Statement of Work (SOW).docx
DOCX document 51 KB Posted
- Solicitation number
- 2024_22577_PM_Arium_Water_Purification_Units
About this file
This document is a Statement of Work (SOW) that outlines the requirements for a preventative maintenance (PM) service contract to maintain seven Sartorius Arium laboratory water purification units at the U.S. Food and Drug Administration's (FDA) Seattle Human and Animal Food Laboratory (SEAHAF).
The SOW details the scope of work, which includes providing a Sartorius original equipment manufacturer (OEM) qualified maintenance technician to perform quarterly PM tasks such as cleaning, sanitizing, replacing components and filters, and recalibrating the total organic carbon (TOC) sensor. The work must be performed on-site at the SEAHAF facility during regular business hours. The contract includes a one-year base period with four one-year option periods. The government has provided a list of the specific Sartorius unit models, serial numbers, and locations. Detailed PM service tasks and required consumables are outlined for both the Arium Comfort and Arium Pro units. Deliverables include providing a quarterly PM schedule, field service reports, and TOC sensor calibration certificates. The government has also outlined the applicable federal holidays and requirements for restoring any displaced, altered, or damaged government property.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Preventative Maintenance Service for Sartorius Arium Laboratory Water Purification Units
1. Background As part of a 2023 laboratory renovation at Seattle Human and Animal Food Laboratory (SEAHAF), the U.S. Food and Drug Administration (FDA) purchased and installed seven Sartorius Arium laboratory water purification units. These units purify and polish city tap water and/or processed water to American Society for Testing and Materials (ASTM) grade water for laboratory use. SEAHAF requires the use of high-grade laboratory water for regulatory sample testing and research work to accomplish the agency’s mission of protecting the public health. A preventative maintenance (PM) service contract is required to maintain these units to consistently produce laboratory grade water.
2. Objective The objective of this requirement is to procure a preventative maintenance service contract to service and maintain seven Sartorius Arium laboratory water purification units.
3. Scope Sartorius Arium water purification units PM service shall include providing a Sartorius original equipment manufacturer (OEM) qualified maintenance technician that is familiar with Sartorius Arium Comfort I, II, and Pro water purification units. The technician shall provide quarterly preventative maintenance (PM) to clean and sanitize each unit, replace components, replace filters, and ensure operational parameters in accordance with the OEM specifications of each water purification unit and the detailed guidance listed below.
