2024-chdv-grants-supp-app-template-2024-04.xlsx

XLSX spreadsheet 909 KB Posted

Attached to
Clean Heavy-Duty Vehicles Grants Federal grant opportunity
Opportunity number
EPA-R-OAR-CHDV-24-06
Issued by
Environmental Protection Agency

About this file

This document is a supplemental application template for the U.S. Environmental Protection Agency's (EPA) Clean Heavy-Duty Vehicles (CHDV) Grant Program. The template provides instructions and data fields for applicants to detail their existing vehicle fleets, new replacement zero-emission vehicles, and supporting electric vehicle infrastructure projects. The grant program is authorized under Section 60101 of the Inflation Reduction Act of 2022 and will provide up to $932 million in funding to incentivize and accelerate the replacement of existing non-zero-emission Class 6 and 7 heavy-duty vehicles with zero-emission vehicles. Eligible applicants include state, local, and tribal governments, as well as eligible nonprofit organizations. The template covers key details such as vehicle information, infrastructure equipment, ownership, costs, and compliance with the Build America, Buy America Act. This document serves as a guide for applicants to submit complete and accurate information as part of their grant application.

2024 CHDV grants supp app template

View the file

Other files for this federal grant opportunity

Other files attached to Clean Heavy-Duty Vehicles Grants, newest first.
File Type Posted
EPA-R-OAR-CHDV-24-06 Updated.pdf PDF
2024-clean-hd-veh-disadv-community-county-list-2024-03.pdf PDF
2024-chdv-grants-tcd-utility-part-template-2024-04.pdf PDF
2024-chdv-grants-schl-dist-approval-certif-2024-04.docx DOCX document
2024-chdv-grants-schl-brd-aware-certif-2024-04.docx DOCX document
2024-chdv-grants-sample-app-narr-template-2024-04.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Instructions_App

U. S. Environmental Protection Agency
Clean Heavy-Duty Vehicles (CHDV) Grant Program
Supplemental Application Template
Burden Statement for EPA Form Number: 5900-689
This collection of information is approved by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 et seq. (OMB Control No. 2060-0754). Responses to this collection of information are voluntary (2 CFR 200 at 2 CFR 1500). An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The public reporting and recordkeeping burden for this collection of information is estimated to be 7.2 hours per response. Send comments on the Agency’s need for this information, the accuracy of the provided burden estimates and any suggested methods for minimizing respondent burden to the Regulatory Support Division Director, U.S. Environmental Protection Agency (2821T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.
Instructions
This supplemental application template should be completed and submitted as part of the application materials for the Clean Heavy-Duty Vehicles Grant Program. Please work with relevant parties (i.e., transportation contractor, bus dealer, etc.) to ensure information submitted is as accurate as feasible at the time of application. The applicant must fill out shaded cells highlighted blue with a diagonal pattern (///) to the best of their ability. Cells highlighted yellow are automatically populated based on previous responses in this spreadsheet. Fields shaded in white are encouraged, but may not be known at the time of application. Additionally, some fields will hash out with a bold diagonal pattern (///) if those fields are not applicable based on the information provided in previous cells. Please complete tabs in this workbook according to the instructions below.
Excel Workbook TabDefinition
1. InstructionsBasic instructions for all worksheets in this reporting workbook.
2. Fleet DescriptionThe Fleet Description tab should detail all vehicles impacted under the project. The Fleet Description should be completed at the time of application; if selected, awardees will update this table quarterly with all vehicle upgrades completed. The applicant must fill out shaded cells highlighted blue with a diagonal pattern (///) to the best of their ability. Fields in yellow will be automatically populated based on previous responses. Fields shaded in white are encouraged, but may not be known at the time of application. Additionally some fields will hash out with a bold diagonal pattern (///) if those fields are not applicable based on the information provided in previous cells. This Fleet Description is broken into two sections: 1) Current Vehicle Information, and 2) New Vehicle Upgrade Information. The sheet has capacity for 100 vehicles. Please refer to the Fleet Description data definitions on tab 4 (Data Dictionary) for data field definitions.
3. InfrastructureThe Infrastructure tab should detail all electric vehicle supply equipment (EVSE) and other eligible supporting infrastructure planned as part of the project; if selected, awardees will update these tables be updated quarterly as EVSEs and other infrastructure are procured and installed. The applicant must fill out shaded cells highlighted blue with a diagonal pattern (///) to the best of their ability. Fields in yellow will be automatically populated based on previous responses. Fields shaded in white are encouraged, but may not be known at the time of application. Additionally, some fields will hash out with a bold diagonal pattern (///) if those fields are not applicable based on the information provided in previous cells. Additional rows may be add as needed to capture all units of supporting infrastructure. The final text field on this tab may be used to supply information about planned hydrogen fueling infrastructure and other types of eligible infrastructure under this program. Please refer to the Infrastructure data definitions on Tab 4 (Data Dictionary) for data field definitions. Reminder: All Level 2 EVSEs must be ENERGY STAR certified, and all infrastructure must comply with Build America, Buy America (BABA) requirements.
4. Data DictionaryPlease refer to the dictionary on this tab for support in completing the Fleet Description and Infrastructure Tabs.

