This is a comprehensive technical specification document for the Fowler Field Park Improvements project in Douglasville, Georgia, prepared by Goodwyn, Mills, Cawood, LLC. The project encompasses site improvements including asphalt walkway repairs and replacements, a new exercise area installation, wooden boardwalk construction, site furnishings, a rain garden with bioretention facilities, and comprehensive site planting with related accessories. The specifications detail work across multiple divisions including cast-in-place concrete (Section 03 3000), joint protection (Section 07 9000), site clearing and earth moving (Sections 31 1000, 31 2000), erosion and sedimentation controls (Section 31 2500), landscape maintenance (Section 32 9005), bioretention soil mixture installation (Section 32 9113), poured-in-place bonded rubber surfacing for playground areas (Section 32 1816.13), sodding (Section 32 9223), and plant installation (Sections 32 9000, 32 9100, 32 9300). The project requires substantial completion within 210 calendar days from the notice to proceed, with bids submitted on a unit price basis.
The specifications require compliance with numerous standards including ASTM, ACI, CPSC, and Georgia Department of Transportation specifications, with materials and workmanship subject to inspection and approval throughout execution. Contractors must provide proof of qualifications including successful completion of a minimum of five similar projects within the past five years. The work includes a one-year landscape maintenance period and one-year plant warranty following substantial completion. Quality assurance provisions mandate independent testing services for concrete, soil, and erosion control measures, with detailed requirements for site preparation, material testing and delivery, proper handling and storage, and comprehensive inspection protocols. The specifications emphasize environmental protection, NPDES permit compliance, and adherence to all local, state, and federal regulations, with specific provisions for utility location notification, erosion control measures, and protection of existing improvements and vegetation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 2025_002 Fowler Field Park Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOWLER FIELD PARK IMPROVEMENTS CITY OF DOUGLASVILLE
DOUGLASVILLE, GEORGIA
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 1 OF 17
SECTION 03 3000
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY:
A. Section Includes:
1. Formwork.
2. Reinforcing.
3. Cast-in place concrete including mix design, placement procedures, and finishes.
B. Cast-in-place concrete includes the following:
1. Foundations and footings.
2. Slabs-on-grade.
3. Slabs on steel deck.
4. Equipment pads and bases.
C. Related Documents: Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
D. Related Sections: The following Sections contain requirements that relate to this Section:
1. Section 31 2000, "Earth Moving": Drainage fill under slabs on grade.
2. Section 32 1313, "Concrete Paving": Concrete paving and walks.
3. Section 07 9000, "Joint Protection": Sealants and joint fillers in concrete work.
1.2 SUBMITTALS:
A. General: Submit the following according to Conditions of the Contract and Division 1 Specification Sections.
B. Product data for proprietary materials and items, including reinforcement and forming accessories, admixtures, patching compounds, waterstops, joint systems, curing compounds, dry-shake finish materials, and others if requested by Architect.
C. Shop drawings for reinforcement detailing fabricating, bending, and placing concrete reinforcement. Comply with ACI 315 "Manual of Standard Practice for Detailing Reinforced Concrete Structures" showing bar schedules, stirrup spacing, bent bar diagrams, and arrangement of concrete reinforcement. Include special reinforcing required for openings through concrete structures.
D. Samples of materials as requested by Architect, including names, sources, and descriptions, as follows:
1. Color finishes.
2. Normal weight aggregates.
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 2 OF 17
E. Laboratory test reports for concrete materials and mix design test.
F. Minutes of pre-installation conference.
1.3 QUALITY ASSURANCE:
A. Codes and Standards: Comply with provisions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified:
1. ACI 301, "Specifications for Structural Concrete for Buildings".
2. ACI 302, "Guide for Concrete Floor and Slab Construction".
3. ACI 304, "Recommended Practice for Measuring, Mixing, Transporting and Placing
Concrete".
4. ACI 305, "Hot Weather Concreting".
5. ACI 306, "Cold Weather Concreting".
6. ACI 309, "Guide for Consolidation of Concrete".
7. ACI 311, "Recommended Practice for Concrete Inspection".
8. ACI 318, "Building Code Requirements for Reinforced Concrete".
9. ACI 347, "Recommended Practice for Concrete Formwork".
10. Concrete Reinforcing Steel Institute (CRSI), "Manual of Standard Practice."
11. American Welding Society, AWS D1.4 "Structural Welding Code - Reinforcing Steel".
B. Concrete Testing Service: Engage a testing agency acceptable to Architect to perform material evaluation tests and to design concrete mixes.
C. Materials and installed work may require testing and retesting at any time during progress of Work. Tests, including retesting of rejected materials for installed Work, shall be done at Contractor's expense.
D. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings" and the following:
1. At least 35 days prior to submitting design mixes, conduct a meeting to review detailed requirements for preparing concrete design mixes and to determine procedures for satisfactory concrete operations. Review requirements for submittals, status of coordinating work, and availability of materials. Establish preliminary work progress schedule and procedures for materials inspection, testing, and certifications. Require representatives of each entity directly concerned with cast-in-place concrete to attend conference, including, but not limited to, the following:
a. Contractor's superintendent.
b. Agency responsible for concrete design mixes.
c. Agency responsible for field quality control.
d. Ready-mix concrete producer.
e. Concrete subcontractor.
f. Primary admixture manufacturers.
