2024-03 Request for Quotation - Waste Water Control Box due 03-06-24.pdf

PDF 130 KB Posted

Attached to
Replacement of Wastewater Control Box
Solicitation number
BD-21-1736-WRTHM-WRTHM-98466
Issued by
Norfolk County, Massachusetts

About this file

This document is a Request for Quotation (RFQ) issued by the Town of Wrentham, Massachusetts for the replacement of a wastewater control box at their wastewater facility located on Randall Road. The RFQ requires the custom fabrication of one (1) stainless steel wastewater control box, including a new 8" PVC Knife Control Valve, disconnection of existing drainage connections, removal and disposal of the existing control box, installation of the new control box, and furnishing and installing all necessary piping and connections to the existing system. Respondents must submit their quotations by March 6, 2024, at 10:00 AM to the Maintenance Supervisor, Glenn Gillespie, at gillespieg@wrenthamschools.org. The RFQ indicates that a site visit may be scheduled to address any questions.

The RFQ does not provide information on pricing terms, set-asides, incumbents, funding requirements or sources, or contract term and renewal options. The focus is solely on the technical requirements for the replacement of the wastewater control box.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Kevin A. Sweet Town Manager

Gregory S. Enos Assistant Town Manager

TOWN OF WRENTHAM

OFFICE OF THE TOWN MANAGER

MUNICIPAL BUILDING

79 South Street

Wrentham, MA 02093 Tel: 508-384-5400 www.wrentham.gov

Request for Quotation 2024-03 Replacement of Wastewater Control Box

The Town of Wrentham is requesting quotes to replace the existing wastewater control box at our wastewater facility located at Randall Road, Wrentham, MA. This quote should include all prevailing labor, materials, and permits.

Replacement of Wastewater Control Box:

• Custom fabricate Qty. (1) stainless steel wastewater control box to match existing.

Including a new 8” PVC Knife Control Valve.

• Disconnection of all existing drainage connections.

• Removal & disposal of the existing failing control box.

• Install a new stainless steel wastewater control box to match the existing one, including a new 8” PVC Knife Control Valve.

• Furnish and install all necessary piping and piping connections to connect the new sorting container to the existing piping system.

• Test new sorting container for proper operation with wastewater treatment operator.

Please feel free to contact me with any questions or to schedule a site visit.

Deadline for quotations March 6, 2024 at 10:00am submit to gillespieg@wrenthamschools.org

Glenn Gillespie Maintenance Supervisor Wrentham Public Schools gillespieg@wrenthamschools.org 508-384-5430 ext 2350 mailto:gillespieg@wrenthamschools.org mailto:gillespieg@wrenthamschools.org

File details come from the government source that posted it. Updated .