20240624 Grant Park Design Phase 1 RTA Drawing Set.pdf
PDF 6 MB Posted
- Attached to
- IFB Grant Park Restoration Federal contract opportunity
- Solicitation number
- W91QF4-24-B-0003
About this file
This document is a set of drawings for the Grant Park Design Phase 1 project at Fort Leavenworth, Kansas. The drawings include plans for site demolition, grading, drainage, landscaping, pickleball courts, shelters, stairs, lighting, and electrical infrastructure. The project is being procured through Solicitation W91QF4-24-B-0003, an Invitation for Bids (IFB) issued by the Department of the Army Materiel Command Mission and Installation Contracting Command (MICC) at Fort Eustis. The IFB covers the full scope of the Grant Park Restoration project, which is planned to be executed in multiple phases. This Phase 1 work focuses on initial site preparation, partial trail construction, pickleball courts, and related utilities and infrastructure. Pricing is required to be broken out by separate Contract Line Item Numbers (CLINs) for the base scope and optional add-ons.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20240628 Grant Park Design Phase 1 RTA Drawing Set.pdf | ||
| Enviornmental Asbestos Abatement Standards Grant Park.pdf | ||
| W91QF4-24-B-0003-Grant_Park_Restoration_FLV.pdf | ||
| WD-KS20240053_Building_dtd_20240405.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF CONSTRUCTION
SHEET LIST
G-001 COVER SHEET
G-002 GEN NOTES AND ABBREVIATIONS
V-001 EXISTING CONDITIONS
C-100 SITE DEMO PLAN
C-101 OVERALL SITE PLAN
C-102 SITE CONTROL PLAN
C-103 GRADING AND DRAINAGE PLAN
C-104 SECTION VIEWS
C-500 CIVIL DETAILS
L-100 LANDSCAPE PLAN
A-100 PICKLEBALL PLAZA PLAN
A-200 PICKLEBALL PLAZA SHELTER
A-300 ENLARGED COURTS PLANS
A-400 BOLLARDS, STONE POSTS, AND LIGHT POST
DETAILS
A-500 WEST STAIR AND NORTH TRAIL HEAD
E-100 OVERALL ELECTRICAL SITE PLAN
E-101 ENLARGED ELECTRICAL PLANS
E-500 ELECTRICAL DETAILS
E-501 ELECTRICAL DETAILS
GRANT PARK REPAIR: PHASE 1
DRAWING SUBMITTAL: READY TO AWARD RTA
DATE: 6/24/2024
FORT LEAVENWORTH
DPW
FT LEAVENWORTH
DPW
SHEET ID
G-001
C O
V
ER
S H
EE
T
G R A N
T
PA
R K D
ES
IG
N
PH
A S E
M cC
LE
LL
A N
A V E, FO
R T
LE
A V
EN
W O
R
TH
K S
7-
D R A W
N B
Y:
D
ES
IG
N
ED
B
Y:
S
IZ
E:
C H
EC
K
ED
B Y:
A N
S I
'D
M
PF
M
PF
JM
5/
/2
IS
S U
E D
A
TE
PR
O
JE
C T
N O
M A R K
D
ES
C R
IP
TI
O
N D
A
TE
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W
O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R A N
C H
G
RA
N T
AV
EN
U E
POPE AVENUE
KEARNEY AVENUE
RTA SUBMITTAL
DD
D
D
D
D D
W
G
AS
G A S
G A S
G A S
G A S
G A S
W
W
A S
PH
A
LT
D R
IV
E
AS
PH
AL
T
D R
IV
E
GAS GAS
ASPHALT DRIVE
OHPB
A S
PH
A
LT
D R
IV
E
GAS
G A S
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
POWER
W W
W
DN
DN
DN
DN
DN
DN
DN
B 24 B 342
A A1
B B1
C C1
W
W
W
W
W
W
W
W
W
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D
D
D
D
W W W W W
W W
W
G A S
G A S
G A S
W
W
A S
PH
A
LT
D R
IV
E
AS
PH
AL
T
D R
IV
E
OHPB
97 GAS
PO
W
ER
PO
W
ER
PO
W
ER
POWER
W W
B 24 B 342
D
D
D
D
D
D
D
D
D D
D
DW
W
W
D
W W W W W
OHP
W
FON
ABBREVIATIONS GENERAL PROJECT NOTES
LEGEND
SANITARY MANHOLE
ELECTRICAL MANHOLE
TRANSFORMER
GUY WIRE
POWER POLE
TELEPHONE PEDESTAL
TREE
WATER VALVE
GAS VALVE
LIGHT POLE
POST INDICATOR VALVE
EXISTING OVERHEAD POWER
LINE
EXISTING BURIED TELEPHONE
LINE
WATER LINE
EXISTING SANITARY LINE
EXISTING CHAIN LINK FENCE
EXISTING STORM SEWER
EXISTING WOOD PLANK FENCE
1. ALL WORK SHALL BE COORDINATED WITH DIRECTORATE OF PUBLIC WORKS (DPW) AND THE CONTRACTING OFFICER. CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES.
CONTRACTOR TO HAVE LOCATES PERFORMED PRIOR TO ANY EXCAVATION. IN THE EVENT THAT A UTILITY IS SITUATED SUCH THAT CONSTRUCTION CANNOT PROCEED AS SHOWN ON THE PLANS, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE(COR) IMMEDIATELY. ANY DISCREPANCIES BETWEEN THE DRAWINGS AND ON SITE CONDITIONS ARE TO BE
CAPTURED VIA REDLINES AND UPDATED ON THE AS BUILT SUBMITTAL.
2. CONTRACTOR SHALL INSTALL TRAFFIC CONTROL SIGNAGE AND CONSTRUCTION BARRICADES IN ACCORDANCE WITH MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
CONSTRUCTION LIMITS SHALL BE INDICATED VIA BLACK MESH TEMPORARY CONSTRUCTION FENCING.
3. CONTRACTOR TO FIELD ADJUST ANY EXISTING UTILITY MANHOLES OR VALVES TO GRADE AS REQUIRED.
4. CONSTRUCTION STAGING AND STORAGE SHALL BE LOCATED ON SITE OR IN THE PARKING LOT OF B 24. SMALLER MATERIALS WILL BE STAGED AT A CONTRACTOR YARD OR AS
ASSIGNED BY THE INSPECTOR. MATERIALS FOR THIS PROJECT SHALL BE STORED AS DETERMINED IN THE PRE-CONSTRUCTION MEETING.
5. CONTRACTOR PARKING SHALL BE ONLY IN THE PARKING LOT OF B 24 OR AS OTHERWISE DICTATED BY THE COR.
6. CONTRACTOR SHALL ENSURE THAT ALL ADJACENT PROPERTY IS PROTECTED FROM DUST, DIRT, RUNOFF, DEBRIS, AND ANY OTHER DAMAGES RESULTING FROM PROJECT ACTIVITIES.
7. CONTRACTOR TO REPLACE OR REPAIR ALL EXISTING ADJACENT FINISHED SURFACE, UTILITIES, EQUIPMENT, PRODUCTS, VEGETATION, AND STRUCTURES, OR PARTS THEREOF, THAT
HAVE BEEN DAMAGED OR REMOVED TO PERFORM THE WORK.
8. CONTRACTOR SHALL ENSURE THAT ALL NON-RECYCLABLE TRASH, DEBRIS, REFUSE, GARBAGE, ETC. IS TAKEN OFF BASE AND DISPOSED OF IN A SAFE AND LEGAL MANNER.
9. CONTRACTOR SHALL ENSURE THAT THE PROJECT SITE IS COMPLETELY CLEAN BEFORE THE PROJECT FINAL WALK-THROUGH. ALL MATERIALS SHALL BE NEW, PROPERLY CLEANED, AND
SHALL BE FREE OF SCUFFS, DIRT, AND DUST. AREAS SURROUNDING THE CONSTRUCTION SITE SHALL ALSO BE CLEANED OF ANY DIRT, DUST, OR DEBRIS.
10. CONTRACTOR TO BREAK DOWN COSTS OF OVERALL PROJECT FOLLOWING CLIN FORMAT. BASE AND ALL CLINS WILL COMPRISE TOTAL PRICE FOR PROJECT TO BE SUBMITTED.