&G OMB Number: 2060-0754 Expiration Date: 04/30/2027 Office of Transportation and Air Quality April 2024

EPA Form Number 5900-689

2. Fleet Description

U. S. Environmental Protection Agency
Clean Heavy-Duty Vehicles (CHDV) Grant Program
Fleet Description
Applicant Name
SAM.gov Unique Entity ID
Project Title
Instructions
The Fleet Description should detail all vehicles anticipated to be replaced under the project and, to the extent details are known at this time, all replacement vehicles that will be purchased using Clean Heavy-Duty Grants funding. Please fill out shaded cells highlighted blue with a diagonal pattern (///) to the best of your ability. Fields in yellow will be automatically populated based on previous responses. Fields shaded in white are highly encouraged, but optional, as these data may not be known at the time of application. Additionally, some fields will hash out with a bold diagonal pattern (///) if those fields are not applicable based on the information provided in previous cells. This Fleet Description is broken into two sections: 1) Current Vehicle Information and 2) New Vehicle Upgrade Information. The sheet has capacity for 100 vehicles. Please refer to the Fleet Description data definitions on tab 4 (Data Dictionary) for data field definitions.
Table 1. CURRENT VEHICLE INFORMATIONTable 2. NEW REPLACEMENT VEHICLE INFORMATION
1a. Basic Fleet Information1b. Current Vehicle Type Information1c. Current Vehicle Usage Information1d. Current Vehicle Place(s) of Performance1e. Vehicle Disposition Process2a. Upgrade Vehicle Information2b. Upgrade Cost2c. New Vehicle Place(s) of Performance2d. BABA Compliance
Primary Place of PerformanceSecondary Place of Performance (if applicable)Additional Location Details (if applicable)Primary Place of PerformanceSecondary Place of Performance (if applicable)Additional Location Details (if applicable)
Optional, but highly encouraged if known*
VehicleGroup NameCurrent Fleet OwnerVehicle Type
(select from dropdown)Vehicle Class
(select from dropdown)Vehicle Vocation
(select from dropdown)Vehicle Group Sector
(select from dropdown)Vehicle Identification NumberVehicle ManufacturerVehicle ModelBaseline Vehicle Model YearBaseline Engine Fuel Type
(select from dropdown)Engine Family Name
(if unregulated, then enter N/A)Gross Vehicle Weight Rating (GVWR)Annual Miles Traveled (miles per vehicle, using the average for the prior 2 years. Please see the NOFO section III.D.2 which describes the minimum mileage required.)Annual Idling Hours (hours per vehicle, using the average for the prior 2 years.)Current Odometer
(in miles)Annual Amount of Fuel Used (gallons/year per engine)School District Name
(if applicable)NCES ID
(if applicable)State
(select from dropdown)County
(select from dropdown)Percentage of Time Operated in CountyPlace of Performance: CitySchool District Name
(if applicable)_2NCES ID
(if applicable)_2State_2County_3Percentage of Time Operated in County_2Place of Performance: City_3Additional Counties Where Vehicle OperatesPercentage of Time Operated in Each Additional CountyAnticipated Vehicle Disposition MethodIf sold or donated, provide the state in which the existing vehicle is expected to primarily operate (if known)If sold or donated, provide the county in which the existing vehicle is expected to primarily operate (if known)Year of Upgrade ActionNew Vehicle Fleet OwnerNew Vehicle Class
(select from dropdown)New Vehicle Fuel TypeNew Vehicle Manufacturer
(if known)New Vehicle Model
(if known)New Vehicle GVWR
(if known)Capable of Bidirectional Charging? (Yes/No/NA)Estimated Range in MilesEstimated Acquisition Cost per VehicleTotal EPA Funds Requested Per Vehicle ($ of Total Cost per Unit)School District Name
(if applicable)_3NCES ID
(if applicable)_3State
(select from dropdown)_3County
(select from dropdown)_3Percentage of Time operated in County_2

(Enter value between 0-1, where 1 = 100%)

