2024.11.06 JDPAC V PWS_draft.pdf
PDF 959 KB Posted
- Attached to
- Joint Distribution Process Analysis Center Distribution Analysis Support V Federal contract opportunity
- Solicitation number
- TRANSCOM25D004
About this file
This document is a draft Performance Work Statement (PWS) for the Joint Distribution Process Analysis Center (JDPAC) Distribution Analysis Support V contract. The PWS describes the services required, which include contract and task order management, operations and policy analysis, modeling and simulation, programmatic analysis, adaptive planning and execution analysis, data support and reporting, and enterprise data science support. Key details include:
The contractor shall provide comprehensive analytical and engineering support for USTRANSCOM's mission to provide air, land, and sea distribution for the Department of Defense. This includes tasks such as developing performance metrics, conducting modeling and simulation to optimize distribution networks, supporting deployment and distribution planning, managing transportation data, and applying data science capabilities. The contract will include a range of classified and unclassified work, with requirements for personnel to hold Top Secret clearances. This PWS is related to a pre-solicitation for the JDPAC Distribution Analysis Support V contract, solicitation number TRANSCOM25D004, issued by the United States Transportation Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2024.11.06 JDPAC RFI.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
Joint Distribution Process Analysis Center (JDPAC)
DISTRIBUTION ANALYSIS SUPPORT V
DRAFT Performance Work Statement (PWS) 06 November 2024
1.0 DESCRIPTION OF SERVICES
1.1 Background. The United States Transportation Command (USTRANSCOM) mission is to provide air, land, and sea distribution for the Department of Defense (DOD), during both peace and war. The Secretary of Defense assigned the United States Transportation Command (USTRANSCOM) as the Joint Deployment and Distribution Coordinator for the DOD. An important functional requirement is the integration of the Transportation Component Commands (TCCs): Military Sealift Command (MSC), HQ Air Mobility Command (AMC), Military Surface Deployment and Distribution Command (SDDC), and Joint Enabling Capabilities Command (JECC). The Joint Distribution Process Analysis Center (JDPAC) was established to serve as the analytic and engineering engine for USTRANSCOM and its Component Commands in support of the Joint Deployment and Distribution Enterprise (JDDE) and the desired capabilities as described in the Joint Logistics (Distribution) Joint Integrating Concept. JDPAC’s core functions include:
Global deployment and distribution network and infrastructure assessments Analytically driven operational courses of action Joint capability analysis to inform programmatic decisions Systems integration and data management JDDE analysis/global distribution performance assessment Future transformation analysis
1.2 Scope. The contractor shall plan for all tasks identified in this PWS and gather all pertinent information. Contractor estimates and timelines shall be determined based on the deliverable due dates specified in paragraph 1.4, Deliverables. The contractor shall coordinate with the Government to ensure that all activities are well synchronized and integrated with other USTRANSCOM and distribution management efforts, and that replicated or overlapping efforts do not occur. All reports, studies, or policies identified in the PWS shall be prepared and submitted for Government approval.
1.3 Specific Tasks.
1.3.1 Task Area 1: Contract Level and Task Order Management. This task consists of functional activities relating to the administration and management of this effort.
1.3.1.1 Task 1.1: Task Order Management Plan (TOMP). The contractor shall provide an integrated (i.e., Government and contractor) project plan that defines tasks, resources, and dependencies. The plan shall describe the technical approach, organizational resources, and management controls employed to meet the cost, performance, and schedule requirements throughout contract execution. The plan should not be merely a reiteration of
Page 2 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V the PWS requirements. The draft TOMP shall be provided for review within fifteen (15) business days after task order start. The final TOMP shall be provided within five (5) business days after Government has provided comments. The contractor shall also designate a Contract Manager as an on-site point of contact for the contract in writing to the Contracting Officer and Contracting Officer’s Representatives (CORs) within fifteen (15) business days after task order start. If the Contract Manager will be absent more than one
(1) business day, the Contract Manager shall inform the CORs by e-mail of an alternate point of contact prior to the Contract Manager’s absence.
1.3.1.2 Task 1.2: Monthly Status Report (MSR). The MSR shall list, by each active task area, the accomplishments of the reporting period. The MSR shall provide a brief synopsis of the efforts completed, deliverables provided, and conferences and trips conducted/attended during the reporting period, and an overall evaluation of the task order to date. Estimated and actual travel costs shall be reported by trip location, purpose, and dates of travel. The report shall list the deliverables for each task and any issues, problem areas, and items that require Government action. The report shall be due by the tenth (10th) calendar day after the month.
1.3.1.3 Task 1.3: Weekly Activity Report (WAR). The contractor shall provide a weekly WAR via email that is a consolidated report of significant process issues and recommendations (for senior leadership), that lists, by each active task/project area, the accomplishments and work in progress each reporting period. No formal cover letter or higher management review is required. This is a minimal time effort. The due date will be coordinated with the Government lead and adjusted as necessary for holidays. These weekly reports shall be used to create the MSR.
1.3.1.4 Task 1.4: Quarterly In-Progress Reviews (IPRs). The contractor shall conduct quarterly IPRs during each period of performance. Presentation materials shall summarize status, progress, recommendations, and concerns in the development of any tasks or documentation described within this PWS. The IPRs shall be in-person meetings and be held within thirty (30) calendar days after the end of the previous quarter. The contractor shall provide presentation materials and IPR meeting minutes, which at a minimum shall reflect key discussion points, decisions made, issues of concern, date, location, and attendees within five (5) business days after the IPR.
1.3.1.5 Task 1.5: Integrated Product Team (IPT) Meetings. The contractor shall participate in IPT meetings at the Government site or via telephone conference monthly.
Meeting topics include updates on work in progress, requirements management, metrics (monthly), upcoming calendar events, and other pertinent issues as agreed upon by the Government. The contractor shall deliver presentation materials one (1) business day prior to the IPT. Minutes shall be provided within two (2) business days after the IPR. IPT minutes, at a minimum shall reflect key discussion points, decisions made, issues of concern, date, location, and attendees.
1.3.1.6 Task 1.6: Trip Reports. When required, the contractor shall submit a trip report within five
Page 3 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
(5) business days of completion of travel. The trip report shall include the following:
- Purpose
- Location and length of trip
- Travelers
- Individuals contacted during trip
- Synopsis of all discussions
- Future actions identified
- Decisions made
- Issues of concern
1.3.1.7 Task 1.7: Employment Status Report. The contractor shall provide an employee status report containing names and labor categories of personnel supporting each major task and vacancy dates (as appropriate). The report shall be provided within fifteen (15) business days after task order award and submitted with the Monthly Status Report.
1.3.1.8
1.3.2 Task Area 2: Operations & Policy. The contractor shall perform analyses and assessments within the realm of the JDDE. The products of such shall enable senior-level operations and policy decision making affecting analytically driven operational courses of action (COAs), global deployment and distribution network infrastructure, and end-to-end deployment/distribution performance. The contractor shall use enterprise data/metrics and applicable commercial leading practices for qualitative and quantitative measurement. The contractor shall provide analytical support for routine distribution monitoring, Global Operations Center (GOC) reach back, adaptive planning analysis support, Command policy, and special analysis as required. The contractor shall leverage analytical capabilities from DOD, commercial industry, and academia enabling JDPAC to model, simulate, and analyze enterprise-wide distribution problems. The contractor shall analyze root cause and potential solutions by leveraging commercial, defense, and academic supply chain expertise using Command- established metrics (e.g., Performance Metrics Framework
(JDDE PMF)).
1.3.2.1 Task 2.1: Operations and Policy Analyses. The contractor shall collect and analyze DOD and commercial business information to support JDPAC-identified business, deployment, or distribution initiatives. Specific analysis shall address functional business practices, processes or capabilities, or other supply chain or distribution requirements. The contractor may be required to complete the analysis independently or in conjunction with a broader JDDE team. The contractor shall provide results and recommendations via e-mail, point paper, briefing, and/or policy recommendation as required by the Government.
Analysis may take the form of queries (i.e., request for information that is readily available), a project (i.e., in-depth data and analysis scenario), or a study (i.e., long-term data and analysis scenario). The contractor shall provide analysis results and recommendations for a query within one (1) business day, a project within ten (10) business days, and a study in accordance with the Study Timeline.
1.3.2.2 Task 2.2: Expansion of the JDDE Performance Metrics Framework. This task
Page 4 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V includes expanding the population of distribution metrics to measure performance of distribution from sources other than sustainment, such as, but not limited to, redistribution (e.g. replenishment of forward depots); Defense Commissary Agency (DeCA)/Army Air Force Exchange Services (AAFES)/ Navy Exchange (NEX) Distribution; and household goods. The contractor shall develop respective metrics for these populations in priority sequence as required by the Government. The contractor shall build upon the foundation established for sustainment distribution (i.e., velocity, precision, information visibility and efficiency) and develop outcome-based enterprise metrics in accordance with models such as the Supply Chain Operations Reference (SCOR)1 model from the discrete task levels to the enterprise level of the redistribution hierarchy. To build the framework the contractor shall, in conjunction with stakeholders, (1) capture the needs of the customer, (2) describe end-to-end processes, (3) propose enterprise metrics, (4) determine baseline performance, and (5) propose benchmarks for possible performance targets, based on commercial best practices. The contractor shall provide a final written report for each population that documents the metrics framework for all customers and stakeholders to include sources of information. The report is due within thirty (30) calendar days of completion of the data population. The contractor shall assist in implementation of the metrics (e.g. performance analysis, root cause analysis, and identify recommendations for improvements).
1 See Supply Chain Council (www.supply-chain.org) for more information.
Page 5 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
1.3.3 Task Area 3: Modeling, Simulation, and Optimization (MS&O). The contractor shall provide and apply advanced modeling and analytical methods including optimization, simulation, and data analyses to underpin optimal distribution decisions and supply chain analyses. Using statistical analysis and modeling/simulation tools, the contractor shall employ data mining, predictive modeling, optimization, and statistical techniques to evaluate end-to-end distribution courses of action to meet warfighter needs, with a specific view to filling USTRANSCOM operational decision support. These courses of action may include but are not limited to stock positioning, network design, route plans, crisis action and deliberate plan refinement and development, demand forecasting, analysis of tradeoffs between inventory and transportation, rule sets for cargo handling and routing, utilization of commercial versus organic capabilities, plus other non-standard distribution solutions. The contractor shall collaborate with Subject Matter Experts (SME) across the supply chain to provide timely and actionable solutions. The contractor shall also provide analytic expertise for MS&O supporting the USTRANSCOM GOC, Sustainment Distribution Planning and Management, and other programs requiring support for discrete and capacity-based movement planning and performance assessment.
Operational MS&O capabilities must align with USTRANSCOM Enterprise Architecture and Operational Blueprint strategies. Analysis data, results, and recommendations shall be provided via written report, email, point paper, briefing, and/or policy recommendation as required by the Government.
1.3.3.1 Task 3.1: Operational Modeling. The contractor shall provide support for current and future ongoing and near-term operational distribution challenges as required.
Examples include evaluation of theater distribution networks, modeling of potential retrograde options as required by the CCMDs, and leading development and administration of cost based decision support. The contractor shall model such cases by employing appropriate commercial supply chain modeling tools (e.g. Supply Chain Guru), to enable informed and optimized courses of action for senior decision makers. Modeling data, results, and recommendations shall be provided via e-mail, point paper, briefing, and/or policy recommendation as required by the Government. Analysis may take the form of queries (i.e., request for information that is readily available), a project (i.e., in-depth data and analysis scenario), or a study (i.e., long-term data and analysis scenario).
The contractor shall provide analysis results and recommendations for a query within one
(1) business day, a project within ten (10) business days, and a study in accordance with the Study Timeline.
1.3.3.2 Task 3.2: GOC Analytic Process Development and Integration. The contractor shall provide functional and technical support, assess suitability, and conduct analyses using USTRANSCOM MS&O tools supporting GOC operational planning processes. This support shall include developing and integrating operational analytic processes to enhance operational decision support, providing analytic reach back for analysts directly supporting GOC optimization processes, and applying analytic models to support operational decision-making. The contractor shall investigate and resolve model issues supporting operational use cases, provide VV&A of new model versions, and integrate new techniques and/or technology. Analysis may take the form of queries (i.e., request for information that is readily available), a project (i.e., in-depth data and analysis scenario), or
Page 6 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V a study (i.e., long-term data and analysis scenario). The contractor shall provide analysis results and recommendations for a query within one (1) business day, a project within ten
(10) business days, and a study in accordance with the Study Timeline. Day to day this task area deals with unclassified through SECRET analysis requirements; however, the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
1.3.3.3 Task 3.3: MS&O Capability Advancement and Analysis. JDPAC requires senior operations research expertise to advance MS&O capabilities through RDT&E and other GOTS or COTS applications intended to support or being adapted to support both discrete and capacity-based distribution planning and predictive analytic objectives. Scope includes process development and integration of MS&O capabilities into operational decision support processes with recommendations for organizational change management.
To enable current and future studies, this support includes maintenance/ enhancement of an in-house air mobility operations event-driven simulation written in object oriented C++, development of model utilities and connectors written in Python, and the creation and management of supporting databases using SQLite and MS Access. The contractor shall modify/tailor all code to accommodate changes in USTRANSCOM/AMC business rules and provide supporting analytic utilities and reports, and update capability documentation accordingly. This support shall also include data analysis, development and application of data analytics algorithms, and collaboration with Enterprise Data Sciences initiatives to ensure MS&O applications progress to support and enhance USTRANSCOM operational decision support. Requirements include developing use cases for application of advanced optimization capabilities for operational planning, providing operations research and logistics technical support in the design and development of such tools, as well as conducting testing, experimentation, and results documentation. Work will explore potential technology gaps, pursue resolution, and apply complex mathematical and transportation logistics concepts to advance operational planning and execution capabilities. Requirement also includes providing expertise to incorporate and advance use of USTRANSCOM business intelligence (BI) capabilities (currently IBM Cognos Analytics) across operational decision support projects and processes; specifically, the contractor shall develop operations- focused business intelligence dashboards, reports, visualizations, and analytic solutions to inform operational business decisions/processes with insights from analytic projects, RDT&E efforts, and GOTS/COTS applications. The contractor shall also provide ad-hoc and internal training limited to the Operations Division within JDPAC on business intelligence (currently IBM Cognos Analytics) functionality and capabilities when requested and coordinated by the Government.
Analysis may take the form of a project (i.e., in-depth data and analysis scenario) or a study (i.e., long-term data and analysis scenario). The contractor shall provide analysis results and recommendations for a project within ten (10) business days and a study in accordance with the Study Timeline. Day to day this task area deals with unclassified through SECRET analysis requirements; however, the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
Page 7 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
1.3.3.4 Task 3.4: GOC Analytic Support Cell. The contractor shall provide MS&O expertise to the GOC Analytic Support Cell supporting GOC planning processes and operational decision support. Analysts will work closely with functional planners to assist in providing what-if analysis, network capacity planning and design, TPFDD refinement, comparative analytics, demand/requirement forecasting and shaping, process performance, integration/application of Enterprise Data Sciences capabilities, or other planning factors as required by GOC leadership. The contractor shall provide in- depth modeling tool knowledge to set up, operate, and communicate analytic results in an operational environment that adequately meets timing and fidelity requirements. Analysis may take the form of queries (i.e., request for information that is readily available) or a project (i.e., in-depth data and analysis scenario). The contractor shall provide analysis results and recommendations for a query within one (1) business day and a project within ten (10) business days.
1.3.3.5 Task 3.5: MS&O Distribution Network Design and Analysis. The contractor shall provide end-to end (origin to destination) multimodal distribution network design and analysis in support of USTRANSCOM global sustainment operations. The contractor shall provide recommended alternative network design courses of action based on capacity, cost, velocity, and forecasted demand, with recommendations to modify the global network based on tradeoffs between effectiveness, efficiency, and readiness. The contractor shall provide quantitative support for the integration of new or modified networks into the existing global network and provide decision makers with network assessments based on quantitative analysis. Analysis may take the form of a project (i.e., in-depth data and analysis scenario) or a study (i.e., long-term data and analysis scenario).
The contractor shall provide analysis results and recommendations for a project within ten
(10) business days and a study in accordance with the Study Timeline.
1.3.3.6 Task 3.6: MS&O Analytic and Functional Data Support. The contractor shall provide senior data and functional analytics expertise to support modeling, simulation, experimentation, data exchange, research projects, integrated planning, and optimization efforts. The scope includes providing a technical bridge between emerging Enterprise Data Sciences capabilities and distribution planning decision making processes, guiding resolution of gaps in analytic and functional data processes, and supporting enterprise transformation toward integrated application of MS&O tools in distribution planning. The contractor shall support development, coordination, and integration of authoritative and relevant enterprise data processes and ensure they align with Enterprise Data Sciences efforts. The contractor shall also, where possible, support automated data management efforts intended to improve data fidelity, enable repeatable and sustainable processes, and improve overall solution quality. Analysis may take the form of a project (i.e., in-depth data and analysis scenario) or a study (i.e., long-term data and analysis scenario). The contractor shall provide analysis results and recommendations for a project within ten (10) business days and a study in accordance with the Study Timeline.
1.3.3.7 Task 3.7: MS&O System Support. The contractor shall provide support to JDPAC Configuration Control Boards, Functional Working Groups, weekly Business Meetings, weekly Backlog Grooming (BLG) and the annual User's Group Meeting.
Page 8 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
Configuration Control Boards and Functional Working Groups are scheduled for each Analysis of Mobility Platform (AMP) software release, and there are approximately two major and six maintenance AMP releases annually. For each event, the contractor shall prepare the agenda, schedule the location, and coordinate briefings. For each weekly Business Meeting, the contractor shall prepare the agenda and schedule the location. The contractor shall provide implementation guidance, technical reports, prototype/GAT testing of software releases, management of User Acceptance Testing (UAT), interface with local and remote users, interface with external developers, provision of training and documentation associated with software releases, and facilitation of Help Desk for JDPAC M&S applications. The contractor shall also provide system administration support for the setup of high-speed analysis hardware with the TCAC and TCJ3 GOTS and COTS tools resident within the USTRANSCOM stable of models and simulations. This support includes managing and troubleshooting virtual and physical infrastructure and installation and maintenance of any other test software needed to complete required analyses and experimentation. The contractor shall provide minutes from Configuration Control Boards, Functional Working Groups, Business Meetings, and the User’s Group Meeting within five (5) business days after the event. The contractor shall provide implementation guidance, technical reports, and training and software release documentation within ten
(10) business days after software release. System administration support must adhere to the Cyberspace Workforce Management and Qualification in accordance with DoDD
8140.01 referenced in appendix 4.
1.3.3.8 Task 3.8: MS&O Enterprise Applications Support. The contractor shall provide support for RDT&E and other MS&O applications and prototypes produced in support of or being adapted for JDDE movement processes. Contractor shall support data analysis to ensure all designated ongoing and future RDT&E, COTS, and GOTS MS&O applications progress to meet USTRANSCOM objectives. Contractor shall provide tool design, testing, and development expertise for MS&O capability development and implementation, including identification of required enhancements. The contractor shall assist with integration and transition of designated MS&O prototypes to support USTRANSCOM operational processes as required. The contractor shall review design documents, lead technical discussions, and provide functional input to program management. Feedback and comments on design documents shall be completed within 3 business days of receipt. Minutes from technical discussions shall be provided within 3 business days of discussion. Functional input shall be provided within 3 business days of request. The contractor shall participate in prototype testing, Government Acceptance Testing (GAT), and User Acceptance Testing (UAT) to verify and validate new model versions. The contractor shall provide written weekly testing feedback via email TEAMS, or JIRA, on assigned test cases/features during AMP GAT/UAT. Written reports documenting data analysis, tool design and development, and test results shall be provided within fifteen (15) business days after analysis completion.
1.3.3.9 Task 3.9: Analysis of Mobility Platform (AMP) Set Up Team Support. The contractor shall provide timely AMP scenario set-up support to provide JDPAC and other AMP user community study/analysis leads (to include those within the Transportation Feasibility Assessment (TFA) planner community) with analysis-ready, study-specific, Page 9 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V tailored AMP set-ups within four (4) calendar weeks of request, or sooner as appropriate per analysis timeline requirements. This support shall include support for studies, force flow conferences, exercises, and real-world events, some simultaneously and some requiring 24-hours-per-day coverage. TS-SCI clearance is required due to the security classification of some analytic scenarios. Support includes establishing and executing a process to verify and validate AMP input data required for model set-ups. Additionally, the contractor shall provide AMP trouble- shooting assistance in order to help analysts rapidly identify and correct model set-up problems until completion of a study/analysis.
The contractor shall assist in the development of new AMP requirements and capabilities and participate in User Acceptance Testing (UAT) to verify and validate new model versions. The contractor shall provide written weekly testing feedback via email on assigned test cases/features during AMP UAT. Additionally, the contractor shall build, organize and conduct AMP training to support the AMP user community. This includes introductory week-long AMP training sessions and shorter topical (e.g. advanced or new functionality) and refresher sessions. Training may be in-person, hands-on classroom training and/or conducted virtually, as needed. The contractor shall develop and maintain self-paced training materials covering a variety of topics. The contractor shall conduct technical presentations or demonstrations for USTRANSCOM, other DOD commands and other AMP users, as needed. Training and presentations may be given at USTRANSCOM, or other venues as required, to include OCONUS locations. Finally, the contractor shall develop techniques and processes to fully utilize AMP output data in support of ongoing analytic efforts and provide a written report documenting the techniques and procedures within ten (10) business days of analysis completion. Day to day this task area deals with unclassified through SECRET analysis requirements; however, the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
1.3.3.10 Task 3.10: Joint Air Refueling Modeling (ARM) Program Support. To enable the development and fielding of DOD air refueling modeling capabilities to be used in the Joint Collaborative analysis area, the contractor shall provide functional analytic support to ARM in collaboration with the joint aerial refueling community, which includes the Office of the Secretary of Defense for Cost Assessment and Program Evaluation (OSD/CAPE), USTRANSCOM directorates (e.g., TCAC, TCAQ, TCJ8, TCJA, and TCJ6), AMC (e.g., A3, A6, 18th Air Force, and 618th Air Operations Center), Services’ ARM analysts/users, and the supporting Joint ARM Working Group. The contractor shall coordinate, assess, centralize, and organize ARM requirements to meet user community analytic needs through improved and maintained analytical tools. Scope includes applying operations research methodologies and knowledge of air refueling processes in facilitating, supporting, drafting, inputting and/or tracking of: user group and working group meetings, capability requirements and supporting design conferences, verification and validation plans and participation, configuration management plans, Capability Development Documents, USTRANSCOM Mission Area Manager (MAM) process, Joint Capabilities Integration and Development System (JCIDS) process, and acquisition process. The contractor shall provide a written report documenting draft requirements compilations and acquisition artifacts to support capability development requirements not later than ten (10) business days after government request.
Page 10 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
1.3.3.11 Task 3.11: MS&O Fuel/Energy Analytic Support. The contractor shall conduct mobility modeling and simulation with a focus on fuel/energy, to ensure energy considerations are sufficiently included in all projects in the Virtual Warfare Center (VWC) located at Scott AFB, and in all AMC/A9 support to Title X wargaming. The contractor shall provide coordination between SAF/IEN and AMC/A9 and synchronize SAF/IEN equities with the VWC’s overall mission of supporting the AMC Commander’s “winning scheme of maneuver.” Mission planning, modeling, and simulation expertise will be leveraged to ensure proposed concepts of operations and material alternatives address SAF/IEN initiatives in areas such as Air Refueling (including Air Refueling Model: ARM), Airlift (including Analysis of Mobility Platform: AMP), theater energy distribution (including AMP), and logistics under attack (including Command Professional Edition). Wargame support will require travel and will focus on modeling and simulation support. The contractor shall provide updated VWC or wargame simulation models and/or scenarios no later than one (1) week prior to the execution of the linked VWC or wargame event. The baseline models (initially built by AMC/A9 or other DoD entities) will be modified by the contractor to include fuel/energy considerations such as: infrastructure, consumption, supply, and efficiency. The contractor shall include documentation necessary to reproduce, maintain, and model changes.