A _____
A AMPS
ABS ABSOLUTE
C _____
C CONDUIT
CJ CONTROL JOINT
CL CENTERLINE
D _____
DWG DRAWING
E _____
EJ EXPANSION JOINT
EM ELECTRIC METER
EQ EQUAL
F _____
FDS FUSIBLE DISCONNECT SWITCH
FL FLOW LINE ELEVATION
H _____
HDPE HIGH DENSITY POLYETHYLENE
J _____
JB JUNCTION BOX
K _____
KVA KILOVOLT AMPS
L _____
LM LUMEN
M _____
MAX MAXIMUM
MIN MINIMUM
N _____
NOM NOMINAL
O _____
OC ON CENTER
P _____
PVC POLYVINYL CHLORIDE
R _____
RCP REINFORCED CONCRETE PIPE
T _____
T TRANSFORMER
TOR TOP OF RIM ELEVATION
TYP TYPICAL
U _____
UNO UNLESS NOTED OTHERWISE
V _____
V VOLTS
VCP VITRIFIED CLAY PIPE
W _____
W WATTS
FT LEAVENWORTH
DPW
SHEET ID
G-002
G
EN
ER
A L
N O
TE
S
A B B R
EV
IA
TI
O N
S
PH
A S
IN
G P
LA
N
A N
D C
LI
N
P
LA
N
G R A N
T
PA
R K D
ES
IG
N
PH
A S E
M cC
LE
LL
A N
A V E, FO
R T
LE
A V
EN
W O
R
TH
K S
7-
D R A W
N B
Y:
D
ES
IG
N
ED
B
Y:
S
IZ
E:
C H
EC
K
ED
B Y:
A N
S I
'D
M
PF
M
PF
JM
5/
/2
IS
S U
E D
A
TE
PR
O
JE
C T
N O
M A R K
D
ES
C R
IP
TI
O
N D
A
TE
1 2 3
4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W
O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R A N
C H
N
GRANT PARK DESIGN PHASING PLANG1
SCALE: 1" = 80'G-001
0 20' 40' 60' 80'
PHASE 1: GRADING AGAINST RETAINING WALLS, PARTIAL MULTI-USE TRAIL, TENNIS COURT,
PICKLEBALL COURTS AND COMMON SPACE, LIGHTING, STORM SEWER, ACCESS FROM THE
NORTH AND FROM THE WEST, GRADING FOR SOCCER FIELD (SOCCER FIELD STRIPING AND
GOALS BY OTHERS)
PHASE 2: MAIN SHELTER, GRILL SPACE, CONCRETE SLAB GATHERING SPACE, LATRINE
BUILDING, COMPLETE NORTH LOOP OF MULTI USE TRAIL, LIGHTING, FIRE PIT AND
GATHERING SPACE
PHASE 3+: POOL DECK EXPANSION, SITE GRADING, PARKING LOT, PLAYGROUNDS, SPLASH
PAD, BASKET BALL COURT, VOLLEYBALL COURT, ACCESS FROM EAST, COMPLETE MULTI
USE TRAIL, STORM SEWER, AND SANITARY SEWER
PHASE 1
PHASE 2
PHASE 3+
N
GRANT PARK DESIGN: PHASE 1 CLIN SCOPESG2
SCALE: 1" = 80'G-001
0 20 40 60 80'
PHASES WITH SCOPE
CLIN SCHEDULE:
BASE: OVERALL SITE AND WEST RETAINING WALL GRADING WITH SWALE(EXCLUDES EAST RETAINING
WALL GRADING), SIDEWALK RAMP FROM NORTH, STORM SEWER DEMO AND NEW CONSTRUCTION,
PARTIAL MULTI USE TRAIL, PARK BENCHES, TENNIS AND PICKLEBALL COURTS WITH ASSOCIATED
LIGHTING/FENCING, PICKLEBALL PLAZA BETWEEN PAIRS OF PICKLEBALL COURTS WITH
ASSOCIATED LIGHTING AND UTILITIES, SHELTER BASE AND FOUNDATIONS(EXCLUDING SHELTER
SUPERSTRUCTURE), WATER FOUNTAIN, BIKE RACK, LANDSCAPING AND SEEDING
CLIN 1: EAST RETAINING WALL GRADING AND SWALE
CLIN 2: WEST STAIRWELL FROM ALLEY TO INCLUDE AT GRADE STEPS, RAILINGS, LANDINGS, AND
DECORATIVE LIGHT POLE BASES WITH LIGHT POLES
CLIN 3: PICKLEBALL PLAZA SHELTER SUPERSTRUCTURE BUILT ATOP BASES AND FOUNDATIONS
INSTALLED IN BASE CONTRACT
CLIN 4: LIGHT POLES FOR MULTI USE TRAIL NOT CAPTURED IN COURT, RAMP, OR STAIR LIGHTING.
LIGHT POLES TO BE INSTALLED ATOP BASES WHICH WERE INSTALLED IN BASE CONTRACT
BASE
CLIN 1
CLIN 3
CLIN 2
RTA SUBMITTAL
G
RA
N T
AV
EN
U E
POPE AVENUE
KEARNEY AVENUE
N
HAUL ROUTE TO HANCOCK BORROW SITEG3
NOT TO SCALEG-002
HAN
CO
CK
A
VE
NUE
BI
D
D
LE
A
VE
N
UE
IOWA AVENUE
NOTES:
1. CONTRACTOR MAY
CHOOSE TO
PROCURE AND HAUL
IN FILL MATERIAL
FROM OFF POST IN
LIEU OF USING ON
POST BORROW SITE
2. HAUL ROUTE IS
APPROXIMATELY 2.4
MILES EACH WAY
3. BORROW SITE
MATERIAL TO BE
SEGREGATED AS
NECESSARY TO
ENSURE NO
CONSTRUCTION
DEBRIS OR STONES
GREATER THAN 6"
ACROSS ARE
UTILIZED ON SITE
AS FILL
LIMITS OF DISTURBANCE
PROJECT
LOCATION
HANCOCK
BORROW SITE
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text W
D
C
B
�CONTROL POINT #5
1/2" IRON BAR WITH ALC CAP
N-387163.57 E-2183146.18
ELV-893.70
O'I ,..., l:O
... 45 CONC
WALL
Dl
A-500 w a..
Cf) en
2 3 dJ
CONTROL POINT #1
1/2" IRON BAR WITH ALC CAP
N-387125.21 E-2183671.42
ELV-879.22
C-101
KEARNYAVE I
I
SITE PLAN PHASE 1
SCALE: 1" = 40'
II
II
II
II
I
I
I I
I
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
II
I
B 34
POWER -L____;-� -----. V7]
a..
:::c:::
I n
H n n ll
H
H ll u
H
H
H
H u ll u
H
H
H
4 5
SHEET KEYNOTES
(D EXISTING BUILDING TO REMAIN
@ EXISTING CONCRETE WALL ALONG WEST SIDE TO REMAIN
@ INSTALL NEW DRINKING FOUNTAIN ON SLAB ON GRADE WITH WATER LINE TO
SERVE. CONSTRUCT 20" DIAMETER BY 3" DEEP¾" CLEAN GRAVEL PIT DIRECTLY
BENEATH FOUNTAIN. DRAIN LINE OF FOUNTAIN TO DAYLIGHT INTO GRAVEL PIT
@ 8' SIDEWALK
@ 6' SIDEWALK
@ TENNIS COURT
(j) PICKLEBALL COURTS
@ CONCRETE STAIRCASE (CLIN 2)
@ SIDEWALK RAMP
@) STORM SEWER (SEE SHEET C-103)
@ APPROXIMATELY 50' X 42" LIMESTONE BLOCK RETAINING WALL.
BLOCKS ARE TO BE TAN COLORED AND INSTALLED WITH A SLIGHT
STEP.
@ SOCCER FIELD (BY OTHERS)
@ LANDSCAPING (SEE SHEET L-100)
@ TAP NEW WATER LINE INTO EXISTING LINE
PER AM WATER STANDARDS AND
SPECIFICATIONS. COORDINATE WATER
LINE INSTALL WITH AM WATER
@ WATER LINE TO BE INSTALLED BY OTHERS.
WATER LINE IS EXPECTED TO BE INSTALLED
PRIOR TO THE CONSTRUCTION OF THIS PROJECT.
FORT LEAVENWORT
DPW
w z
(/} w a:
:E w 0 �" z Cl� ti wN w ::, o"
�(/} N (/} ..._ - Ill 0..
iii :> Cl :> ID w ID Cl � z z l!) 3: - (/} ...J ;;li� w 0..
00 00 a:
Oz 3:o
UV} I
c:i -u ca Z:; z:
�Cl ;;li LL l!) Ol o:5 z w a: l!) f- w - ;;li w (/) zw oG 0 f- z Uww a:
w u w W LL N J: 0.. -u :E (/}
- ',£w ;;: t z a: N
'.'SO "'
....I 3: � w z r!.
...JWN U :i: O :E u w '° ...J "' 0 f-N C,:
"'o LL w <( J: a.
z a.
w
SHEET ID
C-101
RTA SUBMITTAL
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
G A S
A S
PH
A
LT
D R
IV
E
O H
P
O H
P O
H P
O H
P
O
HP
OHP OHP OHP OHPB
97 GAS GAS GAS
GAS
G A S
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
POWER
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
POWER POWER
POWER POWER POWER POWER
A A1
B B1
C C1
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
PO
W
ER
W W
B 24 B 342
A A1
B B1
C C1
D
D
D
D
D
D
D
D
D D
D
D
W W
W W
W W
W W
W
.3
3' O
F
R C P
.5
.7
' O F
R C P
190.55' OF 15" RCP @ 2.8%
5.
' O
F
R C P
.6
108.52' O
F 36" RCP @
1.5%
.2
1' O
F
R C P
116.2' OF 15" HDPE @ 6%
44.8' OF 36"
RCP @ 1.5%
153.9' OF 30" RCP @ 1%
66.82' OF 24" HDPE
@ 20.2%
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
D
80' O F 15"
H D
PE @
1.5%
39.49' OF 15" HDPE @ 2.5%
58.2' OF 6" PERFORATED HDPE @ 11%
27.17' OF 6" HDPE @ X%
875870
N
0 15' 30'
GRADING AND DRAINAGE PLANA1
SCALE: 1" = 30'
1. STORM SEWER DRAINAGE MUST BE MAINTAINED DURING DEMO OF OLD LINES AND CONSTRUCTION OF NEW LINES. STORM DRAINAGE DURING CONSTRUCTION MUST BE ROUTED DOWNSTREAM BACK INTO SYSTEM WHILE MINIMIZING SCOUR AND DAMAGE TO EXISTING CONDITIONS. ANY DAMAGE DUE TO WORK PERFORMED MUST BE RESTORED TO PRE CONSTRUCTION CONDITIONS OR BETTER.
STORMWATER DIVERSION PLAN TO BE SUBMITTED FOR GOVERNMENT APPROVAL BEFORE STORM SEWER DEMO BEGINS.
2. ALL NEW GRADING TO BE COMPACTED TO 95% AS VERIFIED BY PROOF ROLL OF SHEEPS FOOT COMPACTOR. CONSTRUCTION OF FILL TO
BE PERFORMED IN EIGHT INCH LIFTS.
3. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF STORM SEWER STRUCTURES FOR GOVERNMENT APPROVAL PRIOR TO ORDERING
STRUCTURES.
4. EXISTING UTILITY DEPTHS TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION OF NEW UTILITIES.
5. GRADING SHOWN ON THIS SHEET IS PART OF BASE CONTRACT. REFER: C-104 FOR CLIN 1 GRADING.
6. CONTRACTOR TO SUBMIT EROSION PREVENTION PLAN FOR GOVERNMENT REVIEW PRIOR TO BEGINNING GRADING WORK.
7. REFER TO CONTROL PLAN ON C-102 FOR COORDINATE LOCATIONS OF STRUCTURES.
8. NEW STORM SEWER STRUCTURES TO HAVE LADDER FOR ACCESS TO INSIDE OF STRUCTURE VIA MANHOLE ON TOP OF STRUCTURE.
9. NEW STORM SEWER LINES TO BE INSTALLED ATOP BEDDING CONSISTING OF 4" OF GRANULAR MATERIAL TO PROVIDE CONTINUOUS
SUPPORT.