PART 2 - PRODUCTS
2.1 FORM MATERIALS:
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 3 OF 17
A. Forms for Exposed Finish Concrete: Plywood, metal, metal-framed plywood faced, or other acceptable panel-type materials to provide continuous, straight, smooth, exposed surfaces.
Furnish in largest practicable sizes to minimize number of joints and to conform to joint system shown on drawings.
1. Use overlaid plywood complying with U.S. Product Standard PS-1 "A-C or B-B High Density Overlaid Concrete Form," Class I.
2. Use plywood complying with U.S. Product Standard PS-1 "B-B (Concrete Form) Plywood," Class I, Exterior Grade or better, mill-oiled and edge-sealed, with each piece bearing legible inspection trademark.
B. Forms for Unexposed Finish Concrete: Plywood, lumber, metal, or another acceptable material.
Provide lumber dressed on at least two edges and one side for tight fit.
C. Form Liner: Pattern 16020 Rough Sawn Plank, Rough Grain Plank, horizontal orientation by Fitzgerald Formliners, or equal – Concrete walls at monumental stair. Coordinate location with architectural drawings.
D. Form Release Agent: Provide commercial formulation form release agent with a maximum of 350 g/L volatile organic compounds (VOCs) that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.
E. Form Ties: Factory-fabricated, adjustable-length, removable or snap-off metal form ties designed to prevent form deflection and to prevent spalling of concrete upon removal. Provide units that will leave no metal closer than 1-1/2 inches to the plane of the exposed concrete surface.
F. Provide ties that, when removed, will leave holes not larger than 1 inch in diameter in the concrete surface.
2.2 REINFORCING MATERIALS:
A. Reinforcing Bars: ASTM A 615, Grade 60, deformed.
B. Steel Wire: ASTM A 82, plain, cold-drawn steel.
C. Welded Wire Fabric: ASTM A 185, welded steel wire fabric.
D. Deformed-Steel Welded Wire Fabric: ASTM A 497.
E. Supports for Reinforcement: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place. Use wire bar-type supports complying with CRSI specifications.
1. For slabs-on-grade, use supports with sand plates or horizontal runners where base material will not support chair legs.
2. For exposed-to-view concrete surfaces where legs of supports are in contact with forms, provide supports with legs that are protected by plastic (CRSI, Class 1) or stainless steel (CRSI, Class 2).
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 4 OF 17
F. Threaded Dowels: Continuous threaded high-strength steel bars equal to "Lasstud" by Richmond Screw Anchor Co., Inc. Provide inserts compatible with dowels, designed for ultimate pull-out force indicated on the drawings.
G. Mechanical Splices: Equal to "Cadweld Rebar Splices", as manufactured by Erico Products, Inc., "C" Series, for developing 125% of minimum ASTM specified yield strengths, unless otherwise noted on drawings.
H. Steel Shapes, Plates and Rods: Conform to ASTM A 36, "Specification for Structural Steel".
I. Do Not Weld Reinforcing Steel: Unless specifically noted on drawings. If welding is shown, conform to latest revision of AWS D12.1, "Reinforcing Steel Welding Code of the American Welding Society". Perform all welding with certified welders qualified per AWS.
2.3 CONCRETE MATERIALS:
A. Portland Cement: ASTM C 150, Type I.
1. Use one brand of cement throughout Project unless otherwise acceptable to Architect.
B. Fly Ash: ASTM C 618, Type F or C.
1. Limit use of fly ash to not exceed 20 percent of cement content by weight.
C. Normal-Weight Aggregates: ASTM C 33 and as specified. Provide aggregates from a single source for exposed concrete.
1. For exposed exterior surfaces, do not use fine or coarse aggregates that contain substances that cause spalling.
2. Local aggregates not complying with ASTM C 33 that have been shown to produce concrete of adequate strength and durability by special tests or actual service may be used when acceptable to Architect.
D. Water: Potable.
E. Admixtures, General: Provide concrete admixtures that contain not more than 0.1 percent chloride ions.
F. Air-Entraining Admixture: ASTM C 260, certified by manufacturer to be compatible with other required admixtures.
1. Products: Subject to compliance with requirements, provide one of the following:
a. Air-Tite, Cormix Construction Chemicals.
b. Air-Mix or Perma-Air, Euclid Chemical Co.
c. Darex AEA or Daravair, W.R. Grace & Co.
d. MB-VR or Micro-Air, Master Builders, Inc.
e. Sealtight AEA, W.R. Meadows, Inc.
f. Sika AER, Sika Corp.
G. Water-Reducing Admixture: ASTM C 494, Type A.
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 5 OF 17
1. Products: Subject to compliance with requirements, provide one of the following:
a. PSI N, Cormix Construction Chemicals.
b. Eucon WR-75, Euclid Chemical Co.
c. WRDA, W.R. Grace & Co.
d. Pozzolith Normal or Polyheed, Master Builders, Inc.
e. Plastocrete 161, Sika Corp.
H. High-Range Water-Reducing Admixture: ASTM C 494, Type F or Type G.
1. Products: Subject to compliance with requirements, provide one of the following:
a. Eucon 37, Euclid Chemical Co.
b. WRDA 19 or Daracem, W.R. Grace & Co.
c. Rheobuild or Polyheed, Master Builders, Inc.
d. Sikament 300, Sika Corp.
