TO DRAIN

A.A.V.

BYPASS VALVE

CV= 15.0

TO HEATING

EQUIPMENT

COILS

TO HEATING

EQUIPMENT

COILS

VLV-1

DP-1

3"

3"

3" 3" 3" 3"

3"

3"

3"

3"

3"

3"

3"

INITIAL FILL PRESSURE. 1 1 GAL.

30 GAL. MIN. TANK VOLUME

3"

3"

P:\25077\25077m501.dgn

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077m501.dgn

AS SHOWN

WSH

LTF

WSH

25077

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

T

M501

DETAILS - HVAC

A

BC

E

TO SYSTEM

B -ƒ" TO DISCHARGE OF PUMP.

C -ƒ" TO SUCTION OF PUMP.

F - RISER CLAMP. WELD TO 2X3/4 " FLAT

OFFSET BRACKET TO WALL.

A - CHEMICAL FEEDER TANK.

D -ƒ" TO FLOOR DRAIN.

D

4"MIN.

WELD

F

BALL VALVES

E -‚" BALL VALVE FOR VENT.

BY-PASS CHEMICAL FEEDER

NOT TO SCALE

BACKFLOW PREVENTER

1"1"

MAKE - UP WATER STATION

GAUGE COCK

ƒ"

PRESSURE REDUCING

VALVE. SET AT

1"

AIR GAP DRAIN

FITTING

1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR

TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE

CLAMPS SAME MATERIAL AS PIPE.

PSI.

GAUGE

BALL VALVE

BALL VALVE

NOT TO SCALE

TO FILL POINT

OF SYSTEM

BALL VALVE

QUICK FILL

CONNECTION

TO DOMESTIC COLD

WATER SUPPLY

HANGER ROD - SEE SPECIFICATIONS

SECTION OF RIGID INSULATION

SPECIFIED INSULATION

PIPE

• ROUND BEARING PLATE

PLATE WASHER

CUT ROD ABOVE ANGLE LEG

1" MIN.

TRAPEZE HANGER

LONG LEG VERTICAL

SEE SPECIFICATIONS

DOUBLE HEX NUTS

TRAPEZE PIPE HANGER

NOT TO SCALE

SERVICE TEE

ECCENTRIC REDUCER

•" STREET ELL.

AUTOMATIC AIR VENT

MAINS

•"X2" NIPPLE

„"MPT X ‚" FLARE ELL.

‚" COPPER TO FLOOR

DRAIN OR OUTSIDE

AS SHOWN.

AUTOMATIC AIR VENT

NOT TO SCALE

TYPICAL DRAIN VALVE CONNECTION

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

ƒ" BALL VALVE

ADAPTER TO ƒ" HOSE THREAD

PROVIDE HOSE CAP NUT

NOTES:

DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.

2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

NOT TO SCALE

ƒ" CHAMFER

ALL SIDES UNLESS OTHERWISE NOTED

EQUIPMENT

4" MINIMUM ALL SIDES

6" X 6", 10\10 WELDED WIRE

FABRIC AT MID-DEPTH OF

PAD (UNLESS OTHERWISE NOTED)

SLAB, FLOOR, OR SUPPORTING STRUCTURE.

ROUGH UP WHERE CONCRETE DOES NOT HAVE

BROOM FINISH OR ROUGHER.

6" THICK CONCRETE

(INERTIA PAD IDENTICAL)

HOUSEKEEPING PAD DETAIL

NOT TO SCALE

WALL

AS SYSTEM PIPE.

MANUAL AIR VENT

TERMINATE DRAIN WITH HOSE END

CONNECTION 18" ABOVE FLOOR.

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

CEILING. LOCATE VALVE AND TERMINATE DRAIN

HERE, UNLESS NOTED OTHERWISE AND POSITION

VALVE FOR VERTICAL DOWN DISCHARGE.

•" PIPE SAME MATERIAL

2•"

VERTICAL

PIPE

SUPPORT

WELDED PIPETHREADED / BRAISED

PIPING

BALL VALVE (EXPOSED) OR

GATE VALVE (CONCEALED)

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

6"MAX.

