This document is a Request for Bids (RFB) from the City of Sandersville Electric Department for an Electric Department Generator Project. The project consists of installing a 60 kW 3-phase 120/240V generator, including concrete pad, automatic transfer switch, conduit, wiring, and other electrical work. Bidders must submit sealed bids by August 20, 2024, at 3:00 PM, when the bid opening will take place at City Hall. The City of Sandersville reserves the right to accept or reject any or all bids. Bidders must provide a lump-sum bid amount, expected start date, and required documentation such as a W-9 form, E-Verify Contractor Affidavit, SAVE Affidavit, Occupational Tax Certificate, Liability and Property Damage Insurance Certificate, and Workers' Compensation Proof of Insurance. All communication, including questions and substitutions, must be in writing, with responses posted on the City's website.

The contract will be awarded based on several factors, including cost, availability, suitability, and quality. Bidders are responsible for verifying all quantities and measurements prior to bidding, as no change orders will be accepted due to differences between the bid packet and the actual materials required. The successful contractor will be responsible for all aspects of the project, including compliance with federal, state, and municipal laws and regulations, traffic control, and coordination with the Sandersville Electric Director.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2024-16

Electric Department

Electric Department Generator Project

Request for Bids

RFB # 2024-16

Due Date: August 20th 2024

2023-18

REQUEST FOR BIDS

CITY OF SANDERSVILLE

GENERAL

The City of Sandersville Electric Department is seeking bids for the placement of a Generator.

All bids must be sealed and clearly marked “Electric Department Generator Project”. The

City of Sandersville will reserve the right to accept or reject any and all bids and act in the best interest of the City of Sandersville.

SPECIFICATIONS

The project shall consist of the following:

The Contractor will responsible for Sawing cut concrete from the driveway to the electric department building beside the meter base.

The Contractor will be responsible for installing 3 phase 200-amp automatic transfer switch beside the meter base.

The Contractor will be responsible for installing conduit and wire from the meter base to the new switch, then to existing main service inside. Conduit from the transfer switch will be installed to the new generator location underground 60 feet.

The Contractor will be responsible for pulling 100-amp circuit to the generator and terminate, pull control wire in separate conduit and terminate. Contractor will install a ground rod and connect to the main panel at the Annex Building. A 400-amp transfer switch will be installed where the existing meter base is on the Annex Building.

The Contractor will be responsible for digging up the underground feeders and relocate over to the left side of the new transfer switch and reinstall existing meter base. Underground conduit will be installed from the new transfer switch to the new generator. The Contractor will pull 200-amp circuit to the generator and terminate. The Control Wire should be installed in separate conduit and terminate. A new ground rod will be installed and connected to the main panel.

Conduit will be installed and 120volt will be installed to the generator and terminate for block heater and charger.

The Contractor will be responsible for reconnecting wire from 2 indoor panels to the new transfer switch. Contractor will install the concrete pad and 60 kw 3 phase 120/240 generator natural gas. A new ground rod will be installed at the generator and connected to the frame. A new high -pressure regulator for the generator will be installed with a new regulator to refeed existing building.

The Contractor will be responsible to abide by all ECG SPECS and local laws of the City of

Sandersville. The City of Sandersville will provide the ECG SPECS if needed.

The Contractor will acquire all permits and perform 811 locates as required for the purpose of this project and abide by all laws and legal dates. Traffic control, proper signage and zoning will be the responsibility of the Contractor. Road Closures shall be reported to the Sandersville

Electric Director at a minimum of 48 hours in advance.

INDEMNIFICATION AND INSURANCE

The Contractor agrees that he shall and will indemnify, hold harmless and defend the Owner, his agents, servants and employees from and against any and all losses, damages (by judgment or settlement), charges and expenses (including reasonable attorney’s fees) which they or any one or more of them may incur or sustain by reason of any claims or causes of action for personal injury or injuries, including death, to any person or persons whosoever (including the officers, agents, servants or employees of the Contractor or of any subcontractor) including but not limited to such claims or causes of action arising out of, or in any way connected with, or occasioned by the work performed by the Contractor of subcontractors, their respective agents, servants or employees under or pursuant to this contract.

Without limiting his liability under this contract, the Contractor shall procure and maintain at his expense during the life of this contract insurance of the types and in the minimum amounts stated below:

1. Workmen’s Compensation Insurance in full compliance with the Workmen’s

Compensation laws of the State of Georgia.

2. Comprehensive General Liability

Bodily injury, including death $1,000,000 per person

$1,000,000 each occurrence

Property Damage $1,000,000 each occurrence

$2,000,000 aggregate

3. Comprehensive Automobile Liability

Bodily injury, including death $1,000,000 per person

$1,000,000 each occurrence

Property Damage $1,000,000 each occurrence

Said insurance shall be written by a company or companies licensed to do business in the State of Georgia and satisfactory to the Owner. Before commencing any work hereunder, certificates evidencing the maintenance of such insurance shall be furnished to the Owner and shall contain the following statement:

Insurance evidenced by this certificate will not be canceled or altered except 10 days after receipt by the City of Sandersville, Georgia of written notice thereof.

Contractors shall not subcontract the performance of any part of the work without requiring the subcontractor to procure and maintain insurance in the forms and amounts approved by the

Owner, and likewise said subcontractors shall pay wages specified by the Georgia Department of

Labor.

CONTRACTOR’S RESPONSIBILITY

Nothing in these specifications shall be construed as placing the work under the specific direction or control of the Owner or relieving the Contractor from his liability as an independent

Contractor and, as such, he shall be solely responsible for the method, manner and means by which he shall perform his work, including, but not limited to supervision and control of his own personnel and scheduling of the work required to insure its proper and timely performance and he shall exercise due care to prevent bodily injury and damage to property in the prosecution of the work.

It shall be the responsibility of the contractor to verify all quantities and measurements prior to bidding. No change orders will be accepted due to differences in the bid packet measurements and the amount of materials required to complete the scope of the project.

Until the work is accepted, it shall be in the custody and under the charge and care of the

Contractor, and he shall take every necessary precaution against injury or damage to the work by the action of all the elements, or from any other cause whatsoever. The Contractor shall restore and make good at his own expense all injuries or damages to any portion of the work before its completion and acceptance. Issuance of any estimate or partial payment to the Contractor for any part of work done will not be considered as final acceptance of any work.

The Contractor agrees to assume and shall have full and sole responsibility for compliance with all Federal, State or Municipal laws and regulations in any manner affecting the work to be performed by the Contractor or subcontractors.

BID SUBMITTAL

Bids will be lump sum and include all cost of labor and materials to include delivery to the point of destination. The bids will be evaluated and awarded based on several factors to include cost, availability, suitability and quality.

1. Bids will be received until 3:00 p.m. on August 20th 2024 at which time the bid opening will take place – City Hall Conference Room, 141 West Haynes Street, Sandersville, GA.

Any bids received after the deadline shall be null and void. The City of Sandersville reserves the right to accept or reject any or all bids and act in the best interest of the City of Sandersville.

2. All bids must be submitted in a sealed envelope clearly marked “Electric Department

Generator Project” All shipping materials must be clearly marked with the project name.

3. Three (3) copies of the bid with the required information must be submitted and received no later than above date to:

City of Sandersville, Attn: Travis Fort, Electric Department Generator Project

P.O. Box 71, 141 W. Haynes Street, Sandersville, GA 31082

4. All bids must be submitted on the bid forms furnished and accompanied by:

• W-9 Form – Please complete attached form, check appropriate box, fill in Social

Security Number or Employer Identification Number, Sign and Date.

• Notarized E-Verify Contractor Affidavit – Please complete attached form. (To enroll in e-verify, you may visit the website www.uscis.gov/everify.)

• Notarized SAVE Affidavit – Please complete attached form.

• Occupational Tax Certificate

• General Public Liability and Property Damage Insurance Certificate with a limit of liability of not less than $1,000,000.

• Worker’s Compensation Proof of Insurance – For more than three employees.

5. Bid should state the start date and the work should commence within three months after the bid award.

QUESTIONS/ADDENDUMS

All communication including questions and substitutions shall be in a written form. Questions will be answered and responded to until 4:30 p.m. on Tuesday August 13th 2024. Communication may be sent to tfort@sandersvillega.org Questions will be answered and posted on our website at www.sandersvillega.org under City Online, Bid Opportunities tabs.

http://www.uscis.gov/everify mailto:tfort@sandersvillega.org http://www.sandersvillega.org/

BID FORM

ELECTRIC DEPARTMENT

Return Date: 3:00 PM, Tuesday, August 20th 2024

Return to: City of Sandersville, Attn: Travis Fort

141 W. Haynes Street, Sandersville, GA 31082

LUMP SUM BID AMOUNT $ ________ ____________

EXPECTED START DATE: _________________________________________

ALL BID FORMS SHOULD INCLUDE THE FOLLOWING INFORMATION:

Company Submitting Bid: ____________________________

Company Address:

Company Phone No: Company Fax No.

Authorized Representative:

Signature _ Date:___________________

Print Name and Title ____________ Phone: _______________

Email address __________________________________________________________________

Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1)

By executing this affidavit, the undersigned contractor verifies its compliance with

O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of the City of Sandersville has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number

Date of Authorization

Name of Contractor

Name of Project

City of Sandersville

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on _______________, 20___ in _______________________(city), ______(state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE ____ DAY OF ______________,20____.

NOTARY PUBLIC