| Sartorius Unit |
| Model Number |
| Serial Number |
| Location Room Number |
Arium Comfort I BT Combined H20 w/UV lamp and TOC Monitor w/ Smart Station
H2O-I-1-TOC-T
H2O-ARST-UP-T
| 42203341 |
| 95 |
Arium Comfort I BT Combined H20 w/UV lamp and TOC Monitor w/ Smart Station
H2O-I-1-TOC-T
H2O-ARST-UP-T
| 42203342 |
| 149 |
Arium Comfort I TOC w/1 RO Module w/ Smart Station
H2O-I-1-TOC-B
H2O-ARST-UP-T
| 42201757 |
| 146 |
Arium Comfort I TOC w/1 RO Module w/ Smart Station
H2O-I-1-TOC-B
H2O-ARST-UP-T
| 42201758 |
| 135 |
Arium Comfort II EDI w/2 RO Modules w/ Smart Station
H2O-II-2-TOC-B
H2O-ARST-UP-T
| 42203023 |
| 129 |
| Arium Pro VF Ultra Pure w/ Smart Station |
| H2OPRO-VF-B-TOC |
H2O-ARST-UP-T
| 42101878 |
| 193 |
| Arium Pro VF Ultra Pure w/ Smart Station |
| H2OPRO-VF-B-TOC |
H2O-ARST-UP-T
| 42101879 |
| 223 |
| PM Service Part No. |
| Part Description |
| H2O-C-PACK |
| Arium Comfort Kit |
| H2O-CPFCO-1 |
| Arium Comfort Pre-Treatment Cartridge |
| H20-CCS |
| Arium Comfort Cleaning Set |
| H2O-CSO-1 |
| Arium Softener Cartridge (Comfort II) |
| 613CPM4 |
| Arium RO Module (Comfort I) |
| H2O-CRO-H-2 |
| Arium RO Modules (Comfort II) |
| H2O-CBS-20 |
| Arium Bag 20 Liter (Comfort I) |
| H2O-CBS-50 |
| Arium Bag 50 Liter (Comfort II) |
| 84MAB69 |
| Total Organic Carbon (TOC) Probe Exchange |
| 611CEL1 |
| Arium Replacement Ultraviolet (UV) Lamp |
| 5441307H4-CE |
| Arium Sterile Plus Final Filter |
| H2O-A-PACK |
| Arium Pro Analytical Kit |
| 611CDS1 |
| Sanitization Kit (Arium Pro) |
| 611CDU5 |
| Ultrafilter for Arium Pro |
3.1 The contractor shall inform the government ahead of time should any recommended work interrupt lab operations.
| 3.2 | The contractor shall perform the specified quarterly Care and Maintenance tasks as specified in the Arium Comfort I, Comfort II Operating Manual, Section 7, pages 54-79. |
| 3.3 | The contractor shall perform the specified quarterly Care and Maintenance tasks as specified in the Arium Pro UF|VF|DI|UV Operating Manual, Section 7, pages 47-64. |
| 3.4 | The contractor shall perform an on-site recalibration of the TOC sensor that meets OEM specifications or replace the TOC sensor with a recalibrated sensor that meets OEM specifications. The contractor shall provide a Certificate of Calibration within 10 business days of completing the calibration for the each TOC sensor detailing the TOC sensor serial number, identity and serial number of the Reference TOC device (meets appropriate and applicable standard), TOC calibration date, and TOC calibration data including at least four reference TOC points in parts per billion (ppb), TOC sensor reading at the same points as the reference TOC points in ppb, TOC deviation from reference points in ppb, and acceptance criteria not to exceed ±15% relative or ±1 ppb to the reference points, whichever is greater. |
| 3.5 | The contractor shall perform a visual inspection of water purification units each visit. Upon the completion of the inspections of each unit, the contractor shall provide recommendations to adjust, repair, or replace consumables that may result in or prevent unit malfunction or failure. |
| 3.6 | The contractor shall run all units to confirm functionality prior to exiting the building. |
| 3.7 | The contractor shall obtain signature confirmation of work completed from the |
Contracting Officer Representative (COR) or government representative prior to exiting the building.
3.8 The contractor shall provide a field service report to the COR or government representative within 5 days of the completion of the PM service outlining the work performed, the identification of the units serviced, any applicable test and/or measurements assessed to verify that the performance of the units meet or exceed OEM specifications.
4. Additional Requirements
4.1 The contractor shall provide a recommended quarterly maintenance schedule to the COR for review and approval within 10 days of contract award.
4.2 The contractor shall procure all necessary parts & supplies required for routine PM per manufactured recommendations. All consumables, components, and filters used to service the listed units shall not be expired or past the USE BY date.
4.3 The contractor shall perform all work during FDA’s regular business hours on regular business days. Current regular business hours include Monday through Friday, except for established government holidays, 7:00 A.M. to 4:00 P.M. local standard time. These business hours may be subject to change. The contractor shall also schedule PM service at least seven (7) business days prior to PM due date with the COR.
5. Deliveries and Performance
Satisfactory performance of this contract shall be established upon successful delivery of the services and supplies described in this Statement of Work (SOW) and upon acceptance by the COR.
