2024-027785 Addendum 2.pdf

PDF 249 KB Posted

Attached to
Fire Station 15 Bay & Bunker Gear Exhaust Fans
Solicitation number
IFB 410 2024-027785 3
Issued by
Palm Beach County, Florida

About this file

This is Addendum Number Two, issued on November 6, 2026, by the Palm Beach County Board of County Commissioners, Facilities Development and Operations Department, Capital Improvements Division for Project 2024-027785, Fire Station 15 Bay & Bunker Gear Exhaust Fans. The addendum addresses twenty responses to requests for information from prospective bidders, including clarifications on GearGrid bunker gear lockers (20" W x 20" D x 72" H, contractor-furnished and installed per Plan Sheet A2.01), Building Management System integration using Automated Logic equipment, electrical panel specifications (100 amp Panel C fed by 60 amp disconnect), fan voltage requirements (230V single-phase preferred), Zero Strike system installation responsibilities for seven bay doors, door controller replacement requirements, gas detection system installation, HVAC system integration into the new BMS, and fixture specifications for the bunker gear room with occupancy sensors. The addendum includes one attachment providing lighting specifications. Bidders must acknowledge receipt of this addendum by signing and attaching it to their bid proposal form; failure to do so may result in disqualification.

The addendum clarifies critical scope responsibilities between the general contractor, electrical contractor, mechanical contractor, and specialized subcontractors, with direction that contractors determine which trade will provide and install specific systems such as gas detection and control wiring. Specific technical corrections are provided, including confirmation that feeder conductors shall be three #4 copper with one #8 ground in 1-inch conduit, existing door controllers are to be replaced, and no new duct smoke detectors are required. The addendum confirms that Palm Beach County OTI will run low-voltage communication cabling from the router to the controller only, with contractor responsibility for cabling from controller to equipment. The document emphasizes coordination requirements for service outages at the occupied fire station and directs contractors to verify existing site conditions regarding service conductors and Polaris tap feasibility. No pricing, set-asides, funding sources, or contract term information is provided in this addendum.

View the file

Other files

File Type Posted
2024-027785 IFQ no plans.pdf PDF
2024-027785 Addendum 1.pdf PDF
2024-027785 ADD. 2 ATT. 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOARD OF COUNTY COMMISSIONERS

PALM BEACH COUNTY, FLORIDA

FACILITIES DEVELOPMENT AND OPERATIONS DEPARTMENT

CAPITAL IMPROVEMENTS DIVISION

PROJECT NAME: Fire Station 15 Bay & Bunker Gear Exhaust Fans

PROJECT NUMBER: 2024-027785

ADDENDUM NUMBER: TWO

DATE OF ISSUANCE: 11/6/2026

TO: Prospective Bidders

This addendum forms a part of the contract documents, modifies the original bid documents and shall be as binding as if contained therein. Acknowledge receipt of this addendum in the space provided on the "Bid Proposal Form". Failure to do so may subject the Bidder to disqualification.

This Addendum consists of five (5) pages and one (1) attachment.

Attachments:

• Attachment #1 – Lighting Specifications

RESPONSES TO REQUESTS FOR INFORMATION:

THAVI, LLC.

Question #1: Bunker Gear Lockers:

Is the General Contractor required to furnish and install new GearGrid brand lockers?

If so, please provide the specific manufacturer series, wall-mount/freestanding specifications, and quantities required.

Response: The General Contractor shall be responsible for furnishing and installing new

GearGrid lockers, including wall-mounted and freestanding units, as required to accommodate the locker locations shown on Plan Sheet A2.01. All lockers shall be GearGrid brand, measuring 20" W x 20" D x 72" H. The Contractor shall provide the quantities necessary to match the layout and locations indicated on the plans. Prior to purchasing the lockers, the Contractor shall submit product submittals to the Project Manager and Consultant for review and approval, in accordance with Section 3 – Submittals of the IFQ/C Package.

Question #2: Bunker Gear Lockers:

Are these lockers Owner Furnished / Contractor Installed (OFCI), Owner Furnished / Owner Installed (OFOI / NIC), or existing units to be relocated and reinstalled by the contractor?

Response: All lockers shall be furnished and installed by the Contractor in accordance with

Section 1 – Scope of Work of the IFQ/Bid Package and Section 4 – Materials of the IFQ/C Package.

Question #3: Building Management System (BMS):

Does Fire Station 15 have an existing, active Automated Logic Web-based BMS server on-site that the contractor is connecting to?

Response: No existing BMS on site.

Question #4: Building Management System (BMS):

Is the BMS integration work restricted to the local Automated Logic representative (Wisch & Jackson), or may contractors furnish open-protocol BACnet MS/TP DDC controllers provided by an independent certified controls contractor?

Response: Please follow the bid set of plans for the Automated Logic preferred vendor.

Question #5: Building Management System (BMS):

Is the low-voltage communication cabling (BACnet MS/TP network bus) between controllers and the IT board to be provided by the contractor, or will it be handled by Palm Beach County ISS / OTI network cabling vendors?

Response: PBC OTI will run cable from the router to the controller only. From the controller to all equipment is the responsibility of the contractor.

Question #6: Building Management System (BMS):

Please confirm whether the 15-minute door-fan run-on timer logic is to be programmed inside the Master Door Controller panel (C.W. Automation) or through the BMS DDC Application Controller (MAC: 4).

Response: It is to be programmed inside the Master Door Controller panel.

Andrea Construction, Inc.

Question #7: Zero Strike system scope (E2.1)

The note says “Contractor shall provide system and all conduit and wiring per manufacturer requirements” for the 7 bay doors. Please confirm whether the Electrical Contractor or the overhead door contractor furnishes the Zero Strike equipment (LED strips, rotating laser, laser beam, reversing edge). If it is the Electrical Contractor, please give the manufacturer and model, or the acceptable equals.

Response: It is the responsibility of the contractor to decide who will provide and install the system, wiring, conduit, etc; whether control or power wiring.

Question #8: Panel C rating (E0.1).

The panel schedule shows a 100A bus with a 100A main. The riser shows Panel C as

60A MLO, fed from a 60A/60A 2P NEMA 3R fused disconnect. Please confirm the bus rating, and whether the panel is main breaker or MLO.

Response: Provide 100 amp panel C fed by 60 amp disconnect as indicated on plan.

Question #9: Fan voltage (E0.1 vs. M0.1).

The fan schedule lists AEF-1 and AEF-2 at 208V/1Φ. Panel C is 120/240V 1Φ 3W.

Please confirm the fans are rated for 240V operation, or revise the motor voltage.

Response: This is an error on Mechanical schedule. 230V/1-phase preferred.

Question #10:Feeder ground size (E0.1):

Conduit and wire schedule item ① is not legible on the bid set. Please confirm the conductor and ground sizes (we assume 3#6 CU plus #10 CU ground in 1"C).

Response: Conduit & wire schedule specifies three (3) #4 CU, one (1) #8 GND in 1” conduit.

Question #11:Service tap (E0.1, riser key note 1)

Please confirm the size and count of the existing service conductors in the wireway, and that there is room for the new Polaris taps. Please also confirm whether a service outage is allowed, and the required shutdown window and procedure for an occupied station.

Response: This needs to be confirmed by the contractor. Verify existing conductors in the field and feasibility of new Polaris taps. Coordinate shutdowns with ownership.

Question #12: Feeder raceway (E0.1):

Panel C and its disconnect are mounted on the exterior. Please confirm the required raceway material for the exterior feeder (RGC or PVC).

Response: Match existing.

Question #13:Master door controller (E1.1 key note 1, E2.1):

The CW Automation “7 Door Master” is shown. Please confirm it is the basis of design and whether equals are accepted. Please also confirm whether the existing individual door controllers stay, or are replaced (the E2.1 diagram shows “Door #1–7 Controller”).

Response: The Master Door Controller specified on the plan is the Palm Beach County

Standard. No equals are acceptable. E1.1 keynote 1 specifies to replace the existing door controllers. All existing door controllers are to be replaced as per keynote 1 on sheet E1.1.

Question #14:Truck remote control (E2.1):

Please give the number of truck-mounted remote transmitters required, and whether the Electrical Contractor furnishes them.

Response: Verify with ownership to determine number of remote transmitters. Coordinate furnishing specifics with general contractor.

Question #15: Fan controller and fan-failure alarm (E2.1):

The diagram points to “Fan Controller – refer to mech sheets,” but no fan controller appears on the M sheets. Please confirm who furnishes the fan controller, the fan-failure visual alarm, and the manual fan-run override switch, and where they go.

Response: Refer to sheet M2.1 for Apparatus Bat CO and NO2 Detection System and

Apparatus Bay Exhaust Fans Sequence of Operation. Refer to sheet M1.1 for sensor, and panel locations.

Question #16: Gas detection wiring (M2.1, E1.1):

Please confirm that the CO/NO2 system is furnished, installed and wired by the

Mechanical Contractor or Telecomp. That includes the 301C controller, sensors, horn/strobes, network cabling, and the relay outputs to the fans and door controller.

Please also confirm that the Electrical Contractor’s scope is only the 120V circuit C- 7.

Response: It is the responsibility of the contractor to decide who the contractor wants to install the gas detection system, sensors, etc.

Question #17: BMS wiring (M0.1 note 2, E1.1):

Please confirm that all BMS (Automated Logic) control wiring, including the ECM

0–10V speed control, is by the controls contractor. Please also confirm that the Electrical Contractor provides only the 120V circuit C-8.

Response: It is the responsibility of the contractor to decide who the contractor wants to install wiring, conduit, etc; whether control or power wiring.

Question #18: Duct smoke detector (M2.1 vs. M0.1):

The DX split diagram says “Duct smoke detector wired by Elec. Contr. if required by code,” but the HVAC design table says no duct smoke detector is required. Please confirm that no detector or fire alarm work is required.

Response: No new duct smoke detectors are being proposed. Existing split systems are to be connected to new BMS. If existing AHUs have duct smoke detectors, then shutdown control per DX Unit DDC Sequence of Operation on sheet M2.1 may be required.

Question #19: DX split system (M2.1):

A control diagram is shown as “typical for AHU/CU-1 thru 2,” but no new split systems appear on M1.1 or E1.1. Please confirm whether any new AHU/CU units, or electrical connections to them, are in scope.

Response: Existing AHU/CU-1 & AHU/CU-2 are shown on sheet M1.1 and key noted to be integrated into new BMS. Provide necessary provisions to achieve intent.

Question #20:Bunker gear room fixtures (E1.1 key note 5):

No light fixture schedule is provided. Please give the fixture type, manufacturer, and model, and confirm the occupancy sensor type and its mounting (wall or ceiling).

Response: See Attachment #1.

Question #21: Panel C loads (E0.1):

Circuit C-5, “Mezzanine Exhaust Fan,” is shown at 900 VA per leg, but EF-1 is scheduled at 34 W, 115V. Please confirm the load and whether C-5 serves EF-1.

Response: Confirmed.

PLEASE ACKNOWLEDGE RECEIPT OF THIS ADDENDUM NO. TWO BY SIGNING

BELOW AND ATTACHING THIS ADDENDUM TO YOUR BID FORM. THIS ADDENDUM

MUST BE SIGNED BY AN AUTHORIZED AGENT AND ATTACHED TO YOUR BID

FORM, AND RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE

“BID PROPOSAL FORM”. FAILURE TO DO THIS MAY RESULT IN BIDDER’S

DISQUALIFICATION.

ACKNOWLEDGMENT OF RECEIPT:

END OF ADDENDUM - 2

ADDENDUM NUMBER: TWO
TO: Prospective Bidders

File details come from the government source that posted it. Updated .