2025-005 LYNCHBURG REGIONAL AIRPORT GENERATOR UPGRADE DRAWINGS.pdf
PDF 8 MB Posted
- Solicitation number
- 69778
- Issued by
- Campbell County, Virginia
About this file
This document appears to be a set of construction drawings and technical specifications for IFB 2025-005 Lynchburg Regional Airport Generator Upgrade, a state and local contract opportunity issued by the City of Lynchburg, Virginia. The project consists of constructing a new concrete glycol pad, a new concrete generator pad, and installing a non-encased electrical conduit southeast of the airport terminal, adjacent to the apron. The work includes mobilization, erosion control, barricade placement, excavation, paving, and construction of the new concrete pads. The anticipated construction schedule is 60 calendar days following a 60-calendar day administrative phase. The project requires compliance with relevant FAA regulations and the contractor to provide safety and security measures during construction.
The technical specifications outline requirements for concrete, reinforcing steel, earthwork, and masonry, as well as structural details for the foundation, walls, and glycol tank pad. Pricing terms, set-asides, incumbents, or funding sources are not provided in the document. The contract opportunity appears to be open to qualified bidders, with the City of Lynchburg serving as the awarding agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
Y D
E E
D
M
X
RS&H PROJECT NUMBER: 20220047.002
LYNCHBURG REGIONAL AIRPORT - LYH
GENERATOR UPGRADE - CIVIL PACKAGE
Reynolds Smith and Hills, Inc.
2600 PARK TOWER DRIVE, SUITE 101
VIENNA, VA 22180
703-207-4791 www.rsandh.com
VICINITY MAP
SCALE 1" = 400'
LOCATION MAP
N.T.S.
CITY OF LYNCHBURG, VIRGINIA
ABBREVIATIONS
ABC - AGGREGATE BASE COURSE
AC/ACP - ASPHALTIC CONCRETE PAVEMENT
ACI - AMERICAN CONCRETE INSTITUTE
ADG - AIRPLANE DESIGN GROUP
AIP - AIRPORT IMPROVEMENT PROGRAM
AOA - AIRCRAFT OPERATIONS AREA
APPROX. - APPROXIMATE
ASIG - AIRCRAFT SERVICE INTERNATIONAL GROUP
ASR- AIRPORT SURVEILLANCE RADAR
ASTM - AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATCT - AIR TRAFFIC CONTROL TOWER
BLDG - BUILDING
BO - BOTTOM OF
B.O.B. - BOTTOM OF BANK
BOP - BOTTOM OF PIPE
BOD - BOTTOM OF DUCT
BODWP - BOTTOM OF DOUBLE WALL PIPE
BOTT. - BOTTOM
CL/C- CENTERLINE
C - CONDUIT
CBR - CALIFORNIA BEARING RATIO
CLR - CLEARANCE
COM - COMMUNICATION
CONC - CONCRETE
CONN - CONNECTION
CONT - CONTINUOUS
CS - CARBON STEEL
CSSO - CONTRACTOR SAFETY AND SECURITY OFFICER
DBL - DOUBLE
DETL - DETAIL
DIP - DUCTILE IRON PIPE
DIA - DIAMETER
DIAG. - DIAGONAL
DWG - DRAWING
E - EASTING
EA - EACH
EG - EXISTING GROUND
EL/ELEV - ELEVATION
ELEC - ELECTRICAL
ELL - ELBOW
EOP - EDGE OF PAVEMENT
EX/EXST/EXIST - EXISTING
FAA - FEDERAL AVIATION ADMINISTRATION
FH - FIRE HYDRANT
FO - FIBER OPTIC
FOD - FOREIGN OBJECT DEBRIS
FAR - FEDERAL AVIATION REGULATIONS
GALV - GALVANIZED
GND. - GROUND
GNE - GROUNDWATER NOT ENCOUNTERED
GRS - GALVANIZED RIGID STEEL
GSE - GROUND SERVICE EQUIPMENT
GV - GAS VALVE
GWL - GROUND WATER LEVEL
HORT - HORIZONTAL
HP - HYDRANT PIT
HPV - HIGH POINT VENT
ID - IDENTIFICATION
I.D. - INNER DIAMETER
IE/INV - INVERT ELEVATION / INVERT
I.F. - INSULATING FLANGE
ISO - ISOLATION
IVP - ISOLATION VALVE PIT
KIP - 1,000 LBS
L - LIGHTING
LB - POUND
LEO - LAW ENFORCEMENT OFFICER
LF - LINEAR FEET
LOD - LIMITS OF GRADING
LPD - LOW POINT DRAIN
LT - LEFT
MAX - MAXIMUM
MECH - MECHANICAL
MH - MANHOLE
MIN - MINIMUM
MON - MONITORING (WELL)
MSL - MEAN SEA LEVEL
N - NORTHING OR NO. OF BLOWS
NAD - NORTH AMERICAN DATUM
NAVAIDS - NAVIGATIONAL AIDS
NGVD - NATIONAL GEODETIC VERTICAL DATUM
NO - NUMBER
NOTAM - NOTICE TO AIRMEN
NPDES - NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM
NTP - NOTICE TO PROCEED
NTS - NOT TO SCALE
OC - ON CENTER
OD - OUTER DIAMETER
OFA - OBJECT FREE AREA
O/S - OUTSIDE
OZ - OUNCE
PAPI - PRECISION APPROACH PATH INDICATOR SYSTEM
PAVT - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE
PCSM - POST CONSTRUCTION STORMWATER MANAGEMENT
PLAN
PERF - PERFORATED
PF - PLIDCO FLANGE
PG - PRESSURE GAUGE
PG - PROPOSED GRADE
PK - PEAK
PKG - PARKING
PS - PIPE SUPPORT
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PT - POINT OF TANGENCY
PVC - POLYVINYL CHLORIDE
PVI - POINT OF VERTICAL INTERSECTION
RCP - REINFORCED CONCRETE PIPE
RED - REDUCER
REF - REFERENCE
REIL - RUNWAY END IDENTIFIER LIGHT SYSTEM
REINF - REINFORCED
REQ/REQ'D - REQUIRED
RF - RAISED FACE
RIM - RIM ELEVATION
RLD - RESPONSIBLE LAND DISTURBER
ROFZ - RUNWAY OBJECT FREE ZONE
RPR - RESIDENT PROJECT REPRESENTATIVE
RPZ - RUNWAY PROTECTION ZONE
RSA - RUNWAY SAFETY AREA
RT - RIGHT
RW - RUNWAY
S/SAN - SANITARY
SC - SECONDARY CONTAINMENT
SCH/SCHED - SCHEDULE
SD - STORM DRAIN
SIDA - SECURITY IDENTIFICATION DISPLAY AREA
SF - SQUARE FOOT
SF/GAL - SQUARE FEET PER GALLON
SPT - STANDARD PENETRATION TEST
SS - STAINLESS STEEL
STA - STATION
STD - STANDARD
STL - STEEL
STRUCT - STRUCTURE
SW - SINGLE WALL
TBR - TO BE REMOVED
TDZ - TOUCHDOWN ZONE
TEL - TELEPHONE
TEMP - TEMPORARY
THD - THREADED
THK - THICK
T/L - TAXILANE
T.O. - TOP OF
T.O.B. - TOP OF BANK
TOC - TOP OF CONCRETE
TOD - TOP OF DUCT
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
T/W - TAXIWAY
TYP - TYPICAL
UD - UNDERDRAIN
UG - UNDERGROUND
UMH - UNIDENTIFIED MANHOLE
U.N.O. - UNLESS NOTED OTHERWISE
VAC - VACUUM
VDOT - VIRGINIA DEPARTMENT OF TRANSPORTATION
VERT - VERTICAL
W - WATER
WTR - WATER
W/ - WITH
WM - WATER MAIN
WP - WEATHER PROOF
WV - WATER VALVE
JANUARY 11, 2024
BID SET
BID SET DESIGN DRAWINGS
LYH
LYNCHBURG
REGIONAL
AIPORT
PROJECT
SITE
QUANTITY SUMMARY SHEET INDEX
DRAWING
NUMBER SHEET # DESCRIPTION
G001 1 TITLE SHEET
G002 2 SUMMARY OF QUANTITIES AND SHEET INDEX
G003 3 SITE PLAN
G004 4
CONSTRUCTION SAFETY AND PHASING PLANG005 5
G006 6 G007 7 G008 8 G009
CONSTRUCTION SAFETY AND PHASING DETAILS
CONSTRUCTION SAFETY AND PHASING NOTES
EROSION AND SEDIMENT CONTROL PLAN
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
EROSION AND SEDIMENT CONTROL DETAILS
GRADING PLAN
GOO2
SUMMARY OF
QUANTITIES
AND SHEET
INDEX
STRUCTURAL NOTES, FOUNDATION PLAN, SECTIONS AND DETAILS
SPEC
REFERENCE WORK ITEM DESCRIPTION
P-101-5.1 PAVEMENT REMOVAL
P-209-5.1