CitySchool District Name
(if applicable)2NCES ID
(if applicable)2State
(select from dropdown)2County
(select from dropdown)2Percentage of Time operated in County_3
(enter value 0-1, where 1 = 100%)City_4Additional Counties Where Vehicle Operates_2Percentage of Time Operated in Each Additional County_2Is a waiver being used to fulfill BABA compliance for this vehicle?
Example VehicleESBs for District ASarah SmithShort Haul - Single UnitClass 6DrayagePort12345678910ABCDEFGManufacturer NameModel Name or #1995DieselN/A101501400001200015000006000Warren 01123456SCWarren100%SpringhillWarren 01123456SCWarren100%SpringhillScrappedCAAlameda County2025Walton School DistrictClass 6Battery ElectricManufacturer NameModel Name or #12000Yes200$ 375,000.00$ 325,000.00Warren 01123456SCWarren100%
Vehicle 1
Vehicle 2
Vehicle 3
Vehicle 4
Vehicle 5
Vehicle 6
Vehicle 7
Vehicle 8
Vehicle 9
Vehicle 10
Vehicle 11
Vehicle 12
Vehicle 13
Vehicle 14
Vehicle 15
Vehicle 16
Vehicle 17
Vehicle 18
Vehicle 19
Vehicle 20
Vehicle 21
Vehicle 22
Vehicle 23
Vehicle 24
Vehicle 25
Vehicle 26
Vehicle 27
Vehicle 28
Vehicle 29
Vehicle 30
Vehicle 31
Vehicle 32
Vehicle 33
Vehicle 34
Vehicle 35
Vehicle 36
Vehicle 37
Vehicle 38
Vehicle 39
Vehicle 40
Vehicle 41
Vehicle 42
Vehicle 43
Vehicle 44
Vehicle 45
Vehicle 46
Vehicle 47
Vehicle 48
Vehicle 49
Vehicle 50
Vehicle 51
Vehicle 52
Vehicle 53
Vehicle 54
Vehicle 55
Vehicle 56
Vehicle 57
Vehicle 58
Vehicle 59
Vehicle 60
Vehicle 61
Vehicle 62
Vehicle 63
Vehicle 64
Vehicle 65
Vehicle 66
Vehicle 67
Vehicle 68
Vehicle 69
Vehicle 70
Vehicle 71
Vehicle 72
Vehicle 73
Vehicle 74
Vehicle 75
Vehicle 76
Vehicle 77
Vehicle 78
Vehicle 79
Vehicle 80
Vehicle 81
Vehicle 82
Vehicle 83
Vehicle 84
Vehicle 85
Vehicle 86
Vehicle 87
Vehicle 88
Vehicle 89
Vehicle 90
Vehicle 91
Vehicle 92
Vehicle 93
Vehicle 94
Vehicle 95
Vehicle 96
Vehicle 97
Vehicle 98
Vehicle 99
Vehicle 100

&G Office of Transportation and Air Quality Diesel Emissions Reduction Act July 2022

&F &A EPA Form Number 5900-689 Page &P of &N

3. Infrastructure

U. S. Environmental Protection Agency
Clean Heavy-Duty Vehicles (CHDV) Grant Program
Infrastructure Description
Instructions
Below are three tables (Table 3, Table 4, and Table 5), and an additional question below Table 5. Please complete all 4.

The EVSE Equipment Information (Table 3) should detail all electric vehicle supply equipment (EVSE) and supporting infrastructure purchased under the project. Table 4 focuses on on-site power generation systems and Table 5 on battery storage systems. For school district applicants the infrastructure needs to be listed by school district and/or city. That is, if School District A and School District B are procuring the same EVSE, the EVSE will appear as two separate EVSE Groups. Similarly, for large school districts, if EVSE are being installed in two different locations, the EVSE needs to appear as two separate EVSE Groups. If your project includes hydrogen refueling infrastructure, please describe using the text box after Table 5 at the bottom of this tab, about the following features: the type of station (gas or liquid), where hydrogen will be stored (above or below ground), the total hydrogen storage capacity (in kg), the estimated annual hydrogen to be dispensed (in kg), the hydrogen generation pathway (see Data Dictionary for more options), the total cost for acquisition of each eligible component (e.g., fueling pedestals, tanks, compressors, cooling system, etc.), the total funds requested for each eligible component, the total cost for installation of the system, the total funds requested for installation, and any other eligible expenses related to hydrogen fueling projects.

Please fill out shaded cells highlighted blue with a diagonal pattern (///) to the best of your ability. Note, additional rows may be added as needed to capture all equipment. Fields in yellow will be automatically populated based on previous responses. Fields shaded in white are highly encouraged, but optional, as these data may not be known at the time of application. Additionally, some fields will hash out with a bold diagonal pattern (///) if those fields are not applicable based on the information provided in previous cells. Please refer to the Infrastructure data definitions on Tab 4 (Data Dictionary) for data field definitions. Reminder: All Level 2 EVSEs must be ENERGY STAR certified. All EVSE, on-site power generation systems, battery energy storage systems (BESS), and any other infrastructure components must comply with Build America, Buy America (BABA) requirements. See below for more information on BABA.