10. REFER C101 FOR FILL SECTIONS. GRADING INCLUDED IN CLIN 1 IS INDICATED BY DASHED TOPOGRAPHIC LINES.
11. PERFORATED DRAIN TILE TO RUN ENTIRE LENGTH OF WALL AND BE WRAPPED IN GEOTEXTILE FABRIC SUCH THAT SOIL AROUND THE PIPE
DOES NOT CLOG PERFORATIONS.
12. SATISFACTORY MATERIALS FOR FILL BROUGHT ON POST WILL CONSIST OF CL, GW, GP, GC, SP-SC, SW, AND SP WITH STONES SIZING NO
GREATER THAN 6" ACROSS.
13. EXISTING TOP SOIL ON SITE TO BE SALVAGED FOR USE IN FINAL GRADING.
14. ALL FILL AREAS TO RECEIVE 6" TOP SOIL TO MATCH FINAL GRADES. TOP SOIL TO BE PH, AND NUTRIENT TESTED, AND ADJUSTED AS
NECESSARY TO ENSURE OPTIMAL VEGETATIVE GROWTH.
GENERAL NOTES
1. TYPE II CURB INLET
TOR: 872.16
FL IN N(EXISTING) 18" VCP: 866.21
FL OUT S 30" RCP: 866.00
2. AREA INLET
TOR:868.00
FL IN NE 6" HDPE: 865 (CONTRACTOR TO FIELD
VERIFY EXISTING PIPE LOCATION AND DEPTH AT
FACE OF BUILDING AND AT NEW STRUCTURE)
FL IN NW(EXISTING) 6" VCP: ??? (CONTRACTOR TO
FIELD VERIFY PIPE LOCATION DEPTH AT NEW
STRUCTURE LOCATION)
FL IN N 30" RCP: 863.60
FL IN W 15" RCP: 862.50
FL OUT S 30" RCP: 861.75
3. AREA INLET
TOR: 866.80
FL OUT E 15" HDPE: 863.50
4. AREA INLET
TOR: 862.80
FL IN N 30" RCP: 857.50
FL IN W 15" HDPE: 859.00
FL OUT S 30" RCP: 857.00
5. AREA INLET
TOR: 872.00
FL IN W(EXISTING) 8" VCP: 870.00
FL OUT E 15" HDPE: 864.30
6. AREA INLET
TOR: 860.80
FL IN N 30" RCP: 852.00
FL OUT S 30" RCP: 851.80
7. AREA INLET
TOR: 859.50
FL IN N 30" RCP: 850.20
FL IN E 15" HDPE: 856.75
FL OUT W 36" RCP: 850.00
8. TYPE II CURB INLET
TOR: 870.20
FL IN E 15" RCP: 866.89
FL OUT W 15" HDPE: 858.37
9. TYPE II CURB INLET
TOR: 870.62
FL OUT W 15" RCP: 867.12
10. JUNCTION BOX WITH MANHOLE
TOR: 859.70
FL IN W 30" RCP: 854.20
FL IN E 36" RCP: 849.35
FL OUT S(EXISTING) 18" VCP: 845.60
11. AREA INLET
TOR: 859.90
FL IN NW 6" HDPE: 856.9(REF C5/C501;
CONTRACTOR TO FIELD VERIFY UPSTREAM
ELEVATION)
FL IN W 24" HDPE: 856.90
FL IN N 15" HDPE: 856.60
FL OUT E 30" RCP: 856.40
12. AREA INLET
TOR: 860.80
FL OUT S 15" HDPE: 857.80
13. TYPE II CURB INLET
TOR: 873.60
FL OUT E 24" HDPE: 870.10
KEYNOTES
C-103
FT LEAVENWORTH
DPW
SHEET ID
C-103
G R A D
IN
G
A N
D D
R A
IN
A G
E
PL
A N
G R A N
T
PA
R K D
ES
IG
N
PH
A S E
M cC
LE
LL
A N
A V E, FO
R T
LE
A V
EN
W O
R
TH
K S
7-
D R A W
N B
Y:
D
ES
IG
N
ED
B
Y:
S
IZ
E:
C H
EC
K
ED
B Y:
A N
S I
'D
M
PF
M
PF
JM
5/
/2
IS
S U
E D
A
TE
PR
O
JE
C T
N O
M A R K
D
ES
C R
IP
TI
O
N D
A
TE
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W
O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R A N
C H
RTA SUBMITTAL
EXISTING
EXISTING
EX
IS
TI
N
G
EXISTING
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
S
VARIES
1'-0" to 2'-0"
6"
2" ASPHALTIC
CONCRETE SURFACE
COURSE
CONCRETE FILL
(DEPTH VARIES, 6"
MINIMUM)
SAW CUT TO ROCK
BASE OR SUBGRADE
EXISTING
ASPHALTIC
CONCRETE
RE-COMPACT
TOP 6" OF
SUBGRADE
COMPACTED
AGGREGATE LEVELING
COURSE
NOT TO SCALE
CURB REPLACEMENT
GENERAL NOTES (ALL DETAILS THIS SHEET):
1. 3
4" ISOLATION JOINTS WITH 58" DIA. X 2' SMOOTH DOWELS SHALL BE PLACED AT
RADIUS POINTS AND AT 150' INTERVALS. THESE DOWEL BARS SHALL BE GREASED
AND WRAPPED ON ONE END WITH EXPANSION TUBES.
2. 1" DEEP CONTRACTION JOINTS SHALL BE INSTALLED AT APPROXIMATELY 10'
INTERVALS. THESE JOINTS SHALL PASS ACROSS THE ENTIRE CURB SECTION.
3. FIX DOWEL BARS WITH BAR SUPPORTS.
4. DEPTH OF CURB SHALL BE A MINIMUM OF 8" THROUGH THE HANDICAP ACCESS RAMP.
5. CONCRETE SHALL CONFORM TO PROJECT SPECIFICATIONS.
6. SUBGRADE COMPACTION, SHALL EXTEND UNDER ADJACENT CURB SECTIONS AND
TWO FEET (2.0') BEYOND THE BACK OF CURB.
JOINT SPACING:
EXPANSION - 40' MAX.
CONTROL - 5' MAX.
NOTE:
1. CROSS SLOPE SHALL NOT EXCEED 2% ALONG ALL ADA ROUTES.
PROVIDE
SEALANT TO
APPROX. 3/8"
BELOW SURFACE.
1/2"
EXPANSION
JOINT FILLER
4"
CONCRETE
PAVEMENT
TOOL JOINT 1/4
DEPTH OF
CONCRETE x
1/4"WIDE WITHIN
24 HOURS OF
POUR.SEAL.
4" MIN. COMPACTED
CRUSHED LIMESTONE
LEVELING COURSE
8" MIN. COMPACTED TO 95% OF STD.
PROCTOR MAX. DENSITY. IF SITE
CONDITIONS WARRANT, SUBGRADE MAY
REQUIRE CHEMICALLY STABILIZATION
NOT TO SCALE
REINFORCED CONCRETE SIDEWALK PAVEMENT
WELDED WIRE REINFORCEMENT
6 X 6 - W4 X W4
A 2 EA. <) 14x3x3x3'-11 2"
B 4 EA. ⅊ 14X3x0'-3" C 12 EA. ⅊ 14x3x2'-13
8" D 2 EA. <) 14x3x3x2'-11
2" E 26 EA. ⅊ 38Øx0'-21
8" F 27
8" O.C.
130 LB. YARD GRATE 148 LB. PEDESTRIAN GRATE 250 LB. TRAFFIC GRATE
A 2 EA. <) 12x3x3x3'-11 8"
B 4 EA. ⅊ 12X3x0'-3" C 12 EA. ⅊ 12x3x2'-7
8" D 2 EA. <) 14x3x3x2'-1" E 26 EA. ⅊ 38Øx0'-23
8" F 27
8" O.C.
A 2 EA. <) 14x3x3x3'-11 2"
B 4 EA. ⅊ 14X3x0'-3" C 25 EA. ⅊ 14x2x2'-11
8" D 2 EA. <) 14x3x3x2'-11
4"
E 52 EA. ⅊ 3
16x11 2x0'-11
8" F 1- 7
16" O.C.
16"
16"
1" AT TOP
4"
NOT TO SCALE
AREA INLET GRATE
SECTION
PLAN
D
C
A
E
16"
2'-2" 3'-2"
PRECAST INLET
BOX SECTION
F
B
LB.
GRATE
148 LB. & 130 LB. GRATES
#4 REBARS
15" OC BOTH
DIRECTIONS6"
CONCRETE
PAVEMENT
4" MIN. COMPACTED
CRUSHED LIMESTONE
LEVELING COURSE
8" MIN. COMPACTED TO 95% OF STD.
PROCTOR MAX. DENSITY. IF SITE
CONDITIONS WARRANT, SUBGRADE MAY
REQUIRE CHEMICALLY STABILIZATION
NOT TO SCALE
REINFORCED CONCRETE SPORT COURT PAVEMENT
R1 2"
R1 2"
24"
13"
6" 2"
6"
1-1/4"
4"
8" 8"
3"
C1 C-500
C3 C-500
C7 C-500
C2 C-500
FT LEAVENWORTH
DPW
SHEET ID
C-500
C
IV
IL
D
ET
A
IL
S
G R A N
T
PA
R K D
ES
IG
N
PH
A S E
M cC
LE
LL
A N
A V E, FO
R T
LE
A V
EN
W O
R
TH
K S
7-
D R A W
N B
Y:
D
ES
IG
N
ED
B
Y:
S
IZ
E:
C H
EC
K
ED
B Y:
A N
S I
'D
M
PF
M
PF
JM
5/
/2
IS
S U
E D
A
TE
PR
O
JE
C T
N O
M A R K
D
ES
C R
IP
TI
O
N D
A
TE
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W
O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R A N
C H
RTA SUBMITTAL
SETBACK CURB INLET WITH METAL THROAT - PLAN VIEW
NOT TO SCALE
ADDITIONAL #4 BARS AT 45°
SLOPE 1/4"
TYPE I RING AND COVER
PER FOOT
1'-4" MIN.