NOT TO SCALE

TEST PLUG

STRAINER

CHECK VALVE

PIPES SUPPORT

PRESSURE GAUGE

GAUGE COCK

VERTICAL IN-LINE PUMP DETAIL

VERTICAL INLINE PUMP

NOT TO SCALE

ƒ" BALL VALVE W/

HOSE END ADAPTER (TYPICAL)

ƒ" BALL VALVE W/

HOSE END ADAPTER (TYPICAL)

BUTTERFLY VALVE BUTTERFLY VALVE

P:\25077\25077e001.dgn

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077e001.dgn

AS SHOWN

TWT

BCO

TWT

25077

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

T

E001

ELECTRICAL

RISER, & DETAILS -

LEGEND, SCHEDULE,

RECEPTACLES

CIRCUITS

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

QUADRAPLEX - NORMAL

ELECTRICAL LEGEND

WP

H HORIZONTALLY MOUNTED

WEATHER PROOF OUTLET

RACEWAY EXPOSED

FLEXIBLE RACEWAY

CONDUIT UP

CONDUIT DOWN

HOMERUN- ONE ARROW PER CIRCUIT

ONE CROSSMARK PER WIRE

(3 WIRE UNLESS SHOWN)

RACEWAY CONCEALED IN CEILING OR WALL

RACEWAY IN GROUND, SLAB, OR UNDER FLOOR

CAP

CONNECTION TO EQUIPMENT

GENERAL EQUIPMENT

TRANSFORMER

F

PANELBOARD-250 VAC OR LESS

SURFACE MOUNTED

PANELBOARD-250 VAC OR LESS

RECESSED

PANELBOARD-OVER 250 VAC

RECESSED

PANELBOARD-OVER 250 VAC

SURFACE MOUNTED

T

M MANUAL STARTER AND MOTOR RATED SWITCH

EMERGENCY PUSHBUTTON

EXHAUST FAN

MOTOR

JJ J

COMMUNICATIONS

ENCLOSED CIRCUIT BREAKER

JUNCTION BOX - WALL/CEILING/FLOOR

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

COMBINATION STARTER AND DISCONNECT

WITH A RJ45 CONNECTOR. STAINLESS STEEL COVER PLATE

DATA OUTLET WITH A SINGLE CAT 6 CABLE TERMINATED

T L C

MDP

EXISTING

SUPPRESSION

SURGE

SUPPRESSION

SURGE

CONTACTOR

LIGHTING

MDP 1

TO NEW

MDP 1

TO NEW

MDP 1

TO NEW

IN TRIAD CONFIGURATION

MINIMUM 10FT. APART

GROUND RODS SPACED

G

UTLITY TRANSFORMER

POLE MOUNTED

F

3•"C

1#3G, 4#500kcmil, 3•"C

1#3G, 4#500kcmil, R2

2•"C

1#6G, 4#3/0AWG,

1#1/0G, 4"C

4#500kcmil, 2 SETS:

NOT TO SCALE

225kVA

1#500KCMILG

400A/3P/1 SECTIONS 1 & 2

EXISTING R1

T1

TRANSFORMER

EXISTING

MDP 1 L1 M1

EXISTING POWER RISER DIAGRAM

HP-1

J

RP

AC VP

M1

BLR-1

TU2-14

AH-2

CP-1

HP-2

R1-47

R1-43

30/1/1

30/3/1

R1-26

M1-21

M1-27

R1-38 R1-78

M1-14,16,18

VAC. PUMP

R2-21

M1-8

M1-14

M1-20

E301

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

UH-1

VFD-2

TO REMAIN

EXISTING ACP

TO REMAIN

EXISTING AH-1 VFD

H-1

BOILER

EXISTING

REMOVE

M1-7

R1-77

R1-49

R1-51 R2-16

M1-1

SHUT OFF SWITCH

BOILER EMERGENCY

EXISTING

SECOND FLOOR MECHANICAL ROOM 202 - NEW WORK - SYSTEMS/HVAC POWER

LARGE SCALE -

NOTES:(THIS SHEET ONLY)

AND EXISTING CONDUCTORS. CONDUIT CAN BE REUSED.

BOILER WILL BE 120 VOLTS. REMOVE EXISTING 30A/3P FUSED DISCONNECT

DEMO EXISTING 208 VOLT POWER FEEDING THE EXISTING GAS BOILER. NEW

BE LABELED AS SPARE AND TURNED OFF.

THE NEW BREAKERS SHALL SERVE THE NEW BOILER. THE OTHER SHOULD

THE NEW BREAKERS SHALL MATCH EXISTING PANEL AIC RATING. ONE OF

AND PROVIDE TWO 20A/1P CIRCUIT BREAKERS BACK IN THE SAME SPOT.

FINAL CONNECTIONS. REMOVE EXISTING 20A/2P BREAKER AT CIRCUIT R1-43

EXISTING CONDUIT TO SERVE NEW 120 VOLT FEED TO BOILER. MAKE ALL

POSITION. REUSE EXISTING HOMERUN CONDUIT. PROVIDE NEW 3#12 AWG IN

PROVIDE NEW 30A/2P FUSED DISCONNECT THAT IS LOCKABLE IN THE OPEN

M1 CAN BE REUSED TO SERVE THE NEW PUMPS.

REUSED IF PRACTICAL. THE EXISTING 20A/3P CIRCUIT BREAKERS IN PANEL

BACK TO SERVING PANEL. EXISTING CONDUIT BACK TO PANEL M1 CAN BE

HP-2 BEING REMOVED. REMOVE ALL EXISTING STARTERS AND CONDUCTORS

DEMO EXISTING 480 VOLT, 3 PHASE POWER TO EXISTING PUMPS HP-1 AND

CONNECT TO EXISTING 20A/3P CIRCUIT BREAKERS IN PANEL M1.

HOMERUN CONDUIT. EXTEND CONDUIT AS REQUIRED TO NEW PUMPS.

HP-2. PROVIDE NEW 4#10 AWG CONDUCTORS FOR EACH USING EXISTING

BY DIV 23) AND TO THE NEW PUMP MOTORS FOR NEW PUMPS HP-1 AND

NEW VFD. MAKE ALL FINAL CONNECTIONS THROUGH THE VFD (PROVIDED

PROVIDE NEW 30A/3P FUSED DISCONNECT ON THE LINE SIDE OF EACH

PROVIDE 480 VOLT, 3 PHASE POWER TO NEW HEATING WATER PUMP.

FAP

T

K V

A LC

MDP

L1

R1

T1

F

EXISTING MDP

DISCONNECT

R2

ON FIRST FLOOR

OF ELECTRICAL ROOM 134

APPROXIMATE LOCATION

ON FIRST FLOOR

OF ELECTRICAL ROOM 134

APPROXIMATE LOCATION

M1-14

M1-20

F

SECOND FLOOR MECHANICAL ROOM 202 - DEMOLITION - HVAC POWER

LARGE SCALE -

HVAC POWER

NEW WORK - SYSTEMS/

DEMOLITION &

MECHANICAL ROOM 202 -

SECOND FLOOR

LARGE SCALE -

P:\25077\25077e301.dgn

DATE PLOTTED

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077e301.dgn

AS SHOWN

TWT

BCO

TWT

25077

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

J

RP

AC VP

M1

TU2-14

CP-1

R1-47

30/1/1

R1-26

M1-21

M1-27

R1-38 R1-78

M1-14,16,18

VAC. PUMP

R2-21

M1-8

UH-1

VFD-2

TO REMAIN

EXISTING ACP

TO REMAIN

EXISTING AH-1 VFD

H-1

M1-7

R1-77

R1-49

R1-51 R2-16

M1-1

SHUT OFF SWITCH

BOILER EMERGENCY

EXISTING

FAP

T

K V

A LC

MDP

L1

R1

T1

F

EXISTING MDP

DISCONNECT

R2

BLR-1

NEW

HP-2 VFD

HP-1 VFDNEW

NEW

NEW

HP-2

NEW

HP-1

LARGE ANIMAL STALLELECTRICAL ROOM

LARGE ANIMAL STALLELECTRICAL ROOM

TU2-14

AH-1

SCALE:

= 1'-0

4 0 2 4 8

P301

B1

4"FD

4"FD

H1

4"

2"V-UP

4"CO

4"VTR

2"

W1 1•"

4"V-UP

4"W-DN

2"

4"FD

VACUUM PUMP

4"CO

4"

4"-BF

ƒ" MAKEUP

1" ƒ"

4"FD

ASSEMBLY

PRIMER VALVE

MULTIPLE TRAP

ƒ" HB @ 42" AFF.

A E

X

A E

X

SCALE:

= 1'-0

4 0 2 4 8

NOTE TO CONTRACTOR:

PROVIDE ACCESS TO THE CONCEALED UTILITY.

WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO

PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF

TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES

NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING

FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT

WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,

REGULATOR

NUMBER

MBH GAS

INPUT DEMAND PRESSURES

NOTES:

BR-1

B-1

W-1

EQUIPMENT

SERVED

MAXON CO., GENERAL CONTROL OR FISHER.

MANUFACTURER'S ARE: EQUIMETER., AMERICAN METER.

REGULATOR

LOCATION

BUILDING OUTSIDE

MEZZ.

MECH.

1491 MBH

MEZZ.

MECH.

300 MBH

2 PSI/ 11" WC

2 PSI/ 11" WC

HEATER

WATER

L-1 2 PSI/ 11" WC

OUTLETS

LAB

40 CFH

GRILLES, ETC.

PIPE RELIEF VENT FULL SIZE FROM INTAKE

INLET/OUTLET

METER /2 PSI

H-1 MEZZ.

MECH.