Additionally, the contractor shall identify, build, and maintain valid, authoritative mission and flight planning data, to include fuel consumption and vehicle constraints, for incorporation into simulation models and analysis tools. The contractor shall provide the authoritative vehicle mission planning data sets for incorporation into simulation models and analysis tools within one (1) month of an identified requirement for any specific vehicle’s data. The contractor shall document sources used to generate the data sets. The contractor shall also provide production and test versions of any software utilities used to ingest, manipulate, and reformat data for input to simulation models and analysis tools within one (1) month of utility development. The contractor shall include documentation necessary to use, maintain, and modify all software utilities. Day to day this task area deals with unclassified through SECRET analysis requirements; however, the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
1.3.3.12 Task 3.12: Bulk Fuel Analysis. The contractor shall introduce tools, algorithms, data/information management structures that support the Global Bulk POL Manager mission. The contractor will analyze the global bulk fuel distribution enterprise in support of the USTRANSCOM mission as global bulk fuel manager for the Department of Defense. The mission elements include bulk fuel posture, planning, and execution. The scope of bulk fuel distribution includes, but is not limited to production, storage, transportation, and delivery to the operational point of need. The modes of transportation include fuel tanker vessels, other vessels capable of carrying fuel (such as Offshore Support Vessels, or OSVs), pipelines, fuel tanker railcars, and tanker trucks.
It is a preference the contractor shall be familiar with fuel distribution concepts of
Page 11 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V operations (CONOPS) published in Service and Joint Doctrines, or commercial equivalent.The contractor shall become familiar with fuel CONOPS in Defense Planning Scenarios and Operational Plans (OPLANS), within 90 days of task start to provide the appropriate context and framework for conducting analysis. With the preceding CONOPS in mind, the contractor shall design analytical methodologies using available and forthcoming tools (e.g., Analysis of Mobility Platform, Supply Chain Guru, Tableau, etc.)
to address sponsor objectives.
The contractor shall collaborate as necessary with JDPAC analysts, TCJ5/4 fuel planners, and Joint Petroleum Enterprise (JPE) stakeholders such as Combatant Commands, Military Services, TRANSCOM Component Commands, and Defense Logistics Agency, to represent realistic fuel distribution activities in modeling and simulation.
Desired outcomes are applications, data science tools/methods and data structures necessary to support USTRANSCOM as the Global Bulk POL Manager. These applications and tools will primarily be used by planners and operations to make data and analysis informed decisions. The analyses include input on enhancements to the status quo or quantifying the analytic trade space in potential decisions on resources, capabilities, and process improvements to improve bulk fuel management for posture, planning, and execution. Day to day this task area deals with unclassified through SECRET analysis requirements; however, the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
1.3.4 Task Area 4: Programmatic Analysis. The contractor shall perform programmatic analyses and assessments within the realm of the JDDE. Analyses will be accomplished using operations research commercial best practices with commercial off the shelf (COTS) models and simulations and with USTRANSCOM developed (GOTS) modeling tools.
Day to day this task area deals with unclassified through SECRET analysis requirements;
however, the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
1.3.4.1 Task 4.1: Programmatic Support. The contractor shall provide programmatic analysis support for Joint Collaborative Analysis with the Joint Staff, OSD Program Analysis & Evaluation and the CCMDs. Analyses will be as required by OSD, the Commander USTRANSCOM or the Director of the JDPAC. Formulate comprehensive end-to-end analysis of mobility capabilities and requirements using TRANSCOM approved suite of MS&O tools. Evaluate all modes of end-to-end mobility systems and conduct analysis of organic and commercial intermodal and throughput capabilities. The contractor shall provide analytic and model expertise to select data sources and incorporate data with modeling to provide replication of real world model outputs for programmatic analysis to include such support as analytic support to command and DOD for JDDE mobility assessments in preparation of DOD scenarios. The contractor shall deliver final study paper(s), slides, and associated products IAW the specific study plan’s terms of reference.
Page 12 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
1.3.4.2 Task 4.2: Programmatic Study Management. The contractor shall participate in and lead working groups for DOD-Joint collaborative studies and analysis (e.g. next mobility study, Comprehensive Materiel Response Plan/Global Distribution Synchronizer, Commander Estimates). The contractor shall identify and recommend remedial action of JDDE shortfalls; review and recommend appropriate operations research methods and mobility software for the study/project; and participate in development of programs in relation to the analytic requirement. The contractor shall also provide transportation and distribution expertise for involvement and communication with DOD, with emphasis on air mobility and surface movement. This includes assessing analysis projects and documents developed by other DOD organizations within five (5) business days of Government’s request. The contractor shall provide training, documentation, and briefings on programmatic analysis. Day to day this task deals with unclassified through SECRET analysis requirements, however the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios at that level. See paragraph 5.4 for Clearance Requirements and Position Sensitivity. The contractor shall deliver final study paper(s), slides, and associated products IAW the specific study plan’s terms of reference.