FOR ADDITIONAL INFORMATION
REFER TO TYPICAL SECTION "D"
AND 1/2" PER FOOT SLOPE
MAINTAIN GUTTER WIDTH
3'-0"
1'-3"
88.8
B
10' MAXIMUM
5' MINIMUM
INLET 'LENGTH'
DOWNSTREAM
5' TRANSITION
EJ CJ
A
EXTEND THROUGH TRANSITIONS
TO TYPICAL REINFORCING
#4 BAR TIED TO REBAR HOOK
EJ = 1/2" PREMOLDED BITUMINOUS EXPANSION JOINT
CJ = SAWED OR TOOLED CONTROL JOINT 3/4" DEEP
AND BOTH SIDES OF SUMP
10' TRANSITION UPSTREAM
CJ EJ
1'-0"
6" MINIMUM CONCRETE
3/4" CLEAN CRUSHED ROCK
APRON OVER 6" THICK MINIMUM
= TOP OF RIM ELEV PER PLANS
TOP OF FRAME ELEVATION
2'-0" STD CURB
1'-3"
STEEL FRAME
MATCH TOP OF
OF STEEL FRAME
MATCH FLOWLINE
MIN.
6"
CENTER OF LID ALIGNED
WITH LADDER AND 1'-2"
OFF INSIDE FACE OF WALL
2' -6" MIN
10" HIGH STEEL INLET FRAME
MANUFACTURED BY SHAWNEE
STEEL AND WELDING, INC. OR
PRE-APPROVED EQUAL. SEE
STEEL INLET FRAME DETAIL
6" THICK MINIMUM CONCRETE
APRON OVER 6" MINIMUM 3/4"
CLEAN CRUSHED ROCK
MAINTAIN GUTTER WIDTH
AND 1/2" PER FOOT SLOPE
THROUGH TRANSITION
TYPE 1
TYPE 2
CURB TRANSITION - SECTION A
NOT TO SCALE
SETBACK CURB INLET WITH METAL THROAT - SECTION B
NOT TO SCALE
#4 BAR CENTERED IN CONCRETE TIED TO
REBAR HOOK EXTEND THROUGH TRANSITIONS
C4 C-500
C8 C-500
C5 C-500
SPORT COURT SURFACING
NOT TO SCALE
C6 C-500
6" Concrete
Color Coat
Acrylic Resurfacer
White Line Paint
(1 Coat)
(2 Coats)
Pickel Ball Kitchen Area - Brite Red (Product #C1392G) Court Surface - Light Green (Product #C1372G) All Other Areas - Light Blue (Product #C1385G)
Basis of Design - SportMaster Sport Surfaces
WEST WALL TYPCIAL SECTION
NOT TO SCALE
C9 C-500
NOTE:
1. ALL SPORT COURT EXPANSION JOINTS, WHERE PAVEMENT IS IMMEDIATELY
ADJACENT TO EXPANSION JOINT, TO HAVE DOWELS EXTENDING 18" INTO
ADJACENT PAVEMENT. DOWELS TO BE SPACED AT 15" O.C AND TO BE CENTERED
IN THE ADJACENT PAVEMENT'S SECTION.
5'
AutoCAD SHX Text
2. MACRO FIBER REINFORCEMENT MAY BE SUBSTITUTED FOR WELDED WIREMACRO FIBER REINFORCEMENT MAY BE SUBSTITUTED FOR WELDED WIRE
AutoCAD SHX Text 1-1/2" R.
AutoCAD SHX Text 1-1/2" R.
AutoCAD SHX Text
5/8" PER FT.
AutoCAD SHX Text INSTALL 6" PERFORATED DRAIN PIPE ALONG ENTIRE LENGTH OF WALL RE: A1/C103 FOR CONNECTION
AutoCAD SHX Text
AutoCAD SHX Text
CLEAN " GRAVEL 34" GRAVEL WRAPPED IN GEOTEXTILE FABRIC
AutoCAD SHX Text
FINISHED GRADE
AutoCAD SHX Text
EXISTING CONCRETE WALL
EXISTING GROUND
W W W
B
A2 L-100
ERB
G
SB
SB
SB
SB
ERB
JMJM
G
ERB
ERB
SBSB
D
1. ALL DISTURBED GRASS TO BE SEEDED WITH TALL FESCUE BLEND
WITH THREE QUALITY VARIETIES. SEEDED AREAS WILL BE WATERED
AS REQUIRED BY TEMPERATURE AND WIND CONDITIONS. APPLY
WATER AT A RATE SUFFICIENT TO ENSURE THOROUGH WETTING OF
SOIL TO A DEPTH OF TWO INCHES WITHOUT RUNOFF. SEED MIX TO BE
SUBMITTED FOR GOVERNMENT APPROVAL
2. CONTRACTOR TO SUBMIT INFORMATION FOR ORDERING OF SHRUB
AND TREE PLANTINGS FOR GOVERNMENT APPROVAL BEFORE
ORDERING MATERIAL
3. WATER EXTERIOR PLANTINGS AS REQUIRED BY WEATHER AND
TEMPERATURE. WATER SUFFICIENTLY FOR SOIL TO BE SOAKED
THOROUGHLY TO A DEPTH OF 12".
4. SWPPP MEASURES TO REMAIN IN PLACE UNTIL VEGETATIVE GROWTH
IS ESTABLISHED OVER AT LEAST 70% OF SEEDED SURFACE.
LANDSCAPE GENERAL NOTES
N
0 10 20'
LANDSCAPING PLAN
SCALE: 1" = 20'
TREE SCHEDULE
ABBREVIATION NAME CALIPER
ERB EASTERN RED BUD 0'-2"
G GINKO 0'-2"
JM JAPANESE MAPLE 0'-2"
SB SERVICE BERRY 0'-2"
GENERAL NOTES:
1. THREE FOOT WIDE MULCH BED TO BE INSTALLED AROUND SOUTH AND EAST SIDES
OF EXISTING PARKING LOT WITH SHRUB PLANTINGS TO BE INSTALLED CENTERLINE
OF MULCH BED. REF: A4/L100
60°
12"
2 PLY REINFORCED RUBBER
HOSE, POSITIONED DIRECTLY
ABOVE FIRST BRANCH
MINIMUM OF 2 GUYS PER TREE.
GALVANIZED DOUBLE STRAND,
TWISTED GUYING WIRE, EQUALLY
SPACED
GUY WIRE FLAG
KEEP MULCH 2" AWAY
FROM TRUNK 3" MULCH LAYER (JAVA
BROWN IN COLOR)
WITH BLACK FABRIC
WEED BLOCK
6" MOUNDED EARTH
SAUCER
GUYING STAKE
REMOVE BURLAP AND WIRE CAGE
FROM TOP 13 MINIMUM OF BALL,
REMOVE ALL PLASTIC WRAP FABRIC
ROPE AND ALL ROT PROOF WRAP
SET BALL ON UNDISTURBED SOIL
IDENTIFY TRUNK FLARE TO
REMAIN PARTIALLY
VISIBLE AFTER PLANTING.
TOP OF ROOT BALL TO BE
1" ABOVE FINISHED GRADE
TOP OF SOIL 1" ABOVE
GRADE OUTSIDE OF
EARTH SAUCER
PLANTING SOIL MIXTURE
(2) PARTS TOPSOIL
(1) PART COMPOST
FILL HOLE GENTLY, BUT
FIRMLY ADD WATER TO
SETTLE SOIL MIX
TOP OF PLANT BED SOIL
SHALL BE 1" ABOVE GRADE
OUTSIDE OF BERM
CUT & REMOVE
CONTAINER FROM ROOT
BALL
COMPACT SOIL
UNDER ROOT BALL
3" MULCH LAYER JAVA BROWN IN
COLOR W/PRE-EMERGENT HERBICIDE
OR GROUNDCOVER AREA PER PLAN
TEXTILE LANDSCAPE FABRIC ACROSS
ENTIRE MULCH BED AREA TACKED TO
SOIL (WEED BARRIER)
PLANT MIX: 3 PARTS TOPSOIL 1 PART
STABLE MANURE (INCLUDE
FERTILIZER PER LANDSCAPING
NOTES.)
BERM OR LANDSCAPE
EDGING
TURF OR LANDSCAPE
BED PER PLAN
NOT TO SCALE
TREE PLANTING
NOT TO SCALE
SHRUB PLANTING
SHRUB SCHEDULE
NUMBER NAME SIZE
1 JAPANESE FLOWERING QUINCE #3-#5
2 SUMMERSWEET CLETHRA(WHITE) #1
3 BORDER FORSYTHIA(YELLOW) #1
A1 L-100
N
0 5' 10'
ENLARGED SHRUB PLAN
SCALE: 1" = 10'
A2 L-100A4
L-100
A3 L-100
FT LEAVENWORTH
DPW
SHEET ID
L-100
LA
N
D S C A
PE
P
LA
N S A
N D
D
ET
A
IL
S
G R A N
T
PA
R K D
ES
IG
N
PH
A S E
M cC
LE
LL
A N
A V E, FO
R T
LE
A V
EN
W O
R
TH
K S
7-
D R A W
N B
Y:
D
ES
IG
N
ED
B
Y:
S
IZ
E:
C H
EC
K
ED
B Y:
A N
S I
'D
M
PF
M
PF
JM
5/
/2
IS
S U
E D
A
TE
PR
O
JE
C T
N O
M A R K
D
ES
C R
IP
TI
O
N D
A
TE
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W
O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R A N
C H
DO NOT CUT LEADER TREE
SHALL BEAR SAME
RELATION TO FINISH
GRADE AS IN NURSERY
RTA SUBMITTAL
6"
N
2"
E. J.
E. J.
E. J.
E.