I. Water-Reducing, Accelerating Admixture: ASTM C 494, Type E.
1. Products: Subject to compliance with requirements, provide one of the following:
a. Accelguard 80, Euclid Chemical Co.
b. Daraset, W.R. Grace & Co.
c. Pozzutec 20, Master Builders, Inc.
J. Water-Reducing, Retarding Admixture: ASTM C 494, Type D.
1. Products: Subject to compliance with requirements, provide one of the following:
a. Eucon Retarder 75, Euclid Chemical Co.
b. Daratard-17, W.R. Grace & Co.
c. Pozzolith R, Master Builders, Inc.
d. Protard, Prokrete Industries.
e. Plastiment, Sika Corporation.
2.4 PROPORTIONING AND DESIGNING MIXES:
A. Prepare design mixes for each type and strength of concrete by either laboratory trial mixtures or field experience methods as specified in ACI 318-89 Section 5.3. If trial mixtures method used, use an independent testing facility acceptable to Architect for preparing and reporting proposed mix designs. The testing facility shall not be the same as used for field quality control testing, unless otherwise acceptable to Architect.
B. Trial mix designs and strength tests, made by qualified independent material laboratory, in accordance with ACI 318-89 Section 5.3 are required for the following types of concrete:
1. Normal weight concrete with specified strength in excess of 4000 psi.
2. All concrete designs for which a suitable experience record is not available.
C. Mix design based on a record of past performance in accordance with ACI 318-89 Section 5.3, may be provided by qualified concrete supplier or precast concrete manufacturer for concrete designs. Mix design shall be certified by an independent testing laboratory.
D. All concrete mix designs shall include the following information:
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 6 OF 17
1. Proportions of cement, fine and coarse aggregate and water.
2. Water/cement ratio, design strength, slump and air content.
3. Type of cement and aggregates.
4. Type and dosage of all admixtures.
5. Type, color and dosage of integral coloring compounds, where applicable.
6. Special requirements for pumping.
7. Any special characteristics of the mix which require precautions in the mixing, placing or finishing techniques to achieve the finished product specified.
E. Submit written reports to Architect of each proposed mix for each class of concrete at least 15 days prior to start of Work. Do not begin concrete production until proposed mix designs have been reviewed by Architect.
F. Water-Cement Ratio: Provide concrete for following conditions with maximum water-cement (W/C) ratios as follows:
1. Subjected to freezing and thawing: W/C 0.45.
2. Subjected to deicers/watertight: W/C 0.40.
3. Subjected to brackish water, salt spray, or deicers: W/C 0.40.
G. Slump Limits: Proportion and design mixes to result in concrete slump at point of placement as follows:
1. Ramps and sloping surfaces: Not more than 3 inches.
2. Reinforced foundation systems: Not less than 1 inch and not more than 3 inches.
3. Concrete containing high-range water-reducing admixture (superplasticizer): Not more than 8 inches after adding admixture to site-verified 2-to-3-inch slump concrete.
4. Other concrete: Not less than 3 inches and not more than 5 inches.
2.5 ADMIXTURES:
A. Use water-reducing admixture or high-range water-reducing admixture (superplasticizer) in concrete, as required, for placement and workability.
B. Use accelerating admixture in concrete slabs placed at ambient temperatures below 50 deg.F (10 deg.C).
C. Use high-range water-reducing admixture in pumped concrete, concrete for heavy-use industrial slabs, architectural concrete, parking structure slabs, concrete required to be watertight, and concrete with water-cement ratios below 0.50.
D. Use air-entraining admixture in exterior exposed concrete unless otherwise indicated. Add air-entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having total air content with a tolerance of plus or minus 1-1/2 percent within the following limits:
1. Concrete structures and slabs exposed to freezing and thawing, deicer chemicals, or hydraulic pressure:
a. 4.5 percent (moderate exposure); 5.5 percent (severe exposure) for 1-1/2-inch maximum aggregate.
b. 4.5 percent (moderate exposure); 6.0 percent (severe exposure) for 1-inch
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 7 OF 17
maximum aggregate.
c. 5.0 percent (moderate exposure); 6.0 percent (severe exposure) for 3/4-inch maximum aggregate.
d. 5.5 percent (moderate exposure); 7.0 percent (severe exposure) for 1/2-inch maximum aggregate.
2. Other concrete not exposed to freezing, thawing, or hydraulic pressure, or to receive a surface hardener: 2 to 4 percent air.
E. Use admixtures for water reduction and set accelerating or retarding in strict compliance with manufacturer's directions.
2.6 CONCRETE MIXING
A. Ready-Mixed Concrete: Comply with requirements of ASTM C 94, and as specified.
1. When air temperature is between 85 deg.F (30 deg.C) and 90 deg.F (32 deg.C), reduce mixing and delivery time from 1-1/2 hours to 75 minutes, and when air temperature is above 90 deg.F (32 deg.C), reduce mixing and delivery time to 60 minutes.
PART 3 - EXECUTION
3.1 GENERAL:
A. Coordinate the installation of joint materials, vapor retarder/barrier, and other related materials with placement of forms and reinforcing steel.
3.2 FORMS:
A. General: Design, erect, support, brace, and maintain formwork to support vertical, lateral, static, and dynamic loads that might be applied until concrete structure can support such loads.
Construct formwork so concrete members and structures are of correct size, shape, alignment, elevation, and position. Maintain formwork construction tolerances and surface irregularities complying with the following ACI 347 limits:
1. Provide Class A tolerances for concrete surfaces exposed to view.
2. Provide Class C tolerances for other concrete surfaces.
B. Construct forms to sizes, shapes, lines, and dimensions shown and to obtain accurate alignment, location, grades, level, and plumb work in finished structures. Provide for openings, offsets, sinkages, keyways, recesses, moldings, rustications, reglets, chamfers, blocking, screeds, bulkheads, anchorages and inserts, and other features required in the Work. Use selected materials to obtain required finishes. Solidly butt joints and provide backup at joints to prevent cement paste from leaking.
C. Fabricate forms for easy removal without hammering or prying against concrete surfaces.
Provide crush plates or wrecking plates where stripping may damage cast concrete surfaces.
Provide top forms for inclined surfaces where slope is too steep to place concrete with bottom forms only. Kerf wood inserts for forming keyways, reglets, recesses, and the like for easy removal.
D. Provide temporary openings for clean-outs and inspections where interior area of formwork is
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 8 OF 17
inaccessible before and during concrete placement. Securely brace temporary openings and set tightly to forms to prevent losing concrete mortar. Locate temporary openings in forms at inconspicuous locations.
E. Chamfer exposed corners and edges as indicated, using wood, metal, PVC, or rubber chamfer strips fabricated to produce uniform smooth lines and tight edge joints.
F. Provisions for Other Trades: Provide openings in concrete formwork to accommodate work of other trades. Determine size and location of openings, recesses, and chases from trades providing such items. Accurately place and securely support items built into forms.
G. Cleaning and Tightening: Thoroughly clean forms and adjacent surfaces to receive concrete.
Remove chips, wood, sawdust, dirt, or other debris just before placing concrete. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.
3.3 PLACING REINFORCEMENT:
A. General: Comply with Concrete Reinforcing Steel Institute's recommended practice for "Placing Reinforcing Bars," for details and methods of reinforcement placement and supports and as specified.
1. Avoiding cutting or puncturing vapor retarder/barrier during reinforcement placement and concreting operations. Repair damages before placing concrete.
B. Clean reinforcement of loose rust and mill scale, earth, ice, and other materials that reduce or destroy bond with concrete.
C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcing by metal chairs, runners, bolsters, spacers, and hangers, as approved by Architect.
D. Place reinforcement to maintain minimum coverages as indicated for concrete protection.
Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement operations. Set wire ties so ends are directed into concrete, not toward exposed concrete surfaces.
E. Install welded wire fabric in lengths as long as practicable. Lap adjoining pieces at least one full mesh and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction.
3.4 JOINTS:
A. Construction Joints: Locate and install construction joints so they do not impair strength or appearance of the structure, as acceptable to Architect.
B. Provide keyways at least 1-1/2 inches deep in construction joints in walls and slabs and between walls and footings. Bulkheads designed and accepted for this purpose may be used for slabs.
C. Place construction joints perpendicular to main reinforcement. Continue reinforcement across construction joints except as indicated otherwise. Do not continue reinforcement through sides
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 9 OF 17
of strip placements.
D. Use bonding agent on existing concrete surfaces that will be joined with fresh concrete.
E. Isolation Joints in Slabs-on-Grade: Construct isolation joints in slabs-on-grade at points of contact between slabs-on-grade and vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations, as indicated.
1. Joint fillers and sealants are specified in Section 07 9000 - "Joint Protection.”
F. Contraction (Control) Joints in Slabs-on-Grade: Construct contraction joints in slabs-on-grade to form panels of patterns as shown. Use saw cuts 1/8 inch wide by one-fourth of slab depth or inserts 1/4 inch wide by one-fourth of slab depth, unless otherwise indicated.
1. Form contraction joints by inserting premolded plastic, hardboard, or fiberboard strip into fresh concrete until top surface of strip is flush with slab surface. Tool slab edges round on each side of insert. After concrete has cured, remove inserts and clean groove of loose debris.
2. Contraction joints in unexposed floor slabs may be formed by saw cuts as soon as possible after slab finishing as may be safely done without dislodging aggregate.
3. If joint pattern is not shown, provide joints not exceeding 15 feet in either direction and located to conform to bay spacing wherever possible (at column centerlines, half bays, third bays).
4. Joint fillers and sealants are specified in Division 7 Section "Joint Protection."
3.5 PREPARING FORM SURFACES:
A. General: Coat contact surfaces of forms with an approved, nonresidual, low-VOC, form-coating compound before placing reinforcement.
B. Do not allow excess form-coating material to accumulate in forms or come into contact with in-place concrete surfaces against which fresh concrete will be placed. Apply according to manufacturer's instructions.
1. Coat steel forms with a nonstaining, rust-preventative material. Rust-stained steel formwork is not acceptable.
3.6 CONCRETE PLACEMENT:
A. Inspection: Before placing concrete, inspect and complete formwork installation, reinforcing steel, and items to be embedded or cast in. Notify other trades to permit installation of their work.
B. General: Comply with ACI 304, "Guide for Measuring, Mixing, Transporting, and Placing Concrete," and as specified.
C. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened sufficiently to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as specified. Deposit concrete to avoid segregation at its final location.
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 10 OF 17
D. Placing Concrete in Forms: Deposit concrete in forms in horizontal layers no deeper than 24 inches and in a manner to avoid inclined construction joints. Where placement consists of several layers, place each layer while preceding layer is still plastic to avoid cold joints.