1.3.4.3 Task 4.3: En Route Infrastructure Master Plan (ERIMP) & USTRANSCOM Posture Plan Analytical Support. ERIMP is an Annex to the USTRANSCOM Posture Plan, which is an annual OSD and Joint Staff specified requirement articulated in the Joint Strategic Capabilities Plan (JSCP) and the Global Defense Posture (GDP) documents.
ERIMP captures infrastructure, posture, logistics, and strategy from a regional, combatant command and global perspective. The contractor shall support the Government by both conducting necessary analysis, and producing products (e.g., reports or briefings) that document, and summarize work completed. Specific tasks include:
a. Strategic modeling and analysis of programmatic, OPLAN/CONPLAN, and steady state activities requirements to influence and shape both the ERIMP and any other study updates.
b. Nodal site assessments with the ability to use the Analysis of Mobility Platform – Airfield Simulation Tool to assess airfield capability and report recommendations to improve military support.
c. Assessing the modeling results from nodal, strategic, and other initiatives and programs affecting the aerial en route and multi-modal network and environment.
d. Development of new priorities and project recommendations as a result of analysis
As part of providing modeling and simulation expertise to represent the ERIMP network, the contractor shall:
a. Analyze information in order to conceptualize and define operational problems;
b. Define data requirements and then gather and validate information, applying judgement and statistical tests to support modeling and analysis;
c. Perform validation and testing of models to ensure adequacy; reformulate models as necessary;
d. Specify manipulative or computational methods to be applied to models;
e. Study and analyze information about alternative courses of action in order to determine which plan will offer the best outcomes;
Page 13 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V
f. Be proficient in the following tool suites: Analysis of Mobility Platform, Supply Chain Guru or other equivalent COTS transportation network modeling software, Tableau or Cognos.
Day to day this task deals with unclassified through SECRET analysis requirements, however the contractor must be able to provide Critical Sensitive Position (TOP SECRET) support to analyze scenarios or review OSD Contingency Planning Guidance at that level.
See paragraph 5.4 for Clearance Requirements and Position Sensitivity.
1.3.4.4 Task 4.4: En Route Infrastructure Master Plan (ERIMP) Functional, Data Collection, and Publication Support. The contractor shall collect and aggregate data (e.g., airfield and seaport infrastructure characteristics, country-level economic or geopolitical data) that support strategic modeling of the en route network, development of the ERIMP, and other analytical products that support USTRANSCOM global posture.
Specific tasks include:
a. Reviewing and documenting changes in the strategic environment (e.g., Unified
Command Plan, the National Military Strategy, the National Security Strategy, the Joint Logistics Estimate, USTRANSCOM Strategy, Global Force Management, Global Employment of the Force, Global Combatant Commands’ Theater Posture Plans, Theater Campaign Plans, Theater Distribution Plans, the Joint Strategic Capabilities Plan, USTRANSCOM’s Campaign Plan for Global Distribution and Functional Posture Plans, J2 Threat Assessments, J2 Access Basing and Overflight Assessments and J3 Mission Assurance Assessments). The contractor shall provide a report documenting the strategic guidance review within two (2) calendar weeks of initial request for review.
b. Maintaining access and proficiency with historical cargo movement databases (e.g., Single Mobility System, Global Decision Support System, etc.)
c. Build and maintain a repository of nodal data and provide a means to visualize it for the community of stakeholders, and for use in communicating concepts for executive level briefings. For specific nodal data requests, the contractor shall provide data within three (3) business days of request. The contractor shall maintain nodal repository on a monthly basis, or as requested by the Government lead.
d. Leading up to publication of the ERIMP, the contractor shall:
i. Assist in developing or delivering quarterly briefings to the study director, or as-scheduled by the Government lead.
ii. Support ERIMP and Posture Plan product review processes by developing and maintaining comment resolution matrices and support the acceptance or rejection of change recommendations into relevant documents.
iii. Provide draft and final reports IAW the OSD-prescribed schedule for FCC posture plans.
iv. Develop an After-Action/Lessons-Learned Report capturing information not appropriate for the ERIMP or the USTRANSCOM Posture Plan but necessary to set the conditions for future iterations of either document.
e. Execute the analytical processes used to prioritize forces, footprint and agreement 1-n lists in the USTRANSCOM Posture Plan and ERIMP. The contractor shall travel to, and execute in coordination with the Government Lead, the AHP process
Page 14 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V at the annual TRANSCOM Posture Infrastructure Steering Committee (TPISC) meeting that establishes the USTRANSCOM prioritized 1-n list of MILCON projects. Leading up to the conference, the contractor shall assist in the preparation of documents for the TPISC, developing briefings, papers, as required to inform audiences (e.g., GCCs and the Services) about the TPISC. This work may include scheduling and attending meetings and presenting briefings at the conference.
f. Develop point or issue papers on nodal locations that leverage nodal data collection or historical cargo data pulls from available sources to support or deny infrastructure improvements at key USTRANSCOM nodes, or communicate summary-level nodal information for executives. Submittal of draft papers must be four (4) business days in advance of prescribed completion date established by the Government to allow for branch/division chief and executive reviews.
Travel for airfield or seaport site survey visits, and GCC posture conferences or other posture steering committee engagements may be required to support this task. The contractor shall provide nodal reports within ten (10) calendar weeks after scheduled visit;
quick-look (non-travel) nodal assessments within two (2) calendar weeks of government request.
1.3.4.5 Task 4.5: Future Deployment and Distribution Assessment (FDDA). The Future Deployment and Distribution Assessment (FDDA) is a research and analysis effort intended to assess and catalog needed deployment and distribution capabilities and technologies of interest in the extended planning period-the year 2025 and beyond.
JDPAC leads the FDDA at the behest of the Commander, USTRANSCOM in support of the entire JDDE. The contractor shall conduct the next iteration of the FDDA and populate the FDDA DISA DEPS, both NIPR/SIPR sites, to serve as the FDDA single point of insights, observations and recommendations in documents/briefings and papers. The contractor shall coordinate with industry, academia, and Government to gather, research, analyze information/data he JDDE capability gap catalog and the catalog of JDDE-related initiatives. The contractor shall build upon the foundation established in previous iterations of FDDA. The contractor shall (1) conduct research on initiatives and concepts, (2) perform computational examination, parametric analysis, and/or modeling, (3) map the results to the capability gaps to determine the merits of each initiative or concept, and (4) compile results, observations, and recommendations and present them in a published report and in one or more executive briefings. The contractor shall develop input to influence, support, integrate, inform other CBAs, strategies, concepts, doctrine, war games/exercises/joint experimentation, plans and other functional areas, based on the results of the assessment. The contractor shall integrate the FDDA, developing briefings, papers, and other type products other required to inform audiences (i.e., DOD, other Government agencies, industry,) about FDDA. This integration may include scheduling and attending meetings, presenting briefings, and occasional travel. The contractor shall provide updates to the Study Director at least quarterly or more frequently per Government request. The contractor shall submit a briefing at least two (2) business days prior to the update. Each FDDA iteration will have a study timeline, and the contractor shall submit FDDA products IAW the study timeline. For each Senior Leader IPR (i.e., TCCC, TCDC, TCAC Director), final briefings and supporting materials will be submitted
Page 15 of 90 JDPAC DISTRIBUTION ANALYSIS SUPPORT V at least three (3) business days prior to the event. Appropriate pre-briefings will be accomplished at the discretion of the Study Director. The contractor shall develop an After- Action/Lessons-Learned Report within thirty (30) calendar days after a final Assessment Report is published capturing information not appropriate for the Assessment Report but necessary to set the conditions for future iterations of the FDDA.
1.3.4.6 Task 4.6: FDDA Synchronization/Maintenance. The contractor shall participate, as required, in forums, seminars, workgroups, meetings, and conferences to present/discuss FDDA through briefings or represent findings from earlier iterations of study. The contractor will update the "FDDA 101" brief quarterly and prepare correspondence to orient new personnel in the community of interest on the FDDA process, the study iterations, and the major findings. The contractor shall assess ongoing developments in technologies, concepts, and strategic guidance to determine the impact on recommended actions from previous FDDA studies, their relevance to the current iteration of study, or to shape future iterations of work. Assessments Building on the foundation of previous iterations of study, current research and information, the scope of the contractor's effort will include collaboration, interviews, and coordination with not limited to: Geographical Combatant Command, Joint staff, agencies, commercial, academia, labs, and interagency representatives. The contractor shall also engage closely and regularly with principals, stakeholders and action officers internal and external to USTRANSCOM to ensure FDDA efforts are aligned with ongoing and future planned efforts. At the conclusion of an FDDA iteration, the contractor shall provide a document with summaries of research/analysis, to include findings, observations, recommendations, appropriate briefings, and a reference file with quick- win products. The document will be due within thirty (30) calendar days of Government approval of the Assessment Report.
1.3.4.7 Task 4.7: Army Power Projection Program (AP3). The contractor shall analyze the deployment and distribution capabilities of Army forces from origin to destination, given a demand signal from Defense Planning Scenarios (DPS) or OPLANs. The scope of mobility systems include but are not limited to CONUS and OCONUS installation infrastructure and outload capability, road and rail transportation, strategic ports of embarkation capacity and throughput, strategic lift (air and sealift), and theater distribution by air and surface, which includes movement from ports of debarkation to Joint Reception, Staging, Onward Movement, and Integration (JRSOI) locations. The contractor shall collaborate as necessary with JDDE stakeholders such as the Combatant Commands, Military Services, USTRANSCOM Component Commands, Defense Logistics Agency, and Industry where appropriate to represent realistic deployment and distribution activities in modeling and simulation. Desired outcomes of these analyses include input in Army programmatic planning on mobility equities, and to advise Army planners on constraints, shortfalls, and recommended actions to achieve required force closure at destination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .