2024 Bidding Overview - Masonry.pdf

PDF 991 KB Posted

Attached to
Davis Middle School Masonry
Solicitation number
RFP - HCS - 240000001299
Issued by
Hillsdale County, Michigan

About this file

This document is a 2024 Bidding Overview for masonry repairs at Davis Middle School and Bailey Early Childhood Center in Hillsdale, Michigan. The work involves tuckpointing of stone and brick mortar joints, replacement of approximately 100 broken or damaged bricks, and power washing of the east elevation of Davis Middle School. The work must be substantially completed during the summer of 2023 while school is not in session, from June 2nd to July 28th. Site and prep work may begin on the weekends prior to the end of the school year.

The document does not provide details on pricing terms, set asides, incumbents, funding requirements or sources, or contract amounts. It focuses solely on the scope of work and project schedule for the masonry repairs.

View the file

Other files

File Type Posted
HCS - 2024 Masonry Project Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

IL

L S

D A

L E

C O

M M

U N

IT

Y

S C

H O

O L S

S N

O R

W O

O D

A V

E

H

IL

L S

D A

L E

M

I

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

COVER

SHEET

A1

HILLSDALE COMMUNITY

SCHOOLS

SUMMER 2023 – MASONRY

REPAIRS

Davis Middle School

Bailey Early Childhood Center

NOTES

DRAWING INDEX

LOCATION MAPSUMMARY OF WORK

SITE MAP

A1 - COVER SHEET

A2 – SITE PLAN

A3 – SITE PLAN

D1 – DETAILS

PROJECT SCHEDULE

WORK MUST BE SUBSTANTIALLY COMPLETED DURING THE

SUMMER WHILE SCHOOL IS NOT IN SESSION

LAST DAY OF SCHOOL: JUNE 2

nd

FINAL DAY FOR CONSTRUCTION: JULY 28

TH

SITE AND PREP WORK MAY BEGIN ON THE WEEKENDS PRIOR

TO THE END OF SCHOOL

• Davis Middle School (East Elevation):

• Tuckpoint 100% of missing or deteriorated stone mortar joints and joints that were filled in with caulk, care should be taken in matching mortar color as best possible.

• Tuckpoint missing or deteriorated of brick mortar joints and joints that were filled in with caulk, care should be taken in matching mortar color as best possible.

• Remove and replace broken or damaged brick (approx. 100), care should be taken in matching mortar color as best possible.

• Power wash elevation where work was performed, deep stains may not be able to remove.

• Clean up work area

H

IL

L S

D A

L E

C O

M M

U N

IT

Y

S C

H O

O L S

S N

O R

W O

O D

A V

E

H

IL

L S

D A

L E

M

I

SHEET NO.

SHEET TITLE:

INSPECTION

REPORT

SITE

PLAN

A2

DAVIS MIDDLE SCHOOL

2023 Bidding Overview - Masonry.vsdx
A1
A2