2024-01-22 - Addendum 1 - Town of Claremont Water System Upgrades.pdf
PDF 350 KB Posted
- Solicitation number
- 55979
- Issued by
- Surry County, Virginia
About this file
This document is an addendum to the Town of Claremont Water System Upgrades contract opportunity. The project involves upgrades to the existing community water system serving the Town of Claremont, including well entry piping, booster pumps, an above-ground water storage tank, and replacement of portions of the distribution system. The pre-bid meeting minutes and attendee list are attached. Bids are due by February 15, 2024, at 11:00 AM via hard copy delivery to the Town. Contract documents, important dates, and the project scope are outlined, including bid alternates for horizontal directional drilling. The contractor will be responsible for site security, power, and water coordination with the Town. Regulatory agency coordination with VDOT and Surry County is required.
The low bidder will be determined based on the base bids, and bid alternates may be exercised once the low bidder is approved. Materials for the project may be tax-exempt, and the existing water system is currently operated by Sydnor, though the Town has a utilities maintenance team. There are approximately 50 service connections, including 17 fire hydrants, involved in the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
263 McLaws Circle, Suite 205, Williamsburg, Virginia 23185
P: 757.229.1776 | F: 757.229.4683 bowman.com
ADDENDUM NO. 1
DATE: JANUARY 22, 2024
TOWN OF CLAREMONT
WATER SYSTEM UPGRADES
GENERAL INFORMATION:
1. The virtual Pre-bid meeting was held at 11 am on January 17th, 2023 via zoom.
The attached agenda and subsequent meeting minutes of all information discussed during the Pre-bid meeting. The attendees of the meeting are outlined in the meeting minutes as well.
PROJECT MANUAL:
CONTRACT DRAWINGS:
ATTACHMENTS:
Pre-Bid Meeting – Meeting Minutes
END OF ADDENDUM NO. 1
1/22/2024
TOWN OF CLAREMONT WATER SYSTEM UPGRADES
CLAREMONT, VA
PRE-BID CONFERENCE – AGENDA
LOCATION: ZOOM MEETING
JANUARY 17th, AT 11:00 AM
BOWMAN CONSULTING GROUP P a g e | 1 of 2
I. Key People:
Name Present? Company Phone Email
Owner
Louise Hansch X Town of Claremont 757-442-3114 lahansch@gmail.com
Phil Yerby Town of Claremont 757-442-2476 yerbyphil@gmail.com
Laura Crowder Town of Claremont 757-866-8427 townclaremont@aol.com
Engineer
Ken Baybutt X Bowman, Senior Advisor 757-561-2771 kbaybutt@bowman.com
Nitant Desai X Bowman, Project Manager
757-561-2772 ndesai@bowman.com
Jomar Pablo X Bowman, Design Engineer 757-561-2783 jpablo@bowman.com
Brian Wrestler Bowman, Construction Manager
757-477-7172 bwrestler@bowman.com
Tyler Robinson X Bowman, Engineer 757-561-6573 trobinson@bowman.com
Bidders
Laurence Wallace X MT Carter Contracting 757-304-1577 lwallace@mtcarter.org
Jared Wray X Sydnor Hydro Inc., VP 804-586-5614 j.wray@sydnorhydro.com
Donald O’Connor X East Coast Utility Contractors
757-570-9811 doconnor@ecutility.hrcoxmail.com
II. Project Site
III. Pre-bid Conference is encouraged but not required (attendance is not required to submit a Bid).
A. Sign-in Sheet – Type in Contact Information in ZOOM Chat
IV. Contract Documents
A. Project Manual
B. Contract Drawings
V. Important Dates and Information
A. Bid Due Date: February 15, 2024, 11:00 AM
B. Bid Opening Date: February 15, 2024, at 11:05 AM
C. Bids are due by hard copy to be delivered to the Town at
Town of Claremont
Laura Crowder, Treasurer
4115 Spring Grove Ave
Claremont, VA 23899
Only hard copy bids will be accepted. Electronic bids will not be accepted.
D. Submit written pre-bid questions by February 8th, 2024, by 5:00 PM to Brian Wrestler.
Questions shall be submitted via email.
E. Bids received will be publicly opened and read.
VI. Scope of the Project / Design Parameters:
A. Upgrades to the existing community water system currently serving the Town of
Claremont.
PRE-BID CONFERENCE – AGENDA
BOWMAN CONSULTING GROUP P a g e | 2 of 2
1. Well entry piping
2. Booster Pumps
3. Above Ground Horizontal Storage Tank
4. 20 feet x 12 feet pre-cast concrete building
5. Controls
B. Replacement of Portions of existing distribution system
1. Approximately 3,000 LF along Mancha Ave
2. Approximately 1,300 LF along Sloope Point Rd
3. Approximately 10,500 LF along River Road
4. New and Connection to Existing Hydrants Includes relocating existing hydrants to new line as shown on drawings.
5. Bid Alternates are outlined in the project manual. Low bidder is determined based on base bids.
6. Exercising bid alternates shall only be done once low bidder is approved.
a. HDD is specified in specific locations as outlined in the contract drawings;
however, HDD is allowed in non-HDD Specified locations in lieu of open cut.
b. Portions of required HDD shown on plans are not required to be a single pull. Multiple pulls are acceptable.
VII. Construction Access, Site Security, Road Closures and work hours
A. Site should be fully accessible to owner, engineer, property owners and inspection staff.
B. The Contractor is responsible for the securing overnight and weekends. Town shall coordinate with Town Sheriff to provide additional surveillance overnight.
C. Contractor is responsible for securing laydown areas. The Town may allow utilizing the
Town’s Old Playground near the old water tower as a staging area. Full Road Closures may not be permitted due to limited access for residents. Single lane closures are permitted and must follow all traffic management. Full road closures are discouraged.
D. No work on Sundays. Work on Saturdays may be allowed with Approval of the Town.
VIII. Power and Water Availability
A. Power will be Contractor’s responsibility.
B. Water will be available, however, will require Town’s coordination. Water shall be provided via a designated existing fire hydrant. Contractor and Town shall coordinate what hydrant(s) shall be utilized. Contractor may need to provide a pump for flushing of the new waterlines as existing system may not provide adequate velocity to flush the new lines. Contractor may use the new tank and pumps as part of the testing if schedule of construction works.
IX. Regulatory Agency Coordination
A. VDOT Permit Required.
PRE-BID CONFERENCE – AGENDA
BOWMAN CONSULTING GROUP P a g e | 3 of 2
B. Surry County – E&S – Land Disturbance Permit Required
C. VDH Coordination at completion of the project.
X. Addendum Items
A. 01 – Pre-Bid Meeting Questions and Sign-In Sheet
XI. Questions and Comments
A. Are materials purchased for this project tax exempt?
1. To be confirmed.
B. Who operates the existing system?
1. The existing system is operated by Sydnor; however, the Town does have a utilities maintenance team.
C. Are there any service connections on HDD required areas?
1. There are no service connections on HDD required areas.
D. How many service connections are involved in this project?
1. There will be around 50 service connections to the proposed waterline, including the 17 existing and proposed fire hydrants mentioned in the Bid Documents.
END OF AGENDA