C-102-5.1a C-102-5.1b
P-603-5.1
SEDIMENT RETENTION ROLL
DROP INLET PROTECTION
TACK COAT
UNIT
SY
CY
LF
EACH
GAL
QUANTITY
C-105 MOBILIZATION LSUM 1
P-152-4.1 UNCLASSIFIED EXCAVATION CY 350
P-403-8.1 ASPHALT SURFACE COURSE (12") TON 220
CRUSHED AGGREGATE BASE COURSE (12.5")
T-908-5.1 MULCHING SY 150
T-905-5.2 TOPSOIL CY 20
T-901-5.1 SEEDING SY 150
P-152-4.2 BORROW EXCAVATION CY 225
NON-ENCASED ELECTRICAL CONDUIT, 1-WAY 2-INCH LF 650L-110-5.1
-- CY 80REINFORCED CONCRETE PAD AND RETAINING WALL
TOPOGRAPHIC SURVEY
S001 G010
H Y D
EE
D
X X X X X
M
EXISTING
GENERATOR
RELOCATED
GLYCOL TANK
PAD (16' X 16')
TERMINAL DRIVE
EXISTING
GLYCOL TANK
VEHICULAR PARKING
APRON
TERMINAL
PROPOSED
GENERATOR PAD
(444 SF)
REPLACE EXISTING
PAVEMENT (5' X 43')
PROTECT EXISTING
UTILITIES
SEE NOTE 6
PROTECT EXISTING
HYDRANT
1-1
1-3
1-4
1-5
1-6
1-71-2 1-8
1-9
1-10
1-11
1-12
4.0' 3.2'39'
H Y D
EE
D
X X X X X
M
EXISTING
GENERATOR
RELOCATED
GLYCOL TANK
PAD (16' X 16')
TERMINAL DRIVE
EXISTING
GLYCOL TANK
VEHICULAR PARKING
APRON
TERMINAL
PROPOSED
GENERATOR PAD
(444 SF)
REPLACE EXISTING
PAVEMENT (5' X 43')
PROTECT EXISTING
UTILITIES
SEE NOTE 6
PROTECT EXISTING
HYDRANT
1-1
1-3
1-4
1-5
1-6
1-71-2 1-8
1-9
1-10
1-11
1-12
4.0' 3.2'39'
H Y D
EE
D
X X X X X
M
EXISTING
GENERATOR
RELOCATED
GLYCOL TANK
PAD (16' X 16')
TERMINAL DRIVE
EXISTING
GLYCOL TANK
VEHICULAR PARKING
APRON
TERMINAL
PROPOSED
GENERATOR PAD
(444 SF)
REPLACE EXISTING
PAVEMENT (5' X 43')
PROTECT EXISTING
UTILITIES
SEE NOTE 6
PROTECT EXISTING
HYDRANT
1-1
1-3
1-4
1-5
1-6
1-71-2 1-8
1-9
1-10
1-11
1-12
4.0' 3.2'39'
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
Feet 0 30 60
16'
RU
NW
AY
-2
2 TERMINAL
W
ARDS RD
SITE
KEYMAP
LEGEND
D
H DY
E
XX X
MARK
GAS
WORK AREA
BENCHMARK
TELEPHONE PEDESTAL
STORM MANHOLE
LIGHT POLE
FIRE HYDRANT
GAS MARKER
ELECTRIC MANHOLE
ELECTRIC PEDISTAL
GROUND LIGHT
FENCE
1. THIS PROJECT INCLUDES:
· CONSTRUCTION OF NEW CONCRETE GLYCOL PAD
· CONSTRUCTION OF NEW GENERATOR PAD (SIZE MAY BE MODIFIED BASED ON FINAL GENERATOR SIZE
SELECTION)
2. CONSTRUCTION ACCESS TO THE SITE SHALL BE BY THE GATE LOCATED OFF THE RENTAL CAR PARKING LOT AND TERMINAL DRIVE. USE OF THIS ACCESS MUST BE REQUESTED AND APPROVED BY THE AIRPORT IN ADVANCE OF UTILIZING. REQUESTING USE OF THIS ACCESS DOES NOT GUARANTEE APPROVAL FROM THE AIRPORT.
CONSTRUCTION ENTRANCES AND STAGING AREAS ARE TO BE REVIEWED BEFORE THE START OF
CONSTRUCTION.
3. CONTRACTOR EQUIPMENT SHALL CROSS ACTIVE AIRFIELD PAVEMENT ONLY AT THE DESIGNATED ACCESS ROUTE SHOWN ON THE PHASING SHEETS. ALTERNATE ROUTES MUST RECEIVE ENGINEER/RPR APPROVAL PRIOR TO USE.
4. HAUL ROAD AND CONSTRUCTION ENTRANCE SHALL BE RESTORED TO ITS ORIGINAL CONDITION, SEEDED, AND
GRADED TO DRAIN AT NO ADDITIONAL COST TO THE OWNER.
5. CONTRACTOR STAGING AREA: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE STAGING AREA LOCATION WITH THE APPROPRIATE OWNERS WHO HAVE JURISDICTION. STAGING AREA SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR TO THE SATISFACTION OF THE ENGINEER UPON COMPLETION OF BEING USED AS A STAGING AREA. THE BEFORE AND AFTER CONDITION OF THE STAGING AREA SHALL BE JOINTLY INSPECTED, DETERMINED, AND DOCUMENTED BY THE CONTRACTOR AND THE ENGINEER. MISCELLANEOUS CONSTRUCTION AND RESTORATION REQUIRED TO CONSTRUCT TEMPORARY STAGING AREA OR ACCESS POINTS TO THE CONTRACTOR'S STAGING AREA WILL BE THE CONTRACTOR'S TOTAL
RESPONSIBILITY AND SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE START OF WORK.
6. SAWCUTTING SHALL BE DONE ALONG ALL THE DEMOLITION PAVEMENT LIMITS PRIOR TO PAVEMENT MILLING.
MILLING ALONG THE DEMOLITION PAVEMENT LIMITS IS NOT ACCEPTABLE.
7. GLYCOL TANK WILL BE CONNECTED TO ELECTRICAL SERVICE. ELECTRICAL LINE AND SERVICE CONNECTION
SHALL BE INCLUDED IN SEPARATE BID PACKAGE.
PROJECT DESCRIPTION
EXISTING OR NEW
ASPHALT PAVEMENT
PCC TO AC JOINT
SEE DETAIL 2 THIS SHEET
AC
PAVEMENT
1/2" DIA.
BACKER
ROD
JOINT SEALING
FILLER (P-605)
SCALE:N.T.S.
G003
BUTT JOINT SEAL DETAIL
SCALE:N.T.S.
G003
TYPE K BUTT JOINT
NEW PCC PAD. SEE STRUCTURAL
DETAILS FOR GLYCOL AND
GENERATOR FOUNDATION DESIGN
PCC PAD
3/8" SAWCUT
1/ 4"
3/
1/ 8"
G003
G003
REPLACE EXISTING ASPHALT
PAVEMENT, FULL DEPTH
1' WIDE RETAINING WALL
6"
SCALE:N.T.S.
G003
FULL DEPTH PAVEMENT SECTION
12" P-403 - ASPHALT
SURFACE COURSE
12.5" P-209 -
CRUSHED
AGGREGATE BASE
COURSE
P-603 - TACK
COAT
G003
SCALE:N.T.S.
G003
BITUMINOUS JOINT RESERVOIR
CONSTRUCTION JOINT
BETWEEN OVERLAY AND
EXISTING PAVEMENT
5/8" ROD BACKUP
MATERIAL (COMPATIBLE
WITH SEALANT TYPE)
SEALANT MATERIAL
1/4" - 3/8" BELOW
SURFACE
1/2"±1/8" OR AS RECOMMENDED
BY JOINT SEALANT MANUFACTURER
1/4" CHAMFER
1/2" 1-3/8"
~NEW BITUMINOUS PAVEMENT~ ~EXIST. BITUMINOUS PAVEMENT~
G003
JOINT SEALING
FILLER (P-605)
3"
3"
3"
3"
GOO3
SITE PLAN
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
Feet 0 30 60
GOO4
TOPOGRAPHIC
SURVEY
D
X X X X X
M
EXISTING
GENERATOR
RELOCATED
GLYCOL
TANK PAD
TERMINAL DRIVE
PROPOSED
GENERATOR PAD
VEHICULAR PARKING
APRON
TERMINAL
B
B
B B B B
B B
CONTRACTOR
HAUL ROUTE
GATE
GATE CLOSED
DURING
CONSTRUCTION
B
B
B
B B
B
GATE TO REMAIN
OPEN DURING
CONSTRUCTION
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
Feet 0 40 80
RU
NW
AY
-2
2 TERMINAL
W
ARDS RD
SITE
KEYMAP
LEGEND
XX X
WORK AREA
EXISTING FENCE
B B LOW PROFILE BARRICADE
1. THIS PROJECT INCLUDES:
· INSTALLATION OF A NEW GLYCOL PAD
· INSTALLATION OF A NEW GENERATOR PAD
2. CONTRACTOR TO INSTALL AND MAINTAIN LOW PROFILE BARRICADES.
PROJECT FEATURES
ADMINISTRATIVE PHASE:
THIS PHASE INCLUDES SHOP DRAWING REVIEW AND CONTRACTOR MATERIAL ACQUISITION.
NO CONSTRUCTION OR MOBILIZATION OCCURS DURING THE ADMINISTRATIVE PHASE.
CONSTRUCTION:
THIS PHASE INCLUDES MOBILIZATION, EROSION CONTROL MEASURES, AND BARRICADE
PLACEMENT.THIS ALSO INCLUDES ALL CONSTRUCTION ITEMS INCLUDING BUT NOT LIMITED TO:
EXCAVATION, PAVING, CONSTRUCTION OF CONCRETE SLABS.
PROJECT PHASING
PHASE DURATION ANTICIPATED NOTICE-TO-PROCEED
ADMINISTRATIVE 60 CALENDAR DAYS JULY 27, 2023
CONSTRUCTION 60 CALENDAR DAYS
ESTIMATED CONSTRUCTION SCHEDULE
1. ENGINEER/RPR WILL COORDINATE THE SCHEDULE WITH THE AIRPORT
SEVEN (7) DAYS PRIOR TO THE START OF CONSTRUCTION TO ALLOW
AIRPORT OPERATIONS TO ISSUE THE APPROPRIATE NOTAMS.