Services shall be performed upon the commencement of the contract award period of performance in accordance with the following schedule:
PM Quarterly Service Visit
Arium Pro PM Service Tasks Arium Pro Consumables Part Number Arium Comfort I & II PM Service Tasks Arium Comfort I & II Consumables Part Number
| Quarter #1 |
| 1. Replace sterile final filter |
| 5441307H4-CE |
| 1. System cleaning* |
2. Replace pre-treatment cartridge
3. Replace sterile final filter
H20-CCS
H2O-CPFCO-1
5441307H4-CE
| Quarter #2 |
| 1. Sanitization* |
2. Replace sterile final filter
611CDS1
5441307H4-CE
1. System cleaning*
2. Replace water storage bag
3. Replace pre-treatment cartridge
4. Replace softener cartridge (Comfort II)
5. Replace sterile final filter
H20-CCS
H2O-CBS-20 (Comfort I) H2O-CBS-50 (Comfort II)
H2O-CPFCO-1
H2O-CSO-1 (Comfort II)
5441307H4-CE
| Quarter #3 |
| 1. Replace sterile final filter |
| 5441307H4-CE |
| 1. System cleaning* |
2. Replace pre-treatment cartridge
3. Replace sterile final filter
H20-CCS
H2O-CPFCO-1
5441307H4-CE
| Quarter #4 |
| 1. Sanitization* |
2. Change cartridge analytical kit
3. Replace ultrafilter cartridge
4. Replace ultra-violet lamp
5. Recalibrate total organic carbon sensor
6. Replace sterile final filter
611CDS1
H2O-A-PACK
611CDU5
611CEL1
84MAB69
5441307H4-CE
1. System cleaning*
2. Replace water storage bag
3. Replace pre-treatment cartridge
4. Replace reverse-osmosis module
5. Replace softener cartridge (Comfort II)
6. Replace ultra-violet lamp
7. Recalibrate total organic carbon sensor (TOC)
8. Replace comfort kit
9. Replace sterile final filter
H20-CCS
H2O-CBS-20 (Comfort I) H2O-CBS-50 (Comfort II)
H2O-CPFCO-1
613CPM4 (Comfort I) H2O-CRO-H-2 (Comfort II) H2O-CSO-1 (Comfort II)
611CEL1
84MAB69
H2O-C-PACK 5441307H4-CE
*See Attachment Below
6. Deliverables
| Deliverables |
| Date |
| Provide quarterly PM schedule |
| Within ten (10) days of contract award |
| PM service call |
| Seven (7) business days prior PM service due date |
| Provide field service report |
| Within five (5) days of completed PM service |
| Certificate of Calibration |
| Within ten (10) business days of calibration |
7. Government Holidays
a) The government hereby provides notification that government personnel observe the listed days as holidays:
| (1) New Year's Day |
| (7) Labor Day |
| (2) Martin Luther King's Birthday |
| (8) Columbus Day |
| (3) President’s Day |
| (9) Veterans' Day |
| (4) Memorial Day |
| (10) Thanksgiving Day |
| (5) Juneteenth |
| (11) Christmas Day |
(6) Independence Day
b) In addition to the days designated as holidays, the government observes the following days:
(1) Any other day designated by Federal Statute
(2) Any other day designated by Executive Order
(3) Any other day designated by the President’s Proclamation
c) When any such day falls on a Saturday, the following Monday is observed. The contractor personnel will not be able to perform on-site under this contract with FDA on holidays set forth above. The contractor will not charge any holiday as direct charge to the award.
d) It is understood and agreed between the government and the contractor that observance of such days by government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation except as set forth within the award.
e) Nothing in this clause abrogates the rights and responsibilities of the parties relating to stop work provisions as cited in other sections of this contract.
9. Existing Conditions All government property or systems displaced, altered, or damaged during the performance of this contract other than stated in this SOW shall be restored to its original condition at no cost to the government. These repairs, if needed, shall be executed immediately when the contractor is notified by the CO that such repairs are required due to actions by the contractor or his/her subcontractors.
8. Place of Performance
U.S. Food & Drug Administration Seattle Human and Animal Food Laboratory (SEAHAF) 22201 23rd Drive Southeast Bothell, WA 98021
9. Period of Performance
The period of performance shall include one (1) base year and four (4) option periods of twelve (12) months each. The vendor shall perform the PM on-site at the location of the water purification units. The work shall not be performed remotely.
*Attachments:
Appendix A: Field Service Report Template