J
E.J., typ.
E.
J
C.J. C.J. C.J.
C.J.
C.J.
C.J.
C .J
C
.J
C .J
C.J. C.J.
C.J.
C.J. C.J.
C .J
C
.J
C .J
Concrete walk
8' - 0" pickleball courts
62' - 0"
Concrete walk
6' - 0"
6'
0"
Eq
Eq
Concrete walk to stair
CLIN 4 - Pole Trail Light Fixture on BASE COST stone posts
E. J.
Grade, slope away from walk.Re: Civil.
C .J
C
.J
C .J
C
.J
C .J
C
.J
Grade, slope away from walk.
Grade, slope away from walk.
Pole light fixture on stone post
Pole light fixture on stone post, typical of 2 (in Phase I)
Future concrete walk to future Shelter
C .J
E.
J
C
.J
C .J
E. J.
1'
- 6 cle ar
3'
- 0
Pickleball fence openings, typical Pickleball fence opening cle ar
3'
- 0
1'
- 6 clear
3' - 0"
2' - 0"2' - 0" clear
3' - 0"
CL
cle ar fe nc e
4'
- 0 "E. J. E. J.
E.
J
E.
J
E. J.
Picninc table, anchored to concrete, typical of 4
Pickleball Plaza shelter steel structural column on stone post base, typical of 10
Eq ua l
Eq ua l
2'
- 0
5'
- 8
4'
- 8 6"
5'
- 2
5'
- 0
3'
- 1 0"
2'
- 2
6'
- 0
Pickleball 4'-0" fences, typical.
E. J.
E. J.E. J.1'
- 6 cle ar
3'
- 0 clear
3' - 0"
2' - 0"2' - 0" clear
3' - 0" cle ar fe nc e
4'
- 0
1'
- 6 cle ar
3'
- 0
Pickleball Courts, typical
C L C L
Pickleball Plaza steel structural column on stone post base, typical of 4.
CL CL
31' - 0" 31' - 0" op en in g
62' - 0"
1'
- 5
7'
- 7
7'
- 7
1'
- 5
E. J.
E. J.
E.
J
Expansion Joint (E.J.) to be continuous under east, west and end fences (away from Plaza), behind stone posts at Plaza.
Expansion Joint (E.J.) continuous behind pickleball plaza shelter columns and around each stone post/column, typical
Pickleball Courts, typical
E.J.
E.J.
E.
J.
E.
J.
1' - 0 1/2"
14' - 11 3/4" 14' - 11 3/4" 14' - 11 3/4" 14' - 11 3/4"
1' - 0 1/2"
1'
5"
1'
5"
5' - 0"
Drinking fountain, 4-part, Re: Basis of Design spec.
2' - 0" dog
BASIS OF DESIGN (Not direct requirement) - Park Features and "Furniture Picnic Table - Rectangle 8 Foot long, coated expanded metal with powder-coated 2 3/8" steel tub, portable, surface-mount with ABA-compliant end approach.
Park Grille - Surface-Mounted, black powder-coated steel, 4-level grille. American Parks Company, (ABA - 34" max. to grille grate and all operable parts ) Hot Coal Bin - Pilot Rock Model HCB/B-1 - 22 1/2" x 22 1/4" x 32 1/2" high, Color: Red Park Bench with seat back - LandscapeForms "Gretchen" - 72" with ornamental arms, domestically-sourced, thermally modified wood and cast double-curved powder-coated black steel arms and supports.
Park Bench with no back (bi-directional) - LandscapeForms "Gretchen" - 72" with ornamental arms, Ipe wood and cast powder-coated black steel frame and supports.
Bike Rack - 5-loop, 7 Bike Cabacity, Black, Wave-Style. 10-guage steel, powder-coated, 2 3/8" diameter Drinking Fountain: Murdock Industrial park drinking fountain - round column body, brushed stainless steel finish, four fountains (ABA bi-levels each side, bottle fill center and dog bowl behind) Frost Proof Yard Hydrant - Simmons 800LF Series Deluxe with cast iron head and handle, Color: Blue
'-1
0" x
'-0
" c on cr et e pa d
ABA
Bi ke ra ck
C .J
4' - 8 3/4" 8' - 0" 3' - 4" 8' - 0" 13' - 10" 8' - 0" 3' - 4" 8' - 0" 4' - 8 3/4"
Stone layoff Table 1, Re: A1/A100 align joints with columns, typical
NOTES:
1. CLIN 3: Pickleball Shelter including steel columns and above. Stone Posts to be in the
BASE COST.
2. Refer to Sheet A200 for Pickleball Plaza Shelter Reflected Ceiling Plan, Section and Details.
3. Slope grade away from all concrete, Re: Civil.
4. Refer to Civil for all paving and related surfaces.
op en ing op en ing opening op en ing op en ing opening op en ing opening
0"
C .J
C
.J
E. J.
3' - 5" 7' - 0" 3' - 5"
2'
- 4
Lay-Off Stone Table 2 Re: A1/A400
Grille, typical of 2
Hot Coal Bin
Equal Equal
Eq.Eq.2' - 0" 6"
C . J
Frost Proof Yard Hydrant, verify final orientation with Architect
1'
- 0
Bicycles shown for Bike Rack orientation only, Bicycles not in contract, typical
Sport Court Light, typical. Re: Electrical
1-piece stone cap
7' - 0"
3" nom.
4" 3/4" overhang air gap
4" thick split-faced limestone with concave 3/8" joints
Solid limestone cap, beveled top (2% slope)
Reinforced concrete foundation
Grout top of base course (4" min. above slab) with flashing.
Provide weep joints typical all four sides
1 piece stone cap
2' - 4" stone-faced base
2' - 3" 1" overhang
4" sto ne -fa ce d b as e w all
6'
- 5
3"
7'
- 0 " s ton e c ap
2'
- 8
3'
- 0
3" 2'
- 5
1-piece stone cap
7' - 0"
3" 2'
- 5 " 4" thick split-faced limestone, ashlar pattern 4" min.
dimensions, 16" max., with concave 3/8" joints
Solid limestone cap
Slope top away (1%), typical
PLAN
LONG SECTION LONG ELEVATION
Typical each side
1-piece stone cap
2' - 4"
2'
- 5
SHORT SECTION
3"
2'
- 8
3'
- 0
1-piece stone cap
2' - 4"
4" thick split-faced limestone, ashlar pattern 4" min.
dimensions, 16" max., with concave 3/8" joints
SHORT ELEVATION
Typical Each End
1" 2' - 2" 1"
3 5/8"
3/4"
1' - 5 1/4"
3/4"
3 5/8"
Face of stone below
Recessed electrical outlet, Re:
Electrical, typical
Short Elev.
3'
- 6
3'
- 6
Lo ng
El ev
Lo ng
El ev
Lo ng
Se ct
Short Sect.
Short Elev.
Weep joints above grade, typical around.
2'-0" on center min.
Phone/Device charging station. Re:
Electrical.
Stone to be flat (flush) 1" around outlet boxes
3"
3" 2'
- 5
Shelter/Plaza North-South enterline
3" 3" 1" 1"
Quadplex electrical outlet.
Re: Electrical. Stone to be flat (flush) 1" around outlet boxes
3" air gap Sh el te r/P la za Ea st -W es t C en te rli ne
1" 1"
3/16" = 1'-0"A2 Pickleball Plaza Plan 3-16 A-100
PI
C
KL
EB
AL
L
PL
AZ
A
EN
LA
R
G
ED
P
LA
N a nd D
ET
AI
LS
1" = 1'-0"1 BASE COST - Stone Layoff Table 1
RTA SUBMITTAL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
JC
M
JC
M
M
PF
5/
/2
IS
SU
E
D
AT
E:
PR
O
JE
C
T N
O
G ra nt P ar k
D es ig n
FORT LEAVENWORTH
DPW
SHEET ID
M cC
LE
LL
A N A
VE
FO
R T
LE
A
VE
N W O R
TH
, K S
7-
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N B R A N C H
3' - 0" 14' - 11 3/4" 14' - 11 3/4" 14' - 11 3/4" 14' - 11 3/4" 3' - 0"
65' - 11"
East-West Section
D1 A200
C1 A200 typical
B1 A200 typical
Concrete foundation
BASE COST - Limestone cap and Ashlar pattern Stone Post Base
Steel Column and Beam, Prime and Paint
Treated 2x Wood Structure, 12" O.C.
Prefinished standing seam metal roof over building paper and 1/2" treated plywood sheathing
3/4" Composite tongue and grove decking
A1 A2 typ ica l
Lighting Controls, Re: Electrical
(Stone Posts in Base Cost) eave 3' - 0" at c en te r
1'
1/
2"
2x10 rafters at 12" on center Verify structure with Contractor's licensed structural engineer.
Prefinished Standing Seam Metal Roof over 5/8" water-resistant plywood, arced over barrel vault framing
Prefinished break metal flashing with bent drip edge over 3/4" hardwood Sheathing
Straight, level 2x8 ceiling joist
Tube steel column and beam beyond, prime and paint. Contractor's structural engineer to verify all structural designs.
Tapered, laminated wood beam, bolted to steel saddle with stainless steel bolts.
Contractor's structural engineer to verify all.
Prime and paint wood beam
3/4" tongue and groove sinthetic deck material. Verify all, including 12" rafter spacing, with manufacturer and Contractor's structural engineer.
Tapered, arced, 2x8 cut to 45 foot arc, sistered to 2x10 rafters at 12" O.C.
Lighting, Re: Electrical and Shelter Reflected Ceiling Plan. All conduit to be concealed in structure
4'
- 4
3 1 /2"
4'
- 7 1/ 2"
3'
- 0
4"1" 1' - 2" 1"4"
2' - 0"
Slope concrete or grade away from post, typical all
CLIN 3 - Primed and black painted steel shelter column
4" thick split-faced limestone with concave 3/8" joints
BASE COST
Solid limestone cap, beveled top (2% slope away)
Reinforced concrete foundation
Flash with weep joints, typ. around
Grout solid below weep joints, typ.
around
1" 1"
Steel column, typical of 10
Continuous beam, typical of 2.