460 MBH 2 PSI/ 11" WC

2300 MBH

BOILER

ROOM 129

BOILER

LEGEND

SOIL , WASTE VENT

D CONDENSATE DRAIN COLD WATER

HOT WATER (140 ) HOT WATER RETURN

GATE VALVEBALL VALVE

CHECK VALVE

BALANCER (CIRCUIT SETTER)

FLOW INDICATOR

STRAINERPRESSURE REDUCING VALVE

GLOBE VALVE UNION

GAS COCK AQUASTAT

INCREASER FLOOR DRAIN (FD)

CLEANOUT (CO) CLEANOUT (CO)

HUB DRAIN BELOW FLOORBF

ABOVE CEILINGAC ABOVE FINISHED FLOORAFF

EXISTING VENT TO REMAIN

TO REMAIN

EXISTING SOIL, WASTE

WATER TO REMAIN

EXISTING COLD

BE REMOVED

EXISTING PIPING TO

WATER TO REMAIN

EXISTING HOT

RETURN TO REMAIN

EXISTING HOT WATER

LIMIT OF DEMOLITION

NEW TO EXISTING

POINT OF CONNECTION

GEXGAS REGULATOR GAS EXHAUST

G GAS (LOW PRESSURE) MED. PRESSURE GAS (2psi)MPG

H-1

TO REMAIN

EXISTING ACP

TO REMAIN

EXISTING AH-1 VFD

HW PUMP STARTERS

REMOVE EXISTINGHP-2

HP-1

PUMPS HP-1 & 2

HEATING WATER

REMOVE EXISTING

BLR-1

BOILER

EXISTING

REMOVE

WH

COMPRESSOR

AIR

SECOND FLOOR MECHANICAL ROOM 202 - DEMOLITION - PLUMBING

LARGE SCALE -

SECOND FLOOR MECHANICAL ROOM 202 - NEW WORK - PLUMBING

LARGE SCALE -

EXISTING GAS REGULATOR SCHEDULE

NOTES:(THIS SHEET ONLY)

2"

3 CONNECT NEW 2" GAS PIPING TO BOILER.

EXISTING GAS REGULATOR IS TO REMAIN TO SERVE NEW BOILER.

REMOVE EXISTING GAS PIPING SERVING BOILER. REMOVE PIPING BACK TO REGULATOR.

NEW BOILER CONNECTION.

CONNECT NEW 2" GAS PIPING TO EXISTING REGULATOR. ROUTE NEW 2" GAS PIPING TO

NEW WORK - PLUMBING

DEMOLITION &

MECHANICAL ROOM 202 -

SECOND FLOOR

LARGE SCALE -

P:\25077\25077p301.dgn

DATE PLOTTED

DGN FILE

15-AUG-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25077\25077p301.dgn

AS SHOWN

25077

WHD

WHD

WHD

COA Expiration: 6.30.2026

NBP Engineers, Inc.

COA#PEF000774

08.15.2025

F o rt V a ll e y

G e o rg ia

F V S

U P ro je c t

N o

F

V S

U B

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

F o rt V a ll e y S ta te U n iv e rs it y

O n e a l V e t T e c h B o il e r

R e p la c e m e n t

T

TU2-14

AH-2

AH-1

B1

4"FD

4"FD

H1

4"

2"V-UP

4"CO

4"VTR

2"

W1 1•"

4"V-UP

4"W-DN

2"

4"FD

VACUUM PUMP

4"CO

4"

4"-BF

ƒ" MAKEUP

1" ƒ"

4"FD

ASSEMBLY

PRIMER VALVE

MULTIPLE TRAP

ƒ" HB @ 42" AFF.

A E

X

A E

X

H-1

TO REMAIN

EXISTING ACP

TO REMAIN

EXISTING AH-1 VFD

WH

COMPRESSOR

AIR

BLR-1

NEW

HP-2 VFD

HP-1 VFDNEW

NEW

NEW

HP-2

NEW

25077aCov
25077m001
References
tb, 25077tb.dgn
25077m301
References
tb, 25077tb.dgn
afp1, 25077afp2.dgn
afp2, 25077afp2.dgn
existing, 25077m301.dgn
25077m401
References
tb, 25077tb.dgn
25077m501
References
tb, 25077tb.dgn
25077e001
References
tb, 25077tb.dgn
25077e301
References
tb, 25077tb.dgn
afp2-1, 25077afp2.dgn
afp2, 25077afp2.dgn
existing, 25077e301.dgn
hvac new, 25077m301.dgn
A1 Add 11, 25077afp1.dgn
A1 Add 1-1, 25077afp1.dgn
25077p301
References
tb, 25077tb.dgn
afp2-1, 25077afp2.dgn
afp2, 25077afp2.dgn
existing, 25077p301.dgn
hvac new, 25077m301.dgn

File details come from the government source that posted it. Updated .