2. CONTRACTOR TO INSTALL AND MAINTAIN LOW PROFILE BARRICADES
3. AT THE END OF THE GATE CLOSURE, REACTIVATE ALL AIRFIELD LIGHTING
AND SIGNAGE AND RESTORE AIRFIELD TO SAFE OPERATIONAL CONDITION,
CONDUCT FOD CHECK WITH AIRPORT OPERATIONS. CONTRACTOR TO
REMOVE BARRICADES AND REOPEN APRON TO TRAFFIC AFTER APPROVAL
FROM AIRPORT OPERATIONS.
SAFETY AND PHASING NOTES
CONTRACTOR HAUL ROADS/
CONSTRUCTION ENTRANCE
CONCRETE PAD
GOO5
CONSTRUCTION
SAFETY AND
PHASING PLAN
SEPTEMBER 25, 2023
NOTE: SAFETY FLAG SHALL BE
PROMINENTLY DISPLAYED ON ALL
CONSTRUCTION EQUIPMENT.
AVIATION ORANGE
AVIATION WHITE
3'
MIN.
3' MIN.
4' UNLESS
OTHERWISE APPROVED
AVIATION
ORANGE AND
WHITE STRIPES
SAFETY
BARRICADE LIGHT
10"8'
BARRICADE NOTES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING BARRICADES, BARRICADE LIGHTS, AND SANDBAGS/ANCHORS, AS WELL AS PLACEMENT, MAINTENANCE, AND REMOVAL OF BARRICADES. THE BARRICADE POSITIONING SHOWN ON THE PLANS REPRESENTS THE MINIMUM AMOUNT OF BARRICADES REQUIRED TO SAFELY COMPLETE THE CONSTRUCTION. THE CONTRACTOR SHALL STOCKPILE ADDITIONAL BARRICADES ON THE SITE IN THE EVENT THAT AIRPORT OPERATIONS REQUESTS ADDITIONAL SAFETY MEASURES. ADDITIONAL BARRICADES WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
2. BARRICADES SHALL MEET THE REQUIREMENTS OF FAA AC 150/5370-2G, OR LATEST REVISION.
3. THE CONTRACTOR SHALL MAINTAIN PROPER POSITIONING OF ALL BARRICADES, AS WELL AS ENSURE THE BARRICADES
REMAIN FULL OF WATER.
4. THE CONTRACTOR SHALL CHECK OPERABILITY OF LIGHTS DAILY. HAVE REPLACEMENT LIGHTS AND BATTERIES ON-SITE AND REPLACE INOPERATIVE LIGHTS WITHIN ONE (1) HOUR OF NOTIFICATION OF OUTAGE BY THE ENGINEER/RPR OR AIRPORT OPERATIONS. PROVIDE AN ON-SITE REPRESENTATIVE WHO IS AVAILABLE 24-HOURS PER DAY, SEVEN DAYS PER WEEK AND
CAN REPLACE INOPERATIVE LIGHTS.
5. SANDBAGS AND/OR ANCHORS MAY BE REQUIRED TO HOLD THE BARRICADES IN PLACE AS THE BARRICADES WILL BE EXPOSED
TO JET BLAST AND PROP WASH.
6. MAINTENANCE AND SECURING OF BARRICADES IN PLACE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THOUGH MULTIPLE INSTALLATIONS AND REMOVALS OF THE BARRICADES MAY BE REQUIRED, THE CONTRACTOR WILL BE PAID ONLY FOR
THE INITIAL INSTALLATION OF EACH BARRICADE.
7. BARRICADES SHALL REMAIN PROPERTY OF THE CONTRACTOR AT PROJECT COMPLETION.
SCALE:N.T.S.
G006
CONSTRUCTION SAFETY FLAG
SCALE:N.T.S.
G006
TYPE 1 BARRICADE DETAIL
Xref ..\X\IPT-T-HANGAR-BDR_22x34.dwg
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
GOO6
CONSTRUCTION
SAFETY AND
PHASING
DETAILS
SAFETY
1. THE CONTRACTOR SHALL ACQUAINT HIS SUPERVISORS AND EMPLOYEES OF THE AIRPORT ACTIVITY
AND OPERATIONS THAT ARE INHERENT TO LYNCHBURG REGIONAL AIRPORT AND SHALL CONDUCT THE
CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC
REQUIREMENTS AND GUIDELINES ON SAFETY AS SPECIFIED IN THE CONSTRUCTION SAFETY AND PHASING NOTES. CONTRACTOR SHALL SUBMIT A SAFETY PLAN TO THE AIRPORT WHICH WILL BE MONITORED ACCORDINGLY. CONSTRUCTION SHALL NOT COMMENCE UNTIL THIS PLAN IS APPROVED BY
THE AIRPORT. THE SAFETY PLAN SHALL BE SUBMITTED PRIOR TO THE NTP.
2. CONTRACTOR TO PROVIDE A DESIGNATED ON-CALL EMPLOYEE WHO IS AVAILABLE TO QUICKLY
RESPOND TO THE PROJECT SITE 24-HOURS A DAY.
3. ALL CONTRACTOR VEHICLES THAT ARE AUTHORIZED TO OPERATE ON THE AIRPORT IN OR NEAR THE ACTIVE AIRCRAFT OPERATIONS AREA (AOA) SHALL BE REQUIRED TO HAVE THEIR COMPANY LOGO ON BOTH SIDES OF THE VEHICLE AND SHALL DISPLAY IN FULL VIEW A FLASHING AMBER (YELLOW) DOME-TYPE LIGHT VISIBLE IN ALL DIRECTIONS ABOVE THE VEHICLE OR A 3' X 3' OR LARGER, ORANGE
AND WHITE CHECKERBOARD FLAG, EACH CHECKERBOARD COLOR BEING 1-FOOT SQUARE, (SEE
CONSTRUCTION SAFETY FLAG DETAIL), AND ESCORTED UNDER THE CONTROL OF ONE CONTRACTOR MOBILE (TWO-WAY) RADIO OPERATOR ON THE JOB AT ALL TIMES. ANY VEHICLE OPERATING IN OR NEAR THE ACTIVE AOA DURING THE HOURS OF DARKNESS SHALL BE EQUIPPED WITH A FLASHING AMBER (YELLOW) DOME LIGHT, MOUNTED ON TOP OF THE VEHICLE AND BE OF SUCH INTENSITY TO CONFORM TO LOCAL CODES FOR MAINTENANCE AND EMERGENCY VEHICLES. ALL RADIO EQUIPPED VEHICLES SHALL COORDINATE ATCT CALL SIGNS WITH AIRPORT OPERATIONS PRIOR TO OPERATING
ONSITE.
4. ALL NON-RADIO EQUIPPED CONTRACTOR VEHICLES THAT ARE REQUIRED TO OPERATE ON, NEAR OR ACROSS ACTIVE RUNWAYS, TAXIWAYS, APRONS, AND RUNWAY APPROACH AND PROTECTION ZONES
SHALL DO SO UNDER THE DIRECT CONTROL OF A RADIO EQUIPPED ESCORT VEHICLE. ESCORT
VEHICLES, OPERATORS, AND RADIO EQUIPMENT SHALL BE APPROVED BY THE AIRPORT OPERATIONS STAFF. ESCORT VEHICLES SHALL BE MARKED AND LIGHTED AS DESCRIBED IN PARAGRAPH NO. 3
ABOVE AND SHALL BE EQUIPPED WITH AN APPROVED AVIATION BAND RADIO. RADIO EQUIPPED
VEHICLES SHALL CONTINUOUSLY MONITOR GROUND CONTROL FREQUENCY 121.9 MHz. IF WORK IS
PERFORMED DURING PERIODS OF TIME WHEN THE AIR TRAFFIC CONTROL TOWER IS CLOSED, A
FREQUENCY OF 119.1 MHz SHALL USED AND ALL AIRCRAFT SHALL BE MONITORED WHEN SELF- ANNOUNCING THEIR POSITION. ALL AIRCRAFT TRAFFIC ON RUNWAYS, TAXIWAYS AND APRONS SHALL
HAVE PRIORITY OVER CONTRACTOR'S TRAFFIC.
5. NO RUNWAY, TAXIWAY, APRON OR AIRPORT ROADWAY SHALL BE CLOSED WITHOUT WRITTEN
APPROVAL OF AIRPORT OPERATIONS STAFF. TO ENABLE NECESSARY "NOTICES TO AIRMEN" (NOTAM)
OR ADVISORIES TO AIRPORT SERVICES OR TENANTS, A MINIMUM OF 7 DAYS WRITTEN NOTICE
REQUESTING CLOSING SHALL BE DIRECTED TO THE RESIDENT PROJECT REPRESENTATIVE (RPR) WHO
WILL COORDINATE THE REQUEST WITH AIRPORT OPERATIONS STAFF.
6. ANY CONSTRUCTION ACTIVITY WITHIN 85.5 FEET FROM AN ACTIVE TAXIWAY CENTERLINE OR OPEN EXCAVATIONS IN EXCESS OF THREE INCHES DEEP WITHIN THE ABOVE AREAS, WILL REQUIRE CLOSURE OF THE TAXIWAY, UNLESS OTHERWISE APPROVED BY AIRPORT OPERATIONS. CLOSURE REQUIRES
THE SAME PROVISIONS AS PARAGRAPH NO. 5 ABOVE.
7. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS APPROVED BY THE RPR AND/OR AIRPORT OPERATIONS STAFF. IF APPROVED, ADEQUATE FIRE AND SAFETY PRECAUTIONS
MUST BE TAKEN.
8. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING
FROM AIRCRAFT JET BLAST OR WIND CONDITIONS IN EXCESS OF TWENTY MILES PER HOUR.
STOCKPILE HEIGHT SHALL BE LESS THAN 15 FEET AND OUTSIDE THE RUNWAY AND TAXIWAY OBJECT FREE AREAS. IN ADDITION, STOCKPILED MATERIAL SHALL HAVE SILT FENCE LOCATED AROUND THE
MATERIAL TO PREVENT FOD FROM MOVING ONTO THE AIRFIELD PAVEMENTS OR POLLUTING
WATERCOURSES.
9. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIAL LOCATED IN OR NEAR THE AOA SHALL BE
PROMINENTLY MARKED WITH APPROVED FLAGS AND LOW-PROFILE BARRICADES AND LIGHTED BY
APPROVED LIGHT UNITS DURING HOURS OF RESTRICTED VISIBILITY AND DARKNESS.
10. DEBRIS, WASTE AND LOOSE MATERIAL CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING GEARS, PROPELLERS OR BEING INGESTED IN JET ENGINES SHALL NOT BE ALLOWED ON OR NEAR ACTIVE
AIRCRAFT MOVEMENT AREAS. IF THESE MATERIALS ARE OBSERVED TO BE ON OR NEAR ACTIVE
AIRCRAFT MOVEMENT AREAS, THEY WILL BE REMOVED IMMEDIATELY AND CONTINUOUSLY DURING CONSTRUCTION. IF THESE MATERIALS ARE OBSERVED AT ANYTIME, THE CONTRACTOR SHALL REMOVE
THEM IMMEDIATELY.
11. THE CONTRACTOR IS DIRECTED TO COMPLY WITH AND ACQUAINT HIS/HER EMPLOYEES WITH THE
FOLLOWING SAFETY GUIDELINES, RELATED MATERIALS AND FAA ADVISORY CIRCULARS:
150/5200-18C "AIRPORT SAFETY SELF-INSPECTION"
150/5210-5D "PAINTING, MARKING & LIGHTING OF VEHICLES USED ON AIRPORTS"
150/5370-2G "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION"
150/5370-13A "OFF-PEAK CONSTRUCTION OF AIRPORT PAVEMENTS USING HOT-MIX ASPHALT"
COPIES OF THESE DOCUMENTS ARE AVAILABLE ONLINE AT:
HTTP://WWW.FAA.GOV/AIRPORTS/RESOURCES/ADVISORY_CIRCULARS/
12. THE TERM CONTRACTOR MEANS THE PRIME CONTRACTOR, HIS/HER SUBCONTRACTORS, SUPPLIERS, HAULERS, EMPLOYEES, AND OTHERS WHO WILL PERFORM SERVICES FOR OR IN CONJUNCTION WITH
THE PRIME CONTRACTOR.
13. CONSTRUCTION DURING THE PROJECT MAY BE HALTED AT ANY TIME BY THE RESIDENT PROJECT REPRESENTATIVE, ENGINEER AND/OR AIRPORT OPERATIONS STAFF IF IT IS DETERMINED TO BE IN THE
BEST INTEREST OF AIRPORT OPERATIONS OR SAFETY. THE CONTRACTOR MAY BE DIRECTED TO
REMOVE EQUIPMENT AND/OR EVACUATE THE SITE IN ORDER TO ENABLE AIRCRAFT OPERATIONS.
NECESSARY EXTENSIONS IN CONTRACT TIME MAY BE GRANTED OR A STOP WORK ORDER WILL BE ISSUED DUE TO THESE DELAYS. HOWEVER, THERE WILL BE NO ADJUSTMENTS IN CONTRACT PRICE
DUE TO THESE DELAYS.
14. THE CONTRACTOR SHALL PREPARE SAFETY PLANS SPECIFIC TO DAYTIME AND NIGHTTIME
CONSTRUCTION OPERATIONS, AS WELL AS A CONTINGENCY PLAN TO ADDRESS CASES OF ABNORMAL FAILURES OR UNEXPECTED DISASTERS. THE CONTRACTOR SHALL ALSO PREPARE A DESTRUCTIVE
WEATHER PLAN TO SET FORTH GENERAL GUIDANCE AND INFORMATION FOR THE CONTRACTOR TO
COORDINATE PREPAREDNESS PLANS WHEN DESTRUCTIVE WEATHER THREATENS THE AIRPORT. THE
DESTRUCTIVE WEATHER PLAN FORM IS PROVIDED IN THE SPECIFICATIONS.
15. ALL COMMUNICATION WITH THE AIRPORT SHALL BE THROUGH THE ENGINEER/RPR.
16. THE CONTRACTOR SHALL PROVIDE A VACUUM TRUCK AT THE STARTUP OF CONSTRUCTION TO CONTINUOUSLY VACUUM ALL PAVEMENTS AFFECTED BY CONSTRUCTION. THE VACUUM TRUCK SHALL REMAIN ON-SITE FOR THE DURATION OF THE PROJECT AND SHALL BE AVAILABLE AT THE DISCRETION OF THE OWNER TO VACUUM PAVEMENT AREAS ADJACENT TO THE CONSTRUCTION AREAS TO ENSURE
NO FOD IS PRESENT ON PAVEMENTS WITHIN 500 FEET OF ANY CONSTRUCTION AREA.
17. TRANSPORTATION: NO PERSONNEL MAY OPERATE VEHICLES ON THE AIRSIDE UNLESS THEY HAVE FIRST COMPLETED AND PASSED AN AIRPORT APPROVED MOVEMENT AREA AND TRAIN THE TRAINER
TRAINING COURSES. ALL PERSONNEL OPERATING VEHICLES ON SITE MUST COMPLETE ALL
ASSOCIATED AIRPORT MOVEMENT AREA TRAINING PRIOR TO OPERATING VEHICLES ONSITE. ONLY
INDIVIDUALS WHO HAVE COMPLETED THESE COURSES MAY PROVIDE ESCORT OF DELIVERY AND
OTHER CONTRACTOR VEHICLES.
18. THE ENGINEER WILL ARRANGE WITH AIRPORT OPERATIONS FOR INSPECTION PRIOR TO OPENING FOR
AIRCRAFT USE ANY RUNWAY OR TAXIWAY THAT HAS BEEN CLOSED FOR WORK, ON OR ADJACENT
THERETO, OR THAT HAS BEEN USED FOR A CROSSING POINT OR HAUL ROUTE BY THE CONTRACTOR.
19. THE CONTRACTOR SHALL INSTALL ALL REQUIRED BARRICADES AT DESIGNATED PLAN LOCATIONS, HAVE ALL ACCESS GATES GUARDED AND LOCKABLE, HAVE ALL EQUIPMENT EITHER FLAGGED OR
FITTED WITH FLASHING AMBER DOME-TYPE LIGHT ON TOP OF THE VEHICLES. ALL THESE ITEMS SHALL
CONSIST OF THE SAFETY AND SECURITY SYSTEM. THE CONTRACTOR SHALL INSTALL THE
COMPONENTS OF THE SYSTEM AT THE APPROPRIATE TIMES AS SPECIFIED IN THE CONTRACT
DOCUMENTS. THE CONTRACTOR SHALL INSPECT EVERY ASPECT OF THE SAFETY AND SECURITY
SYSTEM ON A DAILY BASIS AND ENSURE ALL COMPONENTS ARE FUNCTIONING PROPERLY. THE
RESIDENT PROJECT REPRESENTATIVE (OWNER'S REPRESENTATIVE) SHALL ALSO DAILY INSPECT THE SYSTEM AND IF ANY DEFICIENCIES ARE NOTED. THE SYSTEM ELEMENTS TO BE INSPECTED WITH
DEFICIENCIES NOTED ARE AS FOLLOWS:
*BARRICADES SET PROPERLY AND ALL FLASHING WARNING LIGHTS OPERATING PROPERLY.
*ALL CONTRACTOR PERSONNEL AND EQUIPMENT ACCESS GATES MANNED.
*ALL SECURITY PROCEDURES IN PLACE.
*ALL EQUIPMENT FLAGGED OR OUTFITTED WITH FLASHING AMBER DOME-TYPE LIGHTS.
*CONTRACTOR USE OF UNAUTHORIZED AIRPORT ACCESS GATES CHECKED.
20. THE CONTRACTOR SHALL MAKE A CONCERTED EFFORT TO ENSURE ALL SAFETY AND SECURITY ITEMS ARE IN PROPER WORKING ORDER EACH DAY DUE TO THE CONSIDERABLE LIABILITY ASSOCIATED WITH
CONSTRUCTION ON AN ACTIVE AIRFIELD.
SECURITY
1. GENERAL INTENT: IT IS INTENDED THAT THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF THE AIRPORT SECURITY PLAN AND WITH THE SECURITY REQUIREMENTS SPECIFIED HEREIN BY
AIRPORT OPERATIONS STAFF. THE CONTRACTOR SHALL DESIGNATE TO THE RPR AND AIRPORT
OPERATIONS STAFF, IN WRITING, THE NAME OF HIS "CONTRACTOR SECURITY & SAFETY OFFICER (CSSO)." THE CSSO SHALL REPRESENT THE CONTRACTOR ON THE SECURITY REQUIREMENTS FOR THE
CONTRACT. THE CSSO SHALL PROVIDE TELEPHONE NUMBERS WHICH ALLOW THE RPR AND/OR
AIRPORT OPERATIONS STAFF THE ABILITY TO CONTACT THE CSSO 24 HOURS A DAY.