Re: Section.
Continuous beam, typical of 2.
Re: Section.
Light fixtures, typical of 8.
Re: Electrical.
3' - 0" 14' - 11 3/4" 14' - 11 3/4" 14' - 11 3/4" 14' - 11 3/4" 3' - 0"
65' - 11"
2'
7'
7" 7'
7"
2'
Equal, typical Equal, typical
Eq ua l, ty p.
Eq ua l, ty p.
A1 A200
A3 A200
B4 A200
6" 1' - 2" 6"
2' - 2"
5" 1'
- 2
5"
BASE COST Stone Post with solid limestone cap
CLIN 3 Pickleball shelter with steel columns above stone posts (BASE COST)
3' - 0"
Steel beam and column, prime and paint
2x10 treated wood blocking
Prefinished break metal flashing 8" min.
up under roofing with three-fold drip edge
Prefinished standing seam metal roof over building paper and 1/2" treated plywood sheathing
2x10 rafters @ 12" on center
3/4" Composite tongue and grove decking
Modify and 2x8 to form 45' radiused arc, sister to 2x10 rafters at 12" on center
2x10 bottom chord @ 12" on center
2x wood nailer stud bolted to top of beam
3/4" cement finish board, prime and paint
1"
Provide solid cap ends to of each steel beam, typical of 4, prime and paint
Prefinished break metal flashing 8" min.
up under roofing with three-fold drip edge
Prefinished standing seam metal roof over building paper and 1/2" treated plywood sheathing
Prefinished aluminum flashing with continuous three-fold drip edge and arced cap 6" up under roofing welded to vertical flashing.
Provide thickness required to eliminate "oil-canning".
Flashing drip edges to extend 1/2" min. below facade to which it's mounted
21' - 0"
0"
3' - 0" 15' - 0" 3' - 0"
6" 2' - 0"
4'-0" high pickleball fence, typical
BASE COST Stone post, typical. Re: details
CLIN 3 - Steel column and base, prime and paint arced 2x10
3' - 0" to fr am in g 1'
1/ 2"
B4 A200
B3 A200 Section
Elevation
North-South Section
Picnic Bench, typ.
Re: Product Notes
Treated 2x4 truss post at each rafter/joist
R 45'-0"
A3 A2 typ ica l
3'
- 0 " 2' - 0"
Primed and black painted steel shelter column (CLIN 3)
4" thick split-faced limestone with concave 3/8" joints
Reinforced concrete foundation over AB3 crushed rock
Flash with weep joints, typ. around
Grout solid below weep joints, typ.
around
1/4" = 1'-0"A3 CLIN 3 - Pickleball Shelter Section A-200
3/4" = 1'-0"D1 CLIN 3 - Pickleball Shelter Roof End Detail
1/2" = 1'-0"B2 Typical Shelter Column Section
1/4" = 1'-0"C3 CLIN 3 - Shelter - Reflected Ceiling Plan 1/2" = 1'-0"C1 Shelter Column Plan
3/4" = 1'-0"B3 CLIN 3 - Pickleball Shelter Eave Section
NOTE: Contractor to retain a professionally licensed Structural Engineer under this contract to provide structual calculations and final stamped design for the Plaza Structure, concrete stairs, all foundations, slabs and any other areas requiring structural analysis.
Design to conform to these aesthetic parameters and all applicable codes.
Design to be drawn up by the contractor's structural engineer and generally reviewed and approved by DPW prior to fabrication.
PI
C
KL
EB
AL
L
PL
AZ
A
SH
EL
TE
R
3/4" = 1'-0"B4 CLIN 3 - Pickleball Shelter Eave Elevation
1/4" = 1'-0"A1 Pickleball Shelter North-South Section
1/2" = 1'-0"B1 BASE COST - Typ. Shelter Column Elev.
3/1 9/2
R ev iew
RTA SUBMITTAL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
JC
M
JC
M
M
PF
5/
/2
IS
SU
E
D
AT
E:
PR
O
JE
C
T N
O
G ra nt P ar k
D es ig n
FORT LEAVENWORTH
DPW
SHEET ID
M cC
LE
LL
A N A
VE
FO
R T
LE
A
VE
N W O R
TH
, K S
7-
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N B R A N typical Lines: 2"
31' - 0" 31' - 0"
"Pickleball Plaza" Re: Enlarged Plan
3/4
2'
- 0
3/4
4"
1'
- 6
3'
- 0 op en in g
No Control Joints in Pickleball or Tennis court area inside the fences fence
3' - 0" fence
2' - 0" fence
2' - 0" fence
3' - 0" fe nc e op en in g
4'
0" opening opening
5' - 6" 20' - 0" 5' - 6"
E. J. E. J.
E. J.
E. J. C. J.
C . J
E. J.
E.
J
Equally spaced fence posts (5'-0"+/-), unless noted otherwise, typical
2'-0" x 2'-0" Pickleball Plaza Shleter Stone Light Post, Re: A200, typical to ce nte rlin e o f p er im ete r f en ce
9'
- 0 to far ed ge of se rvi ce lin e
0" to far ed ge of
7'
- 0
7'
- 0
0"
9'
- 0
Regulation Pickleball Net
22' - 0"
E. J.
E. J.C. J.
E. J. E.
J
E.
J
Surface color in the front "Kitchen" area: RED, typical
Surface color in back quadrants:
GREEN, tyipcal
Perimeter surface color aound court lines: BLUE, typical
Line colors:
White, tyipcal
Note: all pickleball court colors and line layouts to be per USA Pickleball standards
C. J.C. J.
Expansion joint typical around each stone post
E.
J
E.
J
E.
J
Expansion Joint (E. J.) continuous under net, typical
Surface color in Perimeter:
Blue, tyipcal
E.
J
E. J.
4'
- 0
4' - 0" fence opening fen ce op en ing
Ty pi ca l 3
'-0 " f in g al l f ou r c or ne rs o f do ub le c ou rt fe nc ed a re a fe nc e op en 'g
3'
- 0
3'
- 0
9'
3" T yp ic al 9'
3"
T yp ic al
E. J.
3'
- 0 fen ing
Sport Light Pole and base, typical. Top of foundation level with sidewalk and court surface. Re: Detail, Civil and Electrical
Expansion Joint aligns with outside edge of stone posts
C . J
E.
J
4'-0" high Pickleball Fences equally spaced approximately 5'-3" on center unless noted otherwise. Posts set in 9" diameter by 3'-0" deep concrete foundations with expansion joints around each. Typical Re: Civil for all specifications.
E.
J
C . J
C
. J
C . J
C . J
E.
J
E.
J
C . J
C
. J
C . J
C
. J
C . J
C . J
2"
2" 2"
2"
E.
J
C . J
C
. J
C . J
C
. J
C . J
C
. J
C . J
C
. J
C . J
C
. J
E.
J
E. J.
C. J. C. J. C. J. C. J. C. J.C. J.C. J.C. J.
E. J. E. J.
6' - 0"
C. J
C. J.
En d of P ha se
I Pa vi ng
Re: Civil for conintuance of 8 foot path paving connecting to existing drive west of pool fe nc e op en 'g fe nc e op en 'g
C. J. C. J. C. J. C. J.
E.
J
E. J.
E. J.
C. J.
Fence Post, typical.
Tops of foundations level with court surface. Re: Detail and Civil drawings
Concrete Trail
8' - 0"
Re: Civil
Concrete Trail
8' - 0" Re: Civil
Co nc re te Tr ail
8'
- 0
Re : C ivi l
Concrete Walk
6' - 0"
Re: Civil
Note: all court colors and line layouts to be per USA Pickleball
Bi ke
R ac k, G ril le a re a, D rin ki
Fo un ta in
, Y ar d H yd ra nt , R e:
Pi ck le ba ll Pl az a
Pl an
, S he et A
Fu tu re c on ct re te w al k to fu tu re
Sh el te r
5'
- 0
Square concrete light pole foundation to coordinate with future concrete walk, slope to drain away, typical
0"
0" fen ing
"k itc he n" li ne
R 6'
0"
CLIN 4 - Trail light pole and foundation, typical all Trail Lights (other than two (2) Trail Lights which will be deducted if CLIN 2 Shelter is included) Re: Electrical, Civil
BASE COST - Stone Posts, typical of 10 CLIN 3 - Shelter above Limestone Post Cap
No Control Joints in Pickleball or Tennis court areas inside the fences
E. J.
C . J
Surface color inside white lines: GREEN, tyipcal
Perimeter surface color outside and around tennis lines within fence: BLUE, tyipcal
Line colors:
WHITE, tyipcal
4"
4" lo ng m id li ne ba se lin e
4" w id e
2"
E.
J
" T yp ic al
" T yp ic al
E. J.
E. J.
Sport Light Pole, typical of 6 with E.J. around foundation
12' - 0" 4' - 6" 27' - 0" 4' - 6" 12' - 0"
2' - 0"
Concrete Trail
8' - 0" 60' - 0"
Conc. Walk
6' - 0"
2' - 0"
Only an Expansion Joint (E.J.) across the court aligned under the net
Trail Light Pole (no stone base), typical
Turf area, Re: Civil
Turf area, Re: Civil
Turf area, Re: Civil
E.
J
C
. J
C . J
C . J
C . J
13' - 6" 13' - 6"
0'
0"
C on c.
W al k
6'
0"
E.
J
E.
J
2'
1/
2"
2'
1/ 2"
AB
A
3'
0"
4' - 0"
4'-0" Pickleball Court Fences
Regulation USTA Tennis court net
42' - 0"
2"
2"2"2"
E.
J
E.
J
C . J
C
. J
C. J.
C . J ty pi ca l
E. J.
E. J. E. J.
E. J.
E.
J
E. J.E. J.
C . J ty pi ca l
E.
J
C . J
C. J.
typical
E.
J
C. J.
E.
J
E.
J
E.
J
C. J.
E.
J
C. J.
C . J
C . J
C
. J
C . J ty pi ca l E.
J
C . J ty pi ca l
7'
0" 8'
0"
8'
0" 8'
0"
1'
6"
10'-0" high tennis fences equally spaced approximately 5'-3" on center unless noted otherwise. Posts set in 9" diameter by 3'-0" deep concrete foundations with expansion joints around each. Re: Civil for all specifications.
Note: all court colors and line layouts to be per United States Tennis Association typical 2' - 0"
3'
4" op en 'g ty pi ca l
5'
0"
7'
0" 8'
0"
2' - 0"
2' - 0"
7'
0" 8'
0"
Control and Expansion joints to line up with fence posts, verify all with Owner prior to install
Continuous expansion joint under fence around court
E. J.
E. J. E. J.
E. J.
E. J.
4' - 0"
3'
- 0 fence open'g
4'
- 0 fe nc e op en 'g fe nc e op en 'g
3'
- 0 fe nc e op en 'g
3'
- 4 op en
'g
C. J.
C. J.
E. J.
Concrete control joints line up with tennis fence posts, not pickleball
Fence Post, typical.
Foundations level with court surface. Re: D3 on sheet A-400
Light Post, typical. Foundations level with concrete walk, typical.
Re: Electrical, Civil.
Re: Civil Re: Civil
Concrete Trail
8' - 0"
Re: Civil Re: Civil Conc. Walk
6' - 0" typ.
2' - 0"
Park Bench
2' - 0"
Electrical supply and lighting controls, Re: Electrical fe nc e op en 'g fe nc e op en 'g
North Pickleball Courts CLIN 4 - Trail light pole and foundation, typical all Trail Lights (other than two (2) Trail Lights which will be deducted if CLIN 2 Shelter is included) Re: Electrical, Civil
3/16" = 1'-0"A3 Typical Pickleball Courts Plan 1/8" = 1'-0"A1 Tennis Court Plan A-300
TE
N
N
IS
A N
D P
IC
KL
EB
AL
L C
O U
R
TS
EN
LA
R
G
ED
P
LA
N S
RTA SUBMITTAL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
JC
M
JC
M
M
PF
5/
/2
IS
SU
E
D
AT
E:
PR
O
JE
C
T N
O
G ra nt P ar k
D es ig n
FORT LEAVENWORTH
DPW
SHEET ID
M cC
LE
LL
A N A
VE
FO
R T
LE
A
VE
N W O R
TH
, K S
7-
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N B R A N
3'
- 8
4"
4'
- 0 " 4" 1"1' - 2"1" 4"
2' - 0"
Slope concrete or grade away from post, typical all
Light Pole Fixture "A1", Re: Electrical
4" thick split-faced limestone with concave 3/8" joints
Solid limestone cap, beveled top (1% slope)
Square, reinforced concrete foundation.
4 1/2" 1' - 5" 4 1/2"
2' - 2"
3 1 /2"
1'
- 5
3 1 /2"
Trail Light on Stone Post Post Plan / Light Section
Notes:
1. Re: Electrical Drawings for Final "Basis of Design" lighting product selection
2. Final concrete & reinforcing design by Contractor's Structural Engineer
Light Fixture, Re: Electrical
Stone Base (BASE COST) with Trail Light Post (CLIN 4) with expansion joint between each post and sidewalk, typical of 2.
CLIN 4:
New Light Pole on Base Cost Stone Post Base, typical.
Re: Electrical and Civil.
9 1 /2"
9 1 /2"
2' - 0"
3'
- 8
4" 4'
- 0 " 4"1" 1' - 2" 1" air gap
4"
1" 2' - 0" 1" 2' - 2"
3'
- 8
3" 1"
4'
- 0
Section Elevation
Slope concrete or grade away from post, typical all
2' - 0"
4" thick split-faced limestone with concave 3/8" joints4" thick split-faced limestone with concave 3/8" joints.
Set in ashlar pattern
Solid limestone cap, beveled top (1% slope)
Solid limestone cap, beveled top (1% slope)
Reinforced concrete foundation and inner post
Reinforced concrete foundation over compacted AB3 crushed gravel
2' - 0"
2'
- 0
4"1" 1' - 2" 1" 4"
Typ.
1"
2' - 2"
2' - 2" 1"
2'
- 2 1"
Post Plan SectionPost Plan Detail
Grout top of base course (4" min. above grade) with flashing.
Provide weep joints typical all four sides 4" min. above grade
Notes:
1. Final concrete & reinforcing by Contractor's Structural Engineer, typical.
1-piece stone cap
5' - 2"
1" nom.
4" 1"overhang air gap
4" thick split-faced limestone with concave 3/8" joints
Solid limestone cap, beveled top (2% slope)
Grout top of base course (4" min. above slab) with flashing.
Provide weep joints typical all four sides
1 piece stone cap
2' - 0"
5" overhang stone-faced base
1' - 6" 1" overhang
1" sto ne -fa ce d b as e w all
5'
- 0
1"
5'
- 2 " s ton e c ap
2'
- 8
3'
- 0
3" 2'
- 5
1-piece stone cap
5' - 2" 3"
2'
- 5
4" thick split-faced limestone, ashlar pattern 4" min.
dimensions, 16" max., with concave 3/8" joints
Solid limestone cap
Slope top away (1%), typical
PLAN
LONG SECTION
LONG ELEVATION - BACK
(East side)
1-piece stone cap
2' - 0"
3" 2'
- 5
4" thick split-faced limestone, ashlar pattern 4" min.
dimensions, 16" max., with concave 3/8" joints
SHORT ELEVATION
1-piece stone cap
2' - 0"
2'
- 5
SHORT SECTION
3"
2'
- 8
2'
- 1 1 3 /4"
1-piece stone cap
5' - 2"
3" 2'
- 5
2'
- 1 1 3 /4"
4" thick split-faced limestone, ashlar pattern 4" min.
dimensions, 16" max., with concave 3/8" joints, typ. around
LONG ELEVATION - FRONT
(Grille side - West)
2'
- 8
1" 4" 1' - 6" 1"
3 5/8"
3/4"
9 1/4"
3/4"
3 5/8"
1'
- 4
2'
- 4
1'
- 4
4"
3"
1' - 4" 2' - 4" 1' - 4"
Face of stone below
Solid limestone cap
Recessed electrical outlet, Re:
Electrical
Short Elev.
Lo ng
El ev
. Fr on t
Lo ng
El ev
.Ba ck
Lo
Se ct
Short Sect.
Short Elev. Sim.
Opp.
Weep joints above grade, typical around. 2'-0" on center min.
Weep joints above grade, typical around.
2'-0" on center min.
Weep joints above grade, typical around.
2'-0" on center min.
Quad-plex electrical outlet. Re: Electrical
Phone/Device charging station. Re: Electrical.
4"
Notes:
1. Final concrete & reinforcing by Contractor's Structural Engineer, typical.
Reinforced concrete foundation and inner concrete ve rif y w ith lig ht p os t
Expansion Joint, typical around, Re: Civil
Expansion Joint, below fence, typical on east and west sides of courts
BASE COST - Light Pole Base, verify
BASE COST - 4"
Light Pole, verify Sport CourtConcrete WalkConcrete WalkGrass/Grade
Expansion Joint, typical
Concrete to be flush with the adjacent concrete walkway
CLIN 4 - Trail light pole and base cover, Re: Electrical
CLIN 4 - Trail Light Pole Foundation Sport Court Pole Foundation
1'
- 4 3/ 4"
2' - 3"
60.00° Pole Foundation
4'
- 0
1'
- 6
1' - 6"
8"
Thickened, reinforced concrete play surface, Re: Civil
Concrete foundation flush with playing surface and concrete walks adjacent. Slope top away from post to drain.
4" concrete walk, Re: Civil
Black coated steel post and chain link fencing
1/2" = 1'-0"A5 Light on Stone Post Section A-400 1/2" = 1'-0"A3 BASE COST - Stone Post
ST
O
N E
PO
ST
S
AN
D L
IG
H
T
PO
ST
S
1" = 1'-0"A1 BASE COST - Stone Layoff Table 2
1" = 1'-0"B3 Light Post Bases
1/2" = 1'-0"D3 BASE COST - Fence Post Detail
RTA SUBMITTAL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
JC
M
JC
M
M
PF
5/
/2
IS
SU
E
D
AT
E:
PR
O
JE
C
T N
O
G ra nt P ar k
D es ig n
FORT LEAVENWORTH
DPW
SHEET ID
M cC
LE
LL
A N A
VE
FO
R T
LE
A
VE
N W O R
TH
, K S
7-
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N B R A N
20' - 0"
Ex ist ing D im en sio n
6"
6' - 0" 8' - 0" 6' - 0"
C.
J.
C.
J.
C. J. C. J.
2'
- 2
2'
- 2
2'
- 2
Al ign co nc re te wa lk ce nte rlin e w ith nte rlin e o f fu tur e e ve n s he lte r.
Re : C ivi l D ra wi ng s
2' - 8"
36" x 48" wheelchair space adjacent to 8'-0" park bench beyond the main trail, typical
Note: typical park bench/wheelchair space trail bump-out beside trail path. Verify in all instances whether bench faces toward or away from path:
1. North Trail Head: Toward Path
2. West of Tennis Court: Toward Path
3. South of future Event Shelter: Flat, No-Back Bench
4. Future east of Soccer: Away from Path
5. Future two at Play Area: Away from Path
Stone Base (BASE COST) with Trail Light Post (CLIN 4) with expansion joint between each post and sidewalk, typical of 2.
Stone Base with Trail Light Post, typical of 4 at north trail head.
Re: Details
E.
J.
E.
J.
C.
J.
C.
J.
Key:
C. J. - Concrete Control Joint E. J. - Concrete Expansion Joint
Existing sidewalk to remain
Existing sidewalk to remain E. J. E. J.
Existing turf, put back new turf where damaged in construction, typical
Existing turf, put back new turf where damaged in construction, typical
Ne w co nc re te tra ilh ea d
2"
5% m ax ru nn ing sl op e;
2% m ax cr os s s lop e
2" N ew C on cre te Pa th (V er ify w ith C ivi l P lan s)
Eq ua l Eq ua l
New Trail Path, Re: Civil Drawings
Existing back of curb
BASE COST: Entire North Entry and Trailhead from Kearney
Al l c on tro l a nd ex pa ns ion jo int s e qu all y s pa ce d
10' - 8"
New concrete hatched
Ne w co nc re te ha tch ed
KEARNY AVE.
PARKING
Stone Base (BASE COST) with no Trail Light Post, typical of 2 at north trail head. Re: Details
E.
J.
Stone Base (BASE COST) with Trail Light Post (CLIN 4) with expansion joint between each post and sidewalk, typical of 2.
Stone Base (BASE COST) with Trail Light Post (CLIN 4) with expansion joint between each post and sidewalk, typical of 2.
C1 A500
Ex ist ing M cC lel lan A ve ba ck of cu rb
New Light Pole on Stone Post Base, typical of 2 at top of stairs.
Re: Site Plan and Details.
New Light bollards, typical of 14 at West Stair, Re: Enlarged Plan, Re: Electrical
36" high railings, Re: Elevation, Details.
E. J. E. J.
E. J.
E. J.
6'
0" landing
6' - 0"
12 treads at 1'-9" each
21' - 0" landing
6' - 0"
12 treads at 1'-9" each
21' - 0"
9' - 0" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 19' - 11" +/-
BASE COST:
New Stone Post Base, typical of 2 east of CLIN 2 stair just west of trail.
Re: Site Plan and Details.
BASE COST:
8'-0" wide trail just west of pickleball courts and pickleball plaza.
CLIN 4:
New Light Pole on Base Cost Stone Post Base, typical of 2 at bottom of stairs just west of 8'-0" trail and Pickleball Plaza.
Re: Plan and Details.
Note: All CLIN 2 unless noted othewise
19' - 10" +/-21' - 0"6' - 0"21' - 0"6' - 0"
7'
6" 7'
6"
Existing McClellan Ave.
back of curb
New Light Pole on Stone Post Base, typical of 2 at top of stairs. Re: Plan and Details.
BASE COST:
Stone Post Base, typical of 2 at bottom of CLIN 2 stairs just west of 8'-0" trail and Pickleball Plaza. Re: Plan and Details.
Full stair, landings and upper two lights on posts are all to be in CLIN 2
New Light bollards, typical of 8 at West Stair, Re: Enlarged Plan, Re: Electrical
36" high steel railings, prime and paint black Re: Details.
NOTE: Contractor to have a Kansas licensed structural engineer design and stamp stairs, railings posts, foundations and concrete walks, for DPW review and comment prior to construction, typical.
typ.
1' - 9" run, typical 1' - 9" straight
3" radius, typical
Verify all with Civil Plans. Contractor to bring any conflicts to the COR for DPW clarifications as early as possible.
CLIN 4:
New Light Pole on Base Cost Stone Post Base, typical of 2 at bottom of CLIN 2 stairs just west of 8'-0" trail and Pickleball Plaza. Re: Plan and Details.
Note: All CLIN 2 unless noted othewise
1/8" = 1'-0"A4 Enlarged Kearney Trail Head Plan
1/8" = 1'-0"D1 CLIN 2 - Enlarged West Stairs
1/8" = 1'-0"C1 CLIN 2 - West Stair Section
A-500
KE
AR
N
EY
T R
AI
L
H
EA
D
AN
D W
ES
T
ST
AI
R S
EN
LA
R G
ED
P
LA
N
S
AN
D S
EC
TI
O N
RTA SUBMITTAL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
JC
M
JC
M
M
PF
5/
/2
IS
SU
E
D
AT
E:
PR
O
JE
C
T N
O
G ra nt P ar k
D es ig n
FORT LEAVENWORTH
DPW
SHEET ID
M cC
LE
LL
A N A
VE
FO
R T
LE
A
VE
N W O R
TH
, K S
7-
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N B R A N
T T
T
T
FORT LEAVENWORTH
DPW
SHEET ID
E-100
O ve ra ll
El ec tr ic al S ite P la n
M cC
LE
LL
A N
A V E, FO
R T
LE
A V
EN
W O
R
TH
K S
7-
D R A W
N B
Y:
D
ES
IG
N
ED
B
Y:
S
IZ
E:
C H
EC
K
ED
B Y:
A N
S I
'D
IS
S U
E D
A
TE
PR
O
JE
C T
N O
M A R K
D
ES
C R
IP
TI
O
N D
A
TE
1 2 3 4 5
D
C
B
A
D
IR
EC
TO
R A
TE
O F
PU
B
LI
C W
O R K S
EN
G
IN
EE
R
IN
G D
IV
IS
IO
N
D
ES
IG
N
B R A N
C H
GENERAL NOTES
1. 300 AMP NEMA 3R ELECTRICAL PANEL, DISCONNECT SWITCH, AND
ELECTRIC METER. MAINTAIN 10' CLEARANCE ON EXISTING TRANSFORMER
FRONT/DOOR SIDES AND 3' ON ALL OTHER SIDES. SEE SHEET E-501 FOR
DETAIL.
4. 100 AMP NEMA 3R ELECTRICAL SUB-PANEL ALONG WITH A MECHANICAL
TIME SWITCH TO CONTROL THE COURT LIGHTS. BASIS OF DESIGN -
INTERMATIC T1470BR.
1. ALL ELECTRICAL WORK AND INSTALLATION SHALL COMPLY WITH THE
NATIONAL ELECTRIC CODE (NFPA 70).
KEYNOTES
5. CONTRACTOR IS RESPONSIBLE FOR FINAL POWER HOOK-UP. COORDINATE
WITH FREESTATE FOR THE POWER AND ELECTRIC METER HOOK-UP TO THE
TRANSFORMER. COORDINATE CONDUIT ROUTE TO TRANSFORMER, METER,
AND DISCONNECT SWITCH LOCATION WITH FREESTATE PRIOR TO INSTALL.
SEE SHEET E-501 FOR DETAIL.
2. FIELD VERIFY ALL THE EXISTING CONDITIONS AND DIMENSIONS PRIOR TO
STARTING WORK.
3. REFER TO ARCHITECTURAL AND CIVIL DRAWINGS FOR RELATED
INFORMATION.
4. A PULL ROPE SHALL BE PROVIDED IN ALL EMPTY CONDUIT FOR FUTURE
INSTALLATION.
6. EACH ELECTRICAL EQUIPMENT COVER, SHALL BE PROVIDED WITH THE
PANEL NAME AND POSITION INFORMATION. FOR EQUIPMENT WITH
CONDUCTORS LARGER THAN #10 THE CONDUCTOR SIZE SHALL BE INCLUDED.
FOR EQUIPMENT FEED WITH MORE THAN A PHASE, NEUTRAL, AND GROUND,
THE FEEDER SHALL BE CLEARLY IDENTIFIED.
7. PROVIDE PHOTOCELL FOR TRAIL LIGHTS. SEE SCHEDULE ON SHEET E-500
FOR LIGHTING CONTROLS.
8. EACH COURT LIGHT CIRCUIT SHALL HAVE A 60-MINUTE SPRING WOUND
COUNTDOWN TIMER IN A WEATHERPROOF ENCLOSURE. BASIS OF DESIGN -
INTERMATIC FF460M. (SEE SHEET E-101 FOR LOCATION.) ADDITIONALLY,
WIRE ALL THREE COURT LIGHT CIRCUITS INTO A MECHANICAL 24 HOUR TIME
SWITCH TO ALLOW THE LIGHTS TO BE LOCKED OUT FROM 10PM TO 6AM.
BASIS OF DESIGN - INTERMATIC T1470BR.
2. 350 KCMIL TYPE USE CABLE IN 3.5" CONDUIT FROM THE 120/208Y
TRANSFORMER TO THE MDP.
3. 3/0 TYPE USE CABLE IN 2" SCH 40 PVC FROM THE MDP TO THE
SUB-PANEL. ROUTED AROUND POTENTIAL FUTURE CONSTRUCTION.
9. ROUTE ALL WIRE AND CONDUIT UNDERGROUND UNLESS OTHERWISE
NOTED. AVOID ROUTING CONDUIT UNDER COURT SURFACES AS MUCH AS
POSSIBLE. REFER TO DETAIL D1 ON SHEET E-501
10. REFER TO SHEET E-101 FOR ENLARGED PLANS.
B, TYP. 14
A, TYP. 14
A1
SCALE: 1" = 30'E-100
OVERALL ELECTRICAL SITE PLAN
B2 E-101
B3 E-101
A3 E-101
A1 E-101
B1 E-101
NORTH HALF TRAIL (A,A1)
TENNIS COURT (E)
PICKLEBALL NORTH HALF (D)
PICKLEBALL SOUTH HALF (D)
OUTLETS
PICKLEBALL PLAZA LIGHTS (C)
1)
3)
4)
5)
6)
7)
(2)#8 and (1)#8 GND IN 3/4" SCH 40 PVC
CIRCUIT FIXTURE MIN. WIRE SIZE
RTA SUBMITTAL
TRANSFORMER
TRAIL LIGHT POLE
TRAIL LIGHT POLE ON STONE POST
LIGHT BOLLARD
SPORT COURT LIGHT
LEGEND
PHOTOCELL
5/
/2
N
ET
N
ET
M
PF
ELECTRICAL PANEL
A1, TYP. 12
PICKLEBALL PLAZA LIGHTS (C1)8)
SPORT COURT DIAL TIMER
DISC LIGHT
SOUTH HALF TRAIL (A,A1,B)2)
T
11. ALL UNDERGROUND BRANCH WIRE TO BE THWN.
(2)#6 and (1)#6 GND IN 3/4" SCH 40 PVC
(2)#6 and (1)#6 GND IN 3/4" SCH 40 PVC
(2)#6 and (1)#6 GND IN 3/4" SCH 40 PVC
(2)#6 and (1)#6 GND IN 3/4" SCH 40 PVC
(2)#14 and (1)#14 GND IN 1/2" SCH 40 PVC
(2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .