20240514 single_source_justification.pdf
PDF 228 KB Posted
- Attached to
- Energy Management Control Services
- Solicitation number
- Not on record
About this file
This document is a Single Source Justification for a simplified acquisition to obtain Energy Management Control System (EMCS) integration services. The 934th Contracting Office at Minneapolis ARS, Minnesota, intends to award a single source contract to implement software upgrades to the existing base UMCS Tridium Niagara AX front-end, which is no longer supported. The anticipated award date is June 24, 2024, with an estimated cost of $30,000. This is being acquired under FAR 6.302-1 for sole source procurements. The government is not posting a solicitation, but is requesting information from potential offerors on their capability to provide these services by June 24, 2024. Responses should be emailed to the identified contracting officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UFC 3-470-01 UMCS Front End And Integration (12JAN18).pdf | ||
| Notice of Intent SS.pdf | ||
| 20240409 Attachment 1.xlsx | XLSX spreadsheet | |
| UMCS PWS 5-20-2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Single Source Justification (Simplified Acquisition) November 2018 Page of Section A: General Contract Information Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Section B: Description of the Supplies/Services Required Section C: Justification for Soliciting from a Single Source or Brand Name Section D: Efforts to Obtain Competition Section E: Steps to Preclude Future Single Source or Brand Name Awards Section F: Contracting Officer's Determination I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
9.0.0.2.20120627.2.874785
| security_markings: CUI |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Contract_Activity: 934th Contracting Office |
| Project_Name: Energy Management Control System (EMCS) |
| PR-ID_Number: F5G8554121AW01 |
| Estimated_Cost: $30,000.00 |
| Text: |
| Date: 14-May-2024 |
| Name: Eva K. Leavitt, GS-12 |
| Signature: |
File details come from the government source that posted it. Updated .