2. CONTRACTOR PERSONNEL SECURITY ORIENTATION: THE CSSO SHALL BE RESPONSIBLE FOR BRIEFING
ALL CONTRACTOR PERSONNEL ON SECURITY REQUIREMENTS. ALL NEW CONTRACTOR EMPLOYEES
SHALL BE BRIEFED ON SECURITY REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA.
3. ACCESS TO THE SITE: CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON THE PLANS. NO
OTHER ACCESS POINTS SHALL BE ALLOWED UNLESS APPROVED BY AIRPORT OPERATIONS. ALL
CONTRACTOR TRAFFIC AUTHORIZED TO ENTER THE SITE SHALL BE EXPERIENCED IN THE ROUTE OR GUIDED BY AUTHORIZED CONTRACTOR PERSONNEL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE VARIOUS CONSTRUCTION AREAS ON THE SITE, AND FOR THE OPERATION AND SECURITY OF THE ACCESS GATE TO THE SITE. THE CONTRACTOR SHALL NOT PERMIT ANY UNAUTHORIZED CONSTRUCTION PERSONNEL OR TRAFFIC ON THE SITE. ACCESS GATES TO THE SITE SHALL BE LOCKED AND SECURED AT ALL TIMES WHEN NOT ATTENDED BY THE CONTRACTOR. IF
THE CONTRACTOR CHOOSES TO LEAVE ANY ACCESS GATE OPEN, IT SHALL BE ATTENDED BY
CONTRACTOR PERSONNEL WHO ARE FAMILIAR WITH THE REQUIREMENTS OF THE AIRPORT
OPERATIONS SECURITY PROGRAM. THE CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE CLEANUP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS ROUTE AS A RESULT OF HIS CONSTRUCTION TRAFFIC.
DIRECTIONAL SIGNING FROM THE ACCESS GATE ALONG THE DELIVERY ROUTE TO THE STORAGE AREA, PLANT SITE OR WORK SITE SHALL BE AS DIRECTED BY AIRPORT OPERATIONS.
4. CONSTRUCTION AREA LIMITS: THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS, PLANT SITE, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR.
THE CONTRACTOR SHALL ERECT AND MAINTAIN AROUND THE PERIMETER OF THESE AREAS SUITABLE FENCING, MARKING AND WARNING DEVICES VISIBLE FOR DAY/NIGHT USE. TEMPORARY BARRICADES, FLAGGING AND FLASHING WARNING LIGHTS WILL BE REQUIRED AT CRITICAL ACCESS POINTS. TYPE OF
MARKING AND WARNING DEVICES SHALL BE APPROVED BY AIRPORT OPERATIONS.
5. IDENTIFICATION - PERSONNEL: THE AIRPORT RESERVES THE RIGHT TO REQUIRE AIRPORT BADGING FOR CONTRACTOR'S EMPLOYEES DURING THE COURSE OF THIS CONSTRUCTION PROJECT. NO BADGE
WILL BE ISSUED TO ANY PERSON UNTIL A REVIEW OF THE REQUIRED PAPERWORK HAS BEEN
COMPLETED BY AIRPORT OPERATIONS AND ALL REQUIREMENTS ARE MET. PAPERWORK SHALL BE
SUBMITTED AS DIRECTED BY AIRPORT OPERATIONS STAFF BEFORE ISSUANCE OF ANY BADGE. THE
CONTRACTOR AND ITS STAFF ARE RESPONSIBLE FOR ATTENDING TRAINING AND COMPLETING
SECURITY BADGE APPLICATIONS, WHICH WILL INCLUDE AIR/GROUND RADIO, TAXIWAY AND AIRPORT FAMILIARIZATION. ESTIMATED TIME FOR COMPLETION OF TRAINING IS ONE (1) HOUR. AIRPORT OPERATIONS SHOULD BE NOTIFIED IMMEDIATELY IF A BADGE IS LOST. REPLACEMENT BADGES COST $35. CONTRACTOR TO PROVIDE THE ENGINEER/RPR WITH A LIST OF INDIVIDUALS REQUIRING BADGING.
6. FINES: PAYMENT OF ALL FINES ASSESSED TO WILLIAMSPORT REGIONAL AIRPORT AUTHORITY DUE TO VIOLATIONS BY THE CONTRACTOR OF FAA REGULATIONS OR SAFETY REQUIREMENTS SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR.
7. VEHICLE IDENTIFICATION: THE CONTRACTOR, THROUGH THE CSSO, SHALL ESTABLISH AND MAINTAIN A
LIST OF CONTRACTOR AND SUBCONTRACTOR VEHICLES AUTHORIZED TO OPERATE ON THE SITE.
8. VEHICLE PARKING: CONTRACTOR EMPLOYEE VEHICLES SHALL BE RESTRICTED TO THE
CONTRACTOR'S EMPLOYEE PARKING AREA AND ARE NOT ALLOWED ON THE AOA AT ANY TIME.
SAFETY PLAN NARRATIVE
THE SAFETY PLAN SHALL CONSIST OF SHEET G00X ALONG WITH REQUIREMENTS ESTABLISHED IN THE CONTRACT DOCUMENTS AND AS SET FORTH IN AC 150/5370-2G, OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION.
A. THE CONTRACTOR SHALL FOLLOW ALL GUIDELINES AND REQUIREMENTS ESTABLISHED BY
AUTHORITIES HAVING JURISDICTION (EITHER LOCAL, STATE OR FEDERAL) RELATING TO HAZARDOUS
MATERIALS (HAZMAT) DURING THE LIFE OF THE CONSTRUCTION.
B. THE SCOPE OF THIS PROJECT IS THE CONSTRUCTION OF A NEW CONCRETE GLYCOL PAD, A NEW CONCRETE GENERATOR PAD, AND THE INSTALLATION OF A NON-ENCASED ELECTRICAL CONDUIT. THE
SITE WILL BE RETURNED TO ITS ORIGINAL CONDITION FOLLOWING THE COMPLETION OF
CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO, SEEDING, GRADING, AND MULCHING.
C. AIRCRAFT OPERATIONS WILL CONTINUE DURING CONSTRUCTION. TYPE OF AIRCRAFT OPERATIONS DURING CONSTRUCTION: DESIGN GROUP I, II, AND III, AND APPROACH CATEGORY A, B AND C.
D. BASIS FOR TEMPORARY DISPLACED THRESHOLDS: NOT APPLICABLE.
E. BASIS FOR DEVIATING FROM STANDARDS: NOT APPLICABLE.
F. TYPE AND HEIGHT (NOT-TO-EXCEED) OF CONSTRUCTION EQUIPMENT:
TRUCKS (DUMP, FLATBED, PANEL, PICKUP, CONCRETE) - 15 FEET
FRONT END LOADERS - 15 FEET
DOZERS - 15 FEET
CRANE - 25 FEET *
BATCH PLANT - 60 FEET
ROLLERS AND COMPACTORS - 15 FEET
*CONSTRUCTION EQUIPMENT LOCATIONS SHALL NOT VIOLATE RUNWAY 7:1 TRANSITIONAL SURFACES AND RUNWAY APPROACH ZONE HEIGHT LIMITATIONS EXCEPT UNDER SPECIAL WAIVER CONDITIONS.
APPROPRIATE WAIVERS MUST BE OBTAINED BY THE OWNER FROM FAA. CONTRACTOR SHALL NOTIFY
AIRPORT OPERATIONS 48 HOURS PRIOR TO USING CRANE.
G. DATES FOR START AND COMPLETION:
ESTIMATED START: JULY 27, 2023
ESTIMATED COMPLETION: NOVEMBER 24, 2023
CONSTRUCTION TIME: 60 DAYS FOR ADMINISTRATIVE PHASE; 60 DAYS FOR CONSTRUCTION
Xref ..\X\IPT-T-HANGAR-BDR_22x34.dwg
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
GOO7
CONSTRUCTION
SAFETY AND
PHASING
NOTES
D
X X X X X X X X X X X X
X
M
STORM MH
TOP=935.3'
INV IN=928.9' (24"RCP)
INV IN=931.0' (18"RCP)
INV OUT=928.3'
GRATED INLET
TOP=933.71'
INV IN=931.4'
INV OUT=931.3'
CURB INLET
TOP=945.95'
INV OUT=933.9'
CHAIN LINK FENCE
951.0 949.0
7.0
945.0
941.0
940.0
939.0
7.0
937.0936.5 937.5
941.0940.5 941.5945.0944.5945.5
940.0941.0940.5
950.0949.5950.5 945.0945.5
940.0939.5940.5
945.0
IP1
6.
937.0
8.
9.0
EXISTING GENERATOR
~ PARKING LOT ~
GRASS
GRASS
~ APRON ~
PROTECT
HYDRANT
~ TERMINAL ~
TERMINAL DRIVE
EDGE OF
PAVEMENT
PROTECT EXISTING
LIGHTING
PROTECT EXISTING
LIGHTING
RELOCATED
GLYCOL TANK PAD
CARPORT
LO
D
5.
6.
935.5
936.0
5.
PROPOSED
GENERATOR PAD
LOD
LO
D
LOD
LODLODLOD
LO
D
LOD
LOD
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
LEGEND
EXISTING 0.5' CONTOURS
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
Feet 0 20 40
XX FENCEX
RU
NW
AY
-2
2 TERMINAL
W
ARDS RD
SITE
KEYMAP
NOTES:
1. REFER TO SHEETS G007 THRU G008 FOR EROSION AND
CONTROL NOTES AND DETAILS.
2. CONTRACTOR SHALL ENSURE THAT GRATED DRAINAGE
INLET/CATCH BASINS ARE PROTECTED AT ALL TIMES.
LIMITS OF GRADINGLOD
DROP INLET PROTECTION
SEEDING & MULCHING
FLOW DIRECTION
IP1
PIPE FLOW DIRECTION
HAUL ROUTE
SEDIMENT RETENTION ROLL
G008
G008
PROPOSED PAVEMENT
RECONSTRUCTION AREA
1' WIDE RETAINING WALL
GOO8
EROSION AND
SEDIMENT
CONTROL
PLAN
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
Feet 0 30 60
SCALE:N.T.S.
G008
SEDIMENT RETENTION ROLL
SCALE:N.T.S.
G008
DROP INLET PROTECTION
GOO9
EROSION AND
SEDIMENT
CONTROL
DETAILS
BENCHMARK:
TOP OF REBAR
N:3644242.34 E:11281422.30
EL:935.06
STORM MH
TOP=935.3'
INV IN=928.9' (24"RCP)
INV IN=931.0' (18"RCP)
INV OUT=928.3'
GRATED INLET
TOP=933.71'
INV IN=931.4'
INV OUT=931.3'
CURB INLET
TOP=945.95'
INV OUT=933.9'
LYNCHBURG REGIONAL AIRPORT
CITY OF LYNCHBURG
PID #22-A-5
D.B. 101 PAGE 110
CHAIN LINK FENCE
951.0 949.0
7.0
945.0
941.0
940.0
939.0
7.0
937.0936.5 937.5
941.0940.5 941.5945.0944.5945.5
940.0939.5940.5
950.0949.5950.5 945.0945.5
940.0939.5940.5
945.0
VEHICLE PARKING
TERMINAL APRON
GRASS
GRASS
H Y D
EE
D
CARPORT
X X X X X X X X X X X X
X
GAS MARKER
"R
C P
"R
C P
"R
C P
"R
C P
STORM MH
TOP=935.3'
INV IN=928.9' (24"RCP)
INV IN=931.0' (18"RCP)
INV OUT=928.3'
GRATED INLET
TOP=933.71'
INV IN=931.4'
INV OUT=931.3'
CURB INLET
TOP=945.95'
INV OUT=933.9'
M
EXISTING
GENERATOR PAD
LYNCHBURG REGIONAL AIRPORT
CITY OF LYNCHBURG
PID #22-A-5
D.B. 101 PAGE 110
CHAIN LINK FENCE
AIRPORT TERMINAL
2 1/2 STY BRICK
OPEN BENEATH 2ND STORY
CONCRETE
EXISTING
DE-ICING TANK
PAD ELEV=939.16'
CONC
WALL
936.48936.48
936.36 936.36
937.77
TW: 943.36
BW: 937.89
TW: 943.55
BW: 938.12
938.00
5.
6.
935.5
936.0
5.
937.76
937.76938.07 938.05
951.0
945.0 944.5 945.5
940.0 939.5 940.5
950.0 949.5 950.5
W
WH Y D
X X X X X X X X X
W
W
CONC
WALL
937.77
TW: 943.36
BW: 937.89
TW: 943.55
BW: 938.12
938.00
937.76
937.76938.07
938.05
Copyright © 2019. This drawing is an instrument of service and property of RS&H, Inc.Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
KEY PLAN:
BID SET
LSB/GNH
CCA
NO. DESCRIPTION DATE
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2021 RS&H, INC.
01/11/2024
RSY
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com Alexandria VA - Virginia Registration No.
0411-000594
LEGEND
NOTES
1. TOPSOIL, SEED, AND MULCH ALL AREAS OF GROUND
DISTURBANCE.
2. THE CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE
CLEANUP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS
ROUTE AS A RESULT OF CONSTRUCTION TRAFFIC.
3. DUST CONTROL MEASURES/EQUIPMENT MUST BE READILY
AVAILABLE ON SITE FOR THE ENTIRE CONSTRUCTION
DURATION.
4. MAINTAIN POSITIVE DRAINAGE OF THE SITE AT ALL TIMES.
5. NOTIFY ALL UTILITY OWNERS POTENTIALLY AFFECTED BY
THIS PROJECT. CONSTRUCTION SHALL NOT PROCEED
WITHOUT PRIOR IDENTIFICATION AND LOCATION OF ALL
UTILITIES.
EXISTING 0.5' CONTOURS
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED CONCRETE PAD
Feet 0 20 40
PROTECT UNDERGROUND GAS LINE
PROTECT UNDERGROUND
STORM SEWER
PROTECT UNDERGROUND
ELECTRIC AND LIGHT
POLE (TYP.)
BENCHMARK
TELEPHONE PEDESTAL
D STORM MANHOLE
LIGHT POLE
FIRE HYDRANTH DY
GAS MARKERGAS
MARK
ELECTRIC MANHOLEE
ELECTRIC PEDISTAL
XX
GROUND LIGHT
FENCEX
RU
NW
AY
-2
2 TERMINAL
W
ARDS RD
SITE
KEYMAP
PROTECT UNDERGROUND
ELECTRIC AND LIGHT
POLE (TYP.)
SEE STRUCTURAL
DETAILS
SEE STRUCTURAL
DETAILS
PROPOSED ASPHALT PAVEMENT
RECONSTRUCTION AREA
1' WIDE RETAINING WALL
TW TOP OF WALL
BOTTOM OF WALLBW
SEE INSET BELOW
RELOCATED GENERATOR PAD
GO10
GRADING
PLAN
RETAINING WALL SIZE SUBJECT TO CHANGE BASED ON
FINAL GENERATOR SELECTION SIZE. DESIGN CHANGES
WILL BE COORDINATED BY ENGINEER AND RPR.
Feet 0 8 16
INSTALL 650 LF OF 1-WAY 2-INCH
NON-ENCASED ELECTRICAL
CONDUIT FOR FUTURE
ELECTRICAL CONNECTION TO
PROPOSED GLYCOL PAD
PROPOSED 2" PVC CONDUIT -
DIRECT BURIED
DESIGN PER THE 2021 VIRGINIA CONSTRUCTION CODE
1. LIVE LOADS:
SURCHARGE 100 PSF
2. WIND LOADS (PER ASCE 7-16):
ULTIMATE DESIGN WIND SPEED, Vult 109 MPH NOMINAL DESIGN WIND SPEED, Vasd 85 MPH
RISK CATEGORY II
WIND EXPOSURE CATEGORY C
WIND PRESSURE 22 PSF
3. EARTHQUAKE DESIGN DATA (PER ASCE 7-16):
SEISMIC IMPORTANCE FACTOR le = 1.00
MAPPED SPECTRAL RESPONSE ACCELERATIONS SS = 0.153
MAPPED SPECTRAL RESPONSE ACCELERATIONS S1 = 0.057
SPECTRAL RESPONSE COEFFICIENT SDS = 0.163
SPECTRAL RESPONSE COEFFICIENT SD1 = 0.092
SITE CLASS D
SEISMIC DESIGN CATEGORY B
4. FOUNDATION SYSTEM:
ALLOWABLE BEARING PRESSURE 2,000 PSF
DESIGN CRITERIA:
1. CONCRETE (PER ACI 318-19)
RETAINING WALL AND GENERATOR PAD f ' c = 4,500 PSI GLYCOL PAD AND WALLS f ' c = 5,000 PSI
2. REINFORCING STEEL ASTM A615 GRADE 60
MATERIAL PROPERTIES:
1. THE STRUCTURAL NOTES MUST GOVERN IN MATTERS COVERED ON THE STRUCTURAL DRAWINGS.
SEE PROJECT SPECIFICATION AND OTHER DRAWINGS FOR FURTHER REQUIREMENTS. TOTAL
PROJECT DEFINITION WILL BE PROVIDED BY COMBINING PROJECT SPECIFICATIONS, CIVIL,
STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWING PACKAGES.
2. THE DRAWINGS REPRESENT THE FINISHED STRUCTURE, UNLESS OTHERWISE INDICATED. THEY DO
NOT REPRESENT THE METHOD OF CONSTRUCTION.
3. THE CONTRACTOR MUST TAKE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE AND ANY PERSONNEL DURING CONSTRUCTION. SUCH MEASURES SHOULD INCLUDE, BUT NOT BE LIMITED TO TEMPORARY BRACING AND SHORING OF DEAD LOADS, CONSTRUCTION LOADS, WIND LOADS, ETC.
4. FOR TYPICAL DETAILS SHOWN BUT NOT BE REFERRED TO EXCEPT HEREIN, CONFORM TO ALL OF THE REQUIREMENTS OF THESE DETAILS TO THE SAME EXTENT AS IF REFERRED TO BY DETAIL NUMBER.
5. IF FOOTING ELEVATIONS SHOWN OCCUR IN A DISTURBED, UNSTABLE OR UNSUITABLE SOIL THE
ENGINEER MUST BE NOTIFIED.
6. CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS OF EXISTING SITE THAT ARE AFFECTED BY
NEW WORK BEFORE PROCEEDING WITH FABRICATION AND CONSTRUCTION.
7. ALL STRUCTURAL OPENINGS AROUND OR AFFECTED BY MECHANICAL, ELECTRICAL, AND PLUMBING
EQUIPMENT MUST BE VERIFIED WITH EQUIPMENT PURCHASED BEFORE PROCEEDING WITH
STRUCTURAL WORK AFFECTED. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS FOR OPENINGS, SLEEVES, ETC. NOT SHOWN ON THE STRUCTURAL DRAWINGS.
GENERAL NOTES
1. ALL CONCRETE MUST BE IN COMPLIANCE WITH THE BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE ACI 318-19.
2. ALL REINFORCING MUST BE HELD SECURELY IN POSITION WITH STANDARD ACCESSORIES IN CONFORMANCE WITH THE CURRENT EDITIONS OF THE CRSI MANUAL OF STANDARD PRACTICE DURING THE PLACING OF THE
CONCRETE.
3. PROVIDE CORNER BARS AT ALL BEAM AND WALL INTERSECTIONS. CORNER BARS MUST BE THE SAME SIZE AS
THE LARGER INTERSECTING BARS.
4. ALL WALL STEEL MUST BE CONTINUOUS WHERE POSSIBLE.
5. SPLICES IN REINFORCING, WHERE PERMITTED, MUST BE PER SCHEDULE.
6. SEE MECHANICAL, PLUMBING AND ELECTRICAL PLANS FOR CAST-IN-PLACE BOLTS, INSERTS, ANCHORS, ETC
AND FOR ALL SLAB LEAVE-OUTS, SLOPES, DEPRESSIONS, SLEEVES, ETC.
7. ALL HOOKS IN REINFORCING BARS MUST BE AN ACI STANDARD HOOK, UNLESS OTHERWISE NOTED.
8. ALL EXPOSED EDGES OF CONCRETE MUST BE CHAMFERED 3/4", UNLESS OTHERWISE NOTED.
9. PROVIDE 1/2" PREMOLDED EXPANSION JOINT MATERIAL WHERE SLAB ON GRADE IS POURED AGAINST GRADE
BEAMS OR WALLS, UNLESS OTHERWISE SHOWN OR NOTED.
10. ALL CONCRETE MUST BE DESIGNED BY AN APPROVED LABORATORY, AND THE DESIGN MIX MUST BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR REVIEW, AND APPROVAL OBTAINED PRIOR TO USE.
11. NO PIPES OR DUCTS MUST BE PLACED IN STRUCTURAL CONCRETE UNLESS SPECIFICALLY DETAILED. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR LOCATION OF SLEEVES, MOULDS, FLOOR HINGES, ETC TO
BE CAST INTO THE CONCRETE.
CONCRETE AND REINFORCING STEEL:
SITE PREPARATION
1. CLEARING AND STRIPPING MUST CONSIST OF REMOVING EXISTING PAVEMENT, DEMOLITION DEBRIS, AND OTHER DELETERIOUS MATERIALS IN THEIR ENTIRETY FROM THE PROPOSED FOUNDATION FOOTPRINT.
2. ANY EXPOSED SUBGRADE SOILS THAT ARE FOUND TO BE UNSTABLE OR UNSUITABLE MUST BE REMOVED IN THEIR ENTIRETY AND REPLACED WITH WELL COMPACTED STRUCTURAL FILL AS RECOMMENDED BY THE ON-
SITE GEOTECHNICAL ENGINEER.
3. FOUNDATION BEARING SURFACES MUST BE PROTECTED FROM EXPOSURE TO WATER PRIOR TO
INSTALLATION OF CONCRETE AND PLACEMENT OF ENGINEERED FILL. SEEPAGE OR SURFACE WATER RUNOFF MUST NOT BE PERMITTED TO COLLECT AND STAND IN THE FOOTING EXCAVATIONS. SOILS SOFTENED OR LOOSENED BY STANDING WATER OR DISTURBED BY CONSTRUCTION ACTIVITIES MUST BE REMOVED AND
REPLACED WITH COMPACTED ENGINEERING FILL.
4. FILL MUST NOT BE PLACED IN A FROZEN CONDITION OR UPON A FROZEN SUBGRADE. FROZEN MATERIALS MUST NOT BE USED AS ENGINEERED FILL AND NO FILL, FOOTINGS OR SLAB MUST BE PLACED ON SOILS THAT
ARE FROZEN OR CONTAIN FROZEN MATERIAL.
EARTHWORK NOTES:
FOUNDATIONS
1. FOUNDATION DESIGN IS BASED ON THE RECOMMENDATIONS CONTAINED IN GEOTECHNICAL INVESTIGATION PROJECT NO. 20220084 BY HURT AND PROFFITT, INC., DATED NOVEMBER 8, 2022 AND THE ADDENDUM LETTER
DATED FEBRUARY 3, 2023.
2. THE GEOTECHNICAL ENGINEER MUST BE THE SOLE JUDGE AS TO THE SUITABILITY OF UNDERLYING MATERIAL TO SUPPORT FOUNDATIONS AND MUST APPROVE BEARING MATERIAL BEFORE FOUNDATION INSTALLATION.
3. ALL FOUNDATIONS MUST BE FORMED TO PREVENT THE CREATION OF AN ENLARGED AREA OF CONCRETE
(MUSHROOM).
4. FOUNDATION EXCAVATIONS MUST BE OBSERVED, AND CONCRETE PLACED AS QUICKLY AS POSSIBLE TO AVOID EXPOSURE OF THE FOUNDATION BEARING SOILS TO WETTING AND DRYING. SURFACE WATER RUNOFF MUST BE DRAINED AWAY FROM THE EXCAVATIONS AND NOT BE ALLOWED TO POND. THE FOUNDATION CONCRETE MUST BE PLACED DURING THE SAME DAY THE EXCAVATION IS MADE. IF IT IS REQUIRED THAT FOOTING EXCAVATIONS BE LEFT OPEN FOR MORE THAN ONE DAY, THEY SHOULD BE PROTECTED TO REDUCE
EVAPORATION AND ENTRY OF MOISTURE.
2' -9
1'-0"
M
IN6"
1' -0
3'-9" 1'-0" 1'-9"
1'-0"
1' -0
M A
X
6' -6
1'
-3
2' -0
1'-0"
(ASSUMED - COORD. W/ EQUIPMENT PROVIDED)
6'-0" 3'-0"
GENERATOR
54% MAX SLOPE
#5 @ 9" OC MAX, T&B, EW
DOWELS TO MATCH
VERTICAL REINFORCING IN
SIZE AND SPACING W/ STD
HOOK @ BOTTOM
(2) #5 CONT.
#4 @ 12" OC MAX, T&B, EW
PAVEMENT
SEE CIVIL FOR DEMO AND NEW PAVEMENT SECTION
3/4" CHAMFER
3/4" CHAMFER, TYP
12" COMPACTED CLAY SOIL, PLACED IN (2)
6" LIFTS. ONLY HAND COMPACTION
EQUIPMENT IS PERMITTED BEHIND WALL.
FREE-DRAINING GEOTEXTILE FABRIC
AT INTERFACE OF STONE AND SOILS
1'-0" WIDE #57 STONE TO
BOTTOM OF WEEP HOLES
4" DIAMETER WEEP
HOLES AT 7'-0" OC MAX
3"
JOINT PER CIVIL
#4 @ 12" OC MAX, EACH
FACE, EACH WAY.
VERTICAL REINF. W/ STD
HOOK @ TOP.
GEOTECHNICAL ENGINEERING
REPRESENTATIVE MUST BE ON-SITE TO
VERIFY SOIL CONDITIONS MEET OR
EXCEED SOIL DESIGN CRITERIA SHOWN
PRIOR TO POURING CONCRETE
SOIL DESIGN CRITERIA
PARAMETER
ACTIVE (KA)
PASSIVE (KP)
AT-REST (KO)
MOIST UNIT WEIGHT (γm)
ANGLE OF INTERNAL FRICTION (ϕ')
COEFFICIENT OF FRICTION
VALUES
0.36
2.77
0.53
120 PCF
28°
0.35
COHESION (C) 0 PSF
ALLOWABLE BEARING PRESSURE 2 KSF
1'-0"
#5 @ 9" OC MAX
BACKFILL MUST CONSIST OF GRANULAR SOIL AND MUST
BE COMPACTED TO 95% OF THE MATERIALS MAXIMUM
DRY DENSITY PER ASTM D698 (STANDARD PROCTOR).
MOISTURE CONTENT MUST BE WITHIN ±3 PERCENTAGE
POINTS OF OPTIMUM. BACKFILL MUST BE PLACED IN 6"
MAXIMUM LIFTS.
MIN
30.00°
20 GAUGE GALVANIZED
STEEL 1/4" X 1/4" MESH
HARDWARE CLOTH
ANCHORED FIRMLY TO
OUTSIDE OF STRUCTURE AT
WEEP HOLES
LA
P
S P
LI
C
E
2' -0
CONCRETE LAP SPLICE NOTES:
1. TABULATED VALUES ARE BASED ON THE FOLLOWING:
a. ACI 318-19
b. NORMAL WEIGHT CONCRETE.
c. UNCOATED GRADE 60 REINFORCING BARS.
d. CLEAR COVER NOT LESS THAN 1.0 x BAR DIAMETER.
e. CLEAR SPACING NOT LESS THAN 2.0 x BAR DIAMETER.
f. LAP CLASS B.
2. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF
CONCRETE CAST BELOW THE BARS.
TYPICAL LAP
SPLICE SCHEDULE
4,500 PSI CONCRETE
#3
BAR
SIZE
TOP BAR LAP
SPLICE
23"
OTHER BAR LAP
SPLICE
18"
#4
#5
#6
#7
#8
#9
#10
31" 24"
38" 30"
46" 35"
67" 51"
76" 59"
86" 66"
95" 73"
TOP BARS, BOTTOM BARS
AND INTERMEDIATE BARS.
SEE SECTION AND/OR SCHEDULE
CORNER BARS SAME SIZE, LOCATION
AND NUMBER AS TOP BARS, BOTTOM
BARS, AND INTERMEDIATE BARS FROM
DISCONTINUOUS MEMBER.
T Y
P
LA
P
P E
R S
C H
E D
U
LE
TYP
LAP PER SCHEDULE
M E
M B
E R
W
ID
T H
MEMBER WIDTH
CONCRETE EXPOSURE
CAST AGAINST AND PERMANENTLY
IN CONTACT WITH GROUND
EXPOSED TO WEATHER OR IN
CONTACT WITH GROUND
NOT EXPOSED TO WEATHER OR IN
CONTACT WITH GROUND
MEMBER REINFORCEMENT SPECIFIED COVER (INCHES)
ALL
ALL
SLABS, JOISTS,
AND WALLS
BEAMS, COLUMNS,
AND PEDESTALS
ALL
NO. 6 THROUGH NO.
18 BARS
NO. 5 BAR AND
SMALLER
NO. 11 BAR AND
SMALLER
PRIMARY REINFORCEMENT,
STIRRUPS, TIES, SPIRALS,
AND HOOPS
1 1/2
3/4
1 1/2
SPECIFIED CONCRETE COVER FOR
CAST-IN-PLACE CONCRETE MEMBERS
2' -6
2'
-6
1'-0"
6"
1' -0
10"
MIN
3'-0"
5,000 GALLON MAX CAPACITY
GLYCOL TANK DIAMETER
MIN
3'-0" 10"
(2) #5 CONT., TYP
#4 @ 12" OC MAX, T&B, EWEXISTING PAVEMENT / GRADE
SEE CIVIL
1" x 45° CHAMFER, TYP
SIKA WESTEC TPER
WATERSTOP OR
APPROVED EQUAL
#5 @ 12" OC MAX, TYP
M
IN
1' -0
APPLY SIKAGARD-62 OR
APPROVED EQUAL
PROTECTIVE COATING FULL
LENGTH X WIDTH X HEIGHT
GEOTECHNICAL ENGINEERING
REPRESENTATIVE MUST BE ON-SITE TO
VERIFY SOIL CONDITIONS PRIOR TO
POURING CONCRETE
PERIMETER WALLS AND TURN
DOWN EDGE TYP 4 SIDES. SEE
CIVIL FOR PLAN VIEW.
JOINT PER CIVIL
GLYCOL TANK FOUNDATION NOTES:
1. SEE CIVIL SHEETS FOR TOP OF PAD ELEVATIONS.
T Y
P A
LL
3"
C
LR
C O
V E
R
C
LE
A R
3' -0
CLEAR
4'-6"
CLEAR
3'-0"
1' -0
GENERATOR ASSUMED SIZE
LENGTH = 19 FT
WIDTH = 6 FT
WEIGHT = 17 KIPS MAX
SLOPED EARTH
EXISTING PAVEMENT
1' -0
T/ PAVEMENT
100'-0" (REFERENCE)
T/ PAD
EL. VARIES SEE CIVIL
T/ WALL
106'-6" (MAX)
T/ WALL
106'-6" (MAX)
T/ WALL
106'-6" (MAX)
T/ WALL
102'-6"
12" THICK CONCRETE
WALL, TYP
T/ FOUNDATION
99'-0"
T/ FOUNDATION
99'-0"
T/ FOUNDATION
99'-0"
T/ WALL
102'-6"
S001
S001
SIM. W/ T/ WALL SLOPING
CLEAR
3'-0"
EQUIPMENT ASSUMED SIZE
LENGTH = 7'-0"
WIDTH = 3'-4"
FOUNDATION PLAN NOTES:
1. REFERENCE ELEVATION 100'-0" = 937.77 (SEE CIVIL)
2. SEE CIVIL SHEETS FOR TOP OF WALL AND TOP OF PAD ELEVATIONS.
ASSUMED EXISTING WALL SECTION
EXISTING 4" BRICK VENEER
OR 4" CMU BLOCK
8" CMU
RIGID INSULATION
AIR GAP
NOTES:
1. EXISTING CONDITIONS ARE UNKNOWN AND MUST BE FIELD
VERIFIED BY THE CONTRACTOR. EXISTING CONDITIONS
(OPENING SIZES, TYPE OF EXISTING CONSTRUCTION,
DIMENSIONS, ETC.) PERTINENT TO THE SCOPE OF WORK MUST
BE SENT TO THE ENGINEER WITH ACCOMPANYING
PHOTOGRAPHS PRIOR TO COMMENCING REPAIRS.
2. CONTRACTOR MUST SUBMIT A DETAILED PLAN FOR REPAIR
WORK AND MUST RECEIVE APPROVAL FROM THE ENGINEER
PRIOR TO COMMENCING REPAIRS.
3. SCOPE OF WORK INCLUDES PATCHING (2) EXISTING OPENINGS
IN THE ELECTRICAL ROOM WALLS. SEE MECHANICAL SHEETS
FOR LOCATION.
4. WALL PATCHES MUST MATCH EXISTING WALL IN MATERIALS,
SIZE, THICKNESS, COLOR, SPACING, ETC..
EXISTING 8" CMU, TYP
NEW 8" CMU WALL INFILL
EMBED VERTICAL REINFORCING 5
5/8" INTO GROUTED CELLS USING
HILTI HIT-HY 200 OR APPROVED
EQUAL, TYP
#5 VERTICAL @ 32" OC MAX, TYP
ASSUMED EXISTING REINFORCING AROUND OPENING, TYP
NOTES:
1. CONTRACTOR IS TO FIELD VERIFY OPENING SIZES.
2. NEW MASONRY INFILL MUST MATCH EXISTING IN SIZE.
3. FULLY GROUT ALL CELLS.
4. OPENING HEIGHT MUST NOT EXCEED 8'-0".
5. EXISTING OPENINGS SMALLER THAN 36" X 36" DO NOT REQUIRE NEW REINFORCEMENT WITHIN THE MASONRY INFILL.
8" CMU WALL ELEVATION
1. ALL MASONRY WORK MUST CONFORM TO BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES (TMS 402/ACI 530/ASCE 5) AND SPECIFICATIONS FOR MASONRY STRUCTURES (TMS 602/ACI 530.1/ASCE 6).
2. CONCRETE MASONRY UNITS MUST CONFORM TO ASTM C90 WITH f ' m = 2,000 PSI.
3. MORTAR MUST CONFORM TO ASTM C270 TYPE S TYPICAL WITH TYPE M USED BELOW GRADE (UON).
4. GROUT MUST BE 3000 PSI STRENGTH AT 28 DAYS. GROUT SOLID ALL CELLS WITH REINFORCING OR
EMBEDDED BOLTS.
5. REINFORCING STEEL MUST CONFORM TO ASTM A615, GRADE 60.
6. METAL ANCHORS AND TIES MUST BE OF CORROSION RESISTANT METAL HOT DIPPED GALVANIZED.
7. JOINT REINFORCING MUST BE ASTM A153, CLASS B, HOT-DIP GALVANIZED LADDER TYPE WITH #9 GAUGE DEFORMED LONGITUDINAL WIRES AND SMOOTH CROSS WIRES CONFORMING TO ASTM A951. SPACE AT 16" O.C. VERTICAL. EMBED LONGITUDINAL WIRES IN MORTAR WITH A MINIMUM COVER OF 5/8" WHEN EXPOSED TO
WEATHER OR EARTH AND 1/2" WHEN NOT EXPOSED TO WEATHER OR EARTH.
8. PROVIDE TEMPORARY BRACING FOR MASONRY WALLS UNTIL THEY ARE CONSTRUCTED TO THEIR FINAL
DESIGN CONDITION.
9. PROVIDE MASONRY CONTROL JOINTS TO MATCH EXISTING.
10. CONCRETE MASONRY MUST BE INSTALLED IN RUNNING BOND PATTERN.
MASONRY:
Copyright © 2024. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
© 2024 RS&H, INC.
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
/1
/2
:3
:0
A
M C
U s e rs
\m u rd o c k c \D o c u m e n ts
\2
L Y
H
G e n e ra to r
U p g ra d e S
R rv t_
C h ri s .M u rd o c k rs a n d h .c o m
.r v t
BID SET
CMM
RLM
350 TERMINAL DR.
SUITE 100
LYNCHBURG, VA 24502
LYH GENERATOR UPGRADE
20220047.002
01/11/2024
CMM
S001
STRUCTURAL NOTES,
FOUNDATION PLAN,
SECTIONS AND
DETAILS
703-549-2472 Fax 703-549-2582
909 N. Washington Street, Suite 330 Alexandria, Virginia 22314 www.rsandh.com
Alexandria VA - Virginia Registration No.
0411-000594
SCALE: N.T.S.5
SECTION
SCALE: N.T.S.1
CONCRETE LAP SPLICES
SCALE: N.T.S.2
TYPICAL CONCRETE WALL CORNERS
SCALE: N.T.S.6
GLYCOL TANK PAD DETAIL
SCALE: N.T.S.4
FOUNDATION PLAN
SCALE: 3/4" = 1'-0"
WALL PATCH DETAIL
NO. DESCRIPTION DATE
SEAL:
| Sheets and Views |
| LYH-GENERATOR-Title-G001 |
| PLOT |
| LYH-GENERATOR-Cost Estimate and Sheet Index-G002 |
| PLOT |
| LYH-GLYCOL PAD-Project Layout-PROJ LAYT |
| LYH-GLYCOL PAD-Survey-PROJ LAYT |
| LYH-GLYCOL PAD-Construction Safety Phasing Plan-SAFE PHAS |
| LYH-GLYCOL PAD-Construction Safety and Phasing Details-G006 |
| LYH-GLYCOL PAD-Construction Safety and Phasing Details-G007 |
| LYH-GENERATOR-Erosion Sediment Plan-E&S |
| PLOT |
| LYH-GENERATOR-Erosion Sediment Plan-DETL |
| PLOT |
| LYH-GENERATOR-Grading Plan-Layout1 |
| PLOT |
File details come from the government source that posted it. Updated .