This document appears to be Attachment 2 - Specifications for the procurement of 3 ea 4,400 - 5,000 Gallon Aircraft Refueling Units for the Alaska Fire Service, Aviation Fuel Shop. The units will be used to support aviation fueling for fixed wing and rotor wing aircraft in remote areas of Alaska. Key specifications include a Kenworth T680 52" sleeper or equivalent chassis, 4,400 - 5,000 gallon aluminum DOT 406 cargo tank, over-the-wing and underwing fueling capabilities, and bottom loading capability. The units must meet NFPA 385 and 407 standards as well as ATA Spec 103 requirements. The solicitation number is 140L0224Q0023 issued by the Department of the Interior, Bureau of Land Management Alaska Region. Delivery is required FOB Destination to Fort Wainwright, Alaska and the vendor must provide on-site commissioning and training. The on-site training must be completed by April 30, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L0224Q0023_Amd_0001.pdf | ||
| Sol_140L0224Q0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 - Specifications
Purpose: The purpose is for the procurement of 3 ea 4,400 - 5,000 Gallon Aircraft Refueling Units. The units will be used in JET A service for into-plane fueling for fixed wing and rotor wing aircraft.
Mission: The Alaska Fire Service, Aviation Fuel Shop provides aviation fueling support to aircraft and helicopters responding to the following emergencies: initial and extended attack for wildfire suppression, personnel search and rescue and earthquake and flood relief operations. Non-emergency missions supported by the fuel shop include national interest programs and resource projects.
The aircraft refueling units will be used to support missions located in remote areas of Alaska. A typical servicing point is a clearing located off-the road system in a remote area of Alaska. The units must be capable of over-the-road travel as well as operation on unimproved road surfaces with uneven surfaces, such as gravel and dirt roads. On many occasions, steep grades at 7%-12% must be negotiated to get to the servicing location such as the Dalton Highway (Haul Road). The Alaska road system, even paved roads, are unforgiving to vehicles due to frost heaves, gravel, washboards, potholes, etc., so these units are intended to be built to negotiate to their service location while keeping the high reliability demand to service and support their mission.
Specifications:
Note: Vendors, please ensure your bid responds specifically and affirmatively to meeting each specification requirement listed. If your bid does not respond with being able to meet each requirement, it will not be able to be considered.
The refueling unit will need unique characteristics as identified below to adapt to the Alaska Fire Service aviation fuel support mission. Of upmost importance is a focus on this unit being designed to operate in a harsh environment while maintaining high reliability.
Notwithstanding the unique mission requirements, the units must meet all fuel quality and fire safety requirements as identified below. At minimum, the unit must meet the current industry accepted specifications listed below.
1. National Fire Protection Association (NFPA) 385 Standard for Tank Vehicles for Flammable and Combustible Liquids
2. NFPA 407 Standard for Aircraft Fuel Servicing
3. Air Transportation Association Specification 103 Standard for Jet Fuel Quality Control at Airports
Manufacturer of Fuel Tender chassis and engine must have an authorized dealer or maintenance provider within 50 miles of Fairbanks, AK.
Required Specifications:
Chassis Specifications:
Heavy Duty - Kenworth T680 52” sleeper or equivalent
- Truck design will be “straight truck” (as opposed to combination vehicle).
- Cab of vehicle will have two captain’s-style chairs with air ride.
- Cab of vehicle will be equipped with full cab air ride.
- Cab will have sufficient height to accommodate air ride seat when used by individuals 6’ 5” tall.
- Gross Vehicle Weight Rating (GVWR) of chassis must be rated for the full weight of the chassis build, plus weight of tank and all installed accessories identified in these specifications, plus weight of full load of Jet Fuel, plus an additional 2,000 lbs to account for tools and passengers.
- Heavy duty 20,000 lbs rated axles on all axles including steer axle.
- Chassis will have tandem or tri-dem rear axles with inter-axle and differential locks on front and rear axles.
- Ground Clearance: The refueling unit will be designed and built with maximum suspension options for allowable ground clearance for the chassis. The off-road requirements prohibit low hanging components typically installed on airport ramp equipment. No components shall extend beyond the standard width of the chassis nor below the chassis frame.
Cory Cornell Reviewed
- Tires will be rated for the full GVWR rating of the vehicle and rated off/on road use on roads which are unimproved (e.g. gravel, dirt, etc.).
- Battery box must provide adequate protection from dust and wet weather.
- Diesel Exhaust Fluid (DEF) tank will be sized to accommodate a minimum of 20 gallons of DEF.
- All rear axles will be drive axles with differential locks.
- Cab air conditioning system (cool and heat).
- Brakes: In addition to the standard braking system an engine brake retarding system (“jake brake”) is required to safely handle 9% downgrades when fully loaded.
- Chassis Fuel Tanks: A minimum of 200 gallons capacity chassis fuel tanks shall be required either linked or with a mechanical selection valve.
- Rear-end Gearing: Gearing in unit rear ends shall balance engine power and transmission against demands presented by off road travel.
- Windshield glass: Windshields require slight tinting to prevent heat build-up from sunlight exposure.
- Paint: JET A unit chassis shall be painted yellow.
- Engine: Diesel
- Drive train: automatic transmission (auto shift, with ability to down-shift)
- Differential Locks
- Adjustable steering column
- Power steering required.
- Full Service Manual required.
- Backup alarm required.
- Heavy grade mud flaps and mounts required on rear axles.
Tank specifications:
- 4,400 - 5,000 gallon capacity tank rated for Jet fuel.
- Tank will conform to current Department of Transportation (DOT) specifications (DOT 406 Aluminum
Tank).
- Tank will be baffled to conform to DOT specifications for tank capacity and dimensions.
- The material used for cargo tank construction shall be Aluminum.
- The cargo tank data plate, welded to the tank support structure, shall detail tank specifications such as:
Make & Model, Serial Number, Contract Number, Tank Number, Delivery Date, etc.
- The Cargo tank shall have a sump drain with a spring loaded to a closed position valve installed to prevent uncontrolled product releases.
- The cargo tank manhole shall be minimum 20” in diameter to allow personnel entry.
- Emergency Vents: The Cargo tank shall have the appropriately sized emergency vents determined by exposed area calculations.
- Normal Vent: The normal Cargo tank vent should open and close in concert with the internal valve operation.
- Paint: JET A unit chassis and cargo tanks shall be painted yellow.
Aviation Fueling Equipment/System:
- Fueling cabinet will be located at the rear of the vehicle. Rear cabinet and axle placement shall be to minimize overhang beyond the rear axles.
- Fueling system will be equipped with an in-line fuel additive injector with additive (Prist Hi-Flash Hi-Flow or equivalent) minimum reserve capacity of 5 gallons with easy access for refilling.
- Capable of both over-the-wing and underwing into-plane fueling. Over-the-wing and underwing nozzles will be on separate reels (i.e. both nozzles will be attached at all times and will not require changing between fueling styles).
o Underwing fueling will have variable fueling speed control capable of minimum 100 Gallons Per Minute (gpm) and maximum 300 gpm flow rate. Minimum acceptable flow rate on high setting shall be 200 GPM. Minimum of 60’ length of minimum 2” diameter aviation grade fueling hose mounted on a single wrap hose reel with nozzle swivel, and single point nozzle rated for Jet fuel (Carter Eaton Model 60427 or equivalent). Underwing manual fueling will be controlled by a deadman switch equipped with minimum of 100’ of weatherproof cable mounted on a rewind reel.
The nozzle shall have a dust cover and 100 mesh screen installed.
o Over-the-wing fueling will be capable of minimum 50 gpm flow rate. Minimum of 75’ length of
1 ¼” aviation grade fueling hose mounted on a reel with nozzle swivel, and over-the-wing nozzle rated for Jet fuel (OPW 295SAJ-0200 or equivalent). The nozzle shall have a dust cover and 100 mesh screen installed. The nozzle shall have a nozzle bonding wire with clip.
- All hose shall be new hose and must be Energy Institute (EI) 1529 Type Qualified to the current edition of standards.
- In addition to wired/manual control, the PTO, hose reel rewind, emergency stop, and deadman shall also be operable via remote handheld (wireless) control such as BASE Engineering, Inc. ASKW Emergency Stop or equal.
- Fueling system will have a meter compatible with flow rate and fuel will be installed in fueling cabinet as to be visible while fueling. Meter will be capable of reading whole and tenths of gallons. The meter shall have large scale numerals to allow operator observation during fueling operations. The meter shall have a totalizer feature and be calibrated prior to acceptance. An additional digital-read remote readout for the meter will be mounted on the exterior of the rear of the vehicle so as to be visible while fueling. Prefer the readout numeral size be at least 4 inches high. An additional remote readout is required near the over-the-wing nozzle, whether this be in-line next to the nozzle or a handheld wireless unit.
- A direct reading differential pressure gauge will be installed to read differential pressure pre- and post-filter. The gauge shall have a resettable peak hold device to allow operator interpretation after each fueling operation. The gauge shall have the push button test feature for calibration.
- Fueling equipment cabinet will have nozzle holder for both over-the-wing and underwing nozzles to keep them secure when not in use. Must have adequate space to allow for a dust cover.
- Filter vessel rated for full pump flow rate of 300 gpm.
o The filtration type shall be a two/three stage type meeting current IP/ EI 1581 standards.
o The filter vessel shall be set up to coalesce and separate free water.
o The vessel shall have a probe/float that senses excessive water and provides positive shut down preventing water slugs from reaching dispensing nozzles.
o The filter vessel shall have the appropriate accessories such as: air eliminator, sump drain, pressure relief, and differential pressure gauge.
- A system pressure gauge will be installed on the control panel to read system pressure. A pressure gauge indicating nozzle pressure will be installed on the control panel.
- Fuel pump will be Power Take Off (PTO) driven and rated to handle aviation fuels. PTO will be installed high as to not extend below any other part of the chassis to maintain full ground clearance of chassis. The pump shall be shielded from road debris. The pump shall have a built-in pressure relief bypass set to eliminate pressures exceeding system piping/valve designs. An in-line basket strainer shall be positioned adjacent to the pump inlet.
- PTO engagement/disengagement control shall be located at the control panel located in the hose reel compartment as well as controlled via remote handheld control. The PTO shall have an interlock feature installed to prevent unit movement if the PTO is engaged. Cab shall have an in-cab warning light installed indicating PTO engagement.
- The refueling units shall have nozzle interlock systems that prohibit movement when nozzles are not locked in position. A bypass switch shall be required to allow over-road travel where unintentional braking could present a traffic hazard.
- The refueling units shall be designed to allow re-circulation for fuel sampling and pre-operation inspections. The single point hose/nozzle assembly shall be used for this purpose.
- Hose reels will be equipped with electric rewind and backup manual crank. A holder for the manual crank will be provided.
- Emergency fuel shutoffs will be installed at minimum: 1 at side of tank, 1 adjacent to fueling cabinet at rear. The location shall be indicated by decal on tank exterior. The method of operation shall be push to activate.
- Hose reels, nozzles, additive injector and associated equipment (Differential Pressure (DP) gauge, will be fully contained within a cabinet with latching side-swing or roll-up doors. The floor of the cabinet will have integral containment and drain plug to contain incidental fuel spills from fueling hose and equipment.
- Bottom Loading Each refueling unit shall be bottom loading capable with vapor recovery systems installed. The bottom loading system shall be rated at 400 GPM minimum. The bottom loading assembly shall have an interlock to prohibit unit movement when loading hoses are connected. The bottom loading manifold shall have a pressure gauge. Bottom load for tank will have two adapters “Y’d” to allow aviation single point adapter bottom loading as well as a 4” API adapter for bottom loading. The bottom load adapters shall be located to be protected and/or shielded from road debris.
- The Cargo Tank shall have a jet level sensor installed with a test feature located at the bottom loading manifold. The jet level sensor shall be set to limit cargo tank fuel level to 95 % capacity.
- In addition to jet sensor, Scully Duocept 2 (both thermistor and optical), Scully IntelliCheck 3 and
SculSense/Scully Connect liquid level sensors (or equal) will also be installed to allow safe loading at high flow loading racks.
- Scully Groundhog Ground Ball and Scully Ground Bolt will be installed near the bottom load to allow grounding while bottom loading fuel.
- All rigid plumbing will be rated for aviation fuels and unions will be of Dixon style flexible couplings to allow for expansion and movement. Rigid plumbing will not extend below the lowest point of the chassis to allow for full ground clearance and will be protected/shielded to prevent damage from road debris.
- Grounding reel with automatic rewind, cable and clamp will be installed with a minimum of 100’ of grounding cable.
- Bonding reel with automatic rewind, cable, clamp and aircraft bonding plug will be installed inside the fueling cabinet with a minimum of 100’ of cable.
- Isolation Valves: Filter Separator, pump, hose reel and meter isolation valves are required to allow component removal and maintenance when required.
- Internal Valve: A manual override to the operated internal valve is required (pre-check valve).
- Sampling Probes: Gammon inline sampling probes (Gammon Technical Products (GTP) 144 or equal) with
1/4 turn shut-off valves shall be installed upstream and downstream of installed filtration. The specific Gammon Kit # shall be determined by piping set up.
- Layout of fueling cabinet shall allow for ample access and space to items requiring normal service such as:
filter vessel lid for filter changes, additive reservoir for refilling, grease points on hose reels, etc.
Required Accessories/Safety Equipment/Additional Requirements:
- 3 additional (in addition to the fueling cabinet) external mounted storage cabinets for materials and equipment. Size should be no less than 36” W x 24” H x 18” D. Door for cabinet must provide adequate seal from dust and wet weather. All cabinets shall be locking and keyed alike.
- Cold Weather Package: Units shall require ether injection systems, or air system dryers to eliminate condensation impact on operating controls/valves. Block heater and DEF heater for cold weather starts also required.
- Heated side view mirrors if available as an option.
- External mounted work lights on both sides and rear of vehicle. Work light installed inside fueling cabinet which is activated when cabinet doors are open/deactivated when doors are closed.
- Posted Information Requirements: Identification, instruction, schematic diagrams and chart type plates shall be securely attached and located where operators can visually access them.
o A “No Smoking” decal shall be posted in the cab o Controls, valves, gauges, shall be identified with securely attached name plates o Schematic diagrams of pumping, pneumatic and bottom loading systems shall be securely attached to the unit.
o Operating instructions pertaining to dispensing, defueling, and bottom loading operations shall be posted. The operating instructions shall include cautions enabling operators to perform safe vehicle operations.
o A fuel cargo tank capacity chart (tank strapping chart) shall be affixed to the unit in the vicinity of the bottom loading system or where easily readable and accessible by the operator. The chart shall estimate fuel quantities in gallons per inch. A gauging stick and storage bracket shall be required for each refueling unit.
o All plumbing will be labeled with flow direction.
- Full-size spare tire and rim, and tire mount/holder.
- Accessory compressed air outlet mounted inside fueling cabinet or otherwise mounted to be weather and dust protected with a dust cap.
- Mounts for 2 x 20lbs BC rated fire extinguishers. Mounts must be well-secured to prevent loss of fire extinguisher during off-road use.
- No part of the build may extend beyond standard DOT specifications (i.e. vehicle must meet height, length, and width requirements for unrestricted use; not oversize).
- Parts List and Shop Repair Manuals: Each unit shall require a repair manual and parts listing detailing part numbers and manufacturer identifications. The repair manuals shall include general information, technical descriptions, troubleshooting methodologies, service frequencies, illustrated parts breakdown, overhaul instructions, etc. The manuals are required for the chassis, cargo tank and associated piping, valves, and controls.
- Cab shall have minimum 2 x 12V sockets within driver reach. Additional 12V in rear sleeping area if offered as an option.
- Cab shall have a mount and pre-wired for CB radio install.
- Backup camera installed with digital display in cab.
- Unit shall have a ladder bracket installed to accommodate ladder storage without interfering with normal operation.
Delivery and Commissioning:
Vendor will provide delivery FOB Destination to:
1510 Gaffney Rd Fort Wainwright, Alaska 99703
Vendor will provide a technician on-site following delivery to verify alongside Alaska Fire Service personnel that all systems in the vehicle are functioning and that the vehicle meets these specifications. The technician will provide on-site training to Alaska Fire Service personnel in the operation of the vehicle and fueling system. This on-site commissioning and training will be a minimum of 1 day. The date of training will be after successful delivery of the vehicle to the above address and by mutual agreement between the vendor and Alaska Fire Service personnel, but no later than March 31, 2025 with on-site training to occur no later than 30 days after acceptance for a completion date by April 30, 2025.