1. Consolidate placed concrete by mechanical vibrating equipment supplemented by hand-spading, rodding, or tamping. Use equipment and procedures for consolidation of concrete complying with ACI 309.
2. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations no farther than the visible effectiveness of the machine. Place vibrators to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to set. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mix to segregate.
E. Placing Concrete Slabs: Deposit and consolidate concrete slabs in a continuous operation, within limits of construction joints, until completing placement of a panel or section.
1. Consolidate concrete during placement operations so that concrete is thoroughly worked around reinforcement, other embedded items and into corners.
2. Bring slab surfaces to correct level with a straightedge and strike off. Use bull floats or darbies to smooth surface free of humps or hollows. Do not disturb slab surfaces prior to beginning finishing operations.
3. Maintain reinforcing in proper position on chairs during concrete placement.
F. Cold-Weather Placement: Comply with provisions of ACI 306 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.
G. When air temperature has fallen to or is expected to fall below 40 deg.F (4 deg.C), uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg.F (10 deg.C) and not more than 80 deg.F (27 deg.C) at point of placement.
1. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.
2. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise accepted in mix designs.
H. Hot-Weather Placement: When hot weather conditions exist that would impair quality and strength of concrete, place concrete complying with ACI 305 and as specified.
1. Cool ingredients before mixing to maintain concrete temperature at time of placement to below 90 deg.F (32 deg.C). Mixing water may be chilled or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.
2. Cover reinforcing steel with water-soaked burlap if it becomes too hot, so that steel temperature will not exceed the ambient air temperature immediately before embedding in concrete.
3. Fog spray forms, reinforcing steel, and subgrade just before placing concrete. Keep subgrade moisture uniform without puddles or dry areas.
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 11 OF 17
4. Use water-reducing retarding admixture when required by high temperatures, low humidity, or other adverse placing conditions, as acceptable to Architect.
3.7 FINISHING FORMED SURFACES:
A. Rough-Formed Finish: Provide a rough-formed finish on formed concrete surfaces not exposed to view in the finished Work or concealed by other construction. This is the concrete surface having texture imparted by form-facing material used, with tie holes and defective areas repaired and patched, and fins and other projections exceeding 1/4 inch in height rubbed down or chipped off.
B. Smooth-Formed Finish: Provide a smooth-formed finish on formed concrete surfaces exposed to view or to be covered with a coating material applied directly to concrete, or a covering material applied directly to concrete, such as waterproofing, dampproofing, veneer plaster, painting, or another similar system. This is an as-cast concrete surface obtained with selected form-facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch defective areas with fins and other projections completely removed and smoothed.
C. Smooth-Rubbed Finish: Provide smooth-rubbed finish on scheduled concrete surfaces that have received smooth-formed finish treatment not later than 1 day after form removal.
1. Moisten concrete surfaces and rub with carborundum brick or another abrasive until producing a uniform color and texture. Do not apply cement grout other than that created by the rubbing process.
D. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike-off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.
3.8 MONOLITHIC SLAB FINISHES:
A. Scratch Finish: Apply scratch finish to monolithic slab surfaces to receive concrete floor topping or mortar setting beds for tile, portland cement terrazzo, and other bonded applied cementitious finish flooring material, and where indicated.
1. After placing slabs, finish surface to tolerances specified in Section 3.11. Slope surfaces uniformly to drains where required. After leveling, roughen surface before final set with stiff brushes, brooms, or rakes.
B. Float Finish: Apply float finish to monolithic slab surfaces to receive trowel finish and other finishes as specified; slab surfaces to be covered with membrane or elastic waterproofing, membrane or elastic roofing, or sand-bed terrazzo; and where indicated.
1. After screeding, consolidating, and leveling concrete slabs, do not work surface until ready for floating. Begin floating, using float blades or float shoes only, when surface water has disappeared, or when concrete has stiffened sufficiently to permit operation of power-driven floats, or both. Consolidate surface with power-driven floats or by hand-floating if area is small or inaccessible to power units. Finish surfaces to tolerances specified in Section 3.11. Cut down high spots and fill low spots. Uniformly
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 12 OF 17
slope surfaces to drains. Immediately after leveling, refloat surface to a uniform, smooth, granular texture.
C. Trowel Finish: Apply a trowel finish to monolithic slab surfaces exposed to view and slab surfaces to be covered with resilient flooring, carpet, ceramic or quarry tile, paint, or another thin film-finish coating system.
1. After floating, begin first trowel-finish operation using a power-driven trowel. Begin final troweling when surface produces a ringing sound as trowel is moved over surface.
Consolidate concrete surface by final hand-troweling operation, free of trowel marks, uniform in texture and appearance, and finish surfaces to tolerances specified in Section
3.11. Grind smooth any surface defects that would telegraph through applied floor covering system.
D. Trowel and Fine Broom Finish: Where ceramic or quarry tile is to be installed with thin-set mortar, apply a trowel finish as specified, then immediately follow by slightly scarifying the surface with a fine broom.
E. Nonslip Broom Finish: Apply a nonslip broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as indicated.
1. Immediately after float finishing, slightly roughen concrete surface by brooming with fiber-bristle broom perpendicular to main traffic route. Coordinate required final finish with Architect before application.
F. Colored Wear-Resistant Finish: Apply a colored wear-resistant finish to monolithic slab surface indicated.
1. Apply dry shake materials for the colored wear-resistant finish at a rate of 100 lb per 100 sq. ft., unless a greater amount is recommended by material manufacturer.
2. Cast a trial slab approximately 10 feet square to determine actual application rate, color, and finish, as acceptable to Architect.
3. Immediately following the first floating operation, uniformly distribute with mechanical spreader approximately two-thirds of the required weight of the dry shake material over the concrete surface, and embed by power floating. Follow floating operation with second shake application, uniformly distributing remainder of dry shake material with overlapping applications to ensure uniform color, and embed by power floating.
4. After broadcasting and floating, apply a trowel finish as specified. Cure slab surface with a curing compound recommended by the dry shake material manufacturer. Apply the curing compound immediately after the final finishing.
3.9 FLOOR FLATNESS/LEVELNESS REQUIREMENTS:
A. After placing slabs, finish surface to the following tolerances of F(F) (floor flatness) and F(L) (floor levelness) measured according to ASTM E 1155:
FINISH SLAB-ON-GRADE FRAMED FLOOR
OVERALL LOCAL OVERALL LOCAL
FF FL FF FL FF FF
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 13 OF 17
Scratch Finish 18 15 15 13 25 22 Float Finish 20 17 18 15 25 22 Trowel Finish 25 22 20 17 25 22
Specified overall F-numbers apply to the whole floor, taken as one. Minimum local F-numbers apply to each slab, bounded by construction joints.
3.10 MISCELLANEOUS CONCRETE ITEMS:
A. Filling In: Fill in holes and openings left in concrete structures for passage of work by other trades, unless otherwise shown or directed, after work of other trades is in place. Mix, place, and cure concrete as specified to blend with in-place construction. Provide other miscellaneous concrete filling shown or required to complete Work.
B. Curbs: Provide monolithic finish to interior curbs by stripping forms while concrete is still green and by steel-troweling surfaces to a hard, dense finish with corners, intersections, and terminations slightly rounded.
C. Equipment Bases and Foundations: Provide machine and equipment bases and foundations as shown on drawings. Set anchor bolts for machines and equipment to template at correct elevations, complying with diagrams or templates of manufacturer furnishing machines and equipment.
3.11 CONCRETE CURING AND PROTECTION:
A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. In hot, dry, and windy weather protect concrete from rapid moisture loss before and during finishing operations with an evaporation-control material. Apply according to manufacturer's instructions after screeding and bull floating, but before power floating and troweling.
B. No curing agents or sealers are to be applied to the concrete slab where Resilient Athletic Flooring is scheduled.
C. Start initial curing as soon as free water has disappeared from concrete surface after placing and finishing. Weather permitting, keep continuously moist for not less than 7 days.
D. Curing Methods: Cure concrete by curing compound, by moist curing, by moisture-retaining cover curing, or by combining these methods, as specified.
1. Provide moisture curing by the following methods:
a. Keep concrete surface continuously wet by covering with water.
b. Use continuous water-fog spray.
c. Cover concrete surface with specified absorptive cover, thoroughly saturate cover with water, and keep continuously wet. Place absorptive cover to provide coverage of concrete surfaces and edges, with a 4-inch lap over adjacent absorptive covers.
2. Provide moisture-retaining cover curing as follows:
a. Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width with sides and ends lapped at least 3 inches
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 14 OF 17
and sealed by waterproof tape or adhesive. Immediately repair any holes or tears during curing period using cover material and waterproof tape.
3. Apply curing compound on exposed interior slabs and on exterior slabs, walks, and curbs as follows:
a. Apply curing compound to concrete slabs as soon as final finishing operations are complete (within 2 hours and after surface water sheen has disappeared).
Apply uniformly in continuous operation by power spray or roller according to manufacturer's directions. Recoat areas subjected to heavy rainfall within 3 hours after initial application. Maintain continuity of coating and repair damage during curing period.
b. Use membrane curing compounds that will not affect surfaces to be covered with finish materials applied directly to concrete.
E. Curing Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces, by moist curing with forms in place for the full curing period or until forms are removed. If forms are removed, continue curing by methods specified above, as applicable.
F. Curing Unformed Surfaces: Cure unformed surfaces, including slabs, floor topping, and other flat surfaces, by applying the appropriate curing method.
1. Final cure concrete surfaces to receive finish flooring with a moisture-retaining cover, unless otherwise directed.
3.12 REMOVING FORMS:
A. General: Formwork not supporting weight of concrete, such as sides of beams, walls, columns, and similar parts of the work, may be removed after cumulatively curing at not less than 50 deg.F (10 deg.C) for 24 hours after placing concrete, provided concrete is sufficiently hard to not be damaged by form-removal operations, and provided curing and protection operations are maintained.
B. Formwork supporting weight of concrete, such as beam soffits, joists, slabs, and other structural elements, may not be removed in less than 14 days or until concrete has attained at least 75 percent of design minimum compressive strength at 28 days. Determine potential compressive strength of in-place concrete by testing field-cured specimens representative of concrete location or members.
C. Form-facing material may be removed 4 days after placement only if shores and other vertical supports have been arranged to permit removal of form-facing material without loosening or disturbing shores and supports.
3.13 REUSING FORMS:
A. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-coating compound as specified for new formwork.
B. When forms are extended for successive concrete placement, thoroughly clean surfaces, remove fins and laitance, and tighten forms to close joints. Align and secure joint to avoid offsets. Do not use patched forms for exposed concrete surfaces except as acceptable to Architect.
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 15 OF 17
3.14 CONCRETE SURFACE REPAIRS:
A. Patching Defective Areas: Repair and patch defective areas with cement mortar immediately after removing forms, when acceptable to Architect.
B. Mix dry-pack mortar, consisting of one part portland cement to 2-1/2 parts fine aggregate passing a No. 16 mesh sieve, using only enough water as required for handling and placing.
1. Cut out honeycombs, rock pockets, voids over 1/4 inch in any dimension, and holes left by tie rods and bolts down to solid concrete but in no case to a depth less than 1 inch.
Make edges of cuts perpendicular to the concrete surface. Thoroughly clean, dampen with water, and brush-coat the area to be patched with bonding agent. Place patching mortar before bonding agent has dried.
2. For surfaces exposed to view, blend white portland cement and standard portland cement so that, when dry, patching mortar will match surrounding color. Provide test areas at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike-off slightly higher than surrounding surface.
C. Repairing Formed Surfaces: Remove and replace concrete having defective surfaces if defects cannot be repaired to satisfaction of Architect. Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycomb, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning. Flush out form tie holes and fill with dry-pack mortar or precast cement cone plugs secured in place with bonding agent.
1. Repair concealed formed surfaces, where possible, containing defects that affect the concrete's durability. If defects cannot be repaired, remove and replace the concrete.
D. Repairing Unformed Surfaces: Test unformed surfaces, such as monolithic slabs, for smoothness and verify surface tolerances specified for each surface and finish. Correct low and high areas as specified. Test unformed surfaces sloped to drain for trueness of slope and smoothness by using a template having the required slope.
1. Repair finished unformed surfaces containing defects that affect the concrete's durability. Surface defects include crazing and cracks in excess of 0.01 inch wide or that penetrate to the reinforcement or completely through nonreinforced sections regardless of width, spalling, popouts, honeycombs, rock pockets, and other objectionable conditions.
2. Correct high areas in unformed surfaces by grinding after concrete has cured at least 14 days.
3. Correct low areas in unformed surfaces during or immediately after completing surface finishing operations by cutting out low areas and replacing with patching mortar.
Finish repaired areas to blend into adjacent concrete. Proprietary underlayment compounds may be used when acceptable to Architect.
4. Repair defective areas, except random cracks and single holes not exceeding 1 inch in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose reinforcing steel with at least 3/4-inch clearance all around. Dampen concrete surfaces in contact with patching concrete and apply bonding
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 16 OF 17
agent. Mix patching concrete of same materials to provide concrete of same type or class as original concrete. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete.
E. Perform structural repairs with prior approval of Architect for method and procedure, using specified epoxy adhesive and mortar.
F. Repair methods not specified above may be used, subject to acceptance of Architect.
3.15 QUALITY CONTROL TESTING DURING CONSTRUCTION:
A. General: The Owner will employ a testing agency to perform tests and to submit test reports.
B. Sampling and testing for quality control during concrete placement may include the following, as directed by Architect.
1. Sampling Fresh Concrete: ASTM C 172, except modified for slump to comply with
ASTM C 94.
a. Slump: ASTM C 143; one test at point of discharge for each day's pour of each type of concrete; additional tests when concrete consistency seems to have changed.
b. Air Content: ASTM C 173, volumetric method for lightweight or normal weight concrete; ASTM C 231, pressure method for normal weight concrete;
one for each day's pour of each type of air-entrained concrete.
c. Concrete Temperature: ASTM C 1064; one test hourly when air temperature is 40 deg.F (4 deg.C) and below, when 80 deg.F (27 deg.C) and above, and one test for each set of compressive-strength specimens.
d. Compression Test Specimen: ASTM C 31; one set of four standard cylinders for each compressive-strength test, unless otherwise directed. Mold and store cylinders for laboratory-cured test specimens except when field-cured test specimens are required.
C. Compressive-Strength Tests: ASTM C 39; one set for each day's pour exceeding 5 cu. yd. plus additional sets for each 50 cu. yd. more than the first 25 cu. yd. of each concrete class placed in any one day, or for each 5000 sq ft of surface are placed; one specimen tested at 7 days, two specimens tested at 28 days, and one specimen retained in reserve for later testing if required.
1. Any additional cylinder required by the Contractor for early strength gain tests for form stripping or post-tensioning are Contractor’s responsibility and shall be paid for by Contractor.
2. When frequency of testing will provide fewer than five strength tests for a given class of concrete, conduct testing from at least five randomly selected batches or from each batch if fewer than five are used.
3. When total quantity of a given class of concrete is less than 50 cu. yd., Architect may waive strength testing if adequate evidence of satisfactory strength is provided.
4. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, evaluate current operations and provide corrective procedures for protecting and curing the in-place concrete.
5. Strength level of concrete will be considered satisfactory if averages of sets of three consecutive strength test results equal or exceed specified compressive strength and no individual strength test result falls below specified compressive strength by more than
GOODWYN, MILLS, CAWOOD, LLC. CAST-IN-PLACE CONCRETE
GMC PROJECT NO. LATL240002 03 3000 - 17 OF 17
500 psi.
6. Test results will be reported in writing to Architect, Structural Engineer, ready-mix producer, and Contractor within 24 hours after tests. Reports of compressive strength tests shall contain the Project identification name and number, date of concrete placement, name of concrete testing service, concrete type and class, location of concrete batch in structure, design compressive strength at 28 days, concrete mix proportions and materials, compressive breaking strength, and type of break for both 7-day tests and 28-day tests.
7. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted but shall not be used as the sole basis for acceptance or rejection.
8. Additional Tests: The testing agency will make additional tests of in-place concrete when test results indicate specified concrete strengths and other characteristics have not been attained in the structure, as directed by Architect. Testing agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42, or by other methods as directed.
END OF SECTION 03 3000
GOODWYN, MILLS, CAWOOD, LLC. JOINT PROTECTION
GMC PROJECT NO. LATL240002 07 9000 1 OF 6
SECTION 07 9000
JOINT PROTECTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS:
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
B. Related work specified elsewhere includes:
1. Section 03 3000 - “Cast-in-place Concrete”
1.2 DESCRIPTION OF WORK:
A. Work described in this section includes joint sealer systems.
1.3 SYSTEM PERFORMANCES:
A. Provide joint sealers that have been produced and installed to establish and maintain watertight and airtight continuous seals.
1.4 QUALITY ASSURANCE:
A. Installer Qualifications: Engage an Installer who has successfully completed within the last three years at least 3 joint sealer applications similar in type and size to that of this project and who will assign mechanics from these earlier applications to this project, of which one will serve as lead mechanic.
B. Single Source Responsibility for Joint Sealer Materials: Obtain joint sealer materials from a single manufacturer for each different product required.
C. Refer to Division 1 Section “Special Procedures”, for additional information and minimum experience requirements.
1.5 SUBMITTALS:
A. General: Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections.
B. Product Data: Submit manufacturer’s complete product specifications, handling/installation/curing instructions, color charts and performance tested data sheets for each product required.
1.6 DELIVER, STORAGE AND HANDLING:
A. Comply with manufacturer’s current written instructions and recommendations.
B. Deliver materials to project site in original unopened containers or bundles with labels informing about manufacturer, product name and designation, color, expiration period for use, pot life, curing time and mixing instructions for multi-component materials.
GOODWYN, MILLS, CAWOOD, LLC. JOINT PROTECTION
GMC PROJECT NO. LATL240002 07 9000 2 OF 6
C. Store and handle materials to prevent their deterioration or damage due to moisture, temperature changes, contaminants, or other causes.
D. Refer to Division 1 Sections “Summary of Work” and “Special Procedures” for additional information and requirements regarding stored materials.
1.7 PROJECT CONDITIONS:
A. Environmental Conditions: Do not proceed with installation of joint sealers under the following conditions:
1. When ambient and substrate temperature conditions are outside the limits permitted by joint sealer manufacturer or below 40o F.
2. When joint substrates are wet due to rain, frost, condensation or other causes.
B. Joint Width Conditions: Do not proceed with installation of joint sealers when joint widths are less than allowed by joint sealer manufacturer for application indicated.
C. Asbestos Prohibited: Refer to Section 01 3500 - “Special Procedures”.
PART 2 - PRODUCTS
2.1 MATERIALS, GENERAL:
A. Compatibility: Provide joint sealers, joint fillers and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by testing and field experience.
B. Colors: Provide color of exposed joint sealers indicated, or if not indicated, as selected by Architect from manufacturer’s standard colors, to include colors to match window/storefront framing, metal panels, roofing, flashing and fabrications.
2.2 ELASTOMERIC JOINT SEALANTS:
A. Elastomeric Sealant Standard: Provide manufacturer’s standard chemically curing, elastomeric sealant of base polymer indicated which complies with ASTM C 920 requirements, including those for Type, Grade, Class and Uses.
B. Multi-Part Nonsag Urethane Sealant: Type M, Grade NS, Class 25, Uses NR, M, A and, as applicable to joint substrates indicated, O.
1. Products: Subject to compliance with requirements, provide one of the following:
a. BASF Building Systems, “MasterSeal NP 2” (formerly Sonneborn “Sonolastic NP2”)
b. Pecora Corp., “Dynatrol II”
c. Sika Corporation, “Sikaflex 2CNS”
d. Tremco, Inc., “Dymeric 240FC”
2. Locations for Use: Exterior joints and penetrations in vertical surfaces of concrete, and between metal and concrete, mortar of stone; overhead or ceiling joints; perimeters of
GOODWYN, MILLS, CAWOOD, LLC. JOINT PROTECTION
GMC PROJECT NO. LATL240002 07 9000 3 OF 6
metal frames in exterior walls; vertical expansion and control joints in masonry and concrete; and at all miscellaneous locations requiring a joint sealant.
3. Equivalent 1-part sealants will be acceptable for interior surfaces only, by one of the above named manufacturers.
4. Where used in conjunction with stucco or EIFS, provide 1-part non-yellowing aliphatic polyurethane, equivalent to one of the following:
a. BASF Building Systems, “MasterSeal CR 195” (formerly Sonneborn “Ultra”)
b. Pecora Corp., “Dynatrol I-XL Tru-White”
C. Two-Part Pourable Urethane Sealant: Type M, Grade P, Class 25; Uses T, M, A and, as applicable to joint substrates indicated, O.
1. Products: Subject to compliance with requirements, provide one of the following:
a. BASF Building Systems, “MasterSeal SL 2 “(formerly Sonneborn “Sonolastic SL2”);
b. Bostik Findley, “Chem-Calk 550”.
c. Pecora…