Build America, Buy America (BABA) requirements
On November 15, 2021, the Infrastructure Investment and Jobs Act ("IIJA"), Pub. L. No. 117-58, which includes the Build America, Buy America Act (BABA), Public Law 117-58, §§ 70901-52, was signed into law. BABA requires that on or after May 14, 2022, all of the iron, steel, manufactured products, and construction materials used in infrastructure project are produced in the United States. If award recipient will be installing, upgrading, or replacing “infrastructure,” then BABA requirements apply to the infrastructure project, regardless of whether or not the infrastructure project was the primary basis for the award. Additionally, BABA requirements apply even if the award recipient will be using another source of funding, whether in part or wholly, for the infrastructure project. For more information, please visit https://www.epa.gov/cwsrf/build-america-buy-america-baba.
Do you attest that you have read the BABA requirements described above?
Table 3. Electric Vehicle Service Equipment
Table 3a. EVSE Equipment Information OverviewTable 3b. Location of EV InfrastructureTable 3c. Owners & Anticipated Users of EVSETable 3d. Infrastructure Installation InformationTable 3e. EVSE Cost SummaryTable 3f. BABA Compliance
Optional, but highly encouraged if known*Optional, but highly encouraged if known*Optional, but highly encouraged if known*
Type of ChargerIf Level 2, is it ENERGY STAR certifiedEVSE ManufacturerEVSE ModelEVSE Manufacture YearEVSE Maximum Output Power (kW)Number of Plugs on EVSEWill the EVSE Be Capable of Bidirectional Charging?Will the Vehicle and EVSE be Used for Vehicle to Grid (V2G)?Number of EVSE UnitsTotal Estimated Acquisition Cost per EVSE UnitTotal EPA Funds Requested for Acquisition of Each EVSE UnitTotal EPA Funds Requested for EVSE AcquisitionState
(Select from dropdown)County
(Select from dropdown)CityZip CodeStreet AddressWho will own the charger?Anticipated User(s) of the chargerIf serving school districts, will the EVSE serve multiple school districts within this project?Name of the School District(s) the EVSE will serve
(if applicable; use a semicolon between school districts)NCES ID of School District that the EVSE will serve
(if applicable; use a semicolon between school districts)Total Estimated Cost for EVSE InstallationTotal EPA Funds Requested for Installation CostDoes the Infrastructure Equipment Cost Include Installation?Total EPA Funds Requested for EVSE Equipment and InstallationEstimated Total Cost for EVSE Equipment and InstallationIs a waiver being used to fulfill BABA compliance for this EVSE?
Example EV InfrastructureLevel 2YesManufacturer NameModel Name2023242NoNo2$ 16,000.00$ 12,000.00$ 24,000.00VAArlington CountyAlexandria22305400 1st StreetWalton School DistrictElectric school buses serving Walton School DistrictYesWalton School District; Franklin School District1234567; 7654321$12,000$7,000No$31,000.00$44,000.00No - Infrastructure meets all BABA requirements
EVSE Group 1$ - 0
EVSE Group 2$ - 0
EVSE Group 3$ - 0
EVSE Group 4$ - 0
EVSE Group 5$ - 0
EVSE Group 6$ - 0
EVSE Group 7$ - 0
EVSE Group 8$ - 0
EVSE Group 9$ - 0
EVSE Group 10$ - 0
EVSE Group 11$ - 0
EVSE Group 12$ - 0
EVSE Group 13$ - 0
EVSE Group 14$ - 0
EVSE Group 15$ - 0
EVSE Group 16$ - 0
EVSE Group 17$ - 0
EVSE Group 18$ - 0
EVSE Group 19$ - 0
EVSE Group 20$ - 0
EVSE Group 21$ - 0
EVSE Group 22$ - 0
EVSE Group 23$ - 0
EVSE Group 24$ - 0
EVSE Group 25$ - 0
EVSE Group 26$ - 0
EVSE Group 27$ - 0
EVSE Group 28$ - 0
EVSE Group 29$ - 0
EVSE Group 30$ - 0
Note: If the wind or solar power generation includes an energy storage system, information for such system needs to be documented in the table below this one (Table 5).
Table 4. Solar and Wind Power Generation Equipment
Table 4a. Solar and Wind Power Generation Equipment Information Overview4b. Location of Solar and Wind Power Generation Infrastructure4c. Ownership and Use of Solar and Wind Power Generation Infrastructure4d. BABA Compliance
Optional, but highly encouraged if known*Optional, but highly encouraged if known*
Type of energy generationManufacturer of Solar or Wind Power Generation SystemModel of Solar or Wind Power GenerationManufacture Year of Solar or Wind Power GenerationGeneration Capacity of the system (please indicate kW or MW)Total Estimated Acquisition Cost Per Power Generation SystemTotal EPA Funds Requested Per Power Generation SystemTotal Estimated Cost for InstallationTotal EPA Funds Requested for InstallationTotal Estimated Cost of Equipment and InstallationTotal EPA Funds Requested for InstallationStateCountyCityZip CodeStreet AddressWho owns the equipment?Anticipated Users of Solar or Wind Power Generation InfrastructureIf serving school districts, Name of the School District(s) the Solar or Wind Power Generation will serveIf serving school districts, NCES ID of School District that the Solar or Wind Power Generation will serveIs a waiver being used to fulfill BABA compliance for the Solar or Wind Power Generation?
Example Solar or Wind Power GenerationSolarManufacturer NameModel Name202315 kW$ 45,000.00$ 45,000.00$ 7,000.00$ 5,000.00$ 52,000.00$ 50,000.00VAArlington CountyAlexandria22305400 1st StreetWalton School DistrictWalton School District & NoVA Community CollegeWalton School District1234567No - Infrastructure meets all BABA requirements
Solar or Wind Power Generation 1$ - 0$ - 0
Solar or Wind Power Generation 2$ - 0$ - 0
Solar or Wind Power Generation 3$ - 0$ - 0
Solar or Wind Power Generation 4$ - 0$ - 0
Solar or Wind Power Generation 5$ - 0$ - 0
Solar or Wind Power Generation 6$ - 0$ - 0
Solar or Wind Power Generation 7$ - 0$ - 0
Solar or Wind Power Generation 8$ - 0$ - 0
Solar or Wind Power Generation 9$ - 0$ - 0
Solar or Wind Power Generation 10$ - 0$ - 0
Table 5. Battery Energy Storage System (BESS) Equipment Information
5a. BESS Overview5b. Location of BESS Infrastructure5c. Ownership and Use of BESS Infrastructure5d. BABA Compliance
Optional, but highly encouraged if known*Optional, but highly encouraged if known*
Type of BatteryManufacturer of BESSModel of BESSManufacture Year of BESSEnergy Capacity (please indicate kWh or MWh)Total Estimated Acquisition Cost Per Unit of Equipment:Total EPA Funds Requested Per Unit:Total Estimated Cost for Installation:Total EPA Funds Requested for Installation:Total Estimated Cost for Equipment and InstallationTotal EPA Funds Requested for Equipment and InstallationStateCountyCityZip CodeStreet AddressWho owns the equipment?Anticipated Users of BESSIf serving school districts, Name of the School District the BESS will serveIf serving school districts, NCES ID of School District that the BESS will serveIs a waiver being used to fulfill BABA compliance for the BESS?
BESS ExampleLithium-IonManufacturer NameModel Name202336kWh$ 48,000.00$ 20,000.00$ 12,000.00$ 10,000.00$ 60,000.00$ 30,000.00VAArlington CountyAlexandria22305400 1st StreetWalton School DistrictWalton School District & NoVA Community CollegeWalton School District1234567No - Infrastructure meets all BABA requirements
BESS Group 1$ - 0$ - 0
BESS Group 2$ - 0$ - 0
BESS Group 3$ - 0$ - 0
BESS Group 4$ - 0$ - 0
BESS Group 5$ - 0$ - 0
BESS Group 6$ - 0$ - 0
BESS Group 7$ - 0$ - 0
BESS Group 8$ - 0$ - 0
BESS Group 9$ - 0$ - 0
BESS Group 10$ - 0$ - 0
Are there any other infrastructure projects, including hydrogen fueling projects, associated with this grant that are not listed above?(Y or N or N/A)
If no, please leave this section blank. If yes, please provide details in the box below on the infrastructure project and describe how BABA compliance was determined.

For hydrogen fueling projects, please provide as much detail as known or anticipated at time of application, such as: the type of station (gas or liquid), where hydrogen will be stored (above or below ground), the total hydrogen storage capacity (in kg), the estimated annual hydrogen to be dispensed (in kg), the hydrogen generation pathway (see Data Dictionary for more options), the total cost for acquisition of each eligible component (e.g., fueling pedestals, tanks, compressors, cooling system, etc.), the total funds requested for each eligible component, the total cost for installation of the system, the total funds requested for installation, and any other eligible expenses related to hydrogen fueling projects.

&G Office of Transportation and Air Quality Diesel Emissions Reduction Act July 2022

&F &A EPA Form Number 5900-689

4. Data Dictionary

U. S. Environmental Protection Agency
Clean Heavy-Duty Vehicles (CHDV) Grant Program
Data Dictionary
Please refer to the following data field dictionary for support in completing tabs 2 & 3
Tab 2. Fleet Description
Applicant NameEnter the name of the applicant associated with this application, as entered into Grants.gov
SAM.gov Unique Entity IDEnter the SAM.gov Unique Entity ID (UEI) associated with this applicant. The SAM.gov UEI is a 12-character alphanumeric ID assigned to the applying entity by SAM.gov
Project TitleEnter the name of the project's title, as entered into Grants.gov
Table 1. CURRENT VEHICLE INFORMATION
1a. Basic Fleet Information
Group NameEnter the name of the vehicle group to which the vehicle described on this row of the table belongs; this may refer to a group of vehicles referenced in the application or a fleet to which the vehicle belongs.
Current Fleet OwnerEnter the name of the current vehicle owner
1b. Current Vehicle Information
Vehicle Type (Select from dropdown)Select the vehicle type from the dropdown menu; options include: Long Haul - Single Unit, Long Haul - Combination, Short Haul - Single Unit, Short Haul - Combination, Refuse Hauler, School Bus, and Transit Bus
Vehicle Class (Select from dropdown)Select Vehicle Class from dropdown menu: Class 6, Class 7
Vehicle Vocation (select from dropdown)Select Vehicle Vocation from dropdown menu: Delivery, Drayage, Emergency, Long Haul, Other, Refuse Hauler, School Bus, Shuttle Bus, Transit Bus, Utility
Vehicle Group Sector (select from dropdown)Select Vehicle Group Sector from dropdown menu: Agriculture, Airport, Construction, Freight, Industrial, Mining, Municipal, Port, Railyard, School Bus
Vehicle Identification NumberEnter the VIN number for each vehicle.
Vehicle ManufacturerEnter the manufacturer of the existing vehicle.
Vehicle ModelEnter the model of the existing vehicle.
Baseline Vehicle Model YearEnter the model year of the existing vehicle.
Baseline Engine Fuel Type (select from dropdown)Select the type of fuel that is currently being used (prior to upgrade); options include: USLD (diesel), Biodiesel 5, Biodiesel 20, CNG (ft3), CNG (lbs), LNG, LPG/Propane, Gasoline
Engine Family NameEnter the Engine Family name of the existing engine. NOTE: unregulated engines will not have an Engine Family Name. If unregulated, then enter "NA"
1c. Current Vehicle Activity Information
GVWREnter the gross vehicle weight rating (GVWR) of the existing vehicle.
Annual Miles TraveledEnter the average number of vehicle miles traveled per year per vehicle, using the average for the prior 2 years. Please see the NOFO section III.D.2 which describes the minimum mileage required.
Annual Idling HoursEnter the average number of hours the vehicle idles per year, using the average for the prior 2 years.
OdometerEnter the existing vehicle's current odometer reading, in miles.
Annual Amount of Fuel UsedEnter the amount of fuel used in gallons per year.
1d. Current Vehicle Place of Performance
Primary Place of Performance
School District Name (if applicable)Enter the name of the school district in which the vehicle to be scrapped, sold, or donated has operated in.
NCES ID (if applicable)Enter the name of the National Center for Education Statistics (NCES) ID associated with the school district in which the vehicle to be scrapped, sold, or donated has operated in. If you are unsure of the district's NCES ID, you can search for the district at https://nces.ed.gov/ccd/districtsearch/.
State (select from dropdown)Select the two letter postal code for the state from the dropdown menu in which the vehicle to be scrapped, sold, or donated has operated in. Note: the state field is required to enter the specific county field.
County (select from dropdown)Enter the county in which the vehicle to be scrapped, sold, or donated has operated. Note: the list of counties will not populate until the state is selected.
Percentage of Time operated in CountyEnter a value from 0 to 1, where 1 = 100%, to reflect the estimated percentage of time this vehicle operated in the listed county.
Place of Performance: CityEnter the city in which the vehicle to be scrapped, sold, or donated has operated in.
Zip Code(s)Enter the zip codes where the vehicle operates; if there is more than one, separate using a semicolon (ex: 12345; 98765)
Secondary Place of Performance (if applicable)
School District Name (if applicable)Enter the name of the school district in which the vehicle to be scrapped, sold, or donated has operated in.
NCES ID (if applicable)Enter the name of the National Center for Education Statistics (NCES) ID associated with the school district in which the vehicle to be scrapped, sold, or donated has operated in. If you are unsure of the district's NCES ID, you can search for the district at https://nces.ed.gov/ccd/districtsearch/.
State (select from dropdown)Select the two letter postal code for the state from the dropdown menu in which the vehicle to be scrapped, sold, or donated has operated in. Note: the state field is required to enter the specific county field.
County (select from dropdown)Enter the county in which the vehicle to be scrapped, sold, or donated has operated. Note: the list of counties will not populate until the state is selected.
Percentage of Time operated in CountyEnter a value from 0 to 1, where 1 = 100%, to reflect the estimated percentage of time this vehicle operated in the listed county.
Place of Performance: CityEnter the city in which the vehicle to be scrapped, sold, or donated has operated in.
Zip Code(s)Enter the zip codes where the vehicle operates; if there is more than one, separate using a semicolon (ex: 12345; 98765)
Additional Location Details (if applicable)
Additional Counties where Vehicle OperatesList the county name and state for additional counties where the vehicle operates; if there are more than one, separate using a semicolon (e.g., St. Lucie County, FL; Martin County, FL)
% of time operated in each Additional CountyList the estimated percent of time operated in each additional county; if there are more than one, separate using parenthesis and semicolons (e.g., St. Lucie County (10%); Martin County (5%))
1e. Vehicle Disposition Process
Anticipated Vehicle Disposition MethodSelect a vehicle disposition option from dropdown menu; options include: Scrapped, Sold, Donated
If sold or donated, provide the state in which the vehicle is expected to primarily operate (if known)Select the state from the dropdown menu. Note: the state field is required to enter the specific county field.
If sold or donated, provide the county in which the vehicle is expected to primarily operate (if known)Select the county from the dropdown menu. Note: the list of counties will not populate until the state is selected.
Table 2. New Replacement Vehicle Information
2a. Upgrade Vehicle Information
Year of Upgrade Action:Enter the year the upgrade is anticipated to happen.
New Vehicle Fleet OwnerEnter the name of the new vehicle fleet owner
New Vehicle Class (select from dropdown)Select Vehicle Class from dropdown menu: Class 6, Class 7
New Vehicle Fuel Type:Select the fuel type of the new vehicle: Battery Electric, Fuel Cell Electric
New Vehicle Manufacturer:Enter the manufacturer of the new vehicle.
New Vehicle Model:Enter the model of the new vehicle.
New Vehicle GVWR:Enter the gross vehicle weight rating (GVWR) of the new vehicle.
Capable of Bidirectional Charging? (Yes/No/NA)Use the dropdown menu to select whether the vehicle will be capable of bidirectional charging.
Estimate Range in MilesEnter the estimated range in miles for the zero-emission vehicle.
2b. Upgrade Vehicle Information
Upgrade Cost per BusEnter the cost of vehicle in dollars per unit.
Total EPA Funds Expended Per VehicleEnter the EPA funds expended per vehicle in dollars per unit.
2c. New Vehicle Place(s) of Performance
Primary Place of Performance
School District Name (if applicable)Enter the name of the school district in which the new vehicle is expected to operate in.
NCES ID (if applicable)Enter the name of the National Center for Education Statistics (NCES) ID associated with the school district in which the new vehicle is expected to operate in. If you are unsure of the district's NCES ID, you can search for the district at https://nces.ed.gov/ccd/districtsearch/.
State (select from dropdown)Select the two letter postal code for the state from the dropdown menu in which the new vehicle is expected to operate in. Note: the state field is required to enter the specific county field.
County (select from dropdown)Enter the county in which the new vehicle is expected to operate in. Note: the list of counties will not populate until the state is selected.
Percentage of Time operated in CountyEnter a value from 0 to 1, where 1 = 100%, to reflect the estimated percentage of time this vehicle is expected to operate in the listed county.
Place of Performance: CityEnter the city in which the new vehicle is expected to operate in
Zip Code(s)Enter the zip codes where the vehicle operates; if there is more than one, separate using a semicolon (ex: 12345; 98765)
Secondary Place of Performance (if applicable)
School District Name (if applicable)Enter the name of the school district in which the new vehicle is expected to operate in.
NCES ID (if applicable)Enter the name of the National Center for Education Statistics (NCES) ID associated with the school district in which the new vehicle is expected to operate in. If you are unsure of the district's NCES ID, you can search for the district at https://nces.ed.gov/ccd/districtsearch/.
State (select from dropdown)Select the two letter postal code for the state from the dropdown menu in which the new vehicle is expected to operate in. Note: the state field is required to enter the specific county field.
County (select from dropdown)Enter the county in which the new vehicle is expected to operate in. Note: the list of counties will not populate until the state is selected.
Percentage of Time operated in CountyEnter a value from 0 to 1, where 1 = 100%, to reflect the estimated percentage of time this vehicle is expected to operate in the listed county.
Place of Performance: CityEnter the city in which the new vehicle is expected to operate in
Zip Code(s)Enter the zip codes where the vehicle operates; if there is more than one, separate using a semicolon (ex: 12345; 98765)
Additional Location Details (if applicable)
Additional Counties where Vehicle OperatesList the county name and state for additional counties where the vehicle operates; if there are more than one, separate using a semicolon (e.g., St. Lucie County, FL; Martin County, FL)
% of time operated in each Additional CountyList the estimated percent of time operated in each additional county; if there are more than one, separate using parenthesis and semicolons (e.g., St. Lucie County (10%); Martin County (5%)
2d. New Vehicle Place(s) BABA Compliance
Is a waiver being used to fulfill BABA compliance for this vehicle?Please use the dropdown menu to select which of the following best describes how this vehicle's compliance with Buy America Build America (BABA) will be fulfilled. Options include: No - Infrastructure meets all BABA requirements; Yes - EPA's De Minimis Waiver; Yes - EPA's Small Project Waiver; Yes - EPA's Pacific Island Territories General Applicability Waiver; Yes - Project-Level Waiver; and Unsure
Tab 3. INFRASTRUCTURE
Table 3. Electric Vehicle Service Equipment
3a. EVSE Equipment Information Overview
Type of ChargerEnter the type of charger, either Level 2 (AC charging up to 19.2 kW) or DC Fast Charging.
If Level 2, is it ENERGY STAR certifiedConfirm and select yes if applicable. Please see https://www.energystar.gov/
EVSE ManufacturerEnter the manufacturer of the charging equipment
EVSE ModelEnter the model name of the charging equipment.
EVSE Manufacture YearEnter the year the charging equipment was manufactured.
EVSE Maximum Output Power (kW)Enter the maximum power output of the charging equipment, measured in kilowatts.
Number of Plugs on EVSEEnter the number of plugs installed on each unit of the charging equipment.
Is the EVSE Capable of Bidirectional Charging?Select yes or no into the cell to specify whether the charging equipment is capable of bidirectional charging.
Will the Bus and EVSE be Used for V2G?Select yes or no into the cell to specify whether the vehicles and charging equipment will be used for vehicle-to-grid (V2G) services.
Number of EVSE UnitsEnter the quantity of charging equipment unit acquisition.
EVSE Equipment Cost only Per Unit:Enter the cost of the charging equipment per unit acquisition.
Total EPA Funds Expended Per EVSE UnitEnter the total EPA funds expended for charging equipment per unit acquisition.
Total EPA Funds Expended for EVSEAutopopulated field: This field multiplies the number of EVSE units by the Total EPA Funds Expended per EVSE Unit to calculate the total of EPA funds expended for EVSE acquisition
3b. Location of EV Infrastructure
State (select from dropdown)Select the two letter postal code for the state from the dropdown menu in which the new vehicle is expected to operate in. Note: the state field is required to enter the specific county field.
County (select from dropdown)Enter the county in which the new vehicle is expected to operate in. Note: the list of counties will not populate until the state is selected.
CityEnter the city in which the charging equipment will be located.
Zip CodeEnter the zip code in which the charging equipment will be located.
Street AddressEnter the street address in which the charging equipment will be located.
3c. Owners & Anticipated Users of EVSE
Who will own the charger?Enter the name of the school district or organization that will own the charging equipment.
Anticipated User(s) of the chargerEnter the name(s) of the organization(s) that are anticipated to regularly use the charging equipment.
If serving school districts, will the EVSE serve multiple school districts within this project?Select from dropdown: Yes, No, or NA- School Districts not served by this equipment
Name of the School District(s) the EVSE will serve
(if applicable; use a semicolon between school districts)Enter the name(s) of school district(s) the EVSE is expected to serve. Use a semicolon to separate entries when entering multiple districts.
NCES ID of School District that the EVSE will serve
(if applicable; use a semicolon between school districts)Enter the NCES ID(s) of school district(s) the EVSE is expected to serve. Use a semicolon to separate entries when entering multiple districts.
3d. Infrastructure Installation Information
Total Funds Expended Installation CostEnter the total installation costs for the charging equipment for the EV infrastructure group column.
Total EPA Funds Expended Installation CostEnter the total EPA funds expended for installation costs for the charging equipment for the EV infrastructure group column.
Does the Infrastructure Equipment Cost Include Installation?Please enter yes or no into the cell to specify whether the indicated cost of the charging equipment above includes any installation expenses.
3e. EVSE Cost Summary
Total EPA Funds Expended on EVSE Equipment and InstallationAutomated cell that will calculate the total EPA Funds expended for the charging equipment and installation for an EV Infrastructure Group.
Total Funds Expended on EVSE Equipment and InstallationAutomated cell that will calculate the total Funds expended for the charging equipment and installation for an EV Infrastructure Group.
3f. BABA Compliance
Is a waiver being used to fulfill BABA compliance for this EVSE?Please use the dropdown menu to select which of the following best describes how this infrastructure's compliance with Buy America Build America (BABA) will be fulfilled. Options include: No - Infrastructure meets all BABA requirements; Yes - EPA's De Minimis Waiver; Yes - EPA's Small Project Waiver; Yes - EPA's Pacific Island Territories General Applicability Waiver; Yes - Project-Level Waiver
Table 4. Solar and Wind Power Generation Equipment
4a. Solar and Wind Power Generation Equipment Information Overview
Type of energy generationSelect a type of energy generation, solar or wind.
Manufacturer of Solar or Wind Power GenerationEnter the name of the manufacturer of the on-site power generation equipment
Model of Solar or Wind Power GenerationEnter the model name of the on-site power generation equipment
Manufacture Year of Solar or Wind Power GenerationEnter the manufacture year of the on-site power generation equipment
Generation Capacity of the system (please indicate kW or MW)Enter the generation capacity of the system as either kW or MW. Please indicate unit of measurement.
Total Estimated Acquisition Cost Per Power Generation SystemEnter the total estimated cost for the acquisition of each unit of equipment
Total EPA Funds Requested Per Power Generation SystemEnter the EPA funds requested for the acquisition of each unit of equipment
Total Estimated Cost for InstallationEnter the total estimated cost for the installation of each unit of equipment
Total EPA Funds Requested for InstallationEnter the EPA funds requested for the installation of each unit of equipment
Total Estimated Cost of Equipment and InstallationAutopopulated field: this field sums the total entered for estimated costs of acquisition and installation of this equipment
Total EPA Funds Requested for Equipment and InstallationAutopopulated field: this field sums the total entered for total EPA funds requested for the acquisition and installation of this equipment
4b. Location of Solar and Wind Power Generation Infrastructure
StateEnter the state in which the On-Site Power Generation Infrastructure will be installed from the dropdown menu
CountyEnter the county in which the On-Site Power Generation Infrastructure will be installed from the dropdown menu
CityEnter the city in which the On-Site Power Generation Infrastructure will be installed
Zip CodeEnter the zip code in which the On-Site Power Generation Infrastructure will be installed
Street AddressEnter the street address in which the On-Site Power Generation Infrastructure will be installed
4c. Ownership and Use of Solar and Wind Power Generation Infrastructure
Who owns the equipment?Enter the name(s) of the organization(s) that own the equipment
Anticipated Users of Solar or Wind Power Generation InfrastructureEnter the name(s) of the entities and/or organizations that are anticipated to use this equipment
If serving school districts, Name of the School District(s) the Solar or Wind Power Generation will serveIf anticipated users are school districts, provide the name of the districts the On-Site Power Generation equipment will serve; in the event that multiple districts are served, please include a semicolon between district names
If serving school districts, NCES ID of School District that the Solar or Wind Power Generation will serveIf anticipated users are school districts, provide the NCES ID of the districts the On-Site Power Generation equipment will serve; in the event that multiple districts are served, please include a semicolon between NECS IDs
4d. BABA Compliance
Is a waiver being used to fulfill BABA compliance for the Solar or Wind Power Generation?Please use the dropdown menu to select which of the following best describes how this infrastructure's compliance with Buy America Build America (BABA) will be fulfilled. Options include: No - Infrastructure meets all BABA requirements; Yes - EPA's De Minimis Waiver; Yes - EPA's Small Project Waiver; Yes - EPA's Pacific Island Territories General Applicability Waiver; Yes - Project-Level Waiver
Table 5. Battery Energy Storage System (BESS) Equipment Information
5a. BESS Overview
Type of BatteryUse the dropdown menu to select the type of battery in this BESS. Options include: Lithium-Ion; Lead-Acid; Flow; and Flywheels
Manufacturer of BESSEnter the name of the manufacturer of the battery energy storage system equipment
Model of BESSEnter the model name of the battery energy storage system equipment
Manufacture Year of BESSEnter the manufacture year of the battery energy storage system equipment
Energy Capacity (please indicate kWh or MWh)Enter the generation capacity of the system as either kW or MW. Please indicate unit of measurement.
Total Estimated Acquisition Cost Per Unit of Equipment:Enter the total estimated cost for the acquisition of each unit of equipment
Total EPA Funds Requested Per UnitEnter the EPA funds requested for the acquisition of each unit of equipment
Total Estimated Cost for Installation:Enter the total estimated cost for the installation of each unit